CN102653946A - Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation - Google Patents

Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation Download PDF

Info

Publication number
CN102653946A
CN102653946A CN2012101575420A CN201210157542A CN102653946A CN 102653946 A CN102653946 A CN 102653946A CN 2012101575420 A CN2012101575420 A CN 2012101575420A CN 201210157542 A CN201210157542 A CN 201210157542A CN 102653946 A CN102653946 A CN 102653946A
Authority
CN
China
Prior art keywords
fastening band
rubber fastening
raft foundation
construction method
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101575420A
Other languages
Chinese (zh)
Inventor
陈明宝
刘祖国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012101575420A priority Critical patent/CN102653946A/en
Publication of CN102653946A publication Critical patent/CN102653946A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a waterproof construction method for setting a rubber waterstop at the bottom of a large reinforced concrete raft foundation. The method comprises the following steps of: before constructing at the construction joint of a large reinforced concrete raft foundation, for waterproof treatment, paving a layer of geotextile on a plain concrete cushion; paving a layer of PVC (polyvinyl chloride) waterproof coil on the geotextile; sticking a rubber waterstop at the construction joint of the PVC waterproof coil; paving a grouting pipe on the rubber waterstop; applying 1:3 cement mortar at other parts with the PVC waterproof coil; and then binding the steel bars and pouring concrete. The construction method is safe and reliable in use, overcomes the defect that the conventional construction needs to weld a steel bar skeleton, shortens the working period, saves materials and lowers the cost.

Description

Steel concrete raft foundation bottom is provided with the rubber fastening band waterproof construction method
Technical field
The invention belongs to the civil engineering technical field, when being specifically related to steel concrete raft foundation employing ater-casting or the method construction of piecemeal jumping storehouse, the job practices of rubber fastening band waterproof is set in the raft foundation bottom.
Background technology
When building need make full use of the underground space, the general steel concrete raft foundation that adopts in the basis of its building, therefore, the area of steel concrete raft foundation is all bigger, and requires waterproof.Because reinforced concrete foundation is bigger; Maximum can reach 200m * 200m, in design, generally adopts the ater-casting to solve the concrete shrinkage problem; Also can large-scale raft foundation piecemeal be taked to build " piecemeal is jumped the storehouse method " of reserving one and solve the concrete shrinkage problem.But, along the middle part of short transverse steel plate or rubber fastening band to be set all at constuction joint concrete place and carry out waterproof no matter adopt which kind of method construction.At steel concrete raft foundation constuction joint place when short transverse is provided with steel plate or rubber fastening band; Because the position that steel plate or rubber fastening band are provided with is in the centre of concrete floor thickness; Therefore; In the construction, in order to ensure the accuracy of waterstop position, general welded reinforcement fixed mount is fixed steel plate or rubber fastening band.
Summary of the invention
The purpose of this invention is to provide a kind of steel concrete raft foundation bottom the rubber fastening band waterproof construction method is set; This job practices with the waterstop at reinforced concrete construction seam place by being arranged on the centre position of constuction joint place along short transverse; Change into and be arranged on concrete base, and all adopt rubber fastening band, simultaneously; Increase grout pipe, prevented to have built the processing when the constuction joint place leaks behind the concrete.
The present invention seeks to realize like this: a kind of steel concrete raft foundation bottom is provided with the rubber fastening band waterproof construction method; Its main feature is: before the construction of large-sized reinforced concrete raft foundation; In order to solve the steel concrete shrinkage problems; The ater-casting is set usually, or large-sized reinforced concrete is blocked into the blockage of 40m * 40m, adopt at a distance from " piecemeal is jumped the storehouse method " of building a block concrete and construct; No matter adopt ater-casting or " piecemeal is jumped the storehouse method " construction, waterproofing work all will be done by its constuction joint place; Waterproofing work is one deck geotextiles on the plain concrete cushion layer upper berth earlier; One deck PVC waterproof roll on the geotextiles upper berth; Paste rubber fastening band at PVC waterproof roll constuction joint place; On rubber fastening band, lay Grouting Pipe, smear the 1:3 cement mortar, assembling reinforcement then, concreting at the position of other PVC waterproof rolls.When the concrete of building moulding when drainage is found in use, just can utilize the Grouting Pipe of burying underground the caulking joint of being in the milk, reach the purpose of control combination.
Steel concrete raft foundation proposed by the invention bottom is provided with the rubber fastening band waterproof construction method, with steel concrete raft foundation middle part steel plate is set or the rubber fastening band waterproof construction method is compared, and is simple and practical; Rational in infrastructure; Safe and reliable, changed the disadvantage that conventional construction needs the welded reinforcement skeleton, the reduction of erection time; Economical with materials reduces cost.
Combine accompanying drawing and instance that steel concrete raft foundation bottom proposed by the invention is provided with the rubber fastening band waterproof construction method is described further at present.
Description of drawings
Fig. 1 is that this steel concrete raft foundation proposed by the invention bottom is provided with rubber fastening band waterproof construction method constuction joint place waterproof generalized section.
Among the figure: 1. clay; 2. plain concrete cushion layer; 3. geotextiles; 4. PVC coil waterproof layer; 5. mortar levelling layer; 6. after-pouring concrete; 7. raft foundation lower floor two-way concrete slab; 8. horizontal grouting pipe; 9. vertical Grouting Pipe; 10. rubber fastening band; 11. raft foundation upper strata two-way concrete slab; 12. first concreting.
The specific embodiment
As can be seen from Figure 1: steel concrete raft foundation bottom is provided with the rubber fastening band waterproof construction method, it is characterized in that: earlier at raft foundation bottom treatment clay 1, make it satisfy the requirement for bearing capacity of design demand; On clay 1, build the thick plain concrete cushion layer 2 of 100mm again; On plain concrete cushion layer 2, lay geotextiles 3; On geotextiles 3, lay PVC coil waterproof layer 4; Do not laying the thick 1:3 mortar levelling of laying 40mm layer 5 on the position PVC coil waterproof layer 4 of the wide rubber fastening band 10 of 250mm; On concrete construction joint bottom, PVC coil waterproof layer 4, lay the wide rubber fastening band 10 of 250mm, on rubber fastening band, lay horizontal grouting pipe 8, every interval 10m is provided with vertical Grouting Pipe 9 on horizontal grouting pipe 8; After above program construction finishes, colligation raft foundation base plate two-way concrete slab 7 and top two-way concrete slab 11, and first concreting 12; After treating that concrete shrinkage is accomplished basically, the after-pouring concrete 6 again.When finding that the constuction joint place leaks, carry out pressure grouting through vertical Grouting Pipe 9, horizontal grouting pipe 8, reach the purpose of leak stopping.
Change rubber fastening band into be arranged on steel concrete bottom by being arranged on the centre position of reinforced concrete construction seam place, saved the fixedly operation of the reinforcing bar fixed mount of waterstop of welding along short transverse, simple, convenient, practice thrift man-hour, reduce cost; Simultaneously, owing to increased Grouting Pipe, after the concreting of whole raft foundation was accomplished, because other reasons causes the constuction joint place to leak, the method for slip casting can easy to doly be carried out leak stopping in taking to manage, and reaches the purpose that control combines.

Claims (4)

1. a steel concrete raft foundation bottom is provided with the rubber fastening band waterproof construction method; It is characterized in that: one deck geotextiles on the plain concrete cushion layer upper berth; One deck PVC waterproof roll on the geotextiles upper berth is pasted rubber fastening band at PVC waterproof roll constuction joint place, on rubber fastening band, lays Grouting Pipe; Smear the 1:3 cement mortar at the position of other PVC waterproof rolls, assembling reinforcement then, concreting; When the concrete of building moulding when drainage is found in use, can utilize the Grouting Pipe of burying underground the caulking joint of being in the milk, reach the purpose that control combines.
2. steel concrete raft foundation according to claim 1 bottom is provided with the rubber fastening band waterproof construction method, it is characterized in that the wide 250mm of said rubber fastening band.
3. steel concrete raft foundation according to claim 1 bottom is provided with the rubber fastening band waterproof construction method, and the thickness that it is characterized in that said 1:3 cement mortar is 40mm.
4. steel concrete raft foundation according to claim 1 bottom is provided with the rubber fastening band waterproof construction method; When it is characterized in that on rubber fastening band, laying Grouting Pipe; On rubber fastening band, lay the horizontal grouting pipe earlier, every interval 10m is provided with a vertical Grouting Pipe on the horizontal grouting pipe then.
CN2012101575420A 2012-05-21 2012-05-21 Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation Pending CN102653946A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101575420A CN102653946A (en) 2012-05-21 2012-05-21 Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101575420A CN102653946A (en) 2012-05-21 2012-05-21 Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation

Publications (1)

Publication Number Publication Date
CN102653946A true CN102653946A (en) 2012-09-05

Family

ID=46729665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101575420A Pending CN102653946A (en) 2012-05-21 2012-05-21 Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation

Country Status (1)

Country Link
CN (1) CN102653946A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205979A (en) * 2013-03-15 2013-07-17 中国十七冶集团有限公司 Method for constructing large raft foundation under high temperature
CN103205986A (en) * 2013-04-16 2013-07-17 中国十七冶集团有限公司 Concrete raft foundation construction-joint grouting device and construction method
CN104727335A (en) * 2015-02-13 2015-06-24 常熟建工建设集团有限公司 Fast foundation constructing method
CN104878783A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method
CN107083776A (en) * 2017-06-20 2017-08-22 中冶建工集团有限公司 A kind of basement raft foundation rear pouring tape construction method
CN110029628A (en) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 A kind of water conservancy project raft plate dilatation joint waterproof structure
CN114525800A (en) * 2022-02-28 2022-05-24 苏州佳固士新材料科技有限公司 Leakage treatment method for basement raft plate
CN115233720A (en) * 2022-08-28 2022-10-25 中建八局第一建设有限公司 Super-thick radiation-proof raft plate L-shaped construction joint structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060029830A (en) * 2004-10-04 2006-04-07 강인선 Method of drainage trench construction and structure thereof
CN101298781A (en) * 2008-06-13 2008-11-05 浙江省一建建设集团有限公司 Basement bottom plate rear pouring tape construction method
CN201649134U (en) * 2009-12-28 2010-11-24 江苏江中集团有限公司 Bottom plate post-poured strip waterproof structure
CN201738338U (en) * 2010-08-10 2011-02-09 朱奎 Basement post-cast strip structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060029830A (en) * 2004-10-04 2006-04-07 강인선 Method of drainage trench construction and structure thereof
CN101298781A (en) * 2008-06-13 2008-11-05 浙江省一建建设集团有限公司 Basement bottom plate rear pouring tape construction method
CN201649134U (en) * 2009-12-28 2010-11-24 江苏江中集团有限公司 Bottom plate post-poured strip waterproof structure
CN201738338U (en) * 2010-08-10 2011-02-09 朱奎 Basement post-cast strip structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
唐玉宏: "南京地铁二号线钟灵街站防水设计", 《结构工程师》 *
姚锦文等: "某人防工程地下室防水施工控制技术", 《山西建筑》 *
朱新勇: "地铁隧道全包式分区防水施工技术", 《山西建筑》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103205979A (en) * 2013-03-15 2013-07-17 中国十七冶集团有限公司 Method for constructing large raft foundation under high temperature
WO2014139252A1 (en) * 2013-03-15 2014-09-18 中国十七冶集团有限公司 Method for constructing large raft foundation in high-temperature environment
CN103205979B (en) * 2013-03-15 2015-04-08 中国十七冶集团有限公司 Method for constructing large raft foundation under high temperature
CN103205986A (en) * 2013-04-16 2013-07-17 中国十七冶集团有限公司 Concrete raft foundation construction-joint grouting device and construction method
CN104727335A (en) * 2015-02-13 2015-06-24 常熟建工建设集团有限公司 Fast foundation constructing method
CN104878783A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method
CN107083776A (en) * 2017-06-20 2017-08-22 中冶建工集团有限公司 A kind of basement raft foundation rear pouring tape construction method
CN107083776B (en) * 2017-06-20 2019-02-05 中冶建工集团有限公司 A kind of basement raft foundation rear pouring tape construction method
CN110029628A (en) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 A kind of water conservancy project raft plate dilatation joint waterproof structure
CN114525800A (en) * 2022-02-28 2022-05-24 苏州佳固士新材料科技有限公司 Leakage treatment method for basement raft plate
CN115233720A (en) * 2022-08-28 2022-10-25 中建八局第一建设有限公司 Super-thick radiation-proof raft plate L-shaped construction joint structure and construction method

Similar Documents

Publication Publication Date Title
CN103205979B (en) Method for constructing large raft foundation under high temperature
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN102653946A (en) Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation
CN104805866B (en) Prefabricated pipe gallery and construction method
CN106013172B (en) Double-row pile combines Deep Foundation Pit Support for Soft Soil structure and construction method with diagonal brace
CN109235499B (en) Open-cut underground building structure assembly type construction method
CN105019475A (en) Prefabricated integral concrete comprehensive pipe rack and construction method
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN103953114B (en) Steel frame-reinforced masonry shear wall combinative structure and construction method thereof
CN106638940A (en) Fabricated high-rise residence precast concrete component construction method
CN202830989U (en) Semi-general formula of induced joint system for underground structure reinforced concrete wall
CN110205921A (en) The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN108005118A (en) Underground pipe gallery agent structure integrates construction method
CN109183848B (en) A kind of Tunnel Design and building method
CN104295003A (en) Structural column construction method
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN203160254U (en) Pit support structure
CN112813757B (en) Foam light soil composite roadbed construction method for bridge head transition treatment
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN110747898A (en) Basement waterproof construction method
CN110644523A (en) Tower crane foundation and garage raft integrated construction method
CN105507348A (en) Waterproof construction method and structure for joints between independent columns and frame beams of basements
CN107012948A (en) A kind of basement floor building structural and its construction method
CN105019653B (en) Prefabricated assembled concrete underflow pumping plant construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120905