CN102628261B - Constructing method of artificial parent ecological layer - Google Patents

Constructing method of artificial parent ecological layer Download PDF

Info

Publication number
CN102628261B
CN102628261B CN201110141824.7A CN201110141824A CN102628261B CN 102628261 B CN102628261 B CN 102628261B CN 201110141824 A CN201110141824 A CN 201110141824A CN 102628261 B CN102628261 B CN 102628261B
Authority
CN
China
Prior art keywords
ecosphere
cement paste
laying
artificial matrix
artificial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110141824.7A
Other languages
Chinese (zh)
Other versions
CN102628261A (en
Inventor
杨卫平
孙丽君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIAJIE ECO-TECH Co Ltd
Original Assignee
SHANGHAI JIAJIE ECO-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIAJIE ECO-TECH Co Ltd filed Critical SHANGHAI JIAJIE ECO-TECH Co Ltd
Priority to CN201110141824.7A priority Critical patent/CN102628261B/en
Publication of CN102628261A publication Critical patent/CN102628261A/en
Application granted granted Critical
Publication of CN102628261B publication Critical patent/CN102628261B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention relates to a constructing method of an artificial parent ecological layer. The method comprises the following steps: anchoring reinforcing steel bars into the surface of a substrate layer which is a rigid protective slope or protective bank formed by concrete and stones; then polishing and washing the surface of the substrate layer; painting a cement paste mixed with acrylate emulsion on the surface of the substrate layer; hanging a forming mold on the surface of the substrate layer; laying a non-sand concrete material on the surface of the substrate layer, which is painted with the cement paste mixed with the acrylate emulsion, in a sectional way; laying the non-sand concrete material in the forming mold; and laying a non-woven fabric and a nutrient substance bag on the laid section. According to the invention, the defects of instability for loosening, large slope, high possibility of falling, incapability of providing and blending nutrient elements required by plants, and the like in the natural parent layer are overcome; a stable artificial parent layer allowing the vegetation to grow can be also formed on a larger-slope and even vertical concrete or stone surface; and the vegetation can grow on the artificial parent layer to reconstruct an ecological system and create a natural, harmonious and beautiful ecological environment.

Description

A kind of building method of artificial matrix ecosphere
Technical field
The present invention relates to water conservancy and field of environment engineering technology, especially relate to a kind of building method of artificial matrix ecosphere.
Background technology
Ecology and water environmental problems are the research and development directions that current water conservancy industry is new.China river, lake, the water bank bank protection of reservoir, shore protection at present, the rigid materials such as more employing stone-laying, concrete, when having protected water bank water front, bank stability, destroyed the contact of the ecosystem between water-bank, various biologies cannot be survived, be multiplied, the integrality of having destroyed the water bank ecosystem, has affected water bank view, deteriorated human settlement; The exposed mountain rock that civil engineering exploitation rock etc. causes, can go bad the massif ecosystem equally.
Water bank at rigid material revetment recovers the ecosystem, and some places have adopted dismounting original structure both at home and abroad, recover the methods such as original slight slope and vegetation.But after the effects such as typhoon, flood, the water bank that lacks preventive works destroys serious.Therefore must go research and development can ensure water bank, mountain rock protection safety, reduce dismounting amount, can recover again the new technology of water bank, mountain rock ecological environment.
The invention provides the technical method that builds the basic function of the ecosystem on original rigidity body of wall, domatic, mountain rock, can be at concrete, stone-laying, rock surface, rebuild the basic function of the ecosystem, build nature, harmony, ecological environment attractive in appearance.
Summary of the invention
Object of the present invention is exactly the building method that a kind of artificial matrix ecosphere that can rebuild the ecosystem is provided in order to overcome the defect that above-mentioned prior art exists.
Object of the present invention can be achieved through the following technical solutions:
A building method for artificial matrix ecosphere, is characterized in that, the method comprises the following steps:
(1) anchoring: the rigidity bank protection forming using concrete, stone-laying or shore protection, as hypothallus, anchor into reinforcing bar on the surface of hypothallus;
(2) surface preparation: dabbing or polishing cleaning are carried out in hypothallus surface, and then brushing is mixed with the cement paste of acrylic acid ester emulsion;
(3) linked network: hang moulding form on hypothallus surface, and moulding form is fixed on the reinforcing bar that anchoring is good with steel wire;
(4) bonding laying: the non-fine concrete material segmentation that stirring is obtained is laid in and brushes in the hypothallus surface and moulding form of having mixed acrylic acid ester emulsion cement paste, the height at every turn laying is 25cm, lays nonwoven and nutriment bag and obtain artificial matrix ecosphere on the section laying.
5~20wt% that in the cement paste that is mixed with acrylic acid ester emulsion described in step (2), the content of acrylic acid ester emulsion is cement paste.
In the described cement paste that is mixed with acrylic acid ester emulsion, the content of acrylic acid ester emulsion is preferably the 10wt% of cement paste.
The rubble of non-fine concrete material employing average grain diameter 2-3cm described in step (4) or cobble are as aggregate, every cubic metre adds cement 300~320kg, then add water, the water yield is controlled at can make cement paste package aggregate, do not produce trickling for standard, and stirring obtains.
Non-fine concrete material described in step (4) can lay into plane, also can lay into the slope shape structure that height rises and falls, the atmosphere of building depositional gradient.
In nutriment bag described in step (4), be loaded with the required nutriment of plant growth.
In step (4) when bonding laying, vertical concrete or stone-laying surface, can carry out in advance linked network, after the cement paste of concrete or the configuration of stone-laying external coating acrylic acid ester emulsion, pour the artificial chorizon material being stirred into template or grid inner side, build height (length) 25cm at every turn, on section, lay respectively soil conservation nonwoven (take auxotype nonwoven as first-selected) and nutriment bag.
The natural chorizon of this simulation occurring in nature of artificial matrix ecosphere, can adapt to the open structure of plant root growth, artificial matrix ecosphere has certain pore size, inside has charged modified nutritious material, every 50cm level, lay nonwoven strip, prevent that the soil percolation in hole from arriving below, and lay the plant growth nutriment mixed material of paper using or geotextile winding, reel diameter is not more than the imitative chorizon thickness of non-fine concrete, for wall, the artificial chorizon of mountain rock surface construction, at surface spraying by organic matter, water-loss reducer, adhesive, slow release fertilizers etc. form vegetation growth layer, to sow grass seeds by duster or to intercut mode grass planting, recover vegetation, to the artificial chorizon of ramp type, can recover vegetation at surface coverage mold.
This artificial matrix ecosphere maintenance is to after 7-28 days, the artificial chorizon of opposite wall formula, will be after stripping, utilize spray seeder to sow grass seeds by duster and lay plant growth medium on top layer, can will select grass seeds to mix sowing grass seeds by duster in material, also can lay after top soil sowing grass seeds by duster, select to be suitable for grass product kind and to intercut.
Compared with prior art, that loose unstable, the gradient that the present invention has overcome natural chorizon defecated is tear-away, can not provide and allocate the drawbacks such as plant desired nutritional element, on the larger and even vertical concrete of the gradient or stone-laying surface, also can form artificial chorizon stable, that can grow vegetation, and the vegetation that can grow, there is the basic function that rebuilds the ecosystem, build nature, harmony, ecological environment attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the structural representation of artificial matrix ecosphere.
In figure, 1 is that hypothallus, 2 is that reinforcing bar, 3 is that nonwoven, 4 is that nutriment bag, 5 is that non-fine concrete layer, 6 is that vegetable layer, 7 is plant.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
A building method for artificial matrix ecosphere, as shown in Figure 1, the method comprises the following steps the structure of the artificial matrix ecosphere constructing:
(1) anchoring: the rigidity bank protection forming using concrete, stone-laying or shore protection are as hypothallus 1, surface at hypothallus 1 anchors into reinforcing bar 2 every 50cm, its Main Function is the non-fine concrete layer 5 that auxiliary fixed surface lays, prevent large area obscission, simultaneously also can fixed-type mould strengthen the resistance to overturning of artificial chorizon;
(2) surface preparation: dabbing or polishing cleaning are carried out in the surface of hypothallus 1, then brushing is mixed with the cement paste of acrylic acid ester emulsion, the content of acrylic acid ester emulsion is 5~20wt% of cement paste, in the present embodiment, the content of acrylic acid ester emulsion is the 10wt% of cement paste, in order to increase bond strength;
(3) linked network: hang steel wire graticule mesh or geo-grid on vertical hypothallus surface, and steel wire graticule mesh or geo-grid are fixed on the reinforcing bar that anchoring is good with steel wire, as the moulding form that lays non-fine concrete material, to highly less metope, can, without linked network, by design thickness, directly set up template;
(4) bonding laying: the non-fine concrete material segmentation that stirring is obtained is laid in and brushes the hypothallus surface of having mixed acrylic acid ester emulsion cement paste, non-fine concrete material is laid in steel wire graticule mesh, geo-grid or template, on the section laying, lay nonwoven 3 and nutriment bag 4, in nutriment bag 4, be loaded with the required nutriment of plant growth.
The rubble of non-fine concrete material employing average grain diameter 2-3cm or cobble are as aggregate, every cubic metre adds cement 300~320kg, then add water, the water yield is controlled at can make cement paste package aggregate, do not produce trickling for standard, stirring obtains, and non-fine concrete layer 5 can lay into plane, as shown in Figure 1, also can lay into the slope shape structure that height rises and falls, the atmosphere of building depositional gradient.
When bonding laying, vertical concrete or stone-laying surface, can carry out in advance linked network, after the cement paste of concrete or the configuration of stone-laying external coating acrylic acid ester emulsion, pour the artificial chorizon material being stirred into template or grid inner side, build height (length) 25cm at every turn, on section, lay respectively soil conservation nonwoven (take auxotype nonwoven as first-selected) and nutriment bag.
The natural chorizon of this simulation occurring in nature of artificial matrix ecosphere, can adapt to the open structure of plant root growth, artificial matrix ecosphere has certain pore size, inside has charged modified nutritious material, every 50cm level, lay nonwoven 3, prevent that the soil percolation in hole from arriving below, and lay the plant growth nutriment mixed material of paper using or geotextile winding, reel diameter is not more than the imitative chorizon thickness of non-fine concrete, for wall, the artificial chorizon of mountain rock surface construction, at surface spraying by organic matter, water-loss reducer, adhesive, slow release fertilizers etc. form vegetable layer 6, to sow grass seeds by duster or to intercut mode planting plants 7, recover vegetation, to the artificial chorizon of ramp type, can recover plant 7 at surface coverage mold.This artificial matrix ecosphere maintenance is to after 7-28 days, the artificial chorizon of opposite wall formula, will be after stripping, utilize spray seeder to sow grass seeds by duster and lay plant growth medium on top layer, can will select grass seeds to mix sowing grass seeds by duster in material, also can lay after top soil sowing grass seeds by duster, select to be suitable for grass product kind and to intercut.

Claims (8)

1. a building method for artificial matrix ecosphere, is characterized in that, the method comprises the following steps:
(1) anchoring: the rigidity bank protection forming using concrete, stone-laying or shore protection, as hypothallus, anchor into reinforcing bar on the surface of hypothallus;
(2) surface preparation: dabbing or polishing cleaning are carried out in hypothallus surface, and then brushing is mixed with the cement paste of acrylic acid ester emulsion;
(3) linked network: hang moulding form on hypothallus surface, and moulding form is fixed on the reinforcing bar that anchoring is good with steel wire;
(4) bonding laying: the non-fine concrete material segmentation that stirring is obtained is laid in and brushes in the hypothallus surface and moulding form of having mixed acrylic acid ester emulsion cement paste, the height at every turn laying is 25cm, lays nonwoven and nutriment bag and obtain artificial matrix ecosphere on the section laying;
5~20wt% that in the cement paste that is mixed with acrylic acid ester emulsion described in step (2), the content of acrylic acid ester emulsion is cement paste.
2. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, the spacing between the reinforcing bar described in step (1) is 50cm.
3. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, in the described cement paste that is mixed with acrylic acid ester emulsion, the content of acrylic acid ester emulsion is preferably the 10wt% of cement paste.
4. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, the moulding form described in step (3) comprises steel wire graticule mesh, civil grille or profiled sheeting.
5. the building method of a kind of artificial matrix ecosphere according to claim 1, it is characterized in that, the rubble of non-fine concrete material employing average grain diameter 2-3cm described in step (4) or cobble are as aggregate, every cubic metre adds cement 300~320kg, then add water, the water yield is controlled at can make cement paste package aggregate, do not produce trickling for standard, and stirring obtains.
6. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, the non-fine concrete material described in step (4) lays into plane, or lays into the slope shape structure that height rises and falls.
7. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, is loaded with the required nutriment of plant growth in the nutriment bag described in step (4).
8. the building method of a kind of artificial matrix ecosphere according to claim 1, is characterized in that, the vegetation growth layer that the external surface sprayed coating of this artificial matrix ecosphere contains soil, slow release fertilizer, water-loss reducer and adhesive.
CN201110141824.7A 2011-05-27 2011-05-27 Constructing method of artificial parent ecological layer Expired - Fee Related CN102628261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110141824.7A CN102628261B (en) 2011-05-27 2011-05-27 Constructing method of artificial parent ecological layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110141824.7A CN102628261B (en) 2011-05-27 2011-05-27 Constructing method of artificial parent ecological layer

Publications (2)

Publication Number Publication Date
CN102628261A CN102628261A (en) 2012-08-08
CN102628261B true CN102628261B (en) 2014-04-30

Family

ID=46586640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110141824.7A Expired - Fee Related CN102628261B (en) 2011-05-27 2011-05-27 Constructing method of artificial parent ecological layer

Country Status (1)

Country Link
CN (1) CN102628261B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158643B (en) * 2019-05-24 2021-03-26 无锡市天合景观工程有限公司 Construction process for building block stone retaining wall structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11131478A (en) * 1997-10-24 1999-05-18 Sekisui Chem Co Ltd Planting base material having water holding property and manufacture of this planting base material
JP2001316154A (en) * 2000-05-01 2001-11-13 Oji Ryokka Kk Lightweight cement mortar and simplified foundation work using it
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN2866605Y (en) * 2005-11-24 2007-02-07 张宇顺 Green side slope structure
CN1920185A (en) * 2005-08-24 2007-02-28 沈敏鑫 Construction method of green concrete
CN201473958U (en) * 2009-06-09 2010-05-19 朱奎 Greening concrete protective slope

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100332716B1 (en) * 1999-06-30 2002-04-17 허 태 학 methode of construction for bionics river-side operating

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11131478A (en) * 1997-10-24 1999-05-18 Sekisui Chem Co Ltd Planting base material having water holding property and manufacture of this planting base material
JP2001316154A (en) * 2000-05-01 2001-11-13 Oji Ryokka Kk Lightweight cement mortar and simplified foundation work using it
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN1920185A (en) * 2005-08-24 2007-02-28 沈敏鑫 Construction method of green concrete
CN2866605Y (en) * 2005-11-24 2007-02-07 张宇顺 Green side slope structure
CN201473958U (en) * 2009-06-09 2010-05-19 朱奎 Greening concrete protective slope

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
城市河道直立式生态护岸结构方案探讨;苗翠林;《上海水务》;20090630;第25卷(第2期);正文第3-5栏首行至末行 *
苗翠林.城市河道直立式生态护岸结构方案探讨.《上海水务》.2009,第25卷(第2期),正文第3-5栏首行至末行.

Also Published As

Publication number Publication date
CN102628261A (en) 2012-08-08

Similar Documents

Publication Publication Date Title
CN101543168B (en) Method for planting vegetation on the karst area slope
CN108589743B (en) Ecological geogrid for slope protection
CN107700429B (en) Slope runoff erosion preventing device and slope runoff erosion preventing method
CN204305674U (en) Anchor pole grid is utilized to carry out shale side slope plantation greening structure
CN103924605A (en) Sash girder ecological slope protection structure and construction method thereof
CN104314087A (en) Slope greening protective structure and construction method thereof
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN105220698A (en) A kind of rock slope ecological protection method
CN102839679B (en) Method for protecting vegetation of concrete slope
CN108093729A (en) Side-slope greening and protection method
CN105178340A (en) Anti-scouring structure used for ecological regreening of rock slope and concrete material used for anti-scouring structure
CN103708776A (en) Ecological recovery method with combination application of planting ecological concrete and high-molecular aggregates
CN105113518A (en) Construction method for ecological slope protecting base material by arranging slot pits in slope surface
CN112211203A (en) High-strength structure organic fiber composite repair method for high and steep slope
CN102084772A (en) Quick plant-growing method for ragstone slope
CN111802183A (en) Ecological slope protection and vertical greening process
CN110447481B (en) Granule spray-seeding construction method
CN203530993U (en) Steel-bar mesh planting hole
CN205035814U (en) A scour prevention structure that is used for rock matter side slope ecological compound green
CN107023023A (en) Slope vegetation restoration structure and method
CN203334299U (en) Coir mesh ecological protection structure of weathered coarse-grained granite side slope
CN102628261B (en) Constructing method of artificial parent ecological layer
CN103988627A (en) Vegetative component with slow release fertilizer efficiency and water retention function and preparation method of vegetative component
CN111636444A (en) Water and soil conservation method for side slope in high-altitude area
CN206289637U (en) Flexible ceramsite board slope ecological afforestation equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200433, room 1505, golden business building, No. 490, National Road, Shanghai, Yangpu District

Applicant after: SHANGHAI JIAJIE ECO-TECH CO., LTD.

Address before: 200433, room 490, country road 1505, Shanghai, Yangpu District

Applicant before: Shanghai Jiajie Eco-Concrete Lawn Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI JIAJIE ECOLOGICAL CONCRETE LAWN CO., LTD. TO: SHANGHAI JIAJIE ECO-TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140430

Termination date: 20170527

CF01 Termination of patent right due to non-payment of annual fee