CN102595626B - Semi-persistent scheduling (SPS) method, user equipment and network equipment - Google Patents

Semi-persistent scheduling (SPS) method, user equipment and network equipment Download PDF

Info

Publication number
CN102595626B
CN102595626B CN201110009896.6A CN201110009896A CN102595626B CN 102595626 B CN102595626 B CN 102595626B CN 201110009896 A CN201110009896 A CN 201110009896A CN 102595626 B CN102595626 B CN 102595626B
Authority
CN
China
Prior art keywords
sps
user equipment
control signal
feedback
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110009896.6A
Other languages
Chinese (zh)
Other versions
CN102595626A (en
Inventor
权威
姜怡
张戬
陈小锋
黄曲芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201110009896.6A priority Critical patent/CN102595626B/en
Priority to PCT/CN2012/070477 priority patent/WO2012097724A1/en
Publication of CN102595626A publication Critical patent/CN102595626A/en
Application granted granted Critical
Publication of CN102595626B publication Critical patent/CN102595626B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a semi-persistent scheduling (SPS) method, user equipment and network equipment. The method comprises the following steps that: first user equipment acquires the scheduling identification of an SPS group, wherein the user equipment in the same group shares the same scheduling identification of the SPS group; the first user equipment receives a control signaling which is masked on a physical downlink control channel (PDCCH); the control signaling is demasked according to the scheduling identification of the SPS group, and the demasked control signaling containing an SPS command is obtained; the SPS command is used for carrying out SPS scheduling to the user equipment in the group of the first user equipment; the first user equipment receives a medium access control protocol data unit (MAC PDU) on a physical downlink shared channel (PDSCH) according to the demasked control signaling which contains the SPS command; and the MAC PDU comprises a data packet of at least one piece of user equipment in the group of the first user equipment. According to the embodiment of the invention, the PDCCH resources can be saved, and the capacity and the resource utilization rate of a system can be improved.

Description

Semi-static scheduling method, subscriber equipment and the network equipment
Technical field
The present invention relates to mobile communication technology, particularly relate to a kind of Semi-static scheduling method, subscriber equipment and the network equipment.
Background technology
At Long Term Evolution (Long Term Evolution, LTE) in system, base station (eNodeB, eNB) Physical Downlink Control Channel (Physical Downlink Control Channel is used, PDCCH) transmission is used for the control signal of scheduling user's set (User Equipment, UE).When scheduling is in the data of the UE of connected state, this control signal adopts Cell Radio Network Temporary Identifier/Identity, Cell-RNTI (the CellRadio Network Temporary Identity of UE, C-RNTI) carry out adding covering, UE is after listening to the control signal that PDCCH transmits, solution can be carried out with the C-RNTI of self to the control signal of transmission on PDCCH to cover, solution cover after control signal comprise physical channel resources for UE distributes and the concrete modulation coding mode (Modulation and Coding Scheme, MCS) etc. used.UE according to the relevant information of carrying in this control signal, and according to the transmitting-receiving being indicated to the corresponding enterprising row data of physical channel wherein.
The control signal of the upper transmission of PDCCH itself is also be carried on certain physical resource to carry out transmitting.For the community of a 5MHz bandwidth, the control signal that can carry in a Transmission Time Interval (TransmissionTime Interval, TTI) only has tens usually, and this contains uplink and downlink dispatch simultaneously.Therefore, on average arrive upstream or downstream, then can only dispatch several to tens users in a TTI simultaneously.Such as, in addition, under some scenes, in heterogeneous network, in order to reduce the interference of minizone, may only send control signaling in some subframe, now, the quantity of the control signal of the upper transmission of PDCCH will be less.Due to the limited amount of the control signal of transmission on PDCCH, then the number of users can dispatched is also limited, then cause the limited of power system capacity.
Semi-persistent scheduling (Semi-Persistent Scheduling, SPS) refers to that the scheduling of resource is pre-configured, periodic.ENB can pass through wireless heterogeneous networks (Radio Resource Control, RRC) message configures Physical Uplink Control Channel (PhysicalUplink Control Channel, the PUCCH) feedback resources of SPS cycle and employing to UE.For descending SPS, eNB can adopt the control signal of transmission on PDCCH to activate SPS, in follow-up data transmission procedure, SPS cycle downlink data receiving on the time point of correspondence that UE configures according to RRC information, and feed back in the PUCCH feedback resource of configuration, and all adopt PDCCH to dispatch when not needing to dispatch UE at every turn.When needs amendment or release SPS resource, eNB can adopt the control signal of transmission on PDCCH to issue SPS amendment or release command.
In semi-persistent scheduling services, as in the networking telephone (Voice over IP, VoIP) business, may along with the change of wireless channel conditions, need to use continually the control signal of transmission on PDCCH to revise SPS resource, cause the waste of PDCCH resource.
Summary of the invention
The embodiment of the present invention is to provide a kind of Semi-static scheduling method, subscriber equipment and the network equipment, to save PDCCH resource, to improve power system capacity and resource utilization.
Embodiments provide a kind of Semi-static scheduling method, comprising:
First user equipment obtains semi-persistent scheduling SPS group scheduling mark, and wherein, a SPS group scheduling mark shared by the subscriber equipment in same grouping;
Described first user equipment receives in physical downlink control channel PDCCH and adds the control signal covered, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal, wherein, described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
Described first user equipment according to described in comprise SPS order solution cover after control signal, receive the media access control MAC protocol data cell PDU on Physical Downlink Shared Channel PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
Embodiments provide a kind of Semi-static scheduling method, comprising:
The network equipment sends to first user equipment and adopts SPS group scheduling mark to add the control signal covered on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
The described network equipment sends MAC PDU to subscriber equipment on PDSCH, and described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
Embodiments provide a kind of subscriber equipment, comprising:
Acquisition module, for obtaining semi-persistent scheduling SPS group scheduling mark, wherein, the shared SPS group scheduling of other subscriber equipment in described subscriber equipment and same grouping identifies;
Separate mask block, for receiving control signal physical downlink control channel PDCCH adding and covers, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal subscriber equipment, wherein, described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described subscriber equipment place;
Receiver module, solution for comprising SPS order described in basis cover after control signal, receive the media access control MAC protocol data cell PDU on Physical Downlink Shared Channel PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described subscriber equipment place.
Embodiments provide a kind of network equipment, comprising:
Signaling sending module, SPS group scheduling mark is adopted to add the control signal covered for sending to first user equipment on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
Data transmission blocks, for sending MAC PDU to subscriber equipment on PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
As shown from the above technical solution, the UE of the embodiment of the present invention by using the SPS control signal of transmission on PDCCH to dispatch same grouping, make multiple UE can be carried out SPS activation, amendment or release by the control signal of same PDCCH, avoid frequent use control signal to carry out SPS activation, amendment or release, save PDCCH resource; By comprising multiple packets of the UE belonging to same grouping in MAC PDU, the SPS resource of multiple UE being operated simultaneously, improve power system capacity and resource utilization.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, the accompanying drawing used required in describing embodiment is done one below to introduce simply, apparently, accompanying drawing in the following describes is some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the method flow schematic diagram of one embodiment of the invention;
Fig. 2 is the method flow schematic diagram of another embodiment of the present invention;
Fig. 3 is the method flow schematic diagram of another embodiment of the present invention;
Fig. 4 is the method flow schematic diagram of another embodiment of the present invention;
The structural representation of the subscriber equipment that Fig. 5 provides for another embodiment of the present invention;
The structural representation of the network equipment that Fig. 6 provides for another embodiment of the present invention.
Embodiment
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Fig. 1 is the method flow schematic diagram of one embodiment of the invention, comprising:
Step 11 a: UE obtains SPS group scheduling mark, wherein, the UE in same grouping shares a SPS group scheduling mark.
Wherein, a UE can obtain SPS group scheduling mark in the following way:
Described first user equipment receives wireless heterogeneous networks (Radio ResouceControl, the RRC) message that the network equipment sends, and carrying the network equipment in described RRC information is the described SPS group scheduling mark that described first user equipment distributes; Or, described first user equipment paging receiving message, the group mark that beep-page message is corresponding is carried in described beep-page message, using group corresponding for described beep-page message mark as described SPS group scheduling mark, the pager wireless net network temporary mark (Paging-Radio Network Temporary Identity, P-RNTI) corresponding by beep-page message identifies as SPS group scheduling; Or described first user equipment, according to self pre-configured information, obtains described SPS group scheduling mark.
Step 12: a described UE receives on PDCCH and adds the control signal covered, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal, described SPS order be used for described one UE place grouping in UE carry out SPS scheduling.
Step 13: a described UE according to described in comprise SPS order solution cover after control signal, receive medium education (the Media Access Control on PDSCH, MAC) protocol Data Unit (Protocol Data Unit, PDU), described MAC PDU comprises the packet of at least one UE in a described UE place grouping.
Further, after step 13, the present embodiment can further include:
One UE, according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by SPS information sends feedback information or does not feed back.
Wherein, a UE can obtain SPS information in the following way:
Described first user equipment receives the RRC information that the network equipment sends, and comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resource.
Concrete as, when the special PUCCH feedback resource that described PUCCH feedback resource is for a described UE configuration, and when described SPS order activates for SPS or amendment is ordered, a described UE is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not feed back, comprising:
If a described UE successfully solution covers described control signal, and the described MAC PDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if a described UE successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding, then according to the described SPS cycle, described PUCCH feedback resource feeds back nack message; Or, if the unsuccessful solution of a described UE covers described control signal, then do not feed back.
When the PUCCH feedback resource shared that described PUCCH feedback resource is for a described UE configuration, and described SPS order is for SPS activation or when revising, a described UE is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not carry out feedback SPS order, comprising:
If a described UE successfully solution covers described control signal, and there is the packet of self correspondence after the described MAC PDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of a described UE covers described control signal, or, if a described UE successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or, if a described UE successfully solution covers described control signal, and the described MAC PDU that successfully decodes, but without the packet that a described UE is corresponding in the decoded MAC PDU of success, then do not feed back.
When the special PUCCH feedback resource that described PUCCH feedback resource is for a described UE configuration, and described SPS order is when being SPS release command, a described UE is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not feed back, comprising:
If described first user equipment successfully solution covers described control signal, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of a described UE covers described control signal, then do not feed back.
Further, the present embodiment can also comprise:
A described UE receives the packet of network equipment transmission, the packet of described transmission is that the described network equipment to send after receiving the feedback information that described first user equipment sends at execution cost first user equipment, and described feedback information comprises described ACK information or described nack message;
Or,
What a described UE reception network equipment retransmitted on PDCCH adds the control signal covered, and the control signal covered that adds of described re-transmission is that the described network equipment sends after the described feedback information not receiving the transmission of described first user equipment.
The UE of the present embodiment by using the SPS control signal of transmission on PDCCH to dispatch same grouping, make multiple UE can be carried out SPS activation, amendment or release by the control signal of same PDCCH, avoid frequent use control signal to carry out SPS activation, amendment or release, save PDCCH resource; By comprising multiple packets of the UE belonging to same grouping in MAC PDU, the SPS resource of multiple UE being operated simultaneously, improve power system capacity and resource utilization.
Fig. 2 is the method flow schematic diagram of another embodiment of the present invention, comprising:
Step 21: the network equipment sends to a UE and adopts SPS group scheduling mark to add the control signal covered on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
This network equipment includes but not limited to: eNB, eNodeB.
Step 22: the described network equipment sends MAC PDU to subscriber equipment on PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
Before step 21, the present embodiment can also comprise:
The described network equipment sends RRC information to described first user equipment, carrying the network equipment in described RRC information is the SPS group scheduling mark that described first user equipment distributes, so that described first user equipment covers described control signal according to described SPS group scheduling mark solution; Or the described network equipment sends beep-page message to described first user equipment, in described beep-page message, carry the group mark that beep-page message is corresponding, so that described first user equipment covers described control signal according to described group of mark solution.
Further, the present embodiment can also comprise:
The described network equipment knows the reception condition of a described UE according to the feedback of described first user equipment, and the feedback of a described UE comprises: feedback information or do not feed back on the feedback resources indicated by SPS information.
Wherein, before the described network equipment knows the reception condition of described first user equipment according to the feedback of described first user equipment, described method can also comprise: the described network equipment sends RRC information to described first user equipment, comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, PUCCH feedback resource.
When the special PUCCH feedback resource that described PUCCH feedback resource is subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, the described feedback according to described first user equipment knows the reception condition subscriber equipment of described first user equipment, comprise: if according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes; Or, if according to the described SPS cycle, described PUCCH feedback resource receives the nack message of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding; Or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal.
When described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is for SPS activation or when revising, the described feedback according to described first user equipment knows the reception condition subscriber equipment of described first user equipment, comprise: if according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and after the described MAC PDU that successfully decodes, the packet that described first user equipment is corresponding is had in the described MAC PDU of described decoding, or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal, or described first user equipment successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or, described first user equipment successfully solution covers described control signal, and the described MAC PDU that successfully decodes, but without the packet that described first user equipment is corresponding in the decoded MAC PDU of success.
When described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is when being SPS release command, the described feedback according to described first user equipment knows the reception condition subscriber equipment of described first user equipment, comprise: if according to the described SPS cycle, described PUCCH feedback resource receives first user equipment feedback ACK information, then know described first user equipment successfully solution cover described control signal; Or, if do not receive the feedback information of first user equipment, then know that the unsuccessful solution of described first user equipment covers described control signal.
The present embodiment can also comprise: if the described network equipment receives the feedback information that described first user equipment sends, then the packet of first user equipment according to SPS resource transmission, and described feedback information comprises described ACK information or nack message; Or, if the described network equipment does not receive described first user equipment feedack, then on PDCCH, resend to described first user equipment the control signal adding and cover.
Fig. 3 is the method flow schematic diagram of another embodiment of the present invention, the present embodiment for PUCCH feedback resource for base station configures to the special feedback resources of UE.See Fig. 3, the present embodiment comprises:
Step 31:eNB issues RRC information to UE, is included as the SPS information of UE configuration in this RRC information.
Wherein, this SPS information comprises: SPS cycle and PUCCH feedback resource.In the present embodiment, be the PUCCH feedback resource of this UE configure dedicated, that is, in group, each UE has the PUCCH feedback resource of oneself.The UE method identified whether as oneself being configured with special PUCCH feedback resource includes but not limited to several as follows: whether eNB indicates this PUCCH feedback resource to be that UE is special in RRC information, or increase new parameter of distributing (namely sharing in group) PUCCH feedback resource of non-dedicated, if use the PUCCH resource of existing parametric distribution, it is then the private resource of UE, if by the PUCCH resource of new parametric distribution, be not then the private resource of UE; Or when the PUCCH quantity that eNB indicates in RRC information is 1, UE thinks that described PUCCH feedback resource is that UE is special, when quantity is greater than 1, not thinks it is special.
In addition, also can be that UE configures SPS group scheduling mark (as Group-SPS-RNTI) by RRC information, or, SPS group scheduling mark also can be the group mark that beep-page message is corresponding, owing to carrying group mark in beep-page message, therefore can directly this group mark be identified as SPS group scheduling; Also can be adopt the mode of static configuration, be pre-configured in UE side.UE can adopt SPS group scheduling to identify solution and cover out self control signal corresponding, so that the control signal covered according to solution carries out data receiver.
Step 32:eNB sends through adding the control signal covered on PDCCH, comprises SPS order in this control signal, and wherein, this SPS order is used for carrying out SPS scheduling to the UE in the grouping of described UE place.In addition, eNB is at Physical Downlink Shared Channel (Physical Downlink Shared Channel, PDSCH) upper transmission MAC PDU, the packet of at least one UE of this UE place grouping is comprised in this MAC PDU, this packet can be one or more MAC service data unit (MACService Data Unit, and/or one or more MAC Control Element (MAC ControlElements, CE) SDU).
Wherein, SPS order comprises: SPS activates/revise order and SPS release command.The one or more territories in the control signal of transmission on existing PDCCH can be adopted to show, and this SPS order is that SPS activates/amendment order, or SPS release command.Such as, work as NDI=0, represent that SPS activates/amendment order, work as NDI=1, represent SPS release command.
In the embodiment of the present invention, can realize the SPS scheduling based on group, when namely needing the number of the UE dispatched more than one, the control signal that can be transmitted by PDCCH is activated simultaneously/revises or discharges the UE in this group.
Step 33:UE monitors PDCCH, adopts SPS group scheduling mark solution to cover the control signal transmitted on PDCCH, and wherein, the UE in same grouping shares a SPS group scheduling mark.Wherein, the SPS group scheduling mark of UE side can be that eNB adopts RRC information to configure to UE, also can be the group mark that beep-page message is corresponding, also can be pre-configured in UE.
Control signal after step 34:UE covers according to described solution, receives the MAC PDU on PDSCH, and described MAC PDU comprises the packet of at least one UE in the grouping of described UE place.
Wherein, solution cover after control signal in comprise physical channel resources corresponding to UE, so that UE can receive data to the PDSCH of correspondence.
Particularly, be configured with the UE of SPS information after getting SPS order, corresponding SPS can be carried out and receive operation.Such as, if SPS order is for activating/amendment order, then UE is after receiving SPS activation/amendment order, then from receive SPS activate/amendment order time point or SPS activate/amendment order in instruction time point, with the SPS cycle of above-mentioned configuration for the cycle, in the PDSCH resource that periodic trial indicates in SPS order with the mode of SPS order instruction (as the modulation coding mode that uses, the size etc. of the data block transmitted) carry out data receiver, and use the PUCCH resource of above-mentioned configuration to feed back according to data receiver situation.If SPS order is SPS release command, then UE is follow-up no longer receives.
Step 35:UE, according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by the SPS information obtained in advance sends feedback information or does not feed back.
Such as, when SPS order activates/revises order for SPS, if UE successfully solution covers the control signal of transmission on PDCCH, and the MAC PDU of PDSCH transmission of successfully decoding, no matter then whether have oneself packet in the decoded MAC PDU of success, then by the PUCCH of above-mentioned configuration to eNB feeding back ACK information; If UE successfully solution covers the control signal that PDCCH carries, but the MAC PDU that unsuccessful decoding PDSCH carries, then feed back nack message by the PUCCH of above-mentioned configuration to eNB; If the unsuccessful solution of UE covers the control signal that PDCCH carries, then do not feed back.
Again such as, if when SPS order is SPS release command, then feed back according to the reception condition of control signal, such as, when UE successfully receives this control signal, namely UE successfully solution cover out control signal, then feeding back ACK information, otherwise, do not feed back.
Step 36:eNB carries out respective handling according to the feedback of UE.
Such as, if scheduled the data of described UE: receive ACK, think that control signal and data are all successfully received by UE; If receive NACK, then think that UE receives only PDCCH and do not solve PDSCH; If do not received whatever, then think that UE does not receive PDCCH.After receiving ACK or NACK, think that UE receives PDCCH, the follow-up data that can use this UE of group SPS resource transmission; If do not received whatever, then think that UE does not receive PDCCH, the data of this UE of SPS transmitted over resources of the follow-up SPS order notice can not transmitted on this PDCCH.Optionally, in order to improve reliability, when certain or some UE do not feed back, the SPS activation command that eNB can resend on PDCCH activates, and for the UE receiving this SPS activation command, this SPS activation command can be understood as SPS amendment order.
Wherein, after SPS successful activation or amendment, UE activates/revises at this SPS the MAC PDU and the data having oneself in this MAC PDU that order the PDSCH transmitted over resources of instruction follow-up successfully receiving, the PUCCH resource feeding back ACK preset, if successfully receive MAC PDU but there is no oneself data, can not feed back or feed back NACK or feeding back ACK, if UE does not successfully receive MAC PDU, then can not feed back, or feedback NACK; Simultaneously, if UE does not successfully solve MAC PDU, the control signal that possible SPS group scheduling mark adds the Schedule retransmission covered can be monitored, carry out SPS re-transmission, and respective feedback is carried out in pre-configured PUCCH resource or at the relative position of the CCE (Control Channel Element, control channel unit) shared by control signal.Accordingly, in eNB side, if eNB does not have the data of execution cost UE, then eNB can ignore the feedback of this UE.
Wherein, scheduled the data of certain UE as eNB and receive the NACK of UE feedback, then can carry out Schedule retransmission, when eNB retransmits the data of certain or some UE, can continue to use the mode of group scheduling to dispatch the data of UE, or the mode of notice specific schedule retransmits the data of UE.
If UE has exited this group, or SPS business corresponding to UE is released, then this UE does not need monitoring group SPS to dispatch again, can be eNB by signaling explicit notification to UE, also can be that UE judges according to configuration.
It is noted that because the business of different UEs is different, the SPS cycle is also different, but is meeting under certain condition, group SPS scheduling can realize the SPS group scheduling of multiple UE in different SPS cycle.Such as, some UE is the SPS cycle of 20ms, some UE is the SPS cycle of 40ms, when use group SPS dispatches, use the UE in the SPS cycle of 20ms only to need to carry out data receiver in the moment of activationary time point+20ms integral multiple, and use the UE in the SPS cycle of 40ms only to need to carry out data receiver in the moment of activationary time point+40ms integral multiple.
Under normal circumstances, same UE group SPS scheduling and special SPS scheduling (add with SPS-RNTI and cover) can not activate simultaneously.But the priority ratio group SPS optimizing scheduling level of special SPS dispatch is high, that is:
When UE is using special SPS scheduling to carry out data receiver, UE is the signaling of monitoring group SPS scheduling and data no longer;
When UE use group SPS dispatches, special SPS release command can be used to modify or discharge; When for amendment time, eNB and UE carries out SPS transmission according to special SPS order, follow-up same as the prior art, UE also no longer monitoring group SPS dispatch signaling and data; When for release, the data before UE also no longer receives corresponding to use group SPS order, unless UE listens to group SPS activation command again.
Owing to using the usual data volume of business of SPS scheduling mode fewer, so use the UE of SPS scheduling to form one group multiple needs, use group scheduling, on the basis of reducing PDCCH expense, the resource utilization of PDSCH can be improved further.
Fig. 4 is the method flow schematic diagram of another embodiment of the present invention, the present embodiment for PUCCH feedback resource for base station configure to UE share feedback resources.See Fig. 4, the present embodiment comprises:
Step 41:eNB issues RRC information to UE, is included as the SPS information of UE configuration in this RRC information.
That UE in described group shares with step 31 unlike, the PUCCH feedback resource configured in the present embodiment.
Step 42:eNB sends through adding the control signal covered on PDCCH, comprises SPS order in this control signal, and wherein, this SPS order is used for carrying out SPS scheduling to the UE in the grouping of described UE place.In addition, eNB sends MAC PDU on PDSCH, and comprise the packet of at least one UE of this UE place grouping in this MAC PDU, this packet can be one or more MAC SDU and/or one or more MAC CE.
Step 43:UE monitors PDCCH, adopts SPS group scheduling mark solution to cover the control signal transmitted on PDCCH, and wherein, the UE in same grouping shares a SPS group scheduling mark.
Control signal after step 44:UE covers according to described solution, receives the MAC PDU on PDSCH, and described MAC PDU comprises the packet of at least one UE in the grouping of described UE place.
The particular content of step 42-44 can see step 32-34.
Step 45:UE, according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by the SPS information obtained in advance sends feedback information or does not feed back.
Such as, when SPS order activates/revises order for SPS, if UE successfully solution covers the control signal that PDCCH sends, and the MAC PDU of PDSCH transmission of successfully decoding, and, have oneself packet in the decoded MAC PDU of success, then by the PUCCH feedback resource of above-mentioned configuration to eNB feeding back ACK information; If UE successfully solution covers the control signal of transmission on PDCCH, and the MAC PDU of transmission on the PDSCH that successfully decodes, but, there is no oneself packet in the decoded MAC PDU of success, or, if UE successfully solution cover the control signal that PDCCH carries, but the MAC PDU that unsuccessful decoding PDSCH carries, or, if the unsuccessful solution of UE covers the control signal that PDCCH carries, then do not feed back.
Because PUCCH is shared, usually adopt the resource of special SPS release command release UE.
In the present embodiment, UE activates/revises at this SPS the MAC PDU and the data having oneself in this MAC PDU that order the PDSCH transmitted over resources of instruction follow-up successfully receiving, at the corresponding PUCCH resource feeding back ACK by calculating, if successfully receive MAC PDU but there is no oneself data, or, if UE does not successfully receive MAC PDU, then do not feed back; Simultaneously, if UE does not successfully solve MAC PDU, possible group SPS can be monitored retransmit, and carry out respective feedback in pre-configured PUCCH resource or at the relative position of the CCE (Control Channel Element, control channel unit) shared by control signal.
Such as, above pre-configured 10 PUCCH resource, the UE data of current scheduling are 2, then first UE uses first PUCCH resource, and second UE uses second PUCCH resource.
Step 46:eNB carries out respective handling according to the feedback of UE.
Such as, if eNB have sent control signal and scheduled the data of certain UE: receive ACK, think that control signal and data are all successfully received by UE; Otherwise, think that UE does not receive PDCCH, follow-up can not the data of this UE of SPS transmitted over resources of this order notice again.In order to improve reliability, when certain or some UE do not feed back, eNB can resend PDCCH order and activate, and for the UE receiving this order, this order can be understood as amendment order.
Again such as, if before for UE have sent control signal and according to judging that UE successfully receives this control signal above, the current uploading resource transmission of data just indicated at described control signal, then eNB does following judgement: if eNB scheduled the data of certain UE, receives ACK and then thinks that data are all successfully received by UE; If do not receive feedback, then think that data are not successfully received by UE, need Schedule retransmission; If eNB does not dispatch the data of certain UE, then eNB can ignore the feedback of this UE.
When eNB retransmits the data of certain or some UE, can continue to use the mode of group scheduling to dispatch the data of UE, or the mode of notice specific schedule retransmits the data of UE.
In the present embodiment, UE is at subsequently received PDSCH in this SPS resource and after having the data of oneself, feed back in the PUCCH resource of the correspondence by calculating; Meanwhile, UE can monitor possible group SPS and retransmit, and carries out respective feedback.
If UE has exited this group, or SPS business corresponding to UE is released, then this UE does not need monitoring group SPS to dispatch again, and can pass through signaling explicit notification, can judge according to configuration yet.
It is noted that because the business of different UEs is different, the SPS cycle is also different, but is meeting under certain condition, group SPS scheduling can realize the SPS group scheduling of multiple UE in different SPS cycle.Such as, some UE is the SPS cycle of 20ms, some UE is the SPS cycle of 40ms, when use group SPS dispatches, use the UE in the SPS cycle of 20ms only to need to carry out data receiver in the moment of activationary time point+20ms integral multiple, and use the UE in the SPS cycle of 40ms only to need to carry out data receiver in the moment of activationary time point+40ms integral multiple.
Under normal circumstances, same UE group SPS scheduling and special SPS scheduling (add with SPS-RNTI and cover) can not activate simultaneously.But the priority ratio group SPS optimizing scheduling level of special SPS dispatch is high, that is:
When UE is using special SPS scheduling to carry out data receiver, UE is the signaling of monitoring group SPS scheduling and data no longer;
When UE use group SPS dispatches, special SPS release command can be used to modify/discharge; After amendment, eNB and UE carries out SPS transmission according to special SPS order, follow-up same as the prior art, UE also no longer monitoring group SPS scheduling signaling and data; After release, the data before UE also no longer receives corresponding to use group SPS order, unless UE listens to group SPS activation command again.
Owing to using the usual data volume of business of SPS scheduling mode fewer, so use the UE of SPS scheduling to form one group multiple needs, use group scheduling, on the basis of reducing PDCCH expense, the resource utilization of PDSCH can be improved further.
Corresponding said method embodiment, the structural representation of the subscriber equipment that Fig. 5 provides for another embodiment of the present invention, for implementing step corresponding in said method embodiment, comprising acquisition module 51, separating mask block 52 and receiver module 53; Acquisition module 51 is for obtaining SPS group scheduling mark, and wherein, the shared SPS group scheduling of other subscriber equipment in described subscriber equipment and same grouping identifies; Separate mask block 52 for receiving control signal PDCCH adding and covers, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal subscriber equipment, wherein, described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described subscriber equipment place; Receiver module 53 cover for the solution comprising SPS order described in basis after control signal, receive the media access control MAC protocol data cell PDU on Physical Downlink Shared Channel PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described subscriber equipment place.
This enforcement can also comprise feedback module, and feedback module is used for, according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by SPS information sending feedback information or not feeding back.
Wherein, when the special PUCCH feedback resource that described PUCCH feedback resource is described subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, if this feedback module can specifically for described subscriber equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if described subscriber equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding, then according to the described SPS cycle, described PUCCH feedback resource feeds back nack message; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, then do not feed back;
When the PUCCH feedback resource shared that described PUCCH feedback resource is for described user device configuration, and described SPS order is for SPS activation or when revising, described feedback module specifically for: if described subscriber equipment successfully solution cover described control signal, and after the described MAC PDU that successfully decodes, have the packet of self correspondence, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, or, if described control signal covered by described subscriber equipment successfully solution, but the described MAC PDU of unsuccessful decoding, or, if described control signal covered by described subscriber equipment successfully solution, and the described MAC PDU that successfully decodes, but without the packet that described subscriber equipment is corresponding in the decoded MAC PDU of success, then do not feed back.
When the special PUCCH feedback resource that described PUCCH feedback resource is for described user device configuration, and described SPS order is when being SPS release command, described feedback module specifically for: if described subscriber equipment successfully solution cover described control signal, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, then do not feed back.
Optionally, described acquisition module 51, specifically for receiving radio resource control RRC message, carries the described SPS group scheduling mark that the network equipment is described user equipment allocation in described RRC information; Or for paging receiving message, in described beep-page message, carry the group mark that beep-page message is corresponding, using group corresponding for described beep-page message mark as described SPS group scheduling mark; Or for according to pre-configured information, obtain described SPS group scheduling mark.
Optionally, described acquisition module 51 specifically can also be used for the RRC information receiving network equipment transmission, and comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resource.
Optionally, described receiver module 53 specifically can also be used for the packet receiving network equipment transmission, the packet of described transmission is that the described network equipment to send after receiving the feedback information that described subscriber equipment sends at schedule said user's equipment, and described feedback information comprises described ACK information or described nack message; Or, add for what receive that the network equipment retransmits on PDCCH the control signal covered, described re-transmission to add the control signal covered be the described network equipment sends after not receiving the described feedback information that described subscriber equipment sends.
Corresponding said method embodiment, the structural representation of the network equipment that Fig. 6 provides for another embodiment of the present invention, for implementing step corresponding in said method embodiment, comprises signaling sending module 61 and data transmission blocks 62; Signaling sending module 61 adopts SPS group scheduling mark to add the control signal covered for sending to first user equipment on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place; Data transmission blocks 62 for sending MAC PDU to subscriber equipment on PDSCH, and described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
The present embodiment can also comprise receiver module, for knowing the reception condition of described first user equipment according to the feedback of described first user equipment, the feedback of described first user equipment comprises: feedback information or do not feed back on the feedback resources indicated by SPS information.
Wherein, when the special PUCCH feedback resource that described PUCCH feedback resource is subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, if this receiver module can specifically for according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes; Or, if according to the described SPS cycle, described PUCCH feedback resource receives the nack message of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding; Or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal; Or,
When described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is for SPS activation or when revising, described receiver module specifically for: if according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and have the packet that described first user equipment is corresponding after the described MAC PDU that successfully decodes; Or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal, or described first user equipment successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or, described first user equipment successfully solution covers described control signal, and the described MAC PDU that successfully decodes, but without the packet that described first user equipment is corresponding in the decoded MAC PDU of success;
Or, when described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is when being SPS release command, if described receiver module is specifically for according to the described SPS cycle, described PUCCH feedback resource receives first user equipment feedback ACK information, then know described first user equipment successfully solution cover described control signal; Or, if do not receive the feedback information of first user equipment, then know that the unsuccessful solution of described first user equipment covers described control signal.
Optionally, described signaling sending module 61 is concrete also for sending RRC information to described first user equipment, carrying the network equipment in described RRC information is the SPS group scheduling mark that described first user equipment distributes, so that described first user equipment covers described control signal according to described SPS group scheduling mark solution; Or, for sending beep-page message to described first user equipment, in described beep-page message, carry the group mark that beep-page message is corresponding, so that described first user equipment covers described control signal according to described group of mark solution.
Optionally, described signaling sending module 61 is concrete also for sending RRC information to described first user equipment, and comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, PUCCH feedback resource.
Optionally, if the concrete feedback information also receiving the transmission of described first user equipment for the described network equipment of described data transmission blocks 62, the then packet of first user equipment according to SPS resource transmission, described feedback information comprises described ACK information or nack message;
Or,
Optionally, if described signaling sending module 61 does not specifically also receive described first user equipment feedack for the described network equipment, then on PDCCH, resend to described first user equipment the control signal adding and cover.
Be understandable that, the correlated characteristic in the various embodiments described above can reference mutually.
One of ordinary skill in the art will appreciate that: all or part of step realizing said method embodiment can have been come by the hardware that program command is relevant, aforesaid program can be stored in computer read/write memory medium, this program, when performing, performs the step comprising said method embodiment; And aforesaid storage medium comprises: ROM, RAM, magnetic disc or CD etc. various can be program code stored medium.
Last it is noted that above embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (22)

1. a Semi-static scheduling method, is characterized in that, comprising:
First user equipment obtains semi-persistent scheduling SPS group scheduling mark, and wherein, a SPS group scheduling mark shared by the subscriber equipment in same grouping;
Described first user equipment receives in physical downlink control channel PDCCH and adds the control signal covered, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal, wherein, described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
Described first user equipment according to described in comprise SPS order solution cover after control signal, receive the media access control MAC protocol data cell PDU on Physical Downlink Shared Channel PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
2. method according to claim 1, it is characterized in that, after MAC PDU on described reception PDSCH, described method also comprises: described first user equipment, according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by SPS information sends feedback information or does not feed back.
3. method according to claim 1 and 2, is characterized in that, described first user equipment obtains SPS group scheduling mark, comprising:
Described first user equipment receives radio resource control RRC message, and carrying the network equipment in described RRC information is the described SPS group scheduling mark that described first user equipment distributes;
Or,
Described first user equipment paging receiving message, carries the group mark that beep-page message is corresponding in described beep-page message, using group corresponding for described beep-page message mark as described SPS group scheduling mark;
Or,
Described first user equipment, according to pre-configured information, obtains described SPS group scheduling mark.
4. method according to claim 2, is characterized in that, described on the feedback resources indicated by SPS information, send feedback information or do not feed back before, described method also comprises:
Described first user equipment receives the RRC information that the network equipment sends, and comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resource.
5. method according to claim 4, it is characterized in that, when the special PUCCH feedback resource that described PUCCH feedback resource is for described first user Equipments Setting, and when described SPS order activates for SPS or amendment is ordered, described first user equipment is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not feed back, comprising:
If described first user equipment successfully solution covers described control signal, and the described MACPDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource;
Or,
If described first user equipment successfully solution covers described control signal, but the described MACPDU of unsuccessful decoding, then according to the described SPS cycle, described PUCCH feedback resource feeds back nack message;
Or,
If the unsuccessful solution of described first user equipment covers described control signal, then do not feed back.
6. method according to claim 4, it is characterized in that, when the PUCCH feedback resource shared that described PUCCH feedback resource is for described first user Equipments Setting, and described SPS order is for SPS activation or when revising, described first user equipment is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not carry out feedback SPS order, comprising:
If described first user equipment successfully solution covers described control signal, and there is the packet of self correspondence after the described MACPDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource;
Or,
If the unsuccessful solution of described first user equipment covers described control signal, or, if described first user equipment successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or, if described first user equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes, but without the packet that described first user equipment is corresponding in the decoded MAC PDU of success, then do not feed back.
7. method according to claim 4, it is characterized in that, when the special PUCCH feedback resource that described PUCCH feedback resource is for described first user Equipments Setting, and described SPS order is when being SPS release command, described first user equipment is according to described SPS order and the reception condition to described control signal and described MAC PDU, feedback resources indicated by SPS information send feedback information or do not feed back, comprising:
If described first user equipment successfully solution covers described control signal, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource;
Or,
If the unsuccessful solution of described first user equipment covers described control signal, then do not feed back.
8. the method according to any one of claim 5-7, is characterized in that, also comprises:
Described first user equipment receives the packet of network equipment transmission, the packet of described transmission is that the described network equipment to send after receiving the feedback information that described first user equipment sends at execution cost first user equipment, and described feedback information comprises described ACK information or described nack message;
Or,
What the described first user equipment reception network equipment retransmitted on PDCCH adds the control signal covered, and the control signal covered that adds of described re-transmission is that the described network equipment sends after the described feedback information not receiving the transmission of described first user equipment.
9. a Semi-static scheduling method, is characterized in that, comprising:
The network equipment sends to first user equipment and adopts SPS group scheduling mark to add the control signal covered on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
The described network equipment sends MAC PDU to subscriber equipment on PDSCH, and described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
10. method according to claim 9, is characterized in that, also comprises:
The described network equipment knows the reception condition of described first user equipment according to the feedback of described first user equipment, and the feedback of described first user equipment comprises: feedback information or do not feed back on the feedback resources indicated by SPS information.
11. methods according to claim 9 or 10, is characterized in that, the described network equipment sends to first user equipment and adopts before SPS group scheduling mark adds the control signal covered on PDCCH, and described method also comprises:
The described network equipment sends RRC information to described first user equipment, carrying the network equipment in described RRC information is the SPS group scheduling mark that described first user equipment distributes, so that described first user equipment covers described control signal according to described SPS group scheduling mark solution;
Or,
The described network equipment sends beep-page message to described first user equipment, carries the group mark that beep-page message is corresponding in described beep-page message, so that described first user equipment covers described control signal according to described group of mark solution.
12. methods according to claim 10, is characterized in that, before the described network equipment knows the reception condition of described first user equipment according to the feedback of described first user equipment, described method also comprises:
The described network equipment sends RRC information to described first user equipment, and comprise described SPS information in described RRC information, described SPS information comprises: SPS cycle, PUCCH feedback resource.
13. methods according to claim 12, it is characterized in that, when the special PUCCH feedback resource that described PUCCH feedback resource is subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, the described feedback according to described first user equipment knows the reception condition of described first user equipment, comprising:
If according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes;
Or,
If according to the described SPS cycle, described PUCCH feedback resource receives the nack message of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding;
Or,
If do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal.
14. methods according to claim 12, it is characterized in that, when described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is for SPS activation or when revising, the described feedback according to described first user equipment knows the reception condition subscriber equipment of described first user equipment, comprising:
If according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and after the described MAC PDU that successfully decodes, in the described MAC PDU of described decoding, have the packet that described first user equipment is corresponding;
Or,
If do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal, or, described first user equipment successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or described first user equipment successfully solution covers described control signal, and the described MAC PDU that successfully decodes, but without the packet that described first user equipment is corresponding in the decoded MAC PDU of success.
15. methods according to claim 12, it is characterized in that, when described PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is when being SPS release command, the described feedback according to described first user equipment knows the reception condition subscriber equipment of described first user equipment, comprising:
If according to the described SPS cycle, described PUCCH feedback resource receives first user equipment feedback ACK information, then know described first user equipment successfully solution cover described control signal;
Or,
If do not receive the feedback information of first user equipment, then know that the unsuccessful solution of described first user equipment covers described control signal.
16. methods according to any one of claim 13-15, is characterized in that, also comprise:
If the described network equipment receives the feedback information that described first user equipment sends, then the packet of first user equipment according to SPS resource transmission, described feedback information comprises described ACK information or nack message;
Or,
If the described network equipment does not receive described first user equipment feedack, then on PDCCH, resend to described first user equipment the control signal adding and cover.
17. 1 kinds of subscriber equipmenies, is characterized in that, comprising:
Acquisition module, for obtaining semi-persistent scheduling SPS group scheduling mark, wherein, the shared SPS group scheduling of other subscriber equipment in described subscriber equipment and same grouping identifies;
Separate mask block, for receiving control signal physical downlink control channel PDCCH adding and covers, described control signal is covered according to described SPS group scheduling mark solution, the solution obtaining comprising SPS order cover after control signal subscriber equipment, wherein, described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described subscriber equipment place;
Receiver module, solution for comprising SPS order described in basis cover after control signal, receive the media access control MAC protocol data cell PDU on Physical Downlink Shared Channel PDSCH, described MAC PDU comprises the packet of at least one subscriber equipment in the grouping of described subscriber equipment place.
18. subscriber equipmenies according to claim 17, is characterized in that, also comprise:
Feedback module, for according to described SPS order and the reception condition to described control signal and described MAC PDU, the feedback resources indicated by SPS information sends feedback information or does not feed back.
19. subscriber equipmenies according to claim 18, is characterized in that,
When the special PUCCH feedback resource that PUCCH feedback resource is described subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, described feedback module specifically for: if described subscriber equipment successfully solution cover described control signal, and the described MAC PDU that successfully decodes, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if described subscriber equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding, then according to the described SPS cycle, described PUCCH feedback resource feeds back nack message; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, then do not feed back;
When the PUCCH feedback resource shared that PUCCH feedback resource is for described user device configuration, and described SPS order is for SPS activation or when revising, described feedback module specifically for: if described subscriber equipment successfully solution cover described control signal, and after the described MAC PDU that successfully decodes, have the packet of self correspondence, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, or, if described control signal covered by described subscriber equipment successfully solution, but the described MAC PDU of unsuccessful decoding, or, if described control signal covered by described subscriber equipment successfully solution, and the described MAC PDU that successfully decodes, but without the packet that described subscriber equipment is corresponding in the decoded MAC PDU of success, then do not feed back;
Or, when the special PUCCH feedback resource that PUCCH feedback resource is for described user device configuration, and described SPS order is when being SPS release command, described feedback module specifically for: if described subscriber equipment successfully solution cover described control signal, then according to the described SPS cycle, feeding back ACK information in described PUCCH feedback resource; Or, if the unsuccessful solution of described subscriber equipment covers described control signal, then do not feed back.
20. 1 kinds of network equipments, is characterized in that, comprising:
Signaling sending module, SPS group scheduling mark is adopted to add the control signal covered for sending to first user equipment on PDCCH, described control signal comprises SPS order, wherein, a SPS group scheduling mark shared by subscriber equipment in same grouping, and described SPS order is used for carrying out SPS scheduling to the subscriber equipment in the grouping of described first user equipment place;
Data transmission blocks, for sending MAC PDU to subscriber equipment on PDSCH, described MACPDU comprises the packet of at least one subscriber equipment in the grouping of described first user equipment place.
21. equipment according to claim 20, is characterized in that, also comprise:
Receiver module, for knowing the reception condition of described first user equipment according to the feedback of described first user equipment, the feedback of described first user equipment comprises: feedback information or do not feed back on the feedback resources indicated by SPS information.
22. equipment according to claim 21, is characterized in that,
When the special PUCCH feedback resource that PUCCH feedback resource is subscriber equipment, and when described SPS order activates for SPS or amendment is ordered, described receiver module specifically for: if according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and the described MACPDU that successfully decodes; Or, if according to the described SPS cycle, described PUCCH feedback resource receives the nack message of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, but the described MAC PDU of unsuccessful decoding; Or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal;
Or,
When PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is for SPS activation or when revising, described receiver module specifically for: if according to the described SPS cycle, described PUCCH feedback resource receives the ACK information of described first user equipment feedback, then know described first user equipment successfully solution cover described control signal, and have the packet that described first user equipment is corresponding after the described MAC PDU that successfully decodes; Or, if do not receive described first user equipment feedack, then know that the unsuccessful solution of described first user equipment covers described control signal, or described first user equipment successfully solution covers described control signal, but the described MAC PDU of unsuccessful decoding, or, described first user equipment successfully solution covers described control signal, and the described MAC PDU that successfully decodes, but without the packet that described first user equipment is corresponding in the decoded MAC PDU of success;
Or,
When PUCCH feedback resource is the PUCCH feedback resource that subscriber equipment is shared, and described SPS order is when being SPS release command, described receiver module specifically for: if according to the described SPS cycle, described PUCCH feedback resource receives first user equipment feedback ACK information, then know described first user equipment successfully solution cover described control signal; Or, if do not receive the feedback information of first user equipment, then know that the unsuccessful solution of described first user equipment covers described control signal.
CN201110009896.6A 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment Expired - Fee Related CN102595626B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110009896.6A CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment
PCT/CN2012/070477 WO2012097724A1 (en) 2011-01-17 2012-01-17 Semi-persistent scheduling method, user equipment, and network device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110009896.6A CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment

Publications (2)

Publication Number Publication Date
CN102595626A CN102595626A (en) 2012-07-18
CN102595626B true CN102595626B (en) 2014-12-24

Family

ID=46483705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110009896.6A Expired - Fee Related CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment

Country Status (2)

Country Link
CN (1) CN102595626B (en)
WO (1) WO2012097724A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022152938A1 (en) * 2021-01-18 2022-07-21 Telefonaktiebolaget Lm Ericsson (Publ) Activation and recovery of sps transmissions

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150341858A1 (en) * 2014-05-21 2015-11-26 Qualcomm Incorporated Apparatus, methods, and computer program products providing power savings in sps-configured volte with c-drx
CN105898867A (en) * 2014-08-28 2016-08-24 阿尔卡特朗讯 Paging method and device for coverage range enhanced MTC UE
CN105429736B (en) * 2015-11-02 2020-01-07 电信科学技术研究院 Method and equipment for sending and receiving feedback
JP6674050B2 (en) * 2016-05-13 2020-04-01 華為技術有限公司Huawei Technologies Co.,Ltd. Scheduling method, apparatus and system
CN108811166B (en) 2017-05-05 2020-04-21 维沃移动通信有限公司 Method and device for sending and receiving random access response message
CN110856120B (en) * 2018-08-20 2022-03-11 北京中兴高达通信技术有限公司 Message sending and receiving method and device
CN111371532B (en) * 2018-12-26 2022-12-02 华为技术有限公司 Information transmission method and device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100150089A1 (en) * 2008-12-12 2010-06-17 Research In Motion Limited Uplink Semi-Persistent Scheduling Explicit Release Acknowledgement Transmission
WO2010077938A1 (en) * 2008-12-17 2010-07-08 Research In Motion Limited Semi-persistent resource release by wireless communication device
WO2010098548A2 (en) * 2009-02-25 2010-09-02 Lg Electronics Inc. The method of exchanging message and devices in wireless network
CN101820681B (en) * 2009-02-27 2012-05-23 大唐移动通信设备有限公司 Scheduling method and device of eUE

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022152938A1 (en) * 2021-01-18 2022-07-21 Telefonaktiebolaget Lm Ericsson (Publ) Activation and recovery of sps transmissions

Also Published As

Publication number Publication date
CN102595626A (en) 2012-07-18
WO2012097724A1 (en) 2012-07-26

Similar Documents

Publication Publication Date Title
CN102595626B (en) Semi-persistent scheduling (SPS) method, user equipment and network equipment
US9451547B2 (en) Coordinated signaling of scheduling information for uplink and downlink communications
CN102123399B (en) Scheduling request method and device
CN102595600B (en) Semi-static scheduling method, user equipment and network device
CN102595599B (en) Method, base station and system for scheduling evolution base station in long-term evolution system
CN101366207B (en) Allocating radio resources in mobile communications system
US10652923B2 (en) Method for indicating the allocated resources for a HARQ message in a random access procedure for a low-complexity, narrowband terminal
CN102917463B (en) Method, base station and user equipment for transmitting dispatching information
CN106992846B (en) Data sending method, data receiving method and device
US20150139136A1 (en) Method for transmitting feedback information for downlink data, terminal, and base station
US20130003629A1 (en) Paging method and apparatus for communication of m2m/mtc device operating in high power saving reception mode in a mobile communication system, and system thereof
US9155070B2 (en) Method and apparatus for transmitting uplink data burst in wireless connection system
CN103024905B (en) A kind of subframe matching method and device
CN105075148A (en) Method and apparatus for effectively providing TDD configuration information to user equipment and determining uplink transmission timing in mobile communication system supporting TDD
EP3304786B1 (en) Apparatus and method for handling the configuration of bundle sizes
WO2013044985A1 (en) Packet scheduling in communications
CN102884739A (en) Method and apparatus for activating carriers in mobile communication system
CN103384394A (en) Method and device for processing user equipment power consumption and power consumption configuration parameters
WO2013131264A1 (en) Group sps design for low cost mtc devices
CN102892084A (en) Method and device for processing trunking services, base station and user equipment (UE)
CN103796320A (en) Schedule requesting method and device
CN110300458B (en) Downlink HARQ feedback method, device, access network equipment and readable storage medium
CN102740484A (en) Method, user equipment, base station, and system of resource scheduling
CN104303578A (en) Method, Apparatus And System For Processing Data Transmission
CN111034073B (en) Infrastructure equipment, mobile terminal, computer software and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20210117

CF01 Termination of patent right due to non-payment of annual fee