CN102595626A - Semi-persistent scheduling (SPS) method, user equipment and network equipment - Google Patents

Semi-persistent scheduling (SPS) method, user equipment and network equipment Download PDF

Info

Publication number
CN102595626A
CN102595626A CN2011100098966A CN201110009896A CN102595626A CN 102595626 A CN102595626 A CN 102595626A CN 2011100098966 A CN2011100098966 A CN 2011100098966A CN 201110009896 A CN201110009896 A CN 201110009896A CN 102595626 A CN102595626 A CN 102595626A
Authority
CN
China
Prior art keywords
subscriber equipment
sps
control signaling
successfully
feedback resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100098966A
Other languages
Chinese (zh)
Other versions
CN102595626B (en
Inventor
权威
姜怡
张戬
陈小锋
黄曲芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201110009896.6A priority Critical patent/CN102595626B/en
Priority to PCT/CN2012/070477 priority patent/WO2012097724A1/en
Publication of CN102595626A publication Critical patent/CN102595626A/en
Application granted granted Critical
Publication of CN102595626B publication Critical patent/CN102595626B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a semi-persistent scheduling (SPS) method, user equipment and network equipment. The method comprises the following steps that: first user equipment acquires the scheduling identification of an SPS group, wherein the user equipment in the same group shares the same scheduling identification of the SPS group; the first user equipment receives a control signaling which is masked on a physical downlink control channel (PDCCH); the control signaling is demasked according to the scheduling identification of the SPS group, and the demasked control signaling containing an SPS command is obtained; the SPS command is used for carrying out SPS scheduling to the user equipment in the group of the first user equipment; the first user equipment receives a medium access control protocol data unit (MAC PDU) on a physical downlink shared channel (PDSCH) according to the demasked control signaling which contains the SPS command; and the MAC PDU comprises a data packet of at least one piece of user equipment in the group of the first user equipment. According to the embodiment of the invention, the PDCCH resources can be saved, and the capacity and the resource utilization rate of a system can be improved.

Description

Semi-persistent scheduling method, subscriber equipment and the network equipment
Technical field
The present invention relates to mobile communication technology, relate in particular to a kind of semi-persistent scheduling method, subscriber equipment and the network equipment.
Background technology
At Long Term Evolution (Long Term Evolution; LTE) in the system, (eNodeB eNB) uses Physical Downlink Control Channel (Physical Downlink Control Channel in the base station; PDCCH) transmission is used for scheduling user's set (User Equipment, control signaling UE).When dispatching the data of the UE that is in connected state; This control signaling adopts Cell Radio Network Temporary Identifier/Identity, Cell-RNTI (the CellRadio Network Temporary Identity of UE; C-RNTI) add and cover; UE is after listening to the control signaling of transmitting on the PDCCH; The control signaling that can go up transmission to PDCCH with the C-RNTI of self is separated and is covered, separate control signaling after covering be included as physical channel resources that UE distributes and the concrete modulation coding mode that uses (Modulation and Coding Scheme, MCS) etc.UE is according to the relevant information of carrying in this control signaling, and according to wherein the transmitting-receiving that is indicated to the enterprising line data of corresponding physical channel.
The control signaling of the last transmission of PDCCH also is carried on the certain physical resource itself to be transmitted.Sub-district with a 5MHz bandwidth is an example, and Transmission Time Interval (TransmissionTime Interval, the control signaling that can carry in TTI) has only tens usually, and this has comprised the uplink and downlink dispatch simultaneously.Therefore, on average arrive upstream or downstream, then can only dispatch several in TTI simultaneously to tens users.In addition, under some scenes, for example in the heterogeneous network, in order to reduce the interference of minizone, possibly only on some subframe, send control signaling, at this moment, the quantity of the control signaling of the last transmission of PDCCH will be still less.Because PDCCH goes up the limited amount of the control signaling of transmission, the number of users that then can dispatch is also limited, then causes the limited of power system capacity.
(Semi-Persistent Scheduling, the scheduling that SPS) is meant resource is pre-configured, periodic to semi-persistent scheduling.ENB can (Radio Resource Control, RRC) message be to Physical Uplink Control Channel (PhysicalUplink Control Channel, the PUCCH) feedback resources of UE configuration SPS cycle and employing through Radio Resource control.For descending SPS; The control signaling that eNB can adopt PDCCH to go up transmission activates SPS; In follow-up data transmission procedure; UE is according to SPS cycle downlink data receiving on time corresponding point of RRC message arrangement, and on the PUCCH feedback resources of configuration, feeds back, and all adopts PDCCH to dispatch when not needing to dispatch UE at every turn.When needs were revised or discharged the SPS resource, the control transmitting signaling downwards SPS that eNB can adopt PDCCH to go up transmission revised or release command.
In the semi-persistent scheduling business, (Voice over IP VoIP) in the business, possibly need use PDCCH to go up the control signaling of transmitting and revise the SPS resource along with the change of wireless channel conditions continually, has caused the waste of PDCCH resource like the networking telephone.
Summary of the invention
The embodiment of the invention provides a kind of semi-persistent scheduling method, subscriber equipment and the network equipment, to save the PDCCH resource, to improve power system capacity and resource utilization.
The embodiment of the invention provides a kind of semi-persistent scheduling method, comprising:
First subscriber equipment obtains semi-persistent scheduling SPS group scheduling sign, and wherein, the subscriber equipment in the same grouping is shared a SPS group scheduling sign;
Said first subscriber equipment receives on the physical downlink control channel PDCCH and adds the control signaling of covering; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling after covering of separating of SPS order; Wherein, said SPS order is used for the subscriber equipment in the place grouping of said first subscriber equipment is carried out the SPS scheduling;
Said first subscriber equipment is according to the control signaling after covering of separating of the said SPS of comprising order; Receive the media access control MAC protocol data cell PDU on the Physical Downlink Shared Channel PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
The embodiment of the invention provides a kind of semi-persistent scheduling method, comprising:
The network equipment sends employing SPS group scheduling sign to first subscriber equipment and adds the control signaling of covering on PDCCH; Said control signaling comprises the SPS order; Wherein, Subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling;
The said network equipment sends MAC PDU to subscriber equipment on PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
The embodiment of the invention provides a kind of subscriber equipment, comprising:
Acquisition module is used to obtain semi-persistent scheduling SPS group scheduling sign, and wherein, other subscriber equipment in said subscriber equipment and the same grouping is shared a SPS group scheduling sign;
Separate mask; Be used to receive and add the control signaling of covering on the physical downlink control channel PDCCH; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling subscriber equipment after covering of separating of SPS order, wherein, said SPS order is used for the subscriber equipment in the place grouping of said subscriber equipment is carried out the SPS scheduling;
Receiver module; Be used for the control signaling after covering of separating according to the said SPS of comprising order; Receive the media access control MAC protocol data cell PDU on the Physical Downlink Shared Channel PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said subscriber equipment.
The embodiment of the invention provides a kind of network equipment, comprising:
Signaling sending module; Be used on PDCCH, sending employing SPS group scheduling sign and add the control signaling of covering to first subscriber equipment; Said control signaling comprises the SPS order; Wherein, the subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling;
Data transmission blocks is used on PDSCH, sending MAC PDU to subscriber equipment, and said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
Can know by technique scheme; The embodiment of the invention goes up the UE of the same grouping of SPS control signaling scheduling of transmission through using PDCCH; Making a plurality of UE to be carried out SPS by the control signaling of same PDCCH activates, revises or discharge; Avoid frequent use control signaling to carry out the activation of SPS, revise or discharge, saved the PDCCH resource; Through in MAC PDU, comprising a plurality of packets of the UE that belongs to same grouping, simultaneously the SPS resource of a plurality of UE is operated, improved power system capacity and resource utilization.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention; The accompanying drawing of required use is done an introduction simply in will describing embodiment below; Obviously, the accompanying drawing in describing below is some embodiments of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work property, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the method flow sketch map of one embodiment of the invention;
Fig. 2 is the method flow sketch map of another embodiment of the present invention;
Fig. 3 is the method flow sketch map of another embodiment of the present invention;
Fig. 4 is the method flow sketch map of another embodiment of the present invention;
The structural representation of the subscriber equipment that Fig. 5 provides for another embodiment of the present invention;
The structural representation of the network equipment that Fig. 6 provides for another embodiment of the present invention.
Embodiment
For the purpose, technical scheme and the advantage that make the embodiment of the invention clearer; To combine the accompanying drawing in the embodiment of the invention below; Technical scheme in the embodiment of the invention is carried out clear, intactly description; Obviously, described embodiment is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the present invention's protection.
Fig. 1 is the method flow sketch map of one embodiment of the invention, comprising:
Step 11: a UE obtains SPS group scheduling sign, and wherein, the UE in the same grouping shares a SPS group scheduling sign.
Wherein, a UE can adopt following mode to obtain SPS group scheduling sign:
(carrying the network equipment in the said RRC message is the said SPS group scheduling sign of said first user equipment allocation for Radio ResouceControl, RRC) message in the Radio Resource control that said first subscriber equipment reception network equipment sends; Perhaps; The said first subscriber equipment paging receiving message; Carry the corresponding group id of beep-page message in the said beep-page message; The group id that said beep-page message is corresponding identifies as said SPS group scheduling, and (Paging-Radio Network Temporary Identity P-RNTI) identifies as the SPS group scheduling to be about to the corresponding pager wireless net network temporary mark of beep-page message; Perhaps, said first subscriber equipment obtains said SPS group scheduling sign according to self pre-configured information.
Step 12: a said UE receives on the PDCCH and adds the control signaling of covering; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling after covering of separating of SPS order, said SPS order is used for the UE in the said UE place grouping is carried out the SPS scheduling.
Step 13: a said UE is according to the control signaling after covering of separating of the said SPS of comprising order; Receive medium access control (the Media Access Control on the PDSCH; MAC) protocol Data Unit (Protocol Data Unit; PDU), said MAC PDU comprises the packet of at least one UE in the said UE place grouping.
Further, after step 13, present embodiment can further include:
The one UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of SPS information, sends feedback information or do not feed back.
Wherein, a UE can adopt following mode to obtain SPS information:
Said first subscriber equipment receives the RRC message that the network equipment sends, and comprises said SPS information in the said RRC message, and said SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resources.
Concrete as; When said PUCCH feedback resources is the PUCCH feedback resources for the special use of said UE configuration; And said SPS order activates or revises when ordering for SPS; A said UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of SPS information, sends feedback information or do not feed back, and comprising:
If successfully separating, a said UE covers said control signaling, and the said MAC PDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps, cover said control signaling, but the said MAC PDU that successfully do not decode then according to the said SPS cycle, feeds back nack message on said PUCCH feedback resources if a said UE successfully separates; Perhaps, do not cover said control signaling, then do not feed back if a said UE successfully separates.
When said PUCCH feedback resources is the PUCCH feedback resources of sharing for said UE configuration; And when said SPS order activates or revises for SPS; A said UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU; On the indicated feedback resources of SPS information, send feedback information or do not feed back the SPS order, comprising:
Cover said control signaling if a said UE successfully separates, and self corresponding packet is arranged behind the said MAC PDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps,, a said UE do not cover said control signaling if successfully separating, or; If successfully separating, a said UE covers said control signaling, but the said MAC PDU that successfully do not decode, or; If successfully separating, a said UE covers said control signaling; And the said MAC PDU that successfully decodes, but the corresponding packet of a no said UE among the successful decoded M AC PDU does not then feed back.
When said PUCCH feedback resources is the PUCCH feedback resources for the special use of said UE configuration; And when said SPS order is the SPS release command; A said UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU; On the indicated feedback resources of SPS information, send feedback information or do not feed back, comprising:
If successfully separating, said first subscriber equipment covers said control signaling, then according to the said SPS cycle, and feeding back ACK information on said PUCCH feedback resources; Perhaps, do not cover said control signaling, then do not feed back if a said UE successfully separates.
Further, present embodiment can also comprise:
A said UE receives network equipment data packets for transmission; To be the said network equipment send at said first subscriber equipment of scheduling and after receiving the feedback information that said first subscriber equipment sends said data packets for transmission, and said feedback information comprises said ACK information or said nack message;
Perhaps,
A said UE receives the control signaling of covering that adds that the network equipment retransmits on PDCCH, said re-transmission to add the control signaling of covering be the said network equipment after not receiving the said feedback information that said first subscriber equipment sends, sends.
Present embodiment is gone up the UE of the same grouping of SPS control signaling scheduling of transmission through using PDCCH; Making a plurality of UE to be carried out SPS by the control signaling of same PDCCH activates, revises or discharge; Avoid frequent use control signaling to carry out the activation of SPS, revise or discharge, saved the PDCCH resource; Through in MAC PDU, comprising a plurality of packets of the UE that belongs to same grouping, simultaneously the SPS resource of a plurality of UE is operated, improved power system capacity and resource utilization.
Fig. 2 is the method flow sketch map of another embodiment of the present invention, comprising:
Step 21: the network equipment sends employing SPS group scheduling sign to a UE and adds the control signaling of covering on PDCCH; Said control signaling comprises the SPS order; Wherein, Subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling;
This network equipment includes but not limited to: eNB, eNodeB.
Step 22: the said network equipment sends MAC PDU to subscriber equipment on PDSCH, and said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
Before step 21, present embodiment can also comprise:
The said network equipment sends RRC message to said first subscriber equipment; Carrying the network equipment in the said RRC message is the SPS group scheduling sign of said first user equipment allocation, covers said control signaling so that said first subscriber equipment is separated according to said SPS group scheduling sign; Perhaps, the said network equipment sends beep-page message to said first subscriber equipment, carries the corresponding group id of beep-page message in the said beep-page message, covers said control signaling so that said first subscriber equipment is separated according to said group id.
Further, present embodiment can also comprise:
The said network equipment is known the reception condition of a said UE according to the feedback of said first subscriber equipment, and the feedback of a said UE comprises: feedback information or do not feed back on the indicated feedback resources of SPS information.
Wherein, The said network equipment is known before the reception condition of said first subscriber equipment according to the feedback of said first subscriber equipment; Said method can also comprise: the said network equipment sends RRC message to said first subscriber equipment; Comprise said SPS information in the said RRC message, said SPS information comprises: SPS cycle, PUCCH feedback resources.
When said PUCCH feedback resources is the special-purpose PUCCH feedback resources of subscriber equipment; And said SPS order activates or revises when ordering for SPS; Said feedback according to said first subscriber equipment is known the reception condition subscriber equipment of said first subscriber equipment; Comprise: if according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, and the said MAC PDU that successfully decodes; Perhaps,, on said PUCCH feedback resources, receive the nack message of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling if according to the said SPS cycle, but the said MAC PDU that successfully do not decode; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order activates or revises for SPS; Said feedback according to said first subscriber equipment is known the reception condition subscriber equipment of said first subscriber equipment; Comprise: if according to the said SPS cycle, on said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling; And behind the said MAC PDU that successfully decodes, the corresponding packet of said first subscriber equipment is arranged among the said MAC PDU of said decoding; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling; Or said first subscriber equipment is successfully separated and is covered said control signaling, but the said MAC PDU that successfully do not decode; Or; Said first subscriber equipment is successfully separated and is covered said control signaling, and the said MAC PDU that successfully decodes, but the corresponding packet of no said first subscriber equipment among the successful decoded M AC PDU.
When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order is the SPS release command; Said feedback according to said first subscriber equipment is known the reception condition subscriber equipment of said first subscriber equipment; Comprise: if according to the said SPS cycle, on said PUCCH feedback resources, receive the ACK information of first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling; Perhaps, if do not receive the feedback information of first subscriber equipment, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
Present embodiment can also comprise: if the said network equipment receives the feedback information that said first subscriber equipment sends, then according to the packet of said first subscriber equipment of SPS resource transmission, said feedback information comprises said ACK information or nack message; Perhaps, if the said network equipment does not receive the said first subscriber equipment feedack, then on PDCCH, resend and add the control signaling of covering to said first subscriber equipment.
Fig. 3 is the method flow sketch map of another embodiment of the present invention, and present embodiment is that the feedback resources of the base station configuration special use of giving UE is an example with the PUCCH feedback resources.Referring to Fig. 3, present embodiment comprises:
Step 31:eNB issues RRC message to UE, is included as the SPS information of UE configuration in this RRC message.
Wherein, this SPS information comprises: SPS cycle and PUCCH feedback resources.In the present embodiment, be the PUCCH feedback resources of this UE configure dedicated, that is, each UE has the PUCCH feedback resources of oneself in the group.Whether UE identification is that the method that oneself has disposed special-purpose PUCCH feedback resources includes but not limited to following several kinds: whether eNB is that UE is special-purpose at this PUCCH feedback resources of RRC message indication; Or increase new parameter of distributing (promptly sharing in the group) PUCCH feedback resources of non-special use; If the PUCCH resource of using existing parameter to distribute; Then be the private resource of UE, if the PUCCH resource of distributing through new parameter then is not the private resource of UE; Or the PUCCH quantity of in RRC message, indicating as eNB is when being 1, and UE thinks that said PUCCH feedback resources is that UE is special-purpose, when quantity greater than 1 the time, think not to be special-purpose.
In addition; Can be UE configuration SPS group scheduling sign (like Group-SPS-RNTI) through RRC message also, perhaps, SPS group scheduling sign also can be the corresponding group id of beep-page message; Owing to carry group id in the beep-page message, therefore can directly this group id be identified as the SPS group scheduling; Also can be the mode that adopts static configuration, be pre-configured in the UE side.UE can adopt SPS group scheduling sign to separate the control signaling of covering out correspondence self, so that carry out Data Receiving according to separating the control signaling of covering.
Step 32:eNB sends on PDCCH through adding the control signaling of covering, and comprises the SPS order in this control signaling, and wherein, this SPS order is used for the UE in the said UE place grouping is carried out the SPS scheduling.In addition; ENB is at Physical Downlink Shared Channel (Physical Downlink Shared Channel; PDSCH) go up transmission MAC PDU, comprise the packet of at least one UE that divides into groups at this UE place among this MAC PDU, this packet can be one or more MAC service data units (MACService Data Unit; SDU) and/or one or more MAC Control Element (MAC ControlElements, CE).
Wherein, the SPS order comprises: SPS activation/modification order and SPS release command.The one or more territories that can adopt existing PDCCH to go up in the control signaling of transmitting show that this SPS order is SPS activation/modification order, or the SPS release command.For example, work as NDI=0, NDI=1 is worked as in expression SPS activation/modification order, expression SPS release command.
In the embodiment of the invention, can realize the SPS scheduling based on group, the number of the UE that promptly need dispatch is during more than one, can activate simultaneously/revise through the control signaling of PDCCH transmission or discharge the interior UE of this group.
Step 33:UE monitors PDCCH, adopts SPS group scheduling sign to separate and covers the control signaling of on PDCCH, transmitting, and wherein, the UE in the same grouping shares a SPS group scheduling sign.Wherein, the SPS group scheduling of UE side sign can be that eNB adopts the RRC message arrangement to give UE, also can be the corresponding group id of beep-page message, also can be pre-configured among the UE.
Step 34:UE receives the MAC PDU on the PDSCH according to said control signaling of separating after covering, and said MAC PDU comprises the packet of at least one UE in the said UE place grouping.
Wherein, separate and comprise UE corresponding physical channel resource in the control signaling after covering, go up and receive data so that UE can arrive the PDSCH of correspondence.
Particularly, the UE that has disposed SPS information can carry out corresponding SPS and receive operation after getting access to the SPS order.For example; If the SPS order is activation/modification order; Then UE is after receiving SPS activation/modification order; Then the time point of indication begins from the time point that receives SPS activation/modification order or SPS activations/modifications order, with SPS cycle of above-mentioned configuration be the cycle, order the mode of indicating (like employed modulation coding mode with SPS on the periodic PDSCH resource of attempting indication in the SPS order; The size of institute's data block transmitted etc.) carry out Data Receiving, and use the PUCCH resource of above-mentioned configuration to feed back according to the Data Receiving situation.If the SPS order is the SPS release command, then UE is follow-up no longer receives.
Step 35:UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of the SPS information of obtaining in advance, sends feedback information or do not feed back.
For example; When the SPS order is ordered for SPS activation/modification; If successfully separating, UE covers the control signaling that PDCCH goes up transmission; And the MAC PDU of the PDSCH that successfully decodes transmission, no matter whether the packet of oneself is arranged among the then successful decoded M AC PDU, then the PUCCH through above-mentioned configuration is to eNB feeding back ACK information; If successfully separating, UE covers the control signaling that PDCCH carries, but the MAC PDU that the PDSCH that successfully do not decode carries, then the PUCCH through above-mentioned configuration feeds back nack message to eNB; Do not cover the control signaling that PDCCH carries if UE successfully separates, then do not feed back.
Again for example, if SPS order during for the SPS release command, is then fed back according to the reception condition of control signaling, for example, when UE successfully receives this control signaling, promptly UE successfully separates and covers out the control signaling, feeding back ACK information then, otherwise, do not feed back.
Step 36:eNB carries out handled according to the feedback of UE.
For example, if dispatched the data of said UE: receive ACK then think that control signaling and data are all successfully received by UE; If receive NACK, think that then UE receives only PDCCH and do not solve PDSCH; If do not receive whatever, think that then UE does not receive PDCCH.After receiving ACK or NACK, think that UE receives PDCCH, follow-up data that can this UE of use group SPS resource transmission; If do not receive whatever, think that then UE does not receive PDCCH, the data of this UE of SPS transmitted over resources of the follow-up SPS order notice that can not on this PDCCH, transmit.Optional, in order to improve reliability, when certain or some UE did not feed back, the SPS activation command that eNB can resend on the PDCCH activated, and for the UE that receives this SPS activation command, can this SPS activation command be understood as SPS and revise order.
Wherein, after SPS successfully activated or revises, UE had the data of oneself in the follow-up MAC PDU that successfully receives in the PDSCH transmitted over resources that this SPS activation/modification order is indicated and this MAC PDU; At preset PUCCH resource feeding back ACK; If successfully receive MAC PDU but do not have oneself data, can not feed back or feed back NACK or feeding back ACK, if UE does not successfully receive MAC PDU; Then can not feed back, or feedback NACK; Simultaneously; If UE does not successfully solve MAC PDU; Can monitor the control signaling that possible SPS group scheduling sign adds the scheduling re-transmission of covering; Carry out SPS and retransmit, and on pre-configured PUCCH resource or at relative position, carry out respective feedback according to the shared CCE (Control Channel Element, control channel unit) of control signaling.Accordingly, in the eNB side, if eNB does not dispatch the data of said UE, then eNB can ignore the feedback of this UE.
Wherein, When eNB has dispatched the data of certain UE and received the NACK of UE feedback, then can dispatch re-transmission, when eNB retransmits the data of certain or some UE; The data that can continue to use the mode of group scheduling to dispatch UE perhaps notify the mode of specific schedule to retransmit the data of UE.
If UE has withdrawed from this group, or the corresponding SPS business of UE is released, and then this UE does not need the SPS of monitoring group again scheduling, can be that eNB passes through the signaling explicit notification and gives UE, also can be that UE judges according to configuration.
Being noted that of value, because different UEs is professional different, the SPS cycle is also different, but is satisfying under the certain condition, group SPS scheduling can realize the SPS group scheduling of a plurality of UE in different SPS cycles.Such as; Some UE is the SPS cycle of 20ms; Some UE is the SPS cycle of 40ms; During use group SPS scheduling, use the UE in the SPS cycle of 20ms only need carry out Data Receiving, and use the UE in the SPS cycle of 40ms only need carry out Data Receiving in the moment of activationary time point+40ms integral multiple in the moment of activationary time point+20ms integral multiple.
Generally, same UE group SPS scheduling and special-purpose SPS scheduling (add cover with SPS-RNTI) can not activate simultaneously.But the priority ratio group SPS optimizing scheduling level of special-purpose SPS dispatch is high, that is:
When UE is using special-purpose SPS scheduling to carry out Data Receiving, the signaling and the data of no longer monitoring group of UE SPS scheduling;
When UE use group SPS dispatches, can use special-purpose SPS release command to make amendment or discharge; When for modification, eNB and UE are according to special-purpose SPS order carrying out SPS transmission, and follow-up identical with prior art, UE is the signaling and the data of no longer monitoring group SPS scheduling also; When for release, use group SPS ordered pairing data before UE also no longer received, only if UE listens to group SPS activation command once more.
Owing to use the professional common data volume of SPS scheduling mode fewer, so need to use the UE of SPS scheduling to form one group, use group scheduling with a plurality of, can on the basis of minimizing PDCCH expense, further improve the resource utilization of PDSCH.
Fig. 4 is the method flow sketch map of another embodiment of the present invention, and present embodiment is that to give the feedback resources of sharing of UE be example to base station configuration with the PUCCH feedback resources.Referring to Fig. 4, present embodiment comprises:
Step 41:eNB issues RRC message to UE, is included as the SPS information of UE configuration in this RRC message.
Different with step 31 is that the PUCCH feedback resources that disposes in the present embodiment is that the UE in said group shares.
Step 42:eNB sends on PDCCH through adding the control signaling of covering, and comprises the SPS order in this control signaling, and wherein, this SPS order is used for the UE in the said UE place grouping is carried out the SPS scheduling.In addition, eNB sends MAC PDU on PDSCH, comprises the packet of at least one UE that divides into groups at this UE place among this MAC PDU, and this packet can be one or more MAC SDU and/or one or more MAC CE.
Step 43:UE monitors PDCCH, adopts SPS group scheduling sign to separate and covers the control signaling of on PDCCH, transmitting, and wherein, the UE in the same grouping shares a SPS group scheduling sign.
Step 44:UE receives the MAC PDU on the PDSCH according to said control signaling of separating after covering, and said MAC PDU comprises the packet of at least one UE in the said UE place grouping.
The particular content of step 42-44 can be referring to step 32-34.
Step 45:UE is according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of the SPS information of obtaining in advance, sends feedback information or do not feed back.
For example; When the SPS order is ordered for SPS activation/modification; If successfully separating, UE covers the control signaling that PDCCH goes up transmission, and the MAC PDU of the PDSCH transmission of successfully decoding, and; The packet that oneself is arranged among the success decoded M AC PDU, then the PUCCH feedback resources through above-mentioned configuration is to eNB feeding back ACK information; If successfully separating, UE covers the control signaling that PDCCH goes up transmission, and the upward MAC PDU of transmission of PDSCH that successfully decodes, still; Do not have the packet of oneself among the success decoded M AC PDU, perhaps, cover the control signaling that PDCCH carries if UE successfully separates; But the MAC PDU that the PDSCH that successfully do not decode carries; Perhaps, do not cover the control signaling that PDCCH carries, then do not feed back if UE successfully separates.
Because PUCCH shares, adopt special-purpose SPS release command to discharge the resource of UE usually.
In the present embodiment; UE has the data of oneself in the follow-up MAC PDU that successfully receives in the PDSCH transmitted over resources that this SPS activation/modification order is indicated and this MAC PDU; At corresponding PUCCH resource feeding back ACK, if successfully receive MAC PDU but do not have oneself data, perhaps through calculating; If UE does not successfully receive MAC PDU, then do not feed back; Simultaneously; If UE does not successfully solve MAC PDU; Can monitor possible group SPS and retransmit, and on pre-configured PUCCH resource or at relative position, carry out respective feedback according to the shared CCE (Control Channel Element, control channel unit) of control signaling.
Such as, above pre-configured 10 PUCCH resources, the UE data of current scheduling are 2, then first UE uses first PUCCH resource, second UE uses second PUCCH resource.
Step 46:eNB carries out handled according to the feedback of UE.
For example, if the data that eNB has sent the control signaling and dispatched certain UE: receive ACK then think that control signaling and data are all successfully received by UE; Otherwise, think that UE does not receive PDCCH, the follow-up data that can not should order this UE of SPS transmitted over resources of notice again.In order to improve reliability, when certain or some UE did not feed back, eNB can resend the PDCCH order and activate, and for the UE that receives this order, can this order be understood as and revise order.
Again for example; If sent the control signaling and successfully received this control signaling before according to top judgement UE for UE; Current transmitted over resources data of just indicating in said control signaling; Then eNB does as judging: if eNB has dispatched the data of certain UE, receive that ACK thinks that then data are all successfully received by UE; If do not receive feedback, think that then data are not successfully received by UE, need scheduling to retransmit; If eNB does not dispatch the data of certain UE, then eNB can ignore the feedback of this UE.
When eNB retransmitted the data of certain or some UE, the data that can continue to use the mode of group scheduling to dispatch UE perhaps notified the mode of specific schedule to retransmit the data of UE.
In the present embodiment, UE receives at the PDSCH on this SPS resource and after the data of oneself are arranged follow-up, feeds back in the PUCCH resource through the correspondence that calculates; Simultaneously, UE can monitor possible group SPS and retransmit, and carries out respective feedback.
If UE has withdrawed from this group, or the corresponding SPS business of UE is released, and then this UE does not need the SPS of monitoring group again scheduling, can pass through the signaling explicit notification, can judge according to configuration yet.
Being noted that of value, because different UEs is professional different, the SPS cycle is also different, but is satisfying under the certain condition, group SPS scheduling can realize the SPS group scheduling of a plurality of UE in different SPS cycles.Such as; Some UE is the SPS cycle of 20ms; Some UE is the SPS cycle of 40ms; During use group SPS scheduling, use the UE in the SPS cycle of 20ms only need carry out Data Receiving, and use the UE in the SPS cycle of 40ms only need carry out Data Receiving in the moment of activationary time point+40ms integral multiple in the moment of activationary time point+20ms integral multiple.
Generally, same UE group SPS scheduling and special-purpose SPS scheduling (add cover with SPS-RNTI) can not activate simultaneously.But the priority ratio group SPS optimizing scheduling level of special-purpose SPS dispatch is high, that is:
When UE is using special-purpose SPS scheduling to carry out Data Receiving, the signaling and the data of no longer monitoring group of UE SPS scheduling;
When UE use group SPS dispatches, can use special-purpose SPS release command to make amendment/discharge; After the modification, eNB and UE are according to special-purpose SPS order carrying out SPS transmission, and follow-up identical with prior art, UE is the signaling and the data of no longer monitoring group SPS scheduling also; After the release, use group SPS ordered pairing data before UE also no longer received, only if UE listens to group SPS activation command once more.
Owing to use the professional common data volume of SPS scheduling mode fewer, so need to use the UE of SPS scheduling to form one group, use group scheduling with a plurality of, can on the basis of minimizing PDCCH expense, further improve the resource utilization of PDSCH.
The structural representation of the subscriber equipment that corresponding said method embodiment, Fig. 5 provide for another embodiment of the present invention is used for implementing the step of said method embodiment correspondence, comprises acquisition module 51, separates mask 52 and receiver module 53; Acquisition module 51 is used to obtain SPS group scheduling sign, and wherein, other subscriber equipment in said subscriber equipment and the same grouping is shared a SPS group scheduling sign; Separating mask 52 is used to receive and adds the control signaling of covering on the PDCCH; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling subscriber equipment after covering of separating of SPS order; Wherein, said SPS order is used for the subscriber equipment in the place grouping of said subscriber equipment is carried out the SPS scheduling; Receiver module 53 is used for the control signaling after covering of separating according to the said SPS of comprising order; Receive the media access control MAC protocol data cell PDU on the Physical Downlink Shared Channel PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said subscriber equipment.
This enforcement can also comprise feedback module, and feedback module is used for according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of SPS information, sends feedback information or does not feed back.
Wherein, When said PUCCH feedback resources is the special-purpose PUCCH feedback resources of said subscriber equipment; And said SPS order activates or revises when ordering for SPS, successfully separate and cover said control signaling if this feedback module can specifically be used for said subscriber equipment, and the said MAC PDU that successfully decodes; Then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps, cover said control signaling, but the said MAC PDU that successfully do not decode then according to the said SPS cycle, feeds back nack message on said PUCCH feedback resources if said subscriber equipment is successfully separated; Perhaps, do not cover said control signaling, then do not feed back if said subscriber equipment is successfully separated;
When said PUCCH feedback resources is the PUCCH feedback resources of sharing for said user device configuration; And when said SPS order activates or revises for SPS; Said feedback module specifically is used for: cover said control signaling if said subscriber equipment is successfully separated; And self corresponding packet is arranged behind the said MAC PDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps,, said subscriber equipment do not cover said control signaling if successfully separating, or; If successfully separating, said subscriber equipment covers said control signaling, but the said MAC PDU that successfully do not decode, or; If successfully separating, said subscriber equipment covers said control signaling; And the said MAC PDU that successfully decodes, but the corresponding packet of no said subscriber equipment among the successful decoded M AC PDU does not then feed back.
When said PUCCH feedback resources is the PUCCH feedback resources for the special use of said user device configuration; And when said SPS order is the SPS release command; Said feedback module specifically is used for: cover said control signaling if said subscriber equipment is successfully separated; Then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps, do not cover said control signaling, then do not feed back if said subscriber equipment is successfully separated.
Optional, said acquisition module 51 specifically is used to receive radio resource control RRC message, and carrying the network equipment in the said RRC message is the said SPS group scheduling sign of said user equipment allocation; Perhaps be used for paging receiving message, carry the corresponding group id of beep-page message in the said beep-page message, the group id that said beep-page message is corresponding identifies as said SPS group scheduling; Perhaps be used for according to pre-configured information, obtain said SPS group scheduling sign.
Optional, said acquisition module 51 specifically can also be used to receive the RRC message that the network equipment sends, and comprises said SPS information in the said RRC message, and said SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resources.
Optional; Said receiver module 53 specifically can also be used to receive network equipment data packets for transmission; To be the said network equipment send at the said subscriber equipment of scheduling and after receiving the feedback information that said subscriber equipment sends said data packets for transmission, and said feedback information comprises said ACK information or said nack message; Perhaps, be used to receive the control signaling of covering that adds that the network equipment retransmits on PDCCH, said re-transmission to add the control signaling of covering be the said network equipment after not receiving the said feedback information that said subscriber equipment sends, sends.
The structural representation of the network equipment that corresponding said method embodiment, Fig. 6 provide for another embodiment of the present invention is used for implementing the corresponding step of said method embodiment, comprises signaling sending module 61 and data transmission blocks 62; Signaling sending module 61 is used on PDCCH, sending employing SPS group scheduling sign to first subscriber equipment and adds the control signaling of covering; Said control signaling comprises the SPS order; Wherein, Subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling; Data transmission blocks 62 is used on PDSCH, sending MAC PDU to subscriber equipment, and said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
Present embodiment can also comprise receiver module; Be used for knowing according to the feedback of said first subscriber equipment reception condition of said first subscriber equipment, the feedback of said first subscriber equipment comprises: feedback information or do not feed back on the indicated feedback resources of SPS information.
Wherein, When said PUCCH feedback resources is the special-purpose PUCCH feedback resources of subscriber equipment; And said SPS order activates or revises for SPS when ordering, if this receiver module can specifically be used for according to said SPS the cycle, on said PUCCH feedback resources, receives the ACK information of said first subscriber equipment feedback; Knowing then that said first subscriber equipment is successfully separated covers said control signaling, and the said MAC PDU that successfully decodes; Perhaps,, on said PUCCH feedback resources, receive the nack message of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling if according to the said SPS cycle, but the said MAC PDU that successfully do not decode; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling; Perhaps,
When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order activates or revises for SPS; Said receiver module specifically is used for: if according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, and the corresponding packet of said first subscriber equipment is arranged behind the said MAC PDU that successfully decodes; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling; Or said first subscriber equipment is successfully separated and is covered said control signaling, but the said MAC PDU that successfully do not decode; Or; Said first subscriber equipment is successfully separated and is covered said control signaling, and the said MAC PDU that successfully decodes, but the corresponding packet of no said first subscriber equipment among the successful decoded M AC PDU;
Perhaps; When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order is the SPS release command; If said receiver module specifically is used for the cycle according to said SPS, on said PUCCH feedback resources, receive the ACK information of first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling; Perhaps, if do not receive the feedback information of first subscriber equipment, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
Optional; Said signaling sending module 61 specifically also is used for sending RRC message to said first subscriber equipment; Carrying the network equipment in the said RRC message is the SPS group scheduling sign of said first user equipment allocation, covers said control signaling so that said first subscriber equipment is separated according to said SPS group scheduling sign; Perhaps, be used for sending beep-page message, carry the corresponding group id of beep-page message in the said beep-page message, cover said control signaling so that said first subscriber equipment is separated according to said group id to said first subscriber equipment.
Optional, said signaling sending module 61 specifically also is used for sending RRC message to said first subscriber equipment, comprises said SPS information in the said RRC message, and said SPS information comprises: SPS cycle, PUCCH feedback resources.
Optional; If specifically also being used for the said network equipment, said data transmission blocks 62 receives the feedback information that said first subscriber equipment sends; Then according to the packet of said first subscriber equipment of SPS resource transmission, said feedback information comprises said ACK information or nack message;
Perhaps,
Optional, if specifically also being used for the said network equipment, said signaling sending module 61 do not receive the said first subscriber equipment feedack, then on PDCCH, resend and add the control signaling of covering to said first subscriber equipment.
It is understandable that the correlated characteristic reference each other among above-mentioned each embodiment.
One of ordinary skill in the art will appreciate that: all or part of step that realizes said method embodiment can be accomplished through the relevant hardware of program command; Aforesaid program can be stored in the computer read/write memory medium; This program the step that comprises said method embodiment when carrying out; And aforesaid storage medium comprises: various media that can be program code stored such as ROM, RAM, magnetic disc or CD.
What should explain at last is: above embodiment is only in order to explaining technical scheme of the present invention, but not to its restriction; Although with reference to previous embodiment the present invention has been carried out detailed explanation, those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make the spirit and the scope of the essence disengaging various embodiments of the present invention technical scheme of relevant art scheme.

Claims (22)

1. a semi-persistent scheduling method is characterized in that, comprising:
First subscriber equipment obtains semi-persistent scheduling SPS group scheduling sign, and wherein, the subscriber equipment in the same grouping is shared a SPS group scheduling sign;
Said first subscriber equipment receives on the physical downlink control channel PDCCH and adds the control signaling of covering; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling after covering of separating of SPS order; Wherein, said SPS order is used for the subscriber equipment in the place grouping of said first subscriber equipment is carried out the SPS scheduling;
Said first subscriber equipment is according to the control signaling after covering of separating of the said SPS of comprising order; Receive the media access control MAC protocol data cell PDU on the Physical Downlink Shared Channel PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
2. method according to claim 1; It is characterized in that; After the MAC PDU on the said reception PDSCH; Said method also comprises: said first subscriber equipment is according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of SPS information, sends feedback information or do not feed back.
3. method according to claim 1 and 2 is characterized in that, said first subscriber equipment obtains SPS group scheduling sign, comprising:
Said first subscriber equipment receives radio resource control RRC message, and carrying the network equipment in the said RRC message is the said SPS group scheduling sign of said first user equipment allocation;
Perhaps,
The said first subscriber equipment paging receiving message is carried the corresponding group id of beep-page message in the said beep-page message, the group id that said beep-page message is corresponding identifies as said SPS group scheduling;
Perhaps,
Said first subscriber equipment obtains said SPS group scheduling sign according to pre-configured information.
4. method according to claim 2 is characterized in that, said before sending feedback information on the indicated feedback resources of SPS information or not feeding back, said method also comprises:
Said first subscriber equipment receives the RRC message that the network equipment sends, and comprises said SPS information in the said RRC message, and said SPS information comprises: SPS cycle, Physical Uplink Control Channel PUCCH feedback resources.
5. method according to claim 4; It is characterized in that; When said PUCCH feedback resources is the PUCCH feedback resources for the special use of said first user device configuration, and said SPS order activates for SPS or when revising order, and said first subscriber equipment is ordered according to said SPS and to the reception condition of said control signaling and said MAC PDU; On the indicated feedback resources of SPS information, send feedback information or do not feed back, comprising:
If successfully separating, said first subscriber equipment covers said control signaling, and the said MACPDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources;
Perhaps,
Cover said control signaling if said first subscriber equipment is successfully separated, but the said MACPDU that successfully do not decode then according to the said SPS cycle, feeds back nack message on said PUCCH feedback resources;
Perhaps,
Do not cover said control signaling if said first subscriber equipment is successfully separated, then do not feed back.
6. method according to claim 4; It is characterized in that; When said PUCCH feedback resources is the PUCCH feedback resources of sharing for said first user device configuration, and said SPS order is when activating or revising for SPS, and said first subscriber equipment is ordered according to said SPS and to the reception condition of said control signaling and said MAC PDU; On the indicated feedback resources of SPS information, send feedback information or do not feed back the SPS order, comprising:
Cover said control signaling if said first subscriber equipment is successfully separated, and self corresponding packet is arranged behind the said MACPDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources;
Perhaps,
If successfully separating, said first subscriber equipment do not cover said control signaling, or, if successfully separating, said first subscriber equipment covers said control signaling; But said MAC PDU does not successfully decode; Or, if successfully separating, said first subscriber equipment covers said control signaling, and the said MAC PDU that successfully decodes; But the corresponding packet of no said first subscriber equipment does not then feed back among the successful decoded M AC PDU.
7. method according to claim 4; It is characterized in that; When said PUCCH feedback resources is the PUCCH feedback resources for the special use of said first user device configuration, and said SPS order is during for the SPS release command, and said first subscriber equipment is according to said SPS order and to the reception condition of said control signaling and said MAC PDU; On the indicated feedback resources of SPS information, send feedback information or do not feed back, comprising:
If successfully separating, said first subscriber equipment covers said control signaling, then according to the said SPS cycle, and feeding back ACK information on said PUCCH feedback resources;
Perhaps,
Do not cover said control signaling if said first subscriber equipment is successfully separated, then do not feed back.
8. according to each described method of claim 5-7, it is characterized in that, also comprise:
Said first subscriber equipment receives network equipment data packets for transmission; To be the said network equipment send at said first subscriber equipment of scheduling and after receiving the feedback information that said first subscriber equipment sends said data packets for transmission, and said feedback information comprises said ACK information or said nack message;
Perhaps,
Said first subscriber equipment receives the control signaling of covering that adds that the network equipment retransmits on PDCCH, said re-transmission to add the control signaling of covering be the said network equipment after not receiving the said feedback information that said first subscriber equipment sends, sends.
9. a semi-persistent scheduling method is characterized in that, comprising:
The network equipment sends employing SPS group scheduling sign to first subscriber equipment and adds the control signaling of covering on PDCCH; Said control signaling comprises the SPS order; Wherein, Subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling;
The said network equipment sends MAC PDU to subscriber equipment on PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
10. method according to claim 9 is characterized in that, also comprises:
The said network equipment is known the reception condition of said first subscriber equipment according to the feedback of said first subscriber equipment, and the feedback of said first subscriber equipment comprises: feedback information or do not feed back on the indicated feedback resources of SPS information.
11., it is characterized in that the said network equipment send to adopt before SPS group scheduling sign adds the control signaling of covering to first subscriber equipment on the PDCCH according to claim 9 or 10 described methods, said method also comprises:
The said network equipment sends RRC message to said first subscriber equipment; Carrying the network equipment in the said RRC message is the SPS group scheduling sign of said first user equipment allocation, covers said control signaling so that said first subscriber equipment is separated according to said SPS group scheduling sign;
Perhaps,
The said network equipment sends beep-page message to said first subscriber equipment, carries the corresponding group id of beep-page message in the said beep-page message, covers said control signaling so that said first subscriber equipment is separated according to said group id.
12. method according to claim 10 is characterized in that, the said network equipment knows that according to the feedback of said first subscriber equipment said method also comprises before the reception condition of said first subscriber equipment:
The said network equipment sends RRC message to said first subscriber equipment, comprises said SPS information in the said RRC message, and said SPS information comprises: SPS cycle, PUCCH feedback resources.
13. method according to claim 12; It is characterized in that; When said PUCCH feedback resources is the special-purpose PUCCH feedback resources of subscriber equipment; And said SPS order activates or revises when ordering for SPS, and said feedback according to said first subscriber equipment is known the reception condition of said first subscriber equipment, comprising:
If according to the said SPS cycle, on said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, and the said MAC PDU that successfully decodes;
Perhaps,
If according to the said SPS cycle, on said PUCCH feedback resources, receive the nack message of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, but the said MAC PDU that successfully do not decode;
Perhaps,
If do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
14. method according to claim 12; It is characterized in that; When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order activated or revises for SPS, said feedback according to said first subscriber equipment was known the reception condition subscriber equipment of said first subscriber equipment, comprising:
If according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback; Knowing then that said first subscriber equipment is successfully separated covers said control signaling; And behind the said MAC PDU that successfully decodes, the corresponding packet of said first subscriber equipment is arranged among the said MAC PDU of said decoding;
Perhaps,
If do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling, or; Said first subscriber equipment is successfully separated and is covered said control signaling; But the said MAC PDU that successfully do not decode, or said first subscriber equipment is successfully separated and is covered said control signaling; And the said MAC PDU that successfully decodes, but the corresponding packet of no said first subscriber equipment among the successful decoded M AC PDU.
15. method according to claim 12; It is characterized in that; When said PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order was the SPS release command, said feedback according to said first subscriber equipment was known the reception condition subscriber equipment of said first subscriber equipment, comprising:
If according to the said SPS cycle, on said PUCCH feedback resources, receive the ACK information of first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling;
Perhaps,
If do not receive the feedback information of first subscriber equipment, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
16. according to each described method of claim 13-15, it is characterized in that, also comprise:
If the said network equipment receives the feedback information that said first subscriber equipment sends, then according to the packet of said first subscriber equipment of SPS resource transmission, said feedback information comprises said ACK information or nack message;
Perhaps,
If the said network equipment does not receive the said first subscriber equipment feedack, then on PDCCH, resend and add the control signaling of covering to said first subscriber equipment.
17. a subscriber equipment is characterized in that, comprising:
Acquisition module is used to obtain semi-persistent scheduling SPS group scheduling sign, and wherein, other subscriber equipment in said subscriber equipment and the same grouping is shared a SPS group scheduling sign;
Separate mask; Be used to receive and add the control signaling of covering on the physical downlink control channel PDCCH; Separate according to said SPS group scheduling sign and to cover said control signaling; Obtain comprising the control signaling subscriber equipment after covering of separating of SPS order, wherein, said SPS order is used for the subscriber equipment in the place grouping of said subscriber equipment is carried out the SPS scheduling;
Receiver module; Be used for the control signaling after covering of separating according to the said SPS of comprising order; Receive the media access control MAC protocol data cell PDU on the Physical Downlink Shared Channel PDSCH, said MAC PDU comprises the packet of at least one subscriber equipment in the place grouping of said subscriber equipment.
18. subscriber equipment according to claim 17 is characterized in that, also comprises:
Feedback module is used for according to said SPS order and to the reception condition of said control signaling and said MAC PDU, on the indicated feedback resources of SPS information, sends feedback information or does not feed back.
19. subscriber equipment according to claim 18 is characterized in that,
When the PUCCH feedback resources is the special-purpose PUCCH feedback resources of said subscriber equipment; And said SPS order activates or revises when ordering for SPS; Said feedback module specifically is used for: cover said control signaling if said subscriber equipment is successfully separated; And the said MAC PDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps, cover said control signaling, but the said MAC PDU that successfully do not decode then according to the said SPS cycle, feeds back nack message on said PUCCH feedback resources if said subscriber equipment is successfully separated; Perhaps, do not cover said control signaling, then do not feed back if said subscriber equipment is successfully separated;
When the PUCCH feedback resources is the PUCCH feedback resources of sharing for said user device configuration; And when said SPS order activates or revises for SPS; Said feedback module specifically is used for: cover said control signaling if said subscriber equipment is successfully separated; And self corresponding packet is arranged behind the said MAC PDU that successfully decodes, then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps,, said subscriber equipment do not cover said control signaling if successfully separating, or; If successfully separating, said subscriber equipment covers said control signaling, but the said MAC PDU that successfully do not decode, or; If successfully separating, said subscriber equipment covers said control signaling; And the said MAC PDU that successfully decodes, but the corresponding packet of no said subscriber equipment among the successful decoded M AC PDU does not then feed back;
Perhaps; When the PUCCH feedback resources is the PUCCH feedback resources for the special use of said user device configuration; And when said SPS order is the SPS release command; Said feedback module specifically is used for: if successfully separating, said subscriber equipment covers said control signaling, and then according to the said SPS cycle, feeding back ACK information on said PUCCH feedback resources; Perhaps, do not cover said control signaling, then do not feed back if said subscriber equipment is successfully separated.
20. a network equipment is characterized in that, comprising:
Signaling sending module; Be used on PDCCH, sending employing SPS group scheduling sign and add the control signaling of covering to first subscriber equipment; Said control signaling comprises the SPS order; Wherein, the subscriber equipment in the same grouping is shared a SPS group scheduling sign, and said SPS order is used for the subscriber equipment that said first subscriber equipment belongs in dividing into groups is carried out the SPS scheduling;
Data transmission blocks is used on PDSCH, sending MAC PDU to subscriber equipment, and said MACPDU comprises the packet of at least one subscriber equipment in the place grouping of said first subscriber equipment.
21. equipment according to claim 20 is characterized in that, also comprises:
Receiver module is used for knowing according to the feedback of said first subscriber equipment reception condition of said first subscriber equipment, and the feedback of said first subscriber equipment comprises: feedback information or do not feed back on the indicated feedback resources of SPS information.
22. equipment according to claim 21 is characterized in that,
When the PUCCH feedback resources is the special-purpose PUCCH feedback resources of subscriber equipment; And said SPS order activates or revises when ordering for SPS; Said receiver module specifically is used for: if according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, and the said MACPDU that successfully decodes; Perhaps,, on said PUCCH feedback resources, receive the nack message of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling if according to the said SPS cycle, but the said MAC PDU that successfully do not decode; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling;
Perhaps,
When the PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order activates or revises for SPS; Said receiver module specifically is used for: if according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of said first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling, and the corresponding packet of said first subscriber equipment is arranged behind the said MAC PDU that successfully decodes; Perhaps, if do not receive the said first subscriber equipment feedack, know then that said first subscriber equipment is not successfully separated to cover said control signaling; Or said first subscriber equipment is successfully separated and is covered said control signaling, but the said MAC PDU that successfully do not decode; Or; Said first subscriber equipment is successfully separated and is covered said control signaling, and the said MAC PDU that successfully decodes, but the corresponding packet of no said first subscriber equipment among the successful decoded M AC PDU;
Perhaps,
When the PUCCH feedback resources is the PUCCH feedback resources that subscriber equipment is shared; And when said SPS order is the SPS release command; Said receiver module specifically is used for: if according to the said SPS cycle; On said PUCCH feedback resources, receive the ACK information of first subscriber equipment feedback, know then that said first subscriber equipment is successfully separated to cover said control signaling; Perhaps, if do not receive the feedback information of first subscriber equipment, know then that said first subscriber equipment is not successfully separated to cover said control signaling.
CN201110009896.6A 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment Expired - Fee Related CN102595626B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110009896.6A CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment
PCT/CN2012/070477 WO2012097724A1 (en) 2011-01-17 2012-01-17 Semi-persistent scheduling method, user equipment, and network device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110009896.6A CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment

Publications (2)

Publication Number Publication Date
CN102595626A true CN102595626A (en) 2012-07-18
CN102595626B CN102595626B (en) 2014-12-24

Family

ID=46483705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110009896.6A Expired - Fee Related CN102595626B (en) 2011-01-17 2011-01-17 Semi-persistent scheduling (SPS) method, user equipment and network equipment

Country Status (2)

Country Link
CN (1) CN102595626B (en)
WO (1) WO2012097724A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105429736A (en) * 2015-11-02 2016-03-23 电信科学技术研究院 Feedback sending and receiving methods and devices
CN105898867A (en) * 2014-08-28 2016-08-24 阿尔卡特朗讯 Paging method and device for coverage range enhanced MTC UE
CN106464450A (en) * 2014-05-21 2017-02-22 高通股份有限公司 Apparatus, methods, and computer program products providing power savings in sps-configured volte with c-drx
WO2017193403A1 (en) * 2016-05-13 2017-11-16 华为技术有限公司 Scheduling method, apparatus, and system
CN110856120A (en) * 2018-08-20 2020-02-28 北京中兴高达通信技术有限公司 Message sending and receiving method and device
CN111371532A (en) * 2018-12-26 2020-07-03 华为技术有限公司 Information transmission method and device
US11445550B2 (en) 2017-05-05 2022-09-13 Vivo Mobile Communication Co., Ltd. Method of transmitting random access response message, method of receiving random access response message and devices thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022152938A1 (en) * 2021-01-18 2022-07-21 Telefonaktiebolaget Lm Ericsson (Publ) Activation and recovery of sps transmissions

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010068770A1 (en) * 2008-12-12 2010-06-17 Research In Motion Limited Uplink semi-persistent scheduling explicit release acknowledgement transmission
WO2010077938A1 (en) * 2008-12-17 2010-07-08 Research In Motion Limited Semi-persistent resource release by wireless communication device
CN101820681A (en) * 2009-02-27 2010-09-01 大唐移动通信设备有限公司 Scheduling method and device of eUE
US20100246514A1 (en) * 2009-02-25 2010-09-30 Lg Electronics Inc. Method of exchanging message and devices in wireless network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010068770A1 (en) * 2008-12-12 2010-06-17 Research In Motion Limited Uplink semi-persistent scheduling explicit release acknowledgement transmission
WO2010077938A1 (en) * 2008-12-17 2010-07-08 Research In Motion Limited Semi-persistent resource release by wireless communication device
US20100246514A1 (en) * 2009-02-25 2010-09-30 Lg Electronics Inc. Method of exchanging message and devices in wireless network
CN101820681A (en) * 2009-02-27 2010-09-01 大唐移动通信设备有限公司 Scheduling method and device of eUE

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106464450A (en) * 2014-05-21 2017-02-22 高通股份有限公司 Apparatus, methods, and computer program products providing power savings in sps-configured volte with c-drx
CN106464450B (en) * 2014-05-21 2019-11-19 高通股份有限公司 Device, the method and computer program product that power is saved are provided in the VoLTE that the SPS using C-DRX is configured
CN105898867A (en) * 2014-08-28 2016-08-24 阿尔卡特朗讯 Paging method and device for coverage range enhanced MTC UE
CN105429736A (en) * 2015-11-02 2016-03-23 电信科学技术研究院 Feedback sending and receiving methods and devices
WO2017076197A1 (en) * 2015-11-02 2017-05-11 电信科学技术研究院 Method and device for sending and receiving feedback
CN105429736B (en) * 2015-11-02 2020-01-07 电信科学技术研究院 Method and equipment for sending and receiving feedback
WO2017193403A1 (en) * 2016-05-13 2017-11-16 华为技术有限公司 Scheduling method, apparatus, and system
US11026250B2 (en) 2016-05-13 2021-06-01 Huawei Technologies Co., Ltd. Scheduling method, device, and system
US11445550B2 (en) 2017-05-05 2022-09-13 Vivo Mobile Communication Co., Ltd. Method of transmitting random access response message, method of receiving random access response message and devices thereof
CN110856120A (en) * 2018-08-20 2020-02-28 北京中兴高达通信技术有限公司 Message sending and receiving method and device
CN110856120B (en) * 2018-08-20 2022-03-11 北京中兴高达通信技术有限公司 Message sending and receiving method and device
CN111371532A (en) * 2018-12-26 2020-07-03 华为技术有限公司 Information transmission method and device

Also Published As

Publication number Publication date
CN102595626B (en) 2014-12-24
WO2012097724A1 (en) 2012-07-26

Similar Documents

Publication Publication Date Title
CN102595624B (en) Scheduling method based on group, UE and base station
CN102595626B (en) Semi-persistent scheduling (SPS) method, user equipment and network equipment
CN102595600B (en) Semi-static scheduling method, user equipment and network device
CN102595599B (en) Method, base station and system for scheduling evolution base station in long-term evolution system
CN103260251B (en) Data transmission method, base station and subscriber equipment
CN103733711B (en) Control channel for radio communication
CN102917463B (en) Method, base station and user equipment for transmitting dispatching information
CN103414533B (en) Detect the method and apparatus of control information in a wireless communication system
JP5183687B2 (en) Mobile communication system, processing method, mobile station apparatus, and base station apparatus
US20150139136A1 (en) Method for transmitting feedback information for downlink data, terminal, and base station
CN103380649B (en) It is used for communication unit and the method for resource notice of change in broadcast communication
CN102123399A (en) Scheduling request method and device
CN102347825B (en) Method, system and equipment for transmitting feedback information
CN101682399A (en) Radio resource allocation and data transmission in packet based mobile communication system
CN102014508A (en) Method for reactivation of semi-static scheduling, and base station thereof
CN102884739A (en) Method and apparatus for activating carriers in mobile communication system
WO2013044985A1 (en) Packet scheduling in communications
US20080232314A1 (en) METHOD OF PROVIDING A VoIP CONNECTION
CN103384394A (en) Method and device for processing user equipment power consumption and power consumption configuration parameters
EP2790359B1 (en) Method and device for data exchanging
WO2013131264A1 (en) Group sps design for low cost mtc devices
CN103024905A (en) Subframe proportioning method and device
CN102740484A (en) Method, user equipment, base station, and system of resource scheduling
CN110300458B (en) Downlink HARQ feedback method, device, access network equipment and readable storage medium
KR20120025593A (en) Data transmission method, system and apparatus thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20210117