CN102518453A CN2011104177238A CN201110417723A CN102518453A CN 102518453 A CN102518453 A CN 102518453A CN 2011104177238 A CN2011104177238 A CN 2011104177238A CN 201110417723 A CN201110417723 A CN 201110417723A CN 102518453 A CN102518453 A CN 102518453A
Authority
CN
China
Prior art keywords
tunnel
lead
construction
antiskid
barricade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104177238A
Other languages
English (en)
Other versions
CN102518453B (zh
Inventor
史赵鹏
祁玺剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201110417723.8A priority Critical patent/CN102518453B/zh
Publication of CN102518453A publication Critical patent/CN102518453A/zh
Application granted granted Critical
Publication of CN102518453B publication Critical patent/CN102518453B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及隧道进洞施工技术,具体为一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法,解决传统施工方法存在进洞速度慢、周期长、成本高等问题,包括:在隧道处于明洞端临空面的一侧,开挖抗滑挡墙基础,打入钢管桩;将下导钢拱架间隔预支在抗滑挡墙基础内,浇筑混凝土作为抗滑挡墙;支设中导钢拱架,浇筑抗滑挡墙混凝土;掏槽开挖暗洞端的上导拱脚,支护上导钢拱架,与中导钢拱架形成环状;开挖上导拱脚槽,预留上导核心土;上导施工完后,开挖中导、下导,形成隧道三台阶施工。减少边、仰坡刷坡或拉槽土方量,减少对松散黄土坡土体的扰动,减少防护圬工,施工过程安全可靠,隧道结构受力合理,施工效率高,工序简单,施工速度快。

Description

一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法
技术领域
本发明涉及隧道进洞施工技术,具体为一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法。
背景技术
公知,隧道进洞施工常规是先在洞口范围自上而下分层刷边、仰坡并及时打设锚杆挂网喷锚支护,或者拉槽的方式找出洞门端墙位置进行套拱支护进洞施工,在保证洞口稳定和有一定覆盖厚度的情况下采用开挖上弧导的方式进洞施工,许多实践经验证明,这种传统的隧道进洞施工方法是进行大面积破坏原山坡坡体,破坏植被,使本就松散的黄土土体表面结构平衡破坏,尤其是砂质黄土,造成边仰坡防护面积和防护圬工的增大,还有引发边、仰坡坍塌等隧道洞口工程病害的发生。由于隧道洞门进洞为浅埋砂质黄土,单压、坡梁地势与洞门斜倾,进洞场地狭窄的隧道进洞施工,如果采用传统的进洞施工方法,就会存在以下缺点:边、仰坡刷坡或拉槽土方量非常大,增加防护圬工,劳动强度大、进洞速度慢、施工周期长、施工成本高;施工作业比较繁琐,隧道结构受力不合理,而且对松散黄土坡体扰动大,施工安全隐患大;此外,造成周围地表植被破坏严重,环境污染大,不符合文明施工的要求。 
发明内容
本发明为了解决偏压浅埋或单压倾斜砂质黄土隧道进洞施工采用传统施工方法存在进洞速度慢、施工周期长、施工成本高以及环境污染大等问题,提供一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法。 
本发明是采用如下技术方案实现的:一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法,包括以下步骤:步骤一、在隧道处于明洞端临空面的一侧,测量出洞底标高,按下导拱角标高先开挖该侧抗滑挡墙基础,并在抗滑挡墙基础内打入钢管桩,加固临空面;步骤二、将下导钢拱架间隔预支在抗滑挡墙基础内,长度为洞门里程到开挖长度范围内,浇筑混凝土作为抗滑挡墙基础;步骤三、支设中导钢拱架,将其与下导钢拱架连接,继续立模浇筑抗滑挡墙混凝土,形成抗滑挡墙,抗滑挡墙内外侧分别用土回填夯实,同时将该侧上导核心土回填成型;步骤四、掏槽开挖隧道处于暗洞端的上导拱脚,先支护几榀上导钢拱架,与中导钢拱架形成环状,并及时挂网喷设混凝土形成整体,当上导开挖支立钢拱架接触到坡面时,施作超前小导管支护;步骤五、开挖隧道处于暗洞端的上导拱脚槽,预留上导核心土,每次按一榀施工进尺,直至形成上导进洞施工;步骤六、上导进洞施工完成5m后,开挖中导,中导推进一段距离后开挖下导,形成隧道三台阶施工,至此完成隧道进洞施工。
本发明根据隧道进洞洞门为浅埋砂质黄土,单压、坡梁地势与洞门斜倾,进洞场地狭窄,刷坡土方超大的特点,采用加强临空面基础应力,采用抗滑混凝土钢管挡墙,使隧道处于明洞临空面的一侧处于抗滑作用,抵抗单压,形成上导早进洞的施工方法,该方法在确保隧道施工安全、环保不破坏植被以及保护方面效果明显,技术先进,是传统施工望其项背的。 
该方法与常规隧道洞门进洞开挖先刷仰拱、两侧边坡,再打设锚杆挂网喷锚,或者拉槽,施作套拱进洞比较,洞门不须先刷仰坡,而是加固临空面,形成抗滑,抵抗单压、倾斜侧压,创造进洞条件,具有以下优点:
1、大大减少边、仰坡刷坡或拉槽土方量,减少圬工防护,使洞口段尽快形成施工能力;
2、减少对松散砂质黄土坡土体的扰动,施工过程安全可靠,使隧道结构受力更合理;
3、施工范围小,有利于洞口段稳定,施工效率高,施工工序简单,施工速度快;
4、对隧道周围地表植被破坏小和不破坏生态,环境污染小,环保、文明施工程度高;
该方法适用铁路隧道偏压浅埋或者单压倾斜黄土隧道洞门进洞施工,也可用于公路、水工类似隧道施工。
附图说明
图1为本发明的施工过程示意图;
图2为本发明所述抗滑挡墙的平面结构示意图;
图3为本发明所述抗滑挡墙的立面结构示意图;
图4为本发明所述抗滑挡墙内钢管桩的平面布置图;
图中:1-明洞端;2-钢管桩;3-下导钢拱架;4-中导钢拱架;5-回填土;6-上导核心土;7-暗洞端;8-上导钢拱架;9-坡面;10-超前小导管;11-钢筋;12-抗滑挡墙。
具体实施方式
一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法,包括以下步骤:
步骤一、在隧道处于明洞端1临空面的一侧,测量出洞底标高,按下导拱角标高先开挖该侧抗滑挡墙基础(即下导基础),并在抗滑挡墙基础内打入钢管桩2,加固临空面,如图4所示,钢管桩可采用Φ150mm长3.5m钢管桩,间距1m,梅花形布置,增强地基应力;
步骤二、将下导钢拱架3间隔预支在抗滑挡墙基础内,相邻下导钢拱架间距可为0.5m,长度为洞门里程到开挖长度范围内,浇筑混凝土作为抗滑挡墙基础,具体实施时,挡墙基础外侧收0.5m,将右侧下导钢拱架预埋在抗滑挡墙中,钢拱架内侧混凝土保护层8cm;
步骤三、支设中导钢拱架4,将其与下导钢拱架3连接,继续立模浇筑抗滑挡墙混凝土直至上导与中导连接板位置,根据施工侧压实际,挡墙可继续加高,形成抗滑挡墙12,为上导钢拱架支立创造条件,抗滑挡墙内外侧分别用回填土5夯实,同时将该侧上导核心土6回填成型,抗滑挡墙底部宽5m,为下部宽、上部窄的结构,外侧1:0.25收坡,如图2、3所示,为抗滑挡墙的示意图;
步骤四、掏槽开挖隧道处于暗洞端7的上导拱脚,以减少对坡体的扰动,先支护几榀上导钢拱架8,与中导钢拱架形成环状,并及时挂网喷设混凝土形成整体,当上导开挖支立钢拱架接触到坡面9时,施作超前小导管10支护,具体施工中,小导管可采用Φ42mm,L=6m,密排布设;
步骤五、开挖隧道处于暗洞端的上导拱脚槽,预留上导核心土,每次按一榀施工进尺,直至形成上导进洞施工;
步骤六、上导进洞施工完成后,开挖中导,中导推进5m后开挖下导,形成隧道三台阶施工,至此完成隧道进洞施工。
工程实例:
2011年10月年该专利申请人建设的大准至朔黄铁路联络线神华准池铁路,朔州隧道全长11292m,为双线特长隧道,为偏压浅埋或单压倾斜砂质黄土隧道,设5座斜井和进出口共7个作业工区掘进施工,合同工期19.1个月,工期紧,安全风险大,又临近雁北高寒区冬期开工,为满足隧道安全正常施工,冬期前实现早进洞施工,施工中成功应用了本发明所述方法,最大限度地解决了隧道进洞边、仰坡刷方量超大问题,减少防护圬工,节约了成本,经比较,比Φ108mm大管棚法超前支护进洞方法节约费用78万元,比开挖拉槽土方施工方法节省时间20天,经济和社会效益明显。经过施工实践证明,本发明所述方法是目前效率最高,成本最低的施工进洞方法。

Claims (1)

1.一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法,其特征是包括以下步骤:
步骤一、在隧道处于明洞端(1)临空面的一侧,测量出洞底标高,按下导拱角标高先开挖该侧抗滑挡墙基础,并在抗滑挡墙基础内打入钢管桩(2),加固临空面;
步骤二、将下导钢拱架(3)间隔预支在抗滑挡墙基础内,长度为洞门里程到开挖长度范围内,浇筑混凝土作为抗滑挡墙;
步骤三、支设中导钢拱架(4),将其与下导钢拱架(3)连接,继续立模浇筑抗滑挡墙混凝土,形成抗滑挡墙(12),抗滑挡墙内外侧分别用回填土(5)夯实,同时将该侧上导核心土(6)回填成型;
步骤四、掏槽开挖隧道处于暗洞端(7)的上导拱脚,先支护几榀上导钢拱架(8),与中导钢拱架形成环状,并及时挂网喷设混凝土形成整体,当上导开挖支立钢拱架接触到坡面(9)时,施作超前小导管(10)支护;
步骤五、开挖隧道处于暗洞端的上导拱脚槽,预留上导核心土,每次按一榀施工进尺,直至形成上导进洞施工;
步骤六、上导进洞施工完成后,开挖中导,中导推进一段距离后开挖下导,形成隧道三台阶施工,至此完成隧道进洞施工。
CN201110417723.8A 2011-12-14 2011-12-14 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法 Active CN102518453B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110417723.8A CN102518453B (zh) 2011-12-14 2011-12-14 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110417723.8A CN102518453B (zh) 2011-12-14 2011-12-14 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法

Publications (2)

Publication Number Publication Date
CN102518453A true CN102518453A (zh) 2012-06-27
CN102518453B CN102518453B (zh) 2014-08-06

Family

ID=46289491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110417723.8A Active CN102518453B (zh) 2011-12-14 2011-12-14 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法

Country Status (1)

Country Link
CN (1) CN102518453B (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206219A (zh) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 偏压状态下明暗交界段隧道进洞开挖支护结构及施工工法
CN104234081A (zh) * 2014-09-12 2014-12-24 中铁五局(集团)有限公司 沟谷处洞身明洞直接进洞的施工方法
CN105156121A (zh) * 2015-10-08 2015-12-16 中铁二十五局集团第五工程有限公司 一种大断面黄土隧道进洞浅埋段的施工方法
CN105863650A (zh) * 2016-05-20 2016-08-17 浙江省交通规划设计研究院 一种先墙后洞的隧道进洞施工方法
CN106638509A (zh) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 一种能减少边坡开挖的隧洞结构及其施工方法
CN106907162A (zh) * 2017-05-08 2017-06-30 重庆电讯职业学院 一种防隧道洞口失稳的支护的施工方法
CN107060837A (zh) * 2017-03-23 2017-08-18 中铁十六局集团第五工程有限公司 一种浅埋偏压不对称式护拱施工方法
CN108661669A (zh) * 2018-04-28 2018-10-16 中铁六局集团天津铁路建设有限公司 一种适用于浅埋偏压段及下穿浅埋富水段的隧道施工方法
CN109356622A (zh) * 2018-12-04 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 一种处理隧洞冒顶的结构及实施方法
CN109538236A (zh) * 2018-12-07 2019-03-29 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN110318770A (zh) * 2019-06-26 2019-10-11 中铁二十三局集团第三工程有限公司 一种公路隧道半明半暗进洞施工方法
CN111271066A (zh) * 2020-03-03 2020-06-12 中国电建集团华东勘测设计研究院有限公司 一种偏压进洞的斜交正做施工方法
CN111365020A (zh) * 2020-02-25 2020-07-03 中国电建集团华东勘测设计研究院有限公司 一种适用于较差地质条件下偏压进洞的反压回填施工方法
CN111706352A (zh) * 2020-05-21 2020-09-25 中国水利水电第十四工程局有限公司 一种偏压隧道拱套拱进洞方法
CN111911183A (zh) * 2020-07-01 2020-11-10 中铁二院重庆勘察设计研究院有限责任公司 一种基于端墙式导向墙结构的隧道进洞工法
CN112127900A (zh) * 2020-09-07 2020-12-25 中国水利水电第十四工程局有限公司 穿堆积体浅埋偏压隧道明拱暗作半墙半拱防护构造的施工方法
CN116220729A (zh) * 2023-05-06 2023-06-06 太原理工大学 一种浅埋偏压连拱隧道非齐平洞口结构及其施工方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324072A (zh) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 通透肋式拱梁隧道施工方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324072A (zh) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 通透肋式拱梁隧道施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李春奎: "金竹岗隧道出口偏压、浅埋段施工技术", 《公路隧道》 *
龙有华: "明洞渡槽段明挖暗做法施工技术", 《铁道建筑技术》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206219A (zh) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 偏压状态下明暗交界段隧道进洞开挖支护结构及施工工法
CN104234081A (zh) * 2014-09-12 2014-12-24 中铁五局(集团)有限公司 沟谷处洞身明洞直接进洞的施工方法
CN104234081B (zh) * 2014-09-12 2016-09-14 中铁五局(集团)有限公司 沟谷处洞身明洞直接进洞的施工方法
CN105156121A (zh) * 2015-10-08 2015-12-16 中铁二十五局集团第五工程有限公司 一种大断面黄土隧道进洞浅埋段的施工方法
CN105863650A (zh) * 2016-05-20 2016-08-17 浙江省交通规划设计研究院 一种先墙后洞的隧道进洞施工方法
CN105863650B (zh) * 2016-05-20 2018-11-23 浙江省交通规划设计研究院 一种先墙后洞的隧道进洞施工方法
CN106638509A (zh) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 一种能减少边坡开挖的隧洞结构及其施工方法
CN107060837B (zh) * 2017-03-23 2019-08-13 中铁十六局集团第五工程有限公司 一种浅埋偏压不对称式护拱施工方法
CN107060837A (zh) * 2017-03-23 2017-08-18 中铁十六局集团第五工程有限公司 一种浅埋偏压不对称式护拱施工方法
CN106907162A (zh) * 2017-05-08 2017-06-30 重庆电讯职业学院 一种防隧道洞口失稳的支护的施工方法
CN108661669A (zh) * 2018-04-28 2018-10-16 中铁六局集团天津铁路建设有限公司 一种适用于浅埋偏压段及下穿浅埋富水段的隧道施工方法
CN109356622A (zh) * 2018-12-04 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 一种处理隧洞冒顶的结构及实施方法
CN109538236A (zh) * 2018-12-07 2019-03-29 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN109538236B (zh) * 2018-12-07 2024-04-02 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN110318770A (zh) * 2019-06-26 2019-10-11 中铁二十三局集团第三工程有限公司 一种公路隧道半明半暗进洞施工方法
CN111365020A (zh) * 2020-02-25 2020-07-03 中国电建集团华东勘测设计研究院有限公司 一种适用于较差地质条件下偏压进洞的反压回填施工方法
CN111271066A (zh) * 2020-03-03 2020-06-12 中国电建集团华东勘测设计研究院有限公司 一种偏压进洞的斜交正做施工方法
CN111706352A (zh) * 2020-05-21 2020-09-25 中国水利水电第十四工程局有限公司 一种偏压隧道拱套拱进洞方法
CN111911183A (zh) * 2020-07-01 2020-11-10 中铁二院重庆勘察设计研究院有限责任公司 一种基于端墙式导向墙结构的隧道进洞工法
CN111911183B (zh) * 2020-07-01 2022-03-04 中铁二院重庆勘察设计研究院有限责任公司 一种基于端墙式导向墙结构的隧道进洞工法
CN112127900A (zh) * 2020-09-07 2020-12-25 中国水利水电第十四工程局有限公司 穿堆积体浅埋偏压隧道明拱暗作半墙半拱防护构造的施工方法
CN116220729A (zh) * 2023-05-06 2023-06-06 太原理工大学 一种浅埋偏压连拱隧道非齐平洞口结构及其施工方法
CN116220729B (zh) * 2023-05-06 2023-07-07 太原理工大学 一种浅埋偏压连拱隧道非齐平洞口结构及其施工方法

Also Published As

Publication number Publication date
CN102518453B (zh) 2014-08-06

Similar Documents

Publication Publication Date Title
CN102518453B (zh) 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法
CN105840207B (zh) 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法
CN103774675B (zh) 组合双排桩联合竖向预应力锚杆支护体系的施工方法
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN105239586B (zh) 一种采用支撑结构支护基坑的方法
CN207633352U (zh) 一种用于快速抢险施工的边坡加固结构
CN104532868B (zh) 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN103147442A (zh) 超深基坑压灌桩与预应力锚杆联合支护施工方法
CN103306289A (zh) 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法
CN105525627A (zh) 一种双向锚定板挡土墙及其施工方法
CN109441456A (zh) 一种软弱易滑地层的隧道进洞结构及其施工方法
CN108385715A (zh) 一种装配式桩拱组合挡土墙及其施工方法
CN109736884A (zh) 一种紧邻隧道暗河涌水的处置结构及其施工方法
CN109056810A (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法
CN100513705C (zh) 用于边坡加固的地下梁-桩框架结构
CN105804097A (zh) 结合h型抗滑桩处治滑坡的悬挑结构道路及其建设方法
CN205894089U (zh) 一种预制装配式生态型挡土支护结构
CN202323960U (zh) 一种确保边坡稳定的浅基坑成型施工结构
CN204662494U (zh) 一种公路挡土墙加固结构
CN203729309U (zh) 组合双排桩联合竖向预应力锚杆支护体系
CN101793032A (zh) 一种小场地深基坑施工方法
CN208815566U (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造
CN201406687Y (zh) 深基坑支护结构
CN203373753U (zh) 基坑桩锚护壁混凝土锚索冠梁结构
CN105484270A (zh) 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant