CN102513401A - Tubular target bonding method - Google Patents

Tubular target bonding method Download PDF

Info

Publication number
CN102513401A
CN102513401A CN2011104314644A CN201110431464A CN102513401A CN 102513401 A CN102513401 A CN 102513401A CN 2011104314644 A CN2011104314644 A CN 2011104314644A CN 201110431464 A CN201110431464 A CN 201110431464A CN 102513401 A CN102513401 A CN 102513401A
Authority
CN
China
Prior art keywords
target
cold
metal liner
tubulose
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104314644A
Other languages
Chinese (zh)
Inventor
张小国
原和平
王广欣
曾玉林
冯斐斐
刘腾腾
王东亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIYUAN YUGUANG NEW MATERIAL TECHNOLOGY Co Ltd
Original Assignee
JIYUAN YUGUANG NEW MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIYUAN YUGUANG NEW MATERIAL TECHNOLOGY Co Ltd filed Critical JIYUAN YUGUANG NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN2011104314644A priority Critical patent/CN102513401A/en
Publication of CN102513401A publication Critical patent/CN102513401A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Physical Vapour Deposition (AREA)
  • Metal Extraction Processes (AREA)

Abstract

The invention relates to a tubular target bonding method for bonding a tubular target and a metal lining tube. The method makes the whole tubular target with large length be bonded with the metal lining tube in high quality; and the high quality bonding is concretely embodied in cases that the weld thickness is controlled, the weld thickness can be reduced to a common weld thickness of a planar target, even thinner, and the uniformity of the weld thickness can be maintained. The method is beneficial to the welding flux saving and target use performance improvement. The method is suitable for the production of the tubular target with certain plasticity, and the plasticity of the tubular target satisfies requirements of a cold drawing technology.

Description

A kind of adhering method of tubulose target
Technical field
The present invention relates to a kind of adhering method that is used for the tubulose target of bonding tubulose target and metal liner.
Background technology
Sputtering target material is different by shape, can be divided into two big types of planar targets and tubulose targets (also being rotary target material or hollow columnar target).The former sputter utilization rate is about 30%, and the latter's utilization rate can be up to 80%; Because this advantage of tubulose target, it is used more and more widely, and the thing followed is that the kind of tubulose target is also more and more.Known tubulose target has metal, like Ag, Al, Ti tubulose target, also have the pottery, like AZO (zinc oxide aluminum), ITO (tin indium oxide), Si3N4 (silicon nitride) tubulose target.The metal or alloy target that some metal targets, particularly fusing point and intensity are all relatively low, easy place creep in sputter procedure influences the carrying out of sputter procedure.These metal or alloy targets need use the low-melting-point metal (scolder that just it has often been said or solder) of easy deformation to be bonded in the intensity height, to be difficult on the another kind of material of place creep, like stainless steel, Mo etc.The material that this bulk strength is high, be difficult for place creep is called backboard (backing plate) usually for planar targets; And to the tubulose target, then often be called bushing pipe or carry pipe (backing tube).Solder layer also has an important effect except playing the effect that connects target and backboard (bushing pipe) and heat-conductivity conducting.Be exactly the plastic deformation through itself, reduce the stress concentration phenomenon that the mismatch in coefficient of thermal expansion owing to target and backboard (bushing pipe) causes.Because target material surface is raise by the high-energy ion bombardment temperature, sizable stress then because of there being water-cooled but, can taking place and concentrate in backboard (bushing pipe) on target and backboard (bushing pipe) interface, can cause the target cracking when serious, come off during sputter.
Planar targets bonding simple relatively, technology are also quite ripe.And the bonding more complicated of tubulose target does not still have a kind of gratifying method so far.Disclose in the patent of the patent of japanese kokai publication hei 11-71667 patent, Chinese application number 200910166813 and U. S. application numbers 20040074770 and to have utilized heat expansion cold
The principle that contracts closely is enclosed within the target pipe on the bushing pipe, accomplishes bonding method.Some method also; Be employed in target pipe internal surface and bushing pipe outer surface and form certain wavy convex-concave engaging piece (one Chinese patent application number 200710126292); Or things such as flange (one Chinese patent application number 200580042924) are set, thereby mechanically the target pipe is fixed on the bushing pipe at the end face of target pipe and/or bushing pipe.Indispensable heat conduction, conduction, reduction stress that these methods are not all considered scolder and play a part are concentrated, thereby in actual production, seldom are applied.
And the method for employing scolder can not provide gratifying bonding quality up to now.The insider knows that the adhesive linkage of planar targets or layer can be controlled at about 0.2mm very equably, and with the bonding tubulose target of known method so far, its adhesive linkage or layer thickness are mostly about 1mm.For example people such as village will outstanding person (one Chinese patent application number 200910195883) is to target inside pipe wall and bushing pipe outer wall coated with solder, regulate the two position after heating make coating fusing, the thick approximately 1mm of the adhesive linkage of formation or layer.China's application number 200580042924 disclosed methods, its adhesive linkage or layer thickness are also near 1mm.Because a large amount of scolders that use costliness, blocked up adhesive linkage or layer cause the target production cost to increase.In addition, because whole pipe target directly is bonded on the long bushing pipe, practical operation has certain degree of difficulty, and mostly that multistage is the short pipe target of known method is bonded on the long bushing pipe so far, thereby is combined into a long tubulose target.Like this, between section and section, can leave certain slit.In addition, because be not easy to realize the centering of target pipe and bushing pipe, adhesive linkage or layer are in uneven thickness, particularly along pipe target axis direction.These all have harmful effect to sputter procedure.
Summary of the invention
The objective of the invention is to change deficiency of the prior art, and a kind of adhering method of tubulose target is provided, make tubulose target whole, that length is big to bond together in high quality with metal liner; This high-quality bonding throat depth that is embodied in can be controlled, and throat depth can be thinned to the common throat depth of planar targets even thinner, and throat depth can keep uniformity; This to practice thrift scolder, to improve the target serviceability all helpful; The present invention is applicable to the production of the tubulose target with certain plasticity, and its plasticity will satisfy the requirement of cold-drawing technology.
Technical scheme of the present invention is achieved in that
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than
Whole requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is greater than the final metal liner that requires;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the tack coat or the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-3mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-3mm.
The invention has the advantages that:
1, can realize the centering of target pipe and bushing pipe, adhesive linkage or layer thickness are even.
2, can improve the welding quality of target to a great extent, and practice thrift welding material.
3, effectively improve the serviceability of target, prolong the service life of target.
Description of drawings
Fig. 1 is target pipe, scolder, the metal liner relative position before cold-drawn is compound.
Fig. 2 is a material deformation sketch map in the cold-drawn recombination process.
Fig. 3 is target pipe, scolder, the metal liner relative position after cold-drawn is compound.
The specific embodiment
Embodiment 1: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than final requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is greater than the final metal liner that requires;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-3mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-3mm.
Embodiment 2: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than
Whole requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is longer than the metal liner of final requirement;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-0.5mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-0.5mm.
Embodiment 3: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than
Whole requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is longer than the metal liner of final requirement;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-0.2mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-0.2mm.
Embodiment 4: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than
Whole requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is longer than the metal liner of final requirement;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-1mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-1mm.
Embodiment 5: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than final requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is longer than the metal liner of final requirement;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-2mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-2mm.
Embodiment 6: like Fig. 1,2, shown in 3, and a kind of adhering method of tubulose target, the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than final requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is longer than the metal liner of final requirement;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
The suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
Described cold-drawing recovery was combined on the drawbench and carried out the 5th step, and the selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
The 5th goes on foot in the compound process of described cold-drawn; Through selecting suitable drawing deformation amount or cold drawing die size to make metal liner between the tubulose target, produce a capillary gap that is suitable for soldering; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
Soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-1.5mm.
Described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-1.5mm.

Claims (6)

1. the adhering method of a tubulose target, it is characterized in that: the step of this method is following:
The first step: process internal diameter and thickness earlier all greater than the final target pipe that requires, its length is less than
Whole requirement; Choose internal diameter, external diameter and finally require in full accordly, but length is greater than the final metal liner that requires;
Second step: polish in target pipe and the metal liner surface to needs are bonding, sandblast, cleaning, coating film treatment;
The 3rd step: the metal liner outer surface that was processed on the surface applies one deck eutectic solder equably, and the eutectic solder coating layer thickness can not be less than the tack coat or the solder layer thickness of design;
The 4th step: the inside that is sleeved on the metal liner that is coated with eutectic solder the target pipe;
The 5th step: to being sleeved on after together metal liner and target pipe take the lead, it is compound to carry out cold-drawn;
The 6th step: the multiple tube with cold-drawn after compound is placed on and carries out soldering in the heater; The temperature of heater is set and is higher than 50-150 ℃ of eutectic solder fusing point; Be incubated 20-200 minute, until between eutectic solder and target pipe and metal liner, all form 100% firm metallurgical binding.
2. the adhering method of tubulose target according to claim 1 is characterized in that: the suitable Au of being used for of cold-drawing recovery, Ag, Al, Cu, Ni, Sn, Zn tubular metal target described in the 5th step and be the alloy tubulose target of main component with these metals.
3. the adhering method of tubulose target according to claim 1; It is characterized in that: described cold-drawing recovery was combined on the drawbench and carried out the 5th step; The selection of drawing deformation amount or cold drawing die will guarantee that drawing deformation only occurs on target pipe and the scolder, and metal liner does not deform.
4. the adhering method of tubulose target according to claim 1; It is characterized in that: the 5th goes on foot in the compound process of described cold-drawn; Produce a capillary gap that is suitable for soldering between metal liner and the tubulose target through selecting suitable drawing deformation amount or cold drawing die size to make; And capillary gap uniformity, thickness are 0.1mm-3mm, fill eutectic solder in the capillary gap.
5. the adhering method of tubulose target according to claim 1 is characterized in that: soldering compound through the cold-drawn in the 5th step and the 6th step makes and forms a uniformity between metal liner and the tubulose target, and thickness is the solder layer of 0.1mm-3mm.
6. the adhering method of tubulose target according to claim 2; It is characterized in that: described Au, Ag, Al, Cu, Ni, Sn, Zn tubular metal target and be to have uniformity between alloy tubulose target and the metal lining of main component with these metals, and thickness is the solder layer of 0.1mm-3mm.
CN2011104314644A 2011-12-21 2011-12-21 Tubular target bonding method Pending CN102513401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104314644A CN102513401A (en) 2011-12-21 2011-12-21 Tubular target bonding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104314644A CN102513401A (en) 2011-12-21 2011-12-21 Tubular target bonding method

Publications (1)

Publication Number Publication Date
CN102513401A true CN102513401A (en) 2012-06-27

Family

ID=46284611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104314644A Pending CN102513401A (en) 2011-12-21 2011-12-21 Tubular target bonding method

Country Status (1)

Country Link
CN (1) CN102513401A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103567583A (en) * 2012-07-30 2014-02-12 宁波江丰电子材料有限公司 Method for welding aluminum target assemblies
CN105378141A (en) * 2013-07-05 2016-03-02 旭硝子工业陶瓷株式会社 Sputtering target and method for manufacturing same
CN107953084A (en) * 2017-11-24 2018-04-24 韶关市欧莱高新材料有限公司 A kind of manufacture method of rafifinal rotary target material

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1171667A (en) * 1997-08-29 1999-03-16 Raiku:Kk Target structure of sputtering device
CN1330988A (en) * 2000-06-23 2002-01-16 西南新日钢制品有限公司 Technology for making composite metal pipe
CN1375362A (en) * 2002-04-11 2002-10-23 中国石化集团洛阳石油化工工程公司 Manufacture of bimetallic composite pipe
US20070074969A1 (en) * 2005-10-03 2007-04-05 Simpson Wayne R Very long cylindrical sputtering target and method for manufacturing
JP2007302981A (en) * 2006-05-15 2007-11-22 Hitachi Metals Ltd METHOD FOR MANUFACTURING CYLINDRICAL SPUTTERING TARGET MATERIAL OF Mo ALLOY
CN101705472A (en) * 2009-09-18 2010-05-12 上海高展金属材料有限公司 Method for attaching rotary target
JP4617090B2 (en) * 2004-03-11 2011-01-19 株式会社富士機械工作所 Pipe welding apparatus and welding method thereof
CN101994088A (en) * 2009-08-31 2011-03-30 光洋应用材料科技股份有限公司 Hollow columnar target material and assembly thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1171667A (en) * 1997-08-29 1999-03-16 Raiku:Kk Target structure of sputtering device
CN1330988A (en) * 2000-06-23 2002-01-16 西南新日钢制品有限公司 Technology for making composite metal pipe
CN1375362A (en) * 2002-04-11 2002-10-23 中国石化集团洛阳石油化工工程公司 Manufacture of bimetallic composite pipe
JP4617090B2 (en) * 2004-03-11 2011-01-19 株式会社富士機械工作所 Pipe welding apparatus and welding method thereof
US20070074969A1 (en) * 2005-10-03 2007-04-05 Simpson Wayne R Very long cylindrical sputtering target and method for manufacturing
JP2007302981A (en) * 2006-05-15 2007-11-22 Hitachi Metals Ltd METHOD FOR MANUFACTURING CYLINDRICAL SPUTTERING TARGET MATERIAL OF Mo ALLOY
CN101994088A (en) * 2009-08-31 2011-03-30 光洋应用材料科技股份有限公司 Hollow columnar target material and assembly thereof
CN101705472A (en) * 2009-09-18 2010-05-12 上海高展金属材料有限公司 Method for attaching rotary target

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103567583A (en) * 2012-07-30 2014-02-12 宁波江丰电子材料有限公司 Method for welding aluminum target assemblies
CN105378141A (en) * 2013-07-05 2016-03-02 旭硝子工业陶瓷株式会社 Sputtering target and method for manufacturing same
CN105378141B (en) * 2013-07-05 2018-05-18 旭硝子工业陶瓷株式会社 Sputtering target material and its manufacturing method
CN107953084A (en) * 2017-11-24 2018-04-24 韶关市欧莱高新材料有限公司 A kind of manufacture method of rafifinal rotary target material
CN107953084B (en) * 2017-11-24 2019-08-13 韶关市欧莱高新材料有限公司 A kind of manufacturing method of rafifinal rotary target material

Similar Documents

Publication Publication Date Title
Koleňák et al. Shear strength and wettability of active Sn3. 5Ag4Ti (Ce, Ga) solder on Al2O3 ceramics
TWI404813B (en) Tube target
CN104246003B9 (en) Cylindrical sputtering target and manufacturing method therefor
TWI491750B (en) Cylindrical sputtering target and method for manufacturing the same
CN102513401A (en) Tubular target bonding method
JP2012132065A (en) Cylindrical sputtering target and method for manufacturing the same
JP2015036431A (en) Cylindrical sputtering target and manufacturing method of the same
WO2012066764A1 (en) Backing plate, target assembly, and sputtering target
JP5812542B2 (en) Sputtering target component bonding method, sputtering target component bonding assembly, and use of the bonding assembly
JP2018111868A (en) Method for manufacturing cylindrical sputtering target
CN102699593A (en) Welding fixture for diffusion welding of dissimilar metal and welding method thereof
JP6052137B2 (en) Target material for cylindrical sputtering target, cylindrical sputtering target and method for manufacturing the same
TW200408721A (en) Method for connecting magnetic substance target to backing plate, and magnetic substance target
JP2016050358A (en) Manufacturing method for cylindrical sputtering target
CN104108862A (en) Vacuum glass sealing structure and forming method thereof
CN204342868U (en) A kind of powder metallurgy diffusion welding target
JP6546953B2 (en) Sputtering target-backing plate assembly and method for manufacturing the same
CN205347565U (en) Pipe target is sputtered to welding formula
CN107442922A (en) A kind of method that connecting dissimilar material is spread using amorphous intermediate layer
JP6233224B2 (en) Method for manufacturing bonding material sheet and cylindrical sputtering target
JP6053977B2 (en) Cylindrical sputtering target
JP6991172B2 (en) Sputtering target-backing plate junction
KR20140147961A (en) Sputtering target assembly and method of manufacturing the same
CN105036784B (en) A kind of method for reducing stress of sealing
TWI474929B (en) Joined type sputtering target assembly and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120627