CN102508077B - Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer - Google Patents

Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer Download PDF

Info

Publication number
CN102508077B
CN102508077B CN 201110353833 CN201110353833A CN102508077B CN 102508077 B CN102508077 B CN 102508077B CN 201110353833 CN201110353833 CN 201110353833 CN 201110353833 A CN201110353833 A CN 201110353833A CN 102508077 B CN102508077 B CN 102508077B
Authority
CN
China
Prior art keywords
transformer
measuring
phase
zero
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110353833
Other languages
Chinese (zh)
Other versions
CN102508077A (en
Inventor
郭建贞
刘学民
王雪刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tianwei Group Co Ltd
Original Assignee
Baoding Tianwei Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Tianwei Group Co Ltd filed Critical Baoding Tianwei Group Co Ltd
Priority to CN 201110353833 priority Critical patent/CN102508077B/en
Publication of CN102508077A publication Critical patent/CN102508077A/en
Application granted granted Critical
Publication of CN102508077B publication Critical patent/CN102508077B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention relates to a method for measuring no-load loss of a zero phase angle of a dual-core phase-shifting transformer, and belongs to the technical field of transformer tests. The technical scheme comprises the following steps of 1, adjusting a phase shifting switch to be an adjacent branching of the zero phase angle, connecting three low voltage neutral point terminals together, and grounding a high voltage neutral point, applying rated turn voltage of the zero phase angle from a low voltage side, and measuring the no-load loss of the transformer; 2, adjusting the phase shifting switch to be the adjacent branching of the zero phase angle, disconnecting the three connected low voltage neutral point terminals, grounding a high voltage neutral point, applying rated turn voltage of the zero phase angle from the low voltage side, and measuring the no-load loss of the transformer; and 3, calculating the no-load loss of a zero-phase-angle transformer. The method is suitable for measuring the no-load loss of the zero phase angle of the dual-core phase-shifting transformer of which three low voltage terminals and three lower voltage neutral point terminals are led out; the voltage and current which are applied in the method are very low; and by using the method, the no-load loss of the zero phase angle can be conveniently measured in a common laboratory.

Description

A kind of method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer
Technical field
The present invention relates to a kind of method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer, belong to the transformer test technical field.
Background technology
Phase-shifting transformer is again phase-angle adjuster, its mains side and load side voltage equate, are connected between two electric system, can control the electric current of each parallel branch of electric system in parallel, solution makes electric system efficiently and smoothly operated due to the overcurrent problem that transmission circuit in parallel causes.Phase-shifting transformer is three-phase transformer, presses core structure, can be divided into single core phase-shifting transformer and twin-core phase-shifting transformer.The structure of twin-core phase-shifting transformer is different from common power transformer, and it is comprised of exciting transformer and series transformer two parts, and two transformers have iron core separately, but the high pressure winding of two transformers and low pressure winding are connected to together.Usually, this transformer is only drawn high-tension line terminal, high pressure neutral point and low pressure neutral point, for satisfying the test needs, also low-voltage terminal is drawn when shop test.Propose in the power transformer test standard, the transformer noload losses measuring circuit is to apply the sinusoidal wave rated voltage of rated frequency at high pressure winding or low pressure winding, remaining winding open circuit, neutral ground.To the twin-core phase-shifting transformer, at the zero degree phase shifting angle, three low-voltage terminals can't apply voltage and carry out the zero load measurement by short circuit together, as applying voltage from the high-pressure side, need very high-tension testing transformer and measure PT, CT, the very difficult realization in ordinary test chamber.And this moment, series transformer is short-circuit condition, and exciting transformer is light condition, and excitation becomes has open circuit loss, background technology to be difficult to complete kind of a measurement no-load loss of zero phase angle of dual-core phase-shifting transformer.
Summary of the invention
The purpose of this invention is to provide a kind of method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer, realize the no-load loss of zero phase angle of dual-core phase-shifting transformer measurement, satisfy the shop test needs, complete the product testing task, solve the problems referred to above that background technology exists.
Technical scheme of the present invention is: a kind of method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer comprises following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, and three low pressure neutral terminals link together, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po2; 3. calculate the open circuit loss Po of zero degree phase shifting angle transformer=Po2-Po1.
The enforcement order of the first step of the present invention and second step can be exchanged, but when net result calculates, the measurement result the when measurement result when attention will be used " neutral point connection " deducts " neutral point is opened ".
If ignore the measurement loss deviation that no-load current causes, can also implement this technical scheme in other non-zero degree phase shifting angle tap.
The open circuit loss measuring technique that the present invention relates to adopts prior art.
Good effect of the present invention: the present invention is applicable to the no-load loss of zero phase angle of dual-core phase-shifting transformer that three low-voltage terminals are drawn, three low pressure neutral terminals are drawn and measures, apply the voltage measurement no-load loss of zero phase angle of dual-core phase-shifting transformer from low-pressure side, the voltage that the method applies, electric current are very low, use the method conventional test chamber can realize easily that zero phase angle open circuit loss measures.
Description of drawings
Open circuit loss measuring circuit when Fig. 1 is the neutral point connection;
Fig. 2 is neutral point open circuit loss measuring circuit when opening;
In figure: experiment power supply 1, testing transformer 2, measurement current transformer 3, test specimen low pressure winding 4, test specimen high pressure winding 5, measurement instrument 6, measuring voltage mutual inductor 7.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be further described by embodiment.
A kind of method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer comprises following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, and three low pressure neutral terminals link together, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po1, with reference to accompanying drawing 1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po2, with reference to accompanying drawing 2; 3. calculate the open circuit loss Po of zero degree phase shifting angle transformer=Po2-Po1.
The testing equipment that the present invention is used: experiment power supply can be genset, can be also other form power supply; Measurement instrument can be common voltage table, reometer, watt meter, can be also power analyzer.

Claims (1)

1. method of measuring no-load loss of zero phase angle of dual-core phase-shifting transformer, it is characterized in that comprising following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, three low pressure neutral terminals link together and ground connection, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records is counted Po2; 3. calculate the open circuit loss Po of zero degree phase shifting angle transformer=Po2-Po1.
CN 201110353833 2011-11-10 2011-11-10 Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer Expired - Fee Related CN102508077B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110353833 CN102508077B (en) 2011-11-10 2011-11-10 Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110353833 CN102508077B (en) 2011-11-10 2011-11-10 Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer

Publications (2)

Publication Number Publication Date
CN102508077A CN102508077A (en) 2012-06-20
CN102508077B true CN102508077B (en) 2013-11-06

Family

ID=46220182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110353833 Expired - Fee Related CN102508077B (en) 2011-11-10 2011-11-10 Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer

Country Status (1)

Country Link
CN (1) CN102508077B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103630797B (en) * 2013-12-24 2017-03-29 国家电网公司 A kind of transformator turn-to-turn short circuit detection means

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2069371C1 (en) * 1993-06-29 1996-11-20 Павел Анфимович Бутырин Method of diagnostics of power transformers
CN201765285U (en) * 2010-09-07 2011-03-16 山东达驰电气有限公司 Device of monitoring real time wastage and load of transformer in operation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001054238A (en) * 1999-08-09 2001-02-23 Toshiba Corp Drive control for transformer

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2069371C1 (en) * 1993-06-29 1996-11-20 Павел Анфимович Бутырин Method of diagnostics of power transformers
CN201765285U (en) * 2010-09-07 2011-03-16 山东达驰电气有限公司 Device of monitoring real time wastage and load of transformer in operation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
关于变压器低电压下空载试验的若干问题;王若星;《电气试验》;20050831;第1卷(第2期);第44-46页 *
用空载试验发现大型变压器绕组质量缺陷;王明谦;《变压器》;20050831;第42卷(第8期);第16-20页 *
配电变压器空载损耗测试的初步探讨;方魏江;《北京电力高等专科学校学报》;20101231;第27卷(第12期);第361-363页 *

Also Published As

Publication number Publication date
CN102508077A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
CN103558573B (en) A kind of performance test methods of voltage transformer (VT)
CN201145737Y (en) Apparatus for measuring error of current transformer based on parameter measurement
CN105044479A (en) Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method
CN105425175A (en) Iron core remanent magnetism elimination and measurement method based on polarity-reversal DC voltage source
CN102435858A (en) Method and system for online measurement of short-circuit loss and open-circuit loss of transformer
CN102508190A (en) Method for testing error influence quantity to high-voltage three-phase current transformer from high-voltage leakage current
CN103235280B (en) Direct measuring method of magnetic saturation margin of current transformer based on scaling converter
CN102830287B (en) Circuit power frequency parameter measuring device capable of eliminating power frequency interference
CN204575760U (en) A kind of assembled electric cabinet pick-up unit with reactive-load compensation verification
CN103884933A (en) Temperature rise test method for large transformer
CN104833940A (en) Method and device for detecting error of multi-transformation ratio voltage transformer
CN102043139A (en) Calibration device of current transformer and method for calibrating current transformer by using same
CN110824260A (en) Method for measuring and calculating no-load loss of transformer
CN101557109A (en) Three-phase four-cable power distribution system and method for installing balancer in the system
CN104752043A (en) Voltage regulating method for three-phase loaded voltage-regulating self-coupling transformer
CN102508132B (en) Operation impact test method suitable for dual-core phase-shifting transformer
CN202275709U (en) Secondary tapped multi-range high-precision current transformer capable of changing ratio of transformation in real time
Ngo et al. Influence of Harmonics on the Working Efficiency of a 6/1.2 kV Transformer in a Pit Mine
CN102508077B (en) Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer
CN102735940A (en) Three-phase transformer winding leakage reactance simplified measuring method
CN104808022A (en) Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer
CN202563014U (en) Transformer loss measurement control console
CN204679619U (en) A kind of polytropic ratio voltage transformer error pick-up unit
CN203561743U (en) Performance testing device for voltage transformer
CN200968985Y (en) Three-phase electrical energy meter calibration testing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20141110

EXPY Termination of patent right or utility model