CN102508077A - Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer - Google Patents
Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer Download PDFInfo
- Publication number
- CN102508077A CN102508077A CN2011103538332A CN201110353833A CN102508077A CN 102508077 A CN102508077 A CN 102508077A CN 2011103538332 A CN2011103538332 A CN 2011103538332A CN 201110353833 A CN201110353833 A CN 201110353833A CN 102508077 A CN102508077 A CN 102508077A
- Authority
- CN
- China
- Prior art keywords
- transformer
- phase
- measuring
- open circuit
- zero
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The invention relates to a method for measuring no-load loss of a zero phase angle of a dual-core phase-shifting transformer, and belongs to the technical field of transformer tests. The technical scheme comprises the following steps of 1, adjusting a phase shifting switch to be an adjacent branching of the zero phase angle, connecting three low voltage neutral point terminals together, and grounding a high voltage neutral point, applying rated turn voltage of the zero phase angle from a low voltage side, and measuring the no-load loss of the transformer; 2, adjusting the phase shifting switch to be the adjacent branching of the zero phase angle, disconnecting the three connected low voltage neutral point terminals, grounding a high voltage neutral point, applying rated turn voltage of the zero phase angle from the low voltage side, and measuring the no-load loss of the transformer; and 3, calculating the no-load loss of a zero-phase-angle transformer. The method is suitable for measuring the no-load loss of the zero phase angle of the dual-core phase-shifting transformer of which three low voltage terminals and three lower voltage neutral point terminals are led out; the voltage and current which are applied in the method are very low; and by using the method, the no-load loss of the zero phase angle can be conveniently measured in a common laboratory.
Description
Technical field
The present invention relates to a kind of method of measuring twin-core phase-shifting transformer zero phase angle open circuit loss, belong to the transformer test technical field.
Background technology
Phase-shifting transformer is phase-angle adjuster again; Its mains side and load side voltage equate, are connected between two electric system, can control the electric current of parallelly connected each parallel branch of electric system; Solve because the overcurrent problem that parallelly connected transmission circuit causes makes electric system efficiently and smoothly operated.Phase-shifting transformer is a three-phase transformer, presses core structure, can be divided into single core phase-shifting transformer and twin-core phase-shifting transformer.The structure of twin-core phase-shifting transformer is different from common power transformer, and it is made up of exciting transformer and series transformer two parts, and two transformers have iron core separately, but the high pressure winding of two transformers and low pressure winding are connected to together.Usually, this transformer is only drawn high-tension line terminal, high pressure neutral point and low pressure neutral point, for satisfying the test needs, when shop test, also low-voltage terminal is drawn.In the power transformer test standard, propose, the transformer noload losses measuring circuit is the sinusoidal wave rated voltage that applies rated frequency at high pressure winding or low pressure winding, remaining winding open circuit, neutral ground.To the twin-core phase-shifting transformer, at the zero degree phase shifting angle, three low-voltage terminals can't apply voltage and carry out the zero load measurement by short circuit together, as applying voltage from the high-pressure side, then need very high-tension testing transformer and measure PT, CT, and the ordinary test chamber is difficult to realize.And this moment, series transformer is a short-circuit condition, and exciting transformer is a light condition, and excitation becomes has open circuit loss, and background technology is difficult to accomplish plant measures twin-core phase-shifting transformer zero phase angle open circuit loss.
Summary of the invention
The purpose of this invention is to provide a kind of method of measuring twin-core phase-shifting transformer zero phase angle open circuit loss; Realize the measurement of twin-core phase-shifting transformer zero phase angle open circuit loss; Satisfy the shop test needs, accomplish the product testing task, solve the problems referred to above that background technology exists.
Technical scheme of the present invention is: a kind of method of measuring twin-core phase-shifting transformer zero phase angle open circuit loss comprises following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, and three low pressure neutral terminals link together, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po2; 3. calculate the open circuit loss Po=Po2-Po1 of zero degree phase shifting angle transformer.
The enforcement order in the first step of the present invention and second step can be exchanged, but when net result calculates, the measurement result the when measurement result when attention will be used " neutral point connection " deducts " neutral point is opened ".
If ignore the measurement loss deviation that no-load current causes, can also implement this technical scheme in other non-zero degree phase shifting angle tap.
The open circuit loss measuring technique that the present invention relates to adopts prior art.
Good effect of the present invention: the present invention is applicable to that three low-voltage terminals are drawn, three twin-core phase-shifting transformer zero phase angle open circuit loss measurements that the low pressure neutral terminal is drawn; Apply voltage measurement twin-core phase-shifting transformer zero phase angle open circuit loss from low-pressure side; The voltage that this method applies, electric current are very low, use this method conventional test chamber realization zero phase angle open circuit loss easily to measure.
Description of drawings
Open circuit loss measuring circuit when Fig. 1 connects for neutral point;
Open circuit loss measuring circuit when Fig. 2 opens for neutral point;
Among the figure: experiment power supply 1, testing transformer 2, measurement current transformer 3, test specimen low pressure winding 4, test specimen high pressure winding 5, measurement instrument 6, measuring voltage mutual inductor 7.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further specified through embodiment.
A kind of method of measuring twin-core phase-shifting transformer zero phase angle open circuit loss comprises following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, and three low pressure neutral terminals link together, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po1, with reference to accompanying drawing 1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po2, with reference to accompanying drawing 2; 3. calculate the open circuit loss Po=Po2-Po1 of zero degree phase shifting angle transformer.
The testing equipment that the present invention is used: experiment power supply can be a genset, also can be other form power supply; Measurement instrument can be common voltage table, reometer, watt meter, also can be power analyzer.
Claims (2)
1. method of measuring twin-core phase-shifting transformer zero phase angle open circuit loss, it is characterized in that comprising following steps: 1. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, and three low pressure neutral terminals link together, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po1; 2. regulating phase switcher is the adjacent tap of zero degree phase shifting angle, the connection of opening three low pressure neutral terminals, high pressure neutral ground; Apply the specified circle voltage of zero degree phase shifting angle from low-pressure side, the open circuit loss of measuring transformer, and the open circuit loss that records counted Po2; 3. calculate the open circuit loss Po=Po2-Po1 of zero degree phase shifting angle transformer.
2. according to the method for the said measurement twin-core phase-shifting transformer zero phase angle open circuit loss of claim 1, it is characterized in that the enforcement order in the first step and second step can be exchanged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110353833 CN102508077B (en) | 2011-11-10 | 2011-11-10 | Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110353833 CN102508077B (en) | 2011-11-10 | 2011-11-10 | Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102508077A true CN102508077A (en) | 2012-06-20 |
CN102508077B CN102508077B (en) | 2013-11-06 |
Family
ID=46220182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110353833 Expired - Fee Related CN102508077B (en) | 2011-11-10 | 2011-11-10 | Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102508077B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103630797A (en) * | 2013-12-24 | 2014-03-12 | 国家电网公司 | Interturn short circuit detecting device of transformer |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2069371C1 (en) * | 1993-06-29 | 1996-11-20 | Павел Анфимович Бутырин | Method of diagnostics of power transformers |
JP2001054238A (en) * | 1999-08-09 | 2001-02-23 | Toshiba Corp | Drive control for transformer |
CN201765285U (en) * | 2010-09-07 | 2011-03-16 | 山东达驰电气有限公司 | Device of monitoring real time wastage and load of transformer in operation |
-
2011
- 2011-11-10 CN CN 201110353833 patent/CN102508077B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2069371C1 (en) * | 1993-06-29 | 1996-11-20 | Павел Анфимович Бутырин | Method of diagnostics of power transformers |
JP2001054238A (en) * | 1999-08-09 | 2001-02-23 | Toshiba Corp | Drive control for transformer |
CN201765285U (en) * | 2010-09-07 | 2011-03-16 | 山东达驰电气有限公司 | Device of monitoring real time wastage and load of transformer in operation |
Non-Patent Citations (3)
Title |
---|
方魏江: "配电变压器空载损耗测试的初步探讨", 《北京电力高等专科学校学报》 * |
王明谦: "用空载试验发现大型变压器绕组质量缺陷", 《变压器》 * |
王若星: "关于变压器低电压下空载试验的若干问题", 《电气试验》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103630797A (en) * | 2013-12-24 | 2014-03-12 | 国家电网公司 | Interturn short circuit detecting device of transformer |
CN103630797B (en) * | 2013-12-24 | 2017-03-29 | 国家电网公司 | A kind of transformator turn-to-turn short circuit detection means |
Also Published As
Publication number | Publication date |
---|---|
CN102508077B (en) | 2013-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201145737Y (en) | Apparatus for measuring error of current transformer based on parameter measurement | |
CN103558573B (en) | A kind of performance test methods of voltage transformer (VT) | |
CN105044479A (en) | Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method | |
CN102435858A (en) | Method and system for online measurement of short-circuit loss and open-circuit loss of transformer | |
CN201319064Y (en) | Test circuit for field accuracy detection of high-voltage current transformer | |
CN103235280B (en) | Direct measuring method of magnetic saturation margin of current transformer based on scaling converter | |
CN102508190A (en) | Method for testing error influence quantity to high-voltage three-phase current transformer from high-voltage leakage current | |
CN102830287B (en) | Circuit power frequency parameter measuring device capable of eliminating power frequency interference | |
CN102043139B (en) | Calibration device of current transformer and method for calibrating current transformer by using same | |
CN103884933A (en) | Temperature rise test method for large transformer | |
CN101893694A (en) | Error testing device of voltage transformator | |
CN110824260A (en) | Method for measuring and calculating no-load loss of transformer | |
CN101557109A (en) | Three-phase four-cable power distribution system and method for installing balancer in the system | |
CN202041606U (en) | Frequency tripling transformer load test device | |
Ngo et al. | Influence of Harmonics on the Working Efficiency of a 6/1.2 kV Transformer in a Pit Mine | |
CN102508132B (en) | Operation impact test method suitable for dual-core phase-shifting transformer | |
CN102508077B (en) | Method for measuring no-load loss of zero phase angle of dual-core phase-shifting transformer | |
CN104808022A (en) | Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer | |
CN102735940A (en) | Three-phase transformer winding leakage reactance simplified measuring method | |
CN202563014U (en) | Transformer loss measurement control console | |
CN204679619U (en) | A kind of polytropic ratio voltage transformer error pick-up unit | |
CN200968985Y (en) | Three-phase electrical energy meter calibration testing device | |
CN203561743U (en) | Performance testing device for voltage transformer | |
CN203250017U (en) | On-site current transformer comprehensive detection device | |
CN102269786A (en) | Load testing device for triple-frequency transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131106 Termination date: 20141110 |
|
EXPY | Termination of patent right or utility model |