CN102455419A - On-site calibration equipment of integrated electric power voltage transformer - Google Patents

On-site calibration equipment of integrated electric power voltage transformer Download PDF

Info

Publication number
CN102455419A
CN102455419A CN2010105177974A CN201010517797A CN102455419A CN 102455419 A CN102455419 A CN 102455419A CN 2010105177974 A CN2010105177974 A CN 2010105177974A CN 201010517797 A CN201010517797 A CN 201010517797A CN 102455419 A CN102455419 A CN 102455419A
Authority
CN
China
Prior art keywords
flange
transformer
voltage transformer
pressure build
field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105177974A
Other languages
Chinese (zh)
Inventor
鲍清华
欧阳勋
李刚
徐惠康
杜贻涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huadian Electric Co Ltd
Original Assignee
Suzhou Huadian Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huadian Electric Co Ltd filed Critical Suzhou Huadian Electric Co Ltd
Priority to CN2010105177974A priority Critical patent/CN102455419A/en
Publication of CN102455419A publication Critical patent/CN102455419A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses on-site calibration equipment of an integrated electric power voltage transformer. The equipment comprises: a standard voltage transformer, an intermediate connection cylinder, a high voltage bushing, a booster test transformer, a first flange, a left flange, an upper flange, a right flange and a second flange. The first flange is arranged on the standard voltage transformer. The left flange is arranged on an interface of a left side of the intermediate connection cylinder. The right flange is arranged on the interface of a right side of the intermediate connection cylinder. The second flange is arranged on the booster test transformer. The upper flange is arranged on an upper part of the intermediate connection cylinder. The first flange is connected with the left flange. The second flange is connected with the right flange. The high voltage bushing is connected with the upper flange. In a scheme of the invention, the standard voltage transformer and the booster test transformer are combined as one body. Quantities of the high voltage bushings can be reduced, equipment wiring can be simplified and a integrated level of the equipment can be increased. Simultaneously, a vehicle requirement of on-site calibration mechanization and automation operation of the 330KV electric power voltage transformer can be satisfied.

Description

A kind of integral electrical voltage transformer (VT) field-checking equipment
Technical field
The present invention relates to a kind of integral electrical voltage transformer (VT) field-checking equipment, can satisfy the high pressure measurement work such as field-checking of voltage of power mutual inductor, belong to the high pressure measurement equipment technical field.
Background technology
Up to the present, Shang Weiyou can satisfy the integration apparatus of all kinds voltage transformer (VT) verification of the operations of power networks such as the interior voltage transformer (VT) of capacitance type potential transformer, electromagnetic potential transformer and GIS that electric pressure is 330kV.At present the voltage transformer (VT) field-checking remains tester equipment such as scattered standard potential transformer, the equipment that boosts is assembled the wiring operation that makes an experiment temporarily.Need the capacity and the inductance value of frequent adjustment reactor also to lift repeatedly, assemble, adjust in the process of the test to satisfy the field-checking requirement.During on-the-spot transducer check to different groups, need calibration equipment repeatedly be shifted, displacement each time all must repeat installation, wiring and debugging, wastes time and energy, inefficiency, not only causes economic loss, influences the normal power supply guarantee simultaneously; And this equipment volume is big, heavy, automaticity is low and trivial operations, can't centralised arrangement in the electric power transformer field calibration vehicle with mechanical automation functipnal capability of mutual inductor on site verification solution.
Summary of the invention
Technical matters to above-mentioned existence the objective of the invention is: proposed a kind of integral electrical voltage transformer (VT) field-checking equipment that satisfies the high pressure measurement work such as field-checking of voltage of power mutual inductor.
Technical solution of the present invention is achieved in that a kind of integral electrical voltage transformer (VT) field-checking equipment, comprises standard potential transformer, middle connecting cylinder, bushing, pressure build-up test transformer, first flange, left flange, upper flange, right flange, second flange; Said first flange is arranged on the standard potential transformer; The interface in connecting cylinder left side in the middle of said left flange is arranged on; The interface on connecting cylinder right side in the middle of said right flange is arranged on; Said second flange is arranged on the pressure build-up test transformer; The top of connecting cylinder in the middle of said upper flange is arranged on; Said first flange connects with left flange; Said second flange connects with right flange; Said bushing connects with upper flange.
Preferably, said integral electrical voltage transformer (VT) field-checking coordinative composition of equipments has mounting seat, is used to install and fix.
Preferably, said standard potential transformer is installed in the air chamber of described standard potential transformer; The pressure build-up test transformer is installed in the air chamber of described pressure build-up test transformer, and standard potential transformer primary line and pressure build-up test transformer high-voltage winding output line merge in middle coupling tunnel internal exchange through disk insulator is drawn by bushing.
Preferably, the secondary line of said standard potential transformer is drawn through the secondary connection terminal that is installed in the terminal box.
Preferably, press the compensation winding during said pressure build-up test transformer is provided with, and the crimping line terminals is drawn in the process.
Because the utilization of technique scheme, the present invention compared with prior art has advantage:
The present invention program becomes device with the pressure build-up test of pressing compensation in standard potential transformer and the band and is assembled into the integration voltage mutual inductor on site verification configuration that high-pressure section connects combination and drawn by single sleeve pipe.With standard potential transformer and pressure build-up test transformer group integrator equipment, reduced bushing quantity and simplified apparatus wiring, improve the integrated level of equipment; Supportingly press compensation reactor in having; Integration apparatus is carried out reactive-load compensation; Reduce the volume weight of equipment and reduce the carrying load ability that input capacity improves equipment simultaneously, to satisfy the vehicle-mounted requirement that electric pressure is 330kV voltage of power mutual inductor on site verification mechanization, automation mechanized operation.
Description of drawings
Below in conjunction with accompanying drawing technical scheme of the present invention is described further:
Accompanying drawing 1 is the front view of integral electrical voltage transformer (VT) field-checking equipment of the present invention;
Accompanying drawing 2 is the vertical view of integral electrical voltage transformer (VT) field-checking equipment of the present invention;
Wherein: 1, standard potential transformer; 2, middle connecting cylinder; 3, bushing; 4, disk insulator; 5, inferior tie; 6, pressure build-up test transformer; 7, terminal box; 8, secondary connection terminal; 9, first flange; 10, left flange; 11, upper flange; 12, right flange; 13, second flange.
Embodiment
Like accompanying drawing 1, the of the present invention a kind of integral electrical voltage transformer (VT) field-checking equipment shown in 2, comprise standard potential transformer 1, middle connecting cylinder 2, bushing 3, pressure build-up test transformer 6, first flange 9, left flange 10, upper flange 11, right flange 12, second flange 13; Said first flange 9 is arranged on the standard potential transformer 1; The interface in connecting cylinder 2 left sides in the middle of said left flange 10 is arranged on; The interface on connecting cylinder 2 right sides in the middle of said right flange 12 is arranged on; Said second flange 13 is arranged on the pressure build-up test transformer 6; The top of connecting cylinder 2 in the middle of said upper flange 11 is arranged on; Said first flange 9 connects with left flange 10; Said second flange 13 connects with right flange 12; Said bushing 3 connects with upper flange 11; Said integral electrical voltage transformer (VT) field-checking coordinative composition of equipments has mounting seat; Be used to install and fix; And standard potential transformer 1 and pressure build-up test transformer 6 born weight and reduce vibration through web member, thereby make its firm vehicle borne vibration environment that adapts to; Standard potential transformer 1 is installed in the air chamber of described standard potential transformer 1; Pressure build-up test transformer 6 is installed in the air chamber of described pressure build-up test transformer 6, and standard potential transformer 1 primary line and pressure build-up test transformer 6 high pressure winding output lines merge in middle coupling tunnel 2 internal exchanges through disk insulator 4 is drawn by bushing 3; Said each connection place also disposes disk insulator 4 fixing ties 5 and isolates each air chamber, and a described connecting line is connected firmly to adapt to vehicle borne vibration environment and abominable execute-in-place environment; The secondary line of standard potential transformer 1 is drawn through the secondary connection terminal 8 that is installed in the terminal box 7; Press the compensation winding during said pressure build-up test transformer is provided with, and the crimping line terminals is drawn in the process.
The present invention program and compensation are with the regulative reactance use that complements one another; During being provided with, the pressure build-up test transformer presses the compensation winding; When connecting supporting compensation and using REgulatable reactor, but thereby the capacitive reactive power component in the Continuous Compensation test product scope reduces the output waveform distortion of integrated vehicle equipment and reduces input current and improves carrying load ability.
Press the compensation winding during described pressure build-up test transformer configuration has, in the step-up transformer iron core, form perceptual idle flux component through the connection compensation reactor and be used to offset the capacitive reactive power flux component that test product causes.Thereby improve volume and thermal value that limited magnetic flux utilization factor unshakable in one's determination reduces testing transformer, thereby adapt to of the requirement of voltage transformer (VT) field-checking trial voltage waveform and equipment volume weight size.
The moving REgulatable reactor of piezoelectricity during but compensation is adopted with reactor, but Continuous Compensation comprise various the type such as voltage transformer (VT) in electromagnetic potential transformer (TV), capacitor voltage sensor (CVT) and the GIS by the capacitive component of examination voltage transformer (VT).And the opertaing device of supporting belt compensation indication uses light current that it is carried out control operation, thereby the high voltage of xegregating unit guarantees handling safety.
Because the utilization of technique scheme, the present invention compared with prior art has advantage:
The present invention program becomes device with the pressure build-up test of pressing compensation in standard potential transformer and the band and is assembled into the integration voltage mutual inductor on site verification configuration that high-pressure section connects combination and drawn by single sleeve pipe.With standard potential transformer and pressure build-up test transformer group integrator equipment, reduced bushing quantity and simplified apparatus wiring, improve the integrated level of equipment; Supportingly press compensation reactor in having; Integration apparatus is carried out reactive-load compensation; Reduce the volume weight of equipment and reduce the carrying load ability that input capacity improves equipment simultaneously, to satisfy the vehicle-mounted requirement that electric pressure is 330kV voltage of power mutual inductor on site verification mechanization, automation mechanized operation.
The foregoing description only is explanation technical conceive of the present invention and characteristics; Its purpose is to let the personage that is familiar with this technology can understand content of the present invention and implements; Can not limit protection scope of the present invention with this; All equivalences that spirit is done according to the present invention change or modify, and all should be encompassed in protection scope of the present invention.

Claims (5)

1. an integral electrical voltage transformer (VT) field-checking equipment is characterized in that: comprise standard potential transformer, middle connecting cylinder, bushing, pressure build-up test transformer, first flange, left flange, upper flange, right flange, second flange; Said first flange is arranged on the standard potential transformer; The interface in connecting cylinder left side in the middle of said left flange is arranged on; The interface on connecting cylinder right side in the middle of said right flange is arranged on; Said second flange is arranged on the pressure build-up test transformer; The top of connecting cylinder in the middle of said upper flange is arranged on; Said first flange connects with left flange; Said second flange connects with right flange; Said bushing connects with upper flange.
2. integral electrical voltage transformer (VT) field-checking equipment according to claim 1 is characterized in that: the vehicle-mounted coordinative composition of equipments of said integral electrical voltage transformer (VT) field-checking has mounting seat, is used to install and fix.
3. integral electrical voltage transformer (VT) field-checking equipment according to claim 1, it is characterized in that: said standard potential transformer is installed in the air chamber of described standard potential transformer; The pressure build-up test transformer is installed in the air chamber of described pressure build-up test transformer, and standard potential transformer primary line and pressure build-up test transformer high-voltage winding output line merge in middle coupling tunnel internal exchange through disk insulator is drawn by bushing.
4. integral electrical voltage transformer (VT) field-checking equipment according to claim 1, it is characterized in that: the secondary line of said standard potential transformer is drawn through the secondary connection terminal that is installed in the terminal box.
5. integral electrical voltage transformer (VT) field-checking equipment according to claim 1 is characterized in that: press the compensation winding during said pressure build-up test transformer is provided with, and the crimping line terminals is drawn in the process.
CN2010105177974A 2010-10-25 2010-10-25 On-site calibration equipment of integrated electric power voltage transformer Pending CN102455419A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105177974A CN102455419A (en) 2010-10-25 2010-10-25 On-site calibration equipment of integrated electric power voltage transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105177974A CN102455419A (en) 2010-10-25 2010-10-25 On-site calibration equipment of integrated electric power voltage transformer

Publications (1)

Publication Number Publication Date
CN102455419A true CN102455419A (en) 2012-05-16

Family

ID=46038828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105177974A Pending CN102455419A (en) 2010-10-25 2010-10-25 On-site calibration equipment of integrated electric power voltage transformer

Country Status (1)

Country Link
CN (1) CN102455419A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552495A (en) * 2013-11-21 2014-02-05 国家电网公司 Automatic unfolding type on-site verification vehicle for high-voltage transformers
CN104076314A (en) * 2014-07-10 2014-10-01 国家电网公司 Vehicle-mounted 1,000-kilovolt voltage transformer verifying device
CN104155624A (en) * 2014-07-31 2014-11-19 国家电网公司 Boosting calibration equipment used for power frequency resonance test
CN104569898A (en) * 2015-01-04 2015-04-29 国家电网公司 Fixing and voltage sharing device for vehicle-mounted standard voltage transformer used for verifying transformer of 500 kV
CN107369544A (en) * 2017-09-04 2017-11-21 云南电网有限责任公司电力科学研究院 A kind of GIS formulas of band electromagnetic shielding are from the standard potential transformer that boosts
CN108597821A (en) * 2018-06-01 2018-09-28 山东泰开互感器有限公司 A kind of testing transformer and power supply system of built-in no-power compensation function

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4999569A (en) * 1989-09-01 1991-03-12 Abb Power T&D Company Method to calibrate magneto-optic based metering system
CN2280919Y (en) * 1996-11-09 1998-05-06 何排枝 Integrated mutual-inductor calibration device
US20050288876A1 (en) * 2004-06-25 2005-12-29 Power Measurement, Ltd Method and apparatus for instrument transformer reclassification
CN201285439Y (en) * 2008-11-13 2009-08-05 国网武汉高压研究院 Integrated verification equipment for field CVT
CN201583644U (en) * 2009-03-20 2010-09-15 国网电力科学研究院武汉南瑞有限责任公司 High voltage metering and testing vehicle
CN201828658U (en) * 2010-10-25 2011-05-11 苏州华电电气股份有限公司 Integrated on-site check-out equipment for power and voltage transformer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4999569A (en) * 1989-09-01 1991-03-12 Abb Power T&D Company Method to calibrate magneto-optic based metering system
CN2280919Y (en) * 1996-11-09 1998-05-06 何排枝 Integrated mutual-inductor calibration device
US20050288876A1 (en) * 2004-06-25 2005-12-29 Power Measurement, Ltd Method and apparatus for instrument transformer reclassification
CN201285439Y (en) * 2008-11-13 2009-08-05 国网武汉高压研究院 Integrated verification equipment for field CVT
CN201583644U (en) * 2009-03-20 2010-09-15 国网电力科学研究院武汉南瑞有限责任公司 High voltage metering and testing vehicle
CN201828658U (en) * 2010-10-25 2011-05-11 苏州华电电气股份有限公司 Integrated on-site check-out equipment for power and voltage transformer

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552495A (en) * 2013-11-21 2014-02-05 国家电网公司 Automatic unfolding type on-site verification vehicle for high-voltage transformers
CN103552495B (en) * 2013-11-21 2016-03-16 国家电网公司 Automatic unfolding high-voltage mutual inductor on-site proving car
CN104076314A (en) * 2014-07-10 2014-10-01 国家电网公司 Vehicle-mounted 1,000-kilovolt voltage transformer verifying device
CN104155624A (en) * 2014-07-31 2014-11-19 国家电网公司 Boosting calibration equipment used for power frequency resonance test
CN104569898A (en) * 2015-01-04 2015-04-29 国家电网公司 Fixing and voltage sharing device for vehicle-mounted standard voltage transformer used for verifying transformer of 500 kV
CN107369544A (en) * 2017-09-04 2017-11-21 云南电网有限责任公司电力科学研究院 A kind of GIS formulas of band electromagnetic shielding are from the standard potential transformer that boosts
CN107369544B (en) * 2017-09-04 2023-09-15 云南电网有限责任公司电力科学研究院 GIS type self-boosting standard voltage transformer with electromagnetic shielding
CN108597821A (en) * 2018-06-01 2018-09-28 山东泰开互感器有限公司 A kind of testing transformer and power supply system of built-in no-power compensation function

Similar Documents

Publication Publication Date Title
CN102455419A (en) On-site calibration equipment of integrated electric power voltage transformer
CN201298448Y (en) A split type voltage mutual inductor
CN205670479U (en) The combination transformer that a kind of high pressure plug formula connects
CN107015077A (en) A kind of deformation of transformer winding analogue means
CN201828658U (en) Integrated on-site check-out equipment for power and voltage transformer
CN101788636A (en) Resonance voltage resistant test system and voltage resistant test method of sample with large capacitance
CN103336188A (en) Current boosting apparatus suitable for GIS equipment
CN200965824Y (en) Capacitance type voltage mutual-inductor model for dynamic analog test
CN106771813B (en) A kind of Tesla transformer secondary coil on-off measurement method
CN104076314B (en) A kind of vehicular 1000kV voltage transformer (VT) calibration equipment
CN205210297U (en) On -vehicle check -up platform of anti -interference 1000kV extra -high voltage voltage transformer
CN209028166U (en) A kind of high voltage direct current converter realization field local discharge test vehicle
CN2927285Y (en) Ceramic-casing super-voltage sulfur-hexafluoride gas isolated current mutual inductor
CN102945739A (en) Power-frequency single-phase resonant transformer for calibration and boosting of voltage transformer
CN103595291A (en) On-line energy-gaining system of high-voltage series voltage compensation device
CN204065390U (en) A kind of vehicular 1000kV voltage transformer (VT) calibration equipment
CN204558213U (en) A kind of 500kV transducer check mobile transformer line bag is fixed and pressure-equalizing device
CN204422571U (en) A kind of inflatable testing transformer
CN202325976U (en) Automobile ignition coil
CN106024343B (en) A kind of transformer measurement apparatus
CN207067376U (en) Integration voltage current standard transformer
CN201819931U (en) Transformation reactor used for frequency modulation series resonance high-voltage test
CN207232377U (en) A kind of Capacitive Voltage Transformer Test system
CN202018878U (en) An installing structure of a transformer high pressure side current transformer coil
CN107192974A (en) Integration voltage current standard transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120516