CN102403788A - Test system applicable to southern power grid communication guaranteeing system - Google Patents

Test system applicable to southern power grid communication guaranteeing system Download PDF

Info

Publication number
CN102403788A
CN102403788A CN2011101086063A CN201110108606A CN102403788A CN 102403788 A CN102403788 A CN 102403788A CN 2011101086063 A CN2011101086063 A CN 2011101086063A CN 201110108606 A CN201110108606 A CN 201110108606A CN 102403788 A CN102403788 A CN 102403788A
Authority
CN
China
Prior art keywords
communication
test
substation
unit
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101086063A
Other languages
Chinese (zh)
Other versions
CN102403788B (en
Inventor
王峰
贺春
陈志光
任春梅
张冉
倪云玲
张智锐
焦邵麟
袁亮荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Ketop Testing Research Institute Co ltd
XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
XUCHANG KETOP ELECTRIC TESTING INSTITUTE
GUANGDONG CENTER OF ELECTRIC DISPATCHING AND TRANSFORMING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG KETOP ELECTRIC TESTING INSTITUTE, GUANGDONG CENTER OF ELECTRIC DISPATCHING AND TRANSFORMING filed Critical XUCHANG KETOP ELECTRIC TESTING INSTITUTE
Priority to CN201110108606.3A priority Critical patent/CN102403788B/en
Publication of CN102403788A publication Critical patent/CN102403788A/en
Application granted granted Critical
Publication of CN102403788B publication Critical patent/CN102403788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a test system applicable to a southern power grid communication guaranteeing system. The test system comprises a human machine interface, test case database, a communication message and device information database, a main station simulating tool, a preposed communication machine and a communication interface, wherein in the test system, all-around substation test schemes are prestored in a test database; when a substation is tested, only a corresponding command is required to be input into the human machine interface; a corresponding test scheme is retrieved by the main station simulating tool and sent to a substation to be tested by the preposed communication machine; responding communication message data of the substation is read by the preposed communication machine and is compared with prestored standard information; and the comparison result is transferred to the human machine interface so as to improve the automatic degree of the test; the configuration correctness and the information integrality of a substation with failure information are automatically judged; the consistency between configuration information in the substation and read information in a main substation is not required to be checked manually; thereby effectively improving the test efficiency.

Description

Be applicable to the test macro of south electric network guarantor communication system
?
Technical field
the present invention is applicable to a kind of field tests of electrical network guarantor communication system, especially relates to a kind of south electric network that is applicable to and protects the test macro of communication system.
Background technology
relay protection of power system and failure information system (hereinafter to be referred as protecting communication system) comprise main website, substation two parts.At factory's station end; Protecting the substation of communication system communicates by letter with intelligent electronic devices (IED) such as relaying protection, fault oscillograph, automatic safety devices; Collect normal operation, abnormality alarming and the fault message of these devices, on after the preliminary treatment, deliver to the main website that is positioned at dispatching terminal.For configuration information,, protect communication system main website, substation and it must be understood that unanimity for the implication of device information amount, form etc. in order correctly to transmit and explain information.Generally speaking, usual manner is that unified information table is confirmed according to customer requirements in main website, substation, imports its database separately, this way inefficiency, and mistake appears easily.South electric network is protected communication system and is adopted south electric network 103 stipulations standards, has realized that the substation configuration information reads and download function automatically, does not need manual work to repeat input, has guaranteed the consistency of information definition.
are present; The test of protecting the communication system substation to south electric network mainly is to adopt the mode of interoperability test to carry out; That is to say that the guarantor's communication system substation that needs test is linked into the main website that moving or the emulation main website of some producers; According to specific acceptance criteria and acceptance requirement, the substation function to be tested one by one, its Typical Disposition is seen Fig. 1; The typical figure of protection fault message substation test is made up of fault message main website, tested substation, oscillograph, protective device, disconnected control unit and relay-protection tester; Relay-protection tester provides voltage, current data to protective device and disconnected control unit, the state information of oscillograph collection protective device and disconnected control unit and analog quantity etc., and oscillograph information is gathered in tested substation; And communicate with the fault message main website, with delivering to the fault message main website on the information.This class standard is like " Guangdong Power Grid relay protection fault and information system sub-station technical specification ".This test needs the tester to check all protection definite values and actuating signal etc. in record protection device place one by one usually; Check the consistency of relevant information and protective device raw information then at substation and main website place; Workload is very great, and owing to adopt manual work to protecting the operation of letter main website the substation to be tested, content measurement is fixing; It is inconsistent to do test contents because of different people; And each content measurement also maybe be inconsistent, very easily causes content measurement to omit, and can not comprehensively test protecting communication system substation function.
Functional verification test is carried out through the mode of main website and substation uniting and adjustment to the test of protecting the communication system substation in addition in addition in .This class testing is once convened a plurality of substation producers and producer of main website usually; To specific protective device and oscillograph; Carry out scene access and function and concentrate test and appraisal, see 2006 the 6th phases of " relay " magazine " relay protection and fault information system construction experiences what is said or talked about " (Zhao Youcheng, Zhao Manyong, He Chunzhu) literary composition for details.Human cost that this test mode needs and time cost are all than higher, and because producer's product is many, and implementation is various, and the neither one judgment criteria, situation about running in the test is many, poor operability.
Summary of the invention
the object of the present invention is to provide a kind of south electric network that is applicable to protect the test macro of communication system, and the completion presumptive test project of efficient, intelligence, automation improves testing efficiency, reduces testing cost.
For realizing above-mentioned purpose; The technical scheme that the present invention adopts is: the test macro that is applicable to south electric network guarantor communication system; Comprise man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface;
Wherein:
Man-machine interface is used for the input of user command and the demonstration of communication message, data, test result and warning information;
The test cases database is used to preserve the test cases that has preset, and accomplishes calling, edit and preserving of test cases according to the instruction of main website emulation tool and the instruction of prepositive communication computer;
Communication message and device information database; Be used for the instruction of received communication front end processor; Communication message between substation tester and the tested device, data, substation configuration information and judged result are preserved; And the response man-machine interface transfer instruction, return corresponding message information, data message and object information according to the instruction of transferring of man-machine interface;
The main website emulation tool is used for the emulation of test command, to the functional requirement of south electric network failure information system, and the main website order that emulation is all; After the user command of receiving the man-machine interface input, to carry out the testing scheme editor, transfer according to the instruction of receiving, emulation is carried out in the substation initialization and the information point table is called in operation; The testing scheme that editor is accomplished is unique name be deposited in the testing scheme database after, send the test driving command to prepositive communication computer;
prepositive communication computer; Be used for the transmission of main website emulation command and receive the communication message that the substation responds; After the test driving command of the main website emulation tool that receives, in real time communication message is resolved and data preparation; Communication message form, communication process and the communication data of resolving and the standard value that presets are compared, and whether judged result is passed through; And communication message, device information, data and judged result write in communication message and the device information database; Send idsplay order to man-machine interface.
this programme is to the particularity of guarantor's communication system of south electric network; A kind of test macro is provided; This ties up to and has preset comprehensive substation testing scheme in the test database, only need in man-machine interface, import corresponding order during the test substation, transfers corresponding testing scheme by the main website emulation tool and sends out to substation to be measured through prepositive communication computer; Prepositive communication computer reads the responding communication message data of substation and compares with the standard information that presets; And the result is passed to man-machine interface, and improved the automaticity of test, realized configuration correctness, the information integrity of automatic failure judgement information substation;, do not effectively raise testing efficiency in the consistency of the artificial stoning of needs to the information that reads in configuration information in the substation and the main website.
Description of drawings
Fig. 1 protects the typical figure of fault message substation test;
Fig. 2 test macro fundamental diagram;
Fig. 3 main website emulation tool fundamental diagram;
Fig. 4 prepositive communication computer fundamental diagram.
Embodiment
are done detailed explanation below in conjunction with accompanying drawing to the present invention.
can be known by accompanying drawing 2, the present invention includes man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface.Man-machine interface is used for the input of user command and the demonstration of communication message, data, test result and warning information; On man-machine interface, shown the whole test commands of this test macro, the user can select test command according to the test needs, and this order reaches the main website emulation tool.
test cases database is used for presetting the preservation of test cases, and transfers the calling of unit instruction completion test cases, editor and hold function according to data in test cell instruction in the main website emulation tool and the prepositive communication computer; Preset comprehensive substation testing scheme in this testing scheme database, the testing scheme content mainly comprises on the test of substation initialization test, time synchronized, the protection incident/self check information/switching value displacement information/fault localization value to be sent test, reads analog quantity test, the definite value functional test, always call test, fault recorder data test transmission, general file test transmission and calling device fault history information to test.
wherein substation initialization procedure are that special guarantor to solution transmitted the monk station information of conciliating correctly, fast and automatically in " communication of south electric network relay protection and fault information system and interface specification " in the communication system; Like relevant parameters such as the title of station arrangement, definite value, state/analog quantity, circuit etc., numbering, dimensions; Guarantee the consistency of main website end and substation client information definition; Increase work efficiency; The dedicated process standard that reduces cost of labor and formulate, the substation initialization procedure mainly comprises two aspects, reads substation configuration and dress substation configuration down.Reading the substation configuration mainly is that main website obtains substation information through sending the substation configuration read command; Adorning the substation configuration down mainly is when when the main website end is revised the configuration of a certain substation, and main website writes the substation configuration order through transmission and accomplishes the modification to substation information.Reading the substation layoutprocedure mainly comprises: read substation configuration each group heading, read the description of whole clauses and subclauses of one group of information/be worth, read whole clauses and subclauses of one group of information " attribute structure ", read the catalogue of single clauses and subclauses, the value/attribute structure/description of reading single clauses and subclauses.Adorning the substation layoutprocedure down mainly comprises: pass down each group heading of substation configuration, down adorn the description of whole clauses and subclauses of one group of information, adorn " attribute structure " of whole clauses and subclauses of one group of information down.
time synchronization process is that main website issues the time synchronized order, and completion is synchronous to the substation time.
Sending process on protection incident/self check information/switching value displacement information/fault localization value mainly is to accomplish when electrical network breaks down or installs operation to occur when unusual, the action message of substation handle assembly or unusually letter pass to main website.
It is main website regularly reads this device of value acquisition of all clauses and subclauses in the group through the generic service order all analog quantitys that the analog quantity process is read in .
definite value function comprises definite value inquiry, the inquiry of current operation definite value area code, fixed value modification, the current operation definite value of switching district.Main website obtains the operation definite value and the current operation definite value district of certain device in the substation through transmission definite value querying command.Main website accomplishes the modification to definite value through sending to revise definite value and switch the order of definite value district.
calling process always is that the main website timed sending always calls order to accomplish obtaining all state informations of substation.
fault recorder data transmission course is when electrical network breaks down; The substation is collected fault recorder data and is formed in the brief analysis report and delivers to main website; Contain fault relevant information and corresponding record ripple file name in the brief analysis report, main website can directly obtain required record ripple file through the calling order.
general file transmission course generally is a main website calling substation listed files, the selected file that will call from tabulation, the substation is again with sending in the selected file packing, accomplish general file on give.
calling device fault history information process is that main website is through calling query history information, the event information in the acquisition fixed time section.
Content measurement in test cases storehouse has covered the repertoire of substation to be measured, and in the test, the user can transfer the testing scheme that is preset in the test database, also can update testing scheme according to the test needs.
communication message database; Be used for the instruction of received communication front end processor; Communication message between substation tester and the tested device, data, substation configuration information and judged result are preserved; And the response man-machine interface transfer instruction, return corresponding message information, data message and object information according to the instruction of transferring of man-machine interface.
are as shown in Figure 3, and the main website emulation tool is used for the emulation of test command, can be to the functional requirement of south electric network failure information system, and the main website order that emulation is all; After the user command of receiving the man-machine interface input, carry out the testing scheme editor, transfer according to the instruction of receiving, substation initialization emulation and information point table are called in operation; When receiving the edit commands of testing scheme, the testing scheme that editor is accomplished is unique name be deposited in the testing scheme database after, send the test driving command to prepositive communication computer.The main website emulation tool imports the unit by command process unit, testing scheme unit, substation initialization unit, information point table and the test driver element is formed.The command process unit is analyzed operational order after receiving the operational order of man-machine interface, and then sends instruction according to the result who analyzes to units corresponding.
operational order is divided into the editor or the importing of testing scheme, and substation initialization command and information point table import order.If the man-machine interface input is that the information point table imports instruction; Then the information point table imports the unit after the instruction that receives the command process unit; To form corresponding information point table and import order; And will test and drive order and pass to prepositive communication computer, accomplish the further transmission of information by prepositive communication computer.If the man-machine interface input is the substation initialization directive; The substation initialization directive mainly comprises reads substation configuration and dress substation configuration down; When main station system itself is putting into operation or having new substation to put into operation preceding or main website when revising the configuration of a certain substation; All need accomplish the consistency of main website end and substation client information, the substation initialization procedure is exactly a consistency of accomplishing main website end and substation client information correctly, fast and automatically.Reading the substation configuration mainly is that main website obtains substation information through sending the substation configuration read command; Adorning the substation configuration down mainly is when when the main website end is revised the configuration of a certain substation, and main website writes the substation configuration order through transmission and accomplishes the modification to substation information.Reading the substation layoutprocedure mainly comprises: read substation configuration each group heading, read the description of whole clauses and subclauses of one group of information/be worth, read whole clauses and subclauses of one group of information " attribute structure ", read the catalogue of single clauses and subclauses, the value/attribute structure/description of reading single clauses and subclauses.Adorning the substation layoutprocedure down mainly comprises: pass down each group heading of substation configuration, down adorn the description of whole clauses and subclauses of one group of information, adorn " attribute structure " of whole clauses and subclauses of one group of information down.For example the substation configuration order is read in the man-machine interface input; After the command process unit receives the substation initialization directive of man-machine interface; Through Treatment Analysis; Draw be the substation initialization directive after; Instruction is passed to the substation initialization unit, and the substation initialization unit reads value/attribute structure/description that each group heading order of substation configuration, description/value order of reading whole clauses and subclauses of one group of information, " attribute structure " of reading whole clauses and subclauses of one group of information ordered, read the directory command of single clauses and subclauses and read single clauses and subclauses with formation and orders after the instruction that receives the command process unit; And will test and drive order and pass to prepositive communication computer, accomplish the further transmission of information by prepositive communication computer.If being the testing scheme editor or transferring order of man-machine interface input, testing scheme comprise on time synchronized testing scheme, the protection incident/self check information/switching value displacement information/fault localization value send testing scheme, read the analog quantity testing scheme, definite value functional test scheme, always call testing scheme, fault recorder data test transmission scheme, general file test transmission scheme and calling device fault history information testing scheme.To each testing scheme an instruction code is arranged all, if the man-machine interface input is to transfer definite value functional test scheme, then man-machine interface will be with the code command command process unit of definite value functional test scheme; Man-machine interface will be transferred definite value functional test scheme code and pass to the command process unit, and the command process unit is after the instruction that receives man-machine interface, and drawing through Treatment Analysis is that definite value functional test scheme is transferred instruction; Instruction is passed to the testing scheme unit, and then the testing scheme unit compares analysis with the local instructions stored in testing scheme unit after the instruction that receives the command process unit; Identify is that the definite value function scheme is transferred; Carry out the definite value function scheme and transfer operation, testing scheme transfer finish after, if man-machine interface input is to the modification order of this testing scheme; Then carry out testing scheme is made amendment; Instruction after modification finishes is carried out the editor of testing scheme or is transferred, and the testing scheme unit will carry out unique order to testing scheme, and naming method can be put name for default name or manual work; And testing scheme is deposited into the testing scheme database, send the test driving command to prepositive communication computer then.Storing the instruction code identical in the testing scheme unit, be used to discern the instruction of man-machine interface input with human and machine interface unit.
are as shown in Figure 4; Prepositive communication computer; Be used for the transmission of main website emulation command and receive the communication message that tested substation responds, after the test driving command that receives the main website emulation tool, in real time communication message is resolved and data preparation; And communication message form, communication process and the communication data of resolving and the standard value that presets compared, whether judged result is passed through; And communication message, device information, data and judged result write in communication message and the device information database; Send idsplay order to man-machine interface, the data transferred in communication message and the device information database of man-machine interface are carried out the demonstration to information such as communication message, alarm and test results then.Prepositive communication computer by communication preposition command process unit, data transfer unit, communication drivers unit, order and data analysis unit and as a result identifying unit form; The preposition command process of communicating by letter unit is analyzed command instruction after receiving the test driving order of main website emulation tool.Afterwards order being passed to data and transfer unit or communication drivers unit, is that the information point table imports unit instruction or substation initialization directive if the test of main website emulation tool drives command instruction, and the command process unit sends instruction to the communication drivers unit; If the test of main website emulation tool drive command instruction be send test on time synchronized test, the protection incident/self check information/switching value displacement information/fault localization value, read analog quantity test, the definite value functional test, always call test, fault recorder data test transmission or general file test transmission or the test instruction of calling device fault history information; Instruction code is passed to data transfer the unit; After testing scheme was transferred and finished, data were transferred the unit and are sent to the communication drivers unit and transfer the instruction that finishes.After the communication drivers unit receives instruction, to order and data analysis unit, identifying unit sends information analysis and decision instruction as a result as a result, and send communication message to communication interface and send instruction.
The preposition command process of communication unit is used to receive the test driving order of main website emulation tool, afterwards order is passed to data and transfers unit or communication drivers unit.If it is that the information point table imports the unit instruction that the test of main website emulation tool drives command instruction; The command process unit sends the information analysis instruction to the communication drivers unit; The communication drivers unit passes to order and data analysis unit with the information analysis instruction afterwards; Order and data analysis unit begin the information point table data of importing are analyzed, and analysis result are write in communication message and the device information data and preserves after receiving instruction; The substation configuration information that is used for reading with the substation function of initializing compares, to judge the correctness of substation initialization result; If it is the substation initialization directive that the test of main website emulation tool drives command instruction; Then instruction is passed to the communication drivers unit; The communication drivers unit is used for the order simulation communication message that the main website emulation tool generates is sent to communication interface, is used for communicating with tested substation.The communication drivers unit sends the information analysis instruction to order and data analysis unit simultaneously; Order and data analysis unit are after receiving the information analysis instruction; Begin the communication message between substation tester and the substation to be measured is resolved, and substation configuration information in the communication message and data are extracted and calculate.Afterwards communication message and substation configuration information are written in communication message and the device information database; Write finish after; Order is sent decision instruction as a result with data analysis unit to judging unit as a result, and identifying unit compares substation configuration information that obtains through the substation initialization procedure in communication message and the device information database and the substation configuration information through the importing of information point table after receiving instruction as a result; Information is consistent; Then judge and pass through, if information inconsistency is then judged and do not passed through; If the test of main website emulation tool drive command instruction be send test on time synchronized test, the protection incident/self check information/switching value displacement information/fault localization value, read analog quantity test, the definite value functional test, always call test, fault recorder data test transmission or general file test transmission or the test instruction of calling device fault history information; Then instruction code is passed to data and transfer the unit; After data are transferred the unit and are received instruction; Completion is transferred testing scheme from the test cases database according to the testing scheme code; After testing scheme is transferred successfully; And send communication drivers to the communication drivers unit and instruct; And the simulation communication message commands in the testing scheme sent to the communication drivers unit, the communication drivers unit receives after data transfer the communication drivers instruction of unit, begins to send main website simulation communication message commands to communication interface; And to order and data analysis unit and the enabled instruction of identifying unit transmission as a result; Order and data analysis unit and after judging unit receives enabled instruction as a result, order and data analysis unit begin the communication message between main website emulation tool and the substation is resolved, then order and data analysis unit with communication message and process and data passes to identifying unit as a result; Identifying unit compares communication message and the standard procedure that is preset in the identifying unit as a result as a result, and the result is judged whether qualified.After the identifying unit judged result is accomplished as a result, communication message, device information, data and judged result are write in communication message and the device information database; Meanwhile, send idsplay order to man-machine interface, the data transferred in communication message and the device information database of man-machine interface are carried out the demonstration to information such as communication message, alarm and test results then.
communication interface is used for the communication of prepositive communication computer between substation to be measured; Communication interface is after receiving the instruction of prepositive communication computer communication drivers unit communication; Begin to send corresponding main website emulation command to tested substation; And receive, and the communication message of substation response is passed to order and data analysis unit from the communication message of substation response.Communication interface is after the transmission of accomplishing communication message and receiving, and the communication close interface is waited for the communication instruction of received communication front end processor communication drivers unit once more.
are provided with a hardware encipher dog on the main website emulation tool in preferred version of the present invention, the hardware encipher dog its objective is through the encryption to software and data to prevent that intellectual property is by illegal use based on hardware-based cryptographic.Receive the order of man-machine interface when the main website emulation tool after; At first read the authorization information of hardware encipher dog; Checking is carried out the testing scheme editor, is transferred according to the order of man-machine interface through then carrying out further work, and substation initialization, emulation and the importing of information table point etc. are always done; If checking is not passed through, then test stops.
the present invention has broken away from single test specification, and test specification, testing process and testing equipment are combined together, by the leading test of tester, alleviates tester's workload; The edited change of test cases makes things convenient for the tester to set tested object and test target, targetedly the apparatus for checking function; Intellectual analysis is judged the relaying protection configuration information, through design relay protection information point table and import feature thereof, has reduced tester's workload greatly, has practiced thrift the testing time, has improved the accuracy of testing result; The automated job of test overall process: accomplish beginning from the testing scheme configuration; Results suggest, message analysis, data in test process show that the automatic preservation to test data all realizes automation; Improve testing efficiency, also strengthened the standardization of test.Test process can be realized man-machine interaction, also can artificially end, and helps the tester and holds content measurement and testing progress.

Claims (4)

1. a test macro that is applicable to south electric network guarantor communication system is characterized in that, comprises man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface;
Wherein:
Man-machine interface is used for the input of user command and the demonstration of communication message, data, test result and warning information;
The test cases database is used to preserve the test cases that has preset, and accomplishes calling, edit and preserving of test cases according to the instruction of main website emulation tool and the instruction of prepositive communication computer;
Communication message and device information database; Be used for the instruction of received communication front end processor; Communication message between substation tester and the tested device, data, substation configuration information and judged result are preserved; And the response man-machine interface transfer instruction, return corresponding message information, data message and object information according to the instruction of transferring of man-machine interface;
The main website emulation tool is used for the emulation of test command, to the functional requirement of south electric network failure information system, and the main website order that emulation is all; After the user command of receiving the man-machine interface input, carry out the testing scheme editor, transfer according to the instruction of receiving, substation initialization emulation and information point table are called in operation; The testing scheme that editor is accomplished is unique name be deposited in the testing scheme database after, send the test driving command to prepositive communication computer;
Prepositive communication computer; Be used for the transmission of main website emulation command and receive the communication message that the substation responds; After the test driving command of the main website emulation tool that receives, in real time communication message is resolved and data preparation; Communication message form, communication process and the communication data of resolving and the standard value that presets are compared, and whether judged result is passed through; And communication message, device information, data and judged result write in communication message and the device information database; Send idsplay order to man-machine interface.
2. protect the test macro of communication system according to the described south electric network that is applicable to of claim 1; It is characterized in that described main website emulation tool imports the unit by command process unit, testing scheme unit, substation initialization unit, information point table and the test driver element is formed;
The command process unit is used to receive the operational order of man-machine interface, and operational order is analyzed, and imports unit according to the result who analyzes to corresponding testing scheme unit, substation initialization unit, information point table and sends instruction;
The corresponding units that receives instruction will receive instruction process and pass to prepositive communication computer after drive order by test.
3. protect the test macro of communication system according to right according to the described south electric network that is applicable to of claim 1; It is characterized in that, described prepositive communication computer by communication preposition command process unit, data transfer unit, communication drivers unit, order and data analysis unit and as a result identifying unit form;
The preposition command process of communicating by letter unit is used to receive the test driving order of main website emulation tool, and command instruction is analyzed, and afterwards order is passed to data and transfers unit or communication drivers unit;
Data are transferred the unit, are used for the instruction of the preposition command unit of received communication, transfer test cases according to the instruction that receives to the test cases database, transfer finish after, send to the communication drivers unit and to transfer the instruction that finishes;
The communication drivers unit; Be used to receive command process unit and data and transfer the instruction of unit; To order and data analysis unit, identifying unit sends information analysis and decision instruction as a result as a result, and send communication message to communication interface and send instruction, communicate with tested substation;
Order and data analysis unit are used for the communication message between substation tester and the substation to be measured is resolved, with communication message and process and data passes to identifying unit as a result; And substation configuration information in the communication message and data extracted and calculate; Afterwards communication message and substation configuration information are written in communication message and the device information database, write finish after, send decision instruction as a result to judging unit as a result;
Identifying unit as a result; Be used for the communication message that receives be preset at as a result that the standard procedure of identifying unit compares; And the result is judged whether qualified; After the result judges completion, communication message, device information, data and judged result are write in communication message and the device information database; Meanwhile, send idsplay order to man-machine interface.
4. protect the test macro of communication system according to right according to each described south electric network that is applicable among the claim 1-3, it is characterized in that described main website emulation tool is provided with a hardware encipher dog.
CN201110108606.3A 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system Active CN102403788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110108606.3A CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110108606.3A CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Publications (2)

Publication Number Publication Date
CN102403788A true CN102403788A (en) 2012-04-04
CN102403788B CN102403788B (en) 2014-03-26

Family

ID=45885696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110108606.3A Active CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Country Status (1)

Country Link
CN (1) CN102403788B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102821010A (en) * 2012-08-23 2012-12-12 广东电网公司电力调度控制中心 Simulator for protector
CN103117598A (en) * 2013-01-28 2013-05-22 南京南瑞继保电气有限公司 Constant value remote setting maintenance-free system for transformer substation
CN103326467A (en) * 2013-06-03 2013-09-25 中国南方电网有限责任公司 Protection action report implementation method based on information protection main station device recorded information
CN103633742A (en) * 2013-12-10 2014-03-12 国家电网公司 Communication method for implementing synchronous online analysis in fault recording data transmission
CN103675526A (en) * 2013-11-19 2014-03-26 广东电网公司电力调度控制中心 Prudential sub-station test system
CN103678119A (en) * 2013-10-31 2014-03-26 国家电网公司 Power-system-oriented transformer substation simulation software test system and test method thereof
CN105024874A (en) * 2014-04-29 2015-11-04 ***股份有限公司 Offline simulation system based on trusted service management platform
CN105591467A (en) * 2014-10-24 2016-05-18 上海许继电气有限公司 Relay protection fault information main station system based on service-oriented architecture
CN106291159A (en) * 2016-06-24 2017-01-04 国网江苏省电力公司南京供电公司 A kind of main website side power distribution automation signal intelligent checks and accepts device and acceptance method
CN106909615A (en) * 2017-01-13 2017-06-30 中国电力科学研究院 Data message consistency verification method and device between a kind of main website and substation
CN107992019A (en) * 2017-10-31 2018-05-04 中国电力科学研究院有限公司 A kind of boss station integration anti-error system closed loop test method and system
CN108152684A (en) * 2018-01-12 2018-06-12 中国南方电网有限责任公司超高压输电公司检修试验中心 Relay protection information system pressure processing capacity automatic detection device and method
CN110138602A (en) * 2019-04-28 2019-08-16 许昌开普检测研究院股份有限公司 A kind of message emulating processing system
CN110286664A (en) * 2019-04-17 2019-09-27 许昌开普检测研究院股份有限公司 A kind of electric system measure and control device telemetering precision Auto-Test System
CN110851199A (en) * 2019-10-16 2020-02-28 许昌许继软件技术有限公司 Information protection system in power system and initialization method thereof
CN110932393A (en) * 2019-11-19 2020-03-27 许继集团有限公司 Substation information protection master station system and data initialization method thereof
CN111176978A (en) * 2018-11-09 2020-05-19 通用电气航空***有限公司 Tool verification system and method for verifying rejected parts
CN115241978A (en) * 2022-08-15 2022-10-25 山西敬天继保电力有限公司 Remote monitoring system and method for power distribution network

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109001596B (en) * 2018-10-17 2021-06-29 广东电网有限责任公司 Power grid fault diagnosis and power transmission line parameter identification system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09243696A (en) * 1996-03-08 1997-09-19 Hitachi Ltd Digital protective relay testing apparatus
CN101980417A (en) * 2010-11-02 2011-02-23 江西省电力科学研究院 Digital substation testing simulation method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09243696A (en) * 1996-03-08 1997-09-19 Hitachi Ltd Digital protective relay testing apparatus
CN101980417A (en) * 2010-11-02 2011-02-23 江西省电力科学研究院 Digital substation testing simulation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
应站煌等: "继电保护装置自动测试***研究和设计", 《电力***保护与控制》 *
李忠安等: "电力***智能装置自动化测试***的设计", 《电力***自动化》 *

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102821010A (en) * 2012-08-23 2012-12-12 广东电网公司电力调度控制中心 Simulator for protector
CN102821010B (en) * 2012-08-23 2015-05-13 广东电网公司电力调度控制中心 Simulator for protector
CN103117598A (en) * 2013-01-28 2013-05-22 南京南瑞继保电气有限公司 Constant value remote setting maintenance-free system for transformer substation
CN103326467A (en) * 2013-06-03 2013-09-25 中国南方电网有限责任公司 Protection action report implementation method based on information protection main station device recorded information
CN103326467B (en) * 2013-06-03 2015-07-29 中国南方电网有限责任公司 A kind of protection act report implementation method based on Prudential Master device wave-record chart
CN103678119B (en) * 2013-10-31 2016-12-07 国家电网公司 Substation simulation software testing system and method for testing thereof towards power system
CN103678119A (en) * 2013-10-31 2014-03-26 国家电网公司 Power-system-oriented transformer substation simulation software test system and test method thereof
CN103675526A (en) * 2013-11-19 2014-03-26 广东电网公司电力调度控制中心 Prudential sub-station test system
CN103675526B (en) * 2013-11-19 2017-02-15 广东电网公司电力调度控制中心 Prudential sub-station test system
CN103633742B (en) * 2013-12-10 2015-10-21 国家电网公司 Realize the means of communication of synchronous on-line analysis during fault recorder data transmission
CN103633742A (en) * 2013-12-10 2014-03-12 国家电网公司 Communication method for implementing synchronous online analysis in fault recording data transmission
CN105024874A (en) * 2014-04-29 2015-11-04 ***股份有限公司 Offline simulation system based on trusted service management platform
CN105024874B (en) * 2014-04-29 2018-11-27 ***股份有限公司 Off-line emulation system based on trusted service management platform
CN105591467A (en) * 2014-10-24 2016-05-18 上海许继电气有限公司 Relay protection fault information main station system based on service-oriented architecture
CN105591467B (en) * 2014-10-24 2018-07-20 上海许继电气有限公司 Relay protection fault information main station system based on Service-Oriented Architecture Based
CN106291159A (en) * 2016-06-24 2017-01-04 国网江苏省电力公司南京供电公司 A kind of main website side power distribution automation signal intelligent checks and accepts device and acceptance method
CN106291159B (en) * 2016-06-24 2021-06-25 国网江苏省电力公司南京供电公司 Intelligent acceptance device and acceptance method for main station side power distribution automatic signals
CN106909615A (en) * 2017-01-13 2017-06-30 中国电力科学研究院 Data message consistency verification method and device between a kind of main website and substation
CN106909615B (en) * 2017-01-13 2022-09-23 中国电力科学研究院 Method and device for verifying data information consistency between master station and substation
CN107992019A (en) * 2017-10-31 2018-05-04 中国电力科学研究院有限公司 A kind of boss station integration anti-error system closed loop test method and system
CN108152684A (en) * 2018-01-12 2018-06-12 中国南方电网有限责任公司超高压输电公司检修试验中心 Relay protection information system pressure processing capacity automatic detection device and method
CN111176978A (en) * 2018-11-09 2020-05-19 通用电气航空***有限公司 Tool verification system and method for verifying rejected parts
CN111176978B (en) * 2018-11-09 2023-09-29 通用电气航空***有限公司 Tool verification system and method for verifying failed components
CN110286664A (en) * 2019-04-17 2019-09-27 许昌开普检测研究院股份有限公司 A kind of electric system measure and control device telemetering precision Auto-Test System
CN110286664B (en) * 2019-04-17 2022-04-12 许昌开普检测研究院股份有限公司 Automatic test system for remote measurement precision of measurement and control device of power system
CN110138602B (en) * 2019-04-28 2022-08-16 许昌开普检测研究院股份有限公司 Message simulation processing system
CN110138602A (en) * 2019-04-28 2019-08-16 许昌开普检测研究院股份有限公司 A kind of message emulating processing system
CN110851199A (en) * 2019-10-16 2020-02-28 许昌许继软件技术有限公司 Information protection system in power system and initialization method thereof
CN110851199B (en) * 2019-10-16 2023-07-11 许昌许继软件技术有限公司 Information protection system in electric power system and initialization method thereof
CN110932393A (en) * 2019-11-19 2020-03-27 许继集团有限公司 Substation information protection master station system and data initialization method thereof
CN115241978A (en) * 2022-08-15 2022-10-25 山西敬天继保电力有限公司 Remote monitoring system and method for power distribution network

Also Published As

Publication number Publication date
CN102403788B (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN102403788A (en) Test system applicable to southern power grid communication guaranteeing system
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN101718841B (en) Automatic checking system and method of relaying protection device
CN105978159B (en) A kind of substation's remote control test is online to exempt to execute checking method
CN102713652A (en) A method and a system for simulation in a substation
CN110568284B (en) Intelligent substation one-key sequential control automatic test verification method, device and system
CN105093033A (en) Power grid multi-source information-based fault integrated analysis system and analysis method
CN103675526B (en) Prudential sub-station test system
CN105515187A (en) Working method of remote control system of substation automation system
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN102983541A (en) Relay protection constant value remote modification system
CN104076807B (en) The adjustment method of the automated system of intelligent substation
CN101158847A (en) Electric power substation software emulation platform building method and no power off upgrading improved method
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN113343446A (en) Data analysis and verification method and system for transformer substation monitoring system
CN107257304A (en) Telemechanical is exempted to a configuration testing system
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN1972287B (en) Communication protocol record analysis apparatus and its analysis method
CN113629876A (en) Test system and test method of special inspection module
CN102821010A (en) Simulator for protector
CN105743695B (en) A kind of monitor method and system based on IEC104 stipulations
CN105703479B (en) Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension
CN109581098A (en) The intelligent O&M test method of site protective device
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN109634849B (en) Visual signal interaction intelligent substation reconstruction and extension virtual testing device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee after: XUCHANG KETOP TESTING RESEARCH INSTITUTE CO.,LTD.

Patentee after: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address before: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee before: XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.

Patentee before: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address after: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee after: XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.

Patentee after: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address before: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee before: XUCHANG KETOP ELECTRICAL APPARATUS TESTING & Research Institute

Patentee before: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER