CN102383594A - Cavity mold template for carrying out anchor seal to unbonded prestressed end portions - Google Patents

Cavity mold template for carrying out anchor seal to unbonded prestressed end portions Download PDF

Info

Publication number
CN102383594A
CN102383594A CN2011102791418A CN201110279141A CN102383594A CN 102383594 A CN102383594 A CN 102383594A CN 2011102791418 A CN2011102791418 A CN 2011102791418A CN 201110279141 A CN201110279141 A CN 201110279141A CN 102383594 A CN102383594 A CN 102383594A
Authority
CN
China
Prior art keywords
construction
cavity mold
end portions
template
unbonded prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102791418A
Other languages
Chinese (zh)
Inventor
刘志亮
侯福刚
蔡桂荣
刘慧�
刘瑞勃
曾思慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal 72 Engineering Co., Ltd.
China Coal Building & Installation Engineering Group Co., Ltd.
Original Assignee
CHINA COAL 72 ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COAL 72 ENGINEERING Co Ltd filed Critical CHINA COAL 72 ENGINEERING Co Ltd
Priority to CN2011102791418A priority Critical patent/CN102383594A/en
Publication of CN102383594A publication Critical patent/CN102383594A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention relates to a cavity mold template for carrying out anchor seal to unbonded prestressed end portions, which is characterized in that a template body is in a hopper shape with a big top and a small bottom, an upper opening and the lower bottom surface are both quadrate, and a bundled bar through hole is arranged in the middle of the lower bottom surface. The diameter of the bundled bar through hole is 90mm to 150mm. The cavity mold template is precast in a wall-supporting column when a slip form is constructed on the silo wall to carry out the anchor seal to the end portions of a pilaster of the unbonded prestressed silo wall. Compared with a traditional construction technology, the cavity mold template reduces construction processes and has no need to bind reinforcing ribs and erect and remove templates for sealing positions on the side face of the pilaster. Concrete is directly used for sealing the cavity mold reserved in the slip form construction, thereby being high in construction quality, simple in process, convenient in construction, short in construction period and capable of guaranteeing construction safety. The cavity mold template for carrying out the anchor seal to the unbonded prestressed end portions has simple structure, low cost and strong operability.

Description

Sealing off and covering anchorage cave, prestressing without bondn end mould template
Technical field
The present invention relates to sealing off and covering anchorage cave, a kind of prestressing without bondn end mould template.
  
Technical background
Present most of major diameter silo bulkhead adopts the prestressed concrete construction technology; Buttress unbonded prestressing tendon plug at end part adopts the construction of secondary formwork monobloc cast; To prop up the form removal construction to the reinforcing rib and the high-altitude at colligation shutoff position, pilaster side at every turn; Not only how very loaded down with trivial details again operation is, and cause the outward appearance impression poor, and speed of application is slow, workmanship is poor.
  
Content of the present invention
The present invention seeks to existing problem, provide a kind of not only construction quality high, and avoid the required formwork of buttress construction sealing off and covering anchorage, formwork reinforcement operation to people; Operation is few; Duration is short, and speed of application is safety again soon, sealing off and covering anchorage cave, the prestressing without bondn end mould template of economical with materials.
The present invention is characterized in that: described template plate body is up big and down small infundibulate, and suitable for reading and bottom surface is square, has tendon perforation in the middle of the bottom surface.
The tendon perforation is directly through being 90~150mm.
  
Effect of the present invention
Pre-buried cave mould template in buttress when 1, the present invention is employed in the bulkhead sliding formwork; Sealing off and covering anchorage is carried out in non-bonded prestressed silo bulkhead structure pilaster end; Compare with traditional construction technology; Reduced working procedure, need not, prop up form removal the reinforcing rib and the high-altitude at colligation shutoff position, pilaster side as traditional construction technology.It is in the cave mould of in slding form operation, reserving, direct blocking concrete, and therefore not only construction quality is high, and operation is simple, easy construction, duration are short, and has guaranteed the safety of construction.
2, the present invention is simple in structure, and is with low cost, workable.
  
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is user mode figure of the present invention.
  
The specific embodiment
Embodiment 1:
Referring to Fig. 1~2, template plate body 1 of the present invention is up big and down small infundibulate, and suitable for reading 2 are square with bottom surface 3, have tendon perforation 4 in the middle of the bottom surface.The tendon perforation is directly through being 90~150mm.
During the bulkhead slding form operation, pre-buried cave, both sides mould template outside buttress makes presstressed reinforcing steel bundle 5 pass spiral bar 6, paste tight presstressed reinforcing steel anchor plate 7 with exterior sheathing, passes and has tendon perforation and ground tackle 8 under the mould template of cave in the middle of the bottom surface.In time remove cave mould template after the bulkhead sliding formwork rises, note finished product protection during stripping.

Claims (2)

1. sealing off and covering anchorage cave, prestressing without bondn end mould template, it is characterized in that: described template plate body is up big and down small infundibulate, suitable for readingly is square with bottom surface, has tendon perforation in the middle of the bottom surface.
2. sealing off and covering anchorage cave, prestressing without bondn according to claim 1 end mould template is characterized in that: tendon is bored a hole directly through being 90~150mm.
CN2011102791418A 2011-09-20 2011-09-20 Cavity mold template for carrying out anchor seal to unbonded prestressed end portions Pending CN102383594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102791418A CN102383594A (en) 2011-09-20 2011-09-20 Cavity mold template for carrying out anchor seal to unbonded prestressed end portions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102791418A CN102383594A (en) 2011-09-20 2011-09-20 Cavity mold template for carrying out anchor seal to unbonded prestressed end portions

Publications (1)

Publication Number Publication Date
CN102383594A true CN102383594A (en) 2012-03-21

Family

ID=45823394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102791418A Pending CN102383594A (en) 2011-09-20 2011-09-20 Cavity mold template for carrying out anchor seal to unbonded prestressed end portions

Country Status (1)

Country Link
CN (1) CN102383594A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114753A (en) * 2013-03-01 2013-05-22 杨晨 Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof
CN112339065A (en) * 2020-10-14 2021-02-09 燕山大学 Improved method for post-tensioning grouting end-sealing process
CN113323379A (en) * 2021-05-28 2021-08-31 广西建工集团冶金建设有限公司 Steel strand head plugging hole reservation device for slip form construction and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05106340A (en) * 1991-10-15 1993-04-27 Kajima Corp Construction method for lath structure and lath sticking
CN2533198Y (en) * 2002-04-16 2003-01-29 北京市建筑工程研究院 Binding-prestressless bar stretching end plastic cave mould structure and seal anchor cover
CN201539095U (en) * 2009-12-01 2010-08-04 江苏新筑预应力工程有限公司 Unbonded prestressed concrete silo wall column stretching end joint sliding die system
CN202273422U (en) * 2011-09-20 2012-06-13 中煤建筑安装工程集团有限公司 Unbonded prestressed end seal anchor cavity mould template

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05106340A (en) * 1991-10-15 1993-04-27 Kajima Corp Construction method for lath structure and lath sticking
CN2533198Y (en) * 2002-04-16 2003-01-29 北京市建筑工程研究院 Binding-prestressless bar stretching end plastic cave mould structure and seal anchor cover
CN201539095U (en) * 2009-12-01 2010-08-04 江苏新筑预应力工程有限公司 Unbonded prestressed concrete silo wall column stretching end joint sliding die system
CN202273422U (en) * 2011-09-20 2012-06-13 中煤建筑安装工程集团有限公司 Unbonded prestressed end seal anchor cavity mould template

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114753A (en) * 2013-03-01 2013-05-22 杨晨 Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof
CN112339065A (en) * 2020-10-14 2021-02-09 燕山大学 Improved method for post-tensioning grouting end-sealing process
CN112339065B (en) * 2020-10-14 2021-11-23 燕山大学 Improved method for post-tensioning grouting end-sealing process
CN113323379A (en) * 2021-05-28 2021-08-31 广西建工集团冶金建设有限公司 Steel strand head plugging hole reservation device for slip form construction and construction method

Similar Documents

Publication Publication Date Title
CN203247600U (en) Equipment foundation bolt preformed hole die
CN203856202U (en) Simple pullable sizing device of reserved holes
CN103485537A (en) Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure
CN109537894B (en) Grouting construction method for assembled wall
CN102383594A (en) Cavity mold template for carrying out anchor seal to unbonded prestressed end portions
CN103114753A (en) Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof
CN201539095U (en) Unbonded prestressed concrete silo wall column stretching end joint sliding die system
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN202644992U (en) Movable die for reserving hole in box body or wellhead for building
CN102102442A (en) Construction method for plugging end of prestress pilaster steel strand of concrete silo
CN201785750U (en) Easily-stripped concrete pouring pile head
CN202273422U (en) Unbonded prestressed end seal anchor cavity mould template
CN202689344U (en) Tensioning bar connecting device
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN208329580U (en) A kind of external wall scaffold wall connecting piece
CN209115120U (en) A kind of lining of hidden digging structure two concrete vault anticreep sky device
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN106567543A (en) Slab-bottom structural concrete column reserved hole construction method
CN104453235B (en) Current conversion station fire wall construction technology
CN206539016U (en) Constructional column pours device
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN205823298U (en) Existing operation tunnel defect processing template fixed structure
CN203113862U (en) Anchoring end concealed prestress cylinder bin
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN209723594U (en) A kind of positioning of assembled architecture reinforcing bar and check device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CHINA COAL BUILDING + INSTALLING ENGINEERING GROUP

Free format text: FORMER OWNER: CHINA COAL 72 ENGINEERING DEPARTMENT

Effective date: 20120217

Owner name: CHINA COAL 72 ENGINEERING CO., LTD.

Effective date: 20120217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 234000 SUZHOU, ANHUI PROVINCE TO: 056000 HANDAN, HEBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20120217

Address after: 056000 Hebei Province, Handan city Congtai Congtai Road No. 56

Applicant after: China Coal Building & Installation Engineering Group Co., Ltd.

Co-applicant after: China Coal 72 Engineering Co., Ltd.

Address before: 234000 coal seventy-second project, No. 46 East Main Street, Anhui, Suzhou

Applicant before: China Coal 72 Engineering Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120321