CN107762135A - The construction method of skin scaffold wall connecting piece - Google Patents

The construction method of skin scaffold wall connecting piece Download PDF

Info

Publication number
CN107762135A
CN107762135A CN201610698483.6A CN201610698483A CN107762135A CN 107762135 A CN107762135 A CN 107762135A CN 201610698483 A CN201610698483 A CN 201610698483A CN 107762135 A CN107762135 A CN 107762135A
Authority
CN
China
Prior art keywords
skin
connecting piece
embedded section
wall
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610698483.6A
Other languages
Chinese (zh)
Other versions
CN107762135B (en
Inventor
黄杰
陈士红
丁雪林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610698483.6A priority Critical patent/CN107762135B/en
Publication of CN107762135A publication Critical patent/CN107762135A/en
Application granted granted Critical
Publication of CN107762135B publication Critical patent/CN107762135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction method of skin scaffold wall connecting piece, this method determines that skin template needs the position of pre-buried wall-connecting piece first, and the hole with wall-connecting piece screw thread embedded section diameter matches is opened up in the position;After the completion of skin beam reinforced steel bar colligation, inserted after embedded section is screwed into bolt fastener in hole to skin edge beam, embedded section is fastened by bolts part and is fixed in template, and fixed embedded section;Skin concrete is poured, and prevents embedded section from coming off, shifting;When concrete maintaining is dismountable to skin side form, bolt fastener is removed, then removes side form, outside steel pipe is connected through a screw thread embedded section, the anchored end of outside fastener for connection skin scaffold.The method ensure that scaffold wall connecting piece can avoid the potential safety hazard that scaffold is built according to the uniform equidistant placement of specification, solve because pin trick closure and caused by metope seepy question, improve construction quality.

Description

The construction method of skin scaffold wall connecting piece
Technical field
The present invention relates to a kind of construction method of skin scaffold wall connecting piece.
Background technology
With the development of infrastructure, skyscraper is more and more, because most skyscrapers are using framework Shear wall structure so that skin scaffold wall connecting piece can not be uniformly equidistant according to specification because of the presence of outside shear wall Potential safety hazard be present in arrangement, building for scaffold.Wall-connecting piece is used for scaffold support body and building body in architectural engineering Structure connection, pulling force and the component of pressure can be transmitted, the attached wall for realizing scaffold using wall-connecting piece is coupled, for strengthening pin hand The resistance to overturning of frame, improving its stable bearing capacity and avoiding the occurrence of the major accident such as topple over or cave in has critically important work With.And traditional wall-connecting piece has to leave behind pin trick when building by laying bricks or stones, and later stage closure easily causes wall leak, so solving this problem It is very urgent.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of construction method of skin scaffold wall connecting piece, this Method ensures that scaffold wall connecting piece can avoid the potential safety hazard that scaffold is built, solve according to the uniform equidistant placement of specification Metope seepy question caused by because of the closure of pin trick, improves construction quality.
In order to solve the above technical problems, the construction method of skin scaffold wall connecting piece of the present invention includes following step Suddenly:
Step 1: determine that skin template needs the position of pre-buried wall-connecting piece according to the design drawing of skin scaffold Put, and the hole with wall-connecting piece screw thread embedded section diameter matches is opened up in the position;
Step 2: after the completion of skin beam reinforced steel bar colligation, inserted after the embedded section of wall-connecting piece is screwed into bolt fastener Enter in hole to skin edge beam, embedded section is fastened by bolts part and is fixed in template, and embedded section is adopted Fixed with tied silk and reinforcing bar;
Step 3: skin casting concrete, prevents embedded section from coming off, shifting when pouring;
Step 4: when concrete maintaining is dismountable to skin side form, bolt fastener is removed, then removes side Mould, outside steel pipe is connected through a screw thread to the embedded section of wall-connecting piece, the anchored end of outside fastener for connection skin scaffold.
Because the construction method of skin scaffold wall connecting piece of the present invention employs above-mentioned technical proposal, i.e. this method first Determine that skin template needs the position of pre-buried wall-connecting piece, opened up in the position and wall-connecting piece screw thread embedded section diameter matches Hole;After the completion of skin beam reinforced steel bar colligation, inserted after embedded section is screwed into bolt fastener outside hole to building In wall edge beam, embedded section is fastened by bolts part and is fixed in template, and fixed embedded section;Pour skin Concrete, and prevent embedded section from coming off, shifting;When concrete maintaining is dismountable to skin side form, bolt is fastened Part is removed, and then removes side form, outside steel pipe is connected through a screw thread into embedded section, outside fastener for connection skin scaffold Anchored end.The method ensure that scaffold wall connecting piece can avoid the safety that scaffold is built according to the uniform equidistant placement of specification Hidden danger, solve because pin trick closure and caused by metope seepy question, improve construction quality.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the embedded section of wall-connecting piece and the setting schematic diagram of bolt fastener in this method;
Fig. 2 is the connection diagram of the embedded section of wall-connecting piece and outside steel pipe in this method.
Embodiment
As depicted in figs. 1 and 2, the construction method of skin scaffold wall connecting piece of the present invention includes following step to embodiment Suddenly:
Step 1: determine that skin template 2 needs the position of pre-buried wall-connecting piece according to the design drawing of the scaffold of skin 1 Put, and the hole with the diameter matches of wall-connecting piece screw thread embedded section 3 is opened up in the position;
Step 2: after the completion of the beam reinforced steel bar colligation of skin 1, after the embedded section 3 of wall-connecting piece is screwed into bolt fastener 4 Insert in hole to skin edge beam, embedded section 3 is fastened by bolts part 4 and is fixed in template 1, and pre-buried Section 3 is fixed using tied silk 5 with reinforcing bar;
Step 3: the casting concrete of skin 1, prevents embedded section 3 from coming off, shifting when pouring;
Step 4: when concrete maintaining is dismountable to the side form of skin 1, bolt fastener 4 is removed, then removes side Mould, outside steel pipe 6 is connected through a screw thread to the embedded section 3 of wall-connecting piece, the anchoring of the outside connecting building thing exterior wall scaffold of steel pipe 6 End.
This method can be such that wall-connecting piece is uniformly embedded in the agent structure of building, solve shear wall etc. outside building Component affecting and the problem of hinder scaffold wall connecting piece equidistant uniformly pre-buried;And the later stage will not leave behind pin trick when building by laying bricks or stones, solve Metope seepy question caused by because of the closure of pin trick, overcomes problem caused by traditional scaffold wall connecting piece.
The pre-buried mode of wall-connecting piece of this method is simple, readily removable to remove, and saves the later stage and removes scaffold outrigger cutting wall-connecting piece steel The tedious steps of pipe, it is not pre-buried by component affectings such as shear walls, realize that wall-connecting piece is preset by specification, avoid traditional wall-connecting piece shadow Ring carpenter and set up the trouble of high one layer of internal frame, solve job site always existing carpenter for set up internal frame remove wall-connecting piece without The problem of recovery, so as to improve construction quality.

Claims (1)

1. a kind of construction method of skin scaffold wall connecting piece, it is characterised in that this method comprises the following steps:
Step 1: determine that skin template needs the position of pre-buried wall-connecting piece according to the design drawing of skin scaffold Put, and the hole with wall-connecting piece screw thread embedded section diameter matches is opened up in the position;
Step 2: after the completion of skin beam reinforced steel bar colligation, inserted after the embedded section of wall-connecting piece is screwed into bolt fastener Enter in hole to skin edge beam, embedded section is fastened by bolts part and is fixed in template, and embedded section is adopted Fixed with tied silk and reinforcing bar;
Step 3: skin casting concrete, prevents embedded section from coming off, shifting when pouring;
Step 4: when concrete maintaining is dismountable to skin side form, bolt fastener is removed, then removes side Mould, outside steel pipe is connected through a screw thread to the embedded section of wall-connecting piece, the anchored end of outside fastener for connection skin scaffold.
CN201610698483.6A 2016-08-22 2016-08-22 Construction method of scaffold wall connecting piece of building outer wall Active CN107762135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610698483.6A CN107762135B (en) 2016-08-22 2016-08-22 Construction method of scaffold wall connecting piece of building outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610698483.6A CN107762135B (en) 2016-08-22 2016-08-22 Construction method of scaffold wall connecting piece of building outer wall

Publications (2)

Publication Number Publication Date
CN107762135A true CN107762135A (en) 2018-03-06
CN107762135B CN107762135B (en) 2020-01-14

Family

ID=61262354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610698483.6A Active CN107762135B (en) 2016-08-22 2016-08-22 Construction method of scaffold wall connecting piece of building outer wall

Country Status (1)

Country Link
CN (1) CN107762135B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439124A (en) * 2019-09-05 2019-11-12 湖南中力建筑设备租赁有限公司 A kind of pre-embedded device
CN110952767A (en) * 2019-11-06 2020-04-03 上海建工七建集团有限公司 Assembled bolt connection scaffold wall connecting piece and mounting method
CN111364752A (en) * 2020-03-27 2020-07-03 中铁二局集团有限公司 Wall scaffold mounting method and embedded bolt wall connecting piece device
CN115095134A (en) * 2022-07-19 2022-09-23 中铁一局集团(广州)建设工程有限公司 Novel outer frame wall connecting device and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201826517U (en) * 2010-10-21 2011-05-11 锦宸集团有限公司 Scaffold-wall connecting component in construction
CN203129564U (en) * 2013-03-07 2013-08-14 中国十七冶集团有限公司 Simple wall connection device for scaffold in silo slip-form construction
CN203654710U (en) * 2014-01-15 2014-06-18 南通四建集团有限公司 Instrumental connecting tube for external wall scaffold shearing wall portion
CN203669332U (en) * 2013-12-31 2014-06-25 武汉建工股份有限公司 Straight thread connection combined type steel pipe scaffold wall connecting component
CN204139576U (en) * 2014-08-19 2015-02-04 上海建工五建集团有限公司 For the external scaffolding drawknot structure of preset assembling plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201826517U (en) * 2010-10-21 2011-05-11 锦宸集团有限公司 Scaffold-wall connecting component in construction
CN203129564U (en) * 2013-03-07 2013-08-14 中国十七冶集团有限公司 Simple wall connection device for scaffold in silo slip-form construction
CN203669332U (en) * 2013-12-31 2014-06-25 武汉建工股份有限公司 Straight thread connection combined type steel pipe scaffold wall connecting component
CN203654710U (en) * 2014-01-15 2014-06-18 南通四建集团有限公司 Instrumental connecting tube for external wall scaffold shearing wall portion
CN204139576U (en) * 2014-08-19 2015-02-04 上海建工五建集团有限公司 For the external scaffolding drawknot structure of preset assembling plate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439124A (en) * 2019-09-05 2019-11-12 湖南中力建筑设备租赁有限公司 A kind of pre-embedded device
CN110952767A (en) * 2019-11-06 2020-04-03 上海建工七建集团有限公司 Assembled bolt connection scaffold wall connecting piece and mounting method
CN111364752A (en) * 2020-03-27 2020-07-03 中铁二局集团有限公司 Wall scaffold mounting method and embedded bolt wall connecting piece device
CN115095134A (en) * 2022-07-19 2022-09-23 中铁一局集团(广州)建设工程有限公司 Novel outer frame wall connecting device and construction method thereof

Also Published As

Publication number Publication date
CN107762135B (en) 2020-01-14

Similar Documents

Publication Publication Date Title
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN203856202U (en) Simple pullable sizing device of reserved holes
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN106088447A (en) A kind of exterior wall builder's jack shaped steel eye protective brick device and construction method
CN103510466B (en) Wet joint construction method of T-shaped beam bridge floor system
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN202509764U (en) Template bracing structure for constructional column
CN207633342U (en) A kind of bridge pile foundation pile crown abolishes device
CN107023154A (en) A kind of new builder's jack component and its construction method
CN206815795U (en) A kind of new builder's jack component
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN215484618U (en) A pour template structure for assembled shear force wall and post
CN203113332U (en) Anchor rod construction structure device after construction
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN106320687A (en) Detachable wall connecting component for scaffold
CN109779226A (en) A kind of opposite sex chimney construction security platform structure and its construction method
CN211369499U (en) Wall connecting device for external scaffold
CN206319404U (en) A kind of building precast exterior sheathing
CN205558271U (en) Building engineering box out ware
CN213477639U (en) Penetrating continuous support for building concrete floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant