CN102322055A - Construct and construction method of preventing pavement around manhole from subsiding - Google Patents
Construct and construction method of preventing pavement around manhole from subsiding Download PDFInfo
- Publication number
- CN102322055A CN102322055A CN201110178118A CN201110178118A CN102322055A CN 102322055 A CN102322055 A CN 102322055A CN 201110178118 A CN201110178118 A CN 201110178118A CN 201110178118 A CN201110178118 A CN 201110178118A CN 102322055 A CN102322055 A CN 102322055A
- Authority
- CN
- China
- Prior art keywords
- manhole
- grouting pipe
- cushion cap
- grouting pipes
- around
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention relates to a construct and a construction method of preventing a pavement around a manhole from subsiding, which belong to the field of urban road projects and relate to a road structure and a method of strengthening the pavement around the manhole. The construct mainly comprises the manhole, grouting pipes, cushion caps and bar mat reinforcements, wherein the grouting pipes are arranged at the external side of the manhole circularly; the cushion caps are supported on the grouting pipes; cement paste is injected into the grouting pipes so that soil is solidified and the density of the soil is improved; the cement paste which permeates through the soil is in a capillary shape and is distributed around the grouting pipes so that the friction force between the grouting pipes and the soil is improved; and a basement layer and a surface layer of a road are supported by the grouting pipes and the cushion caps so that the pavement does not settle. The construction quality of the road is ensured; the settlement of the pavement around the manhole is effectively prevented; the driving safety is ensured; and the maintenance cost of the pavement is reduced through the construct and the construction method of preventing the pavement around the manhole from subsiding.
Description
Technical field
The present invention relates to a kind of the manhole structure and job practices of roadbed subsidence on every side of preventing, belong to the urban road engineering field, particularly reinforce the manhole structure and the job practices on road surface on every side.
Background technology
Underground utilities under the urban road are important component parts of urban infrastructure; Various underground utilities need certain safe spacing underground burying underground; The width that all is embedded in sidewalk under the sidewalk can not meet the demands, and therefore, (GB289-98) stipulate " Code for comprehensive planning of urban engineering pipeline "; " planned position of utilities pipeline below road should be arranged in below sidewalk or the nonmotorized vehicle lane.Utilities pipelines such as communication cable, feedwater water delivery, combustion gas gas transmission, dirty rain-water drainage can be arranged in below nonmotorized vehicle lane or the motorway ".Therefore, when carrying out the urban road design, generally storm sewer and sewage conduct are arranged under nonmotorized vehicle lane or the motorway, various pipelines need be provided with manhole at a certain distance, so that maintenance.Because during the pipeline groove backfill construction; Compacting machinary can not be close to manhole and roll, and banketing around the manhole is difficult to compacting, through sedimentation after a while; Come to nothing under the road structure around the manhole; Sedimentation phenomenon appears on every side in manhole easily that be arranged in nonmotorized vehicle lane or motorway, the comfortable and traffic safety of influence driving, and this is one of ubiquitous disease of urban road.
Summary of the invention
The purpose of this invention is to provide a kind of the manhole structure and job practices of roadbed subsidence on every side of preventing, the backfill leakiness causes the roadbed subsidence problem around the solution prior art manhole.Beneficial effect is: through the uncompacted soil of backfill around the manhole is reinforced, guarantee the construction quality of road, prevent manhole roadbed subsidence on every side effectively, guarantee traffic safety, reduce the pavement maintenance expense.
The present invention realizes through following technology:
Prevent the manhole structure of roadbed subsidence on every side, mainly comprise manhole 1, Grouting Pipe 2, cushion cap 3, steel mesh reinforcement 4.Described Grouting Pipe 2 is looped around the outside of manhole 1 and arranges that cushion cap 3 is supported on the top of Grouting Pipe 2, is furnished with aperture on Grouting Pipe 2 tube walls, and top is stretched in the cushion cap 3, with steel mesh reinforcement 4 welding.Cushion cap 3 ringwise, around the outside of manhole 1, be positioned at roadbase 6 below.In Grouting Pipe 2, inject cement paste; Cement paste is through in the uncompacted soil of backfill around the infiltration of the aperture on the Grouting Pipe 2 manhole 1, and the cement paste that infiltrates soil is capillary, is covered with around Grouting Pipe 2; Increased the frictional force of Grouting Pipe 2 with soil; Fill up fixed cement paste in the Grouting Pipe 2, form with the capillary channel of radiation towards periphery 5 and have the very root pile of high-bearing capacity, earth consolidation has been improved the compactness of soil.Because the soil around the manhole 1 is by fixed, and there are the support of Grouting Pipe 2 and cushion cap 3 in laying road basic unit 6 and surface course 7 on the top of cushion cap 3, and the road surface sedimentation can not occur again, and Fig. 1 is seen in the structure signal.
Description of drawings
Fig. 1 prevents the manhole organigram of roadbed subsidence on every side;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the B-B sectional drawing of Fig. 1;
Fig. 4 prevents the manhole structure construction sketch map of roadbed subsidence on every side.
Among the figure: the 1-manhole, the 2-Grouting Pipe, the 3-cushion cap, the 4-steel mesh reinforcement, the 5-capillary channel, the 6-roadbase, the 7-surface course, the 8-cannelure, the 9-injected hole, the 10-filler, 11-seals, 12-high-pressure hose, 13-threeway.
The specific embodiment
When pipeline groove is backfilled to the bottom surface absolute altitude of roadbase 6; Dig out a cannelure 8 in the periphery of manhole 1, cannelure 8 internal diameters are identical with the external diameter of manhole 1, and external diameter increases by 1000 millimeters in the outside of internal diameter; Be 1000 millimeters of ring widthes, 250 millimeters of the degree of depth of cannelure 8.The centre of cannelure 8 is uniformly distributed with six injected holes 9 around manhole 1, and injected hole 9 adopts rig boring, 100 millimeters in aperture, and the degree of depth gets final product near the shaft bottom.In each injected hole 9, put into a Grouting Pipe 2, Grouting Pipe 2 adopts the steel pipe processing of 25 millimeters of diameters, and the bottom will be shut, and on the tube wall of Grouting Pipe 2, whenever is uniformly distributed with at a distance from 100 millimeters and bores four 5 millimeters aperture, and the top mantle fiber of Grouting Pipe 2 is so that connect grouting pump.Grouting Pipe 2 is put into injected hole 9, and filler 10 is inserted in the slit of Grouting Pipe 2 peripheries, and filler 10 adopts sand gravel, and the 200 millimeters scopes in aperture seal 11 with concreting, and cloth hole and injected hole setting are seen Fig. 2, Fig. 4.
After waiting to seal 11 concrete settings, through threeway 13 branches six Grouting Pipe 2 are connected with grouting pump with high-pressure hose 12, slip casting in six Grouting Pipe 2 simultaneously, cement paste is pressed in the hole of soil by the high pressure of grouting pump.After treating that cement paste solidifies, the steel mesh reinforcement of making 4 is placed in the cannelure 8, Grouting Pipe 2 and steel mesh reinforcement 4 firm welding are seen Fig. 3, adopt concreting cushion cap 3.The concrete of cushion cap 3 reaches builder's road basic unit 6 and surface course 7 after the intensity, sees Fig. 1.
The injecting paste material slurry adopts the cement, flyash compound, cement: flyash=1:0.25~0.5, and pressure and the two controls of grouting amount are adopted in slip casting control, and grouting pressure is controlled at 0.8~1.5Mpa, and grouting amount calculates according to the porosity of the volume of reinforcing soil, soil to be confirmed.
Claims (6)
1. one kind prevents the manhole structure of roadbed subsidence on every side; Mainly comprise manhole (1), Grouting Pipe (2), cushion cap (3), steel mesh reinforcement (4); It is characterized in that: described Grouting Pipe (2) is looped around the outside of manhole (1) and arranges that cushion cap (3) is supported on the top of Grouting Pipe (2).
2. the manhole structure of roadbed subsidence on every side that prevents according to claim 1, it is characterized in that: be furnished with aperture on described Grouting Pipe (2) tube wall, top is stretched in the cushion cap (3), welds with steel mesh reinforcement (4).
3. the manhole structure of roadbed subsidence on every side that prevents according to claim 1; It is characterized in that: described cushion cap (3) ringwise, around the outside of manhole (1), be positioned at roadbase (6) below; In establish steel mesh reinforcement (4), adopt concreting.
4. one kind prevents the manhole job practices of the structure of roadbed subsidence on every side; It is characterized in that: adopt rig to bore injected hole (9) on every side at manhole (1); In injected hole (9), put into Grouting Pipe (2); Filler (10) is inserted in the slit of Grouting Pipe (2) periphery, and the 200 millimeters scopes in aperture are sealed (11) with concreting.
5. a kind of manhole job practices of the structure of roadbed subsidence on every side that prevents according to claim 4, it is characterized in that: pressure and the two controls of grouting amount are adopted in slip casting in Grouting Pipe (2), slip casting.
6. a kind of manhole job practices of the structure of roadbed subsidence on every side that prevents according to claim 4; It is characterized in that: Grouting Pipe (2) and steel mesh reinforcement (4) firm welding; Adopt concreting cushion cap (3), go up builder's road basic unit (6) and surface course (7) at cushion cap (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110178118A CN102322055A (en) | 2011-06-29 | 2011-06-29 | Construct and construction method of preventing pavement around manhole from subsiding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110178118A CN102322055A (en) | 2011-06-29 | 2011-06-29 | Construct and construction method of preventing pavement around manhole from subsiding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102322055A true CN102322055A (en) | 2012-01-18 |
Family
ID=45449881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110178118A Pending CN102322055A (en) | 2011-06-29 | 2011-06-29 | Construct and construction method of preventing pavement around manhole from subsiding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102322055A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644295A (en) * | 2012-04-28 | 2012-08-22 | 江苏阳湖建设项目管理有限公司 | Construction method for preventing peripheral and local sedimentation of road surface inspection well |
CN104652238A (en) * | 2015-01-07 | 2015-05-27 | 南通大学 | Barrier-free base construction method for urban roads |
CN105569087A (en) * | 2016-01-13 | 2016-05-11 | 中国十九冶集团有限公司 | Construction method for inspection well |
CN107816060A (en) * | 2017-09-12 | 2018-03-20 | 浙江山海建设有限公司 | Prevent the structure of roadbed subsidence around inspection shaft |
CN110295628A (en) * | 2019-07-02 | 2019-10-01 | 广东源基建设工程有限公司 | A kind of pavement construction method with inspection shaft |
CN114855536A (en) * | 2022-05-31 | 2022-08-05 | 广州市交通设计研究院有限公司 | Method for preventing and treating highway pipeline diseases |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2136274Y (en) * | 1992-09-30 | 1993-06-16 | 庞学雷 | Antisettling combined manhole cover |
CN1760455A (en) * | 2005-11-15 | 2006-04-19 | 陈玉恒 | Method for treating collapsed road surface around inspection-pit for underground lines |
CN1876972A (en) * | 2006-07-19 | 2006-12-13 | 梁彬 | Inspection well mouth seat and inspection well with the same and construction, repair method thereof |
JP2008240425A (en) * | 2007-03-28 | 2008-10-09 | Teikoku Hume Kan Higashi Nippon Kk | Water-stopping construction method |
CN201762723U (en) * | 2010-07-23 | 2011-03-16 | 华瀚科技有限公司 | Plastic-steel winding pipe network inspection well |
-
2011
- 2011-06-29 CN CN201110178118A patent/CN102322055A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2136274Y (en) * | 1992-09-30 | 1993-06-16 | 庞学雷 | Antisettling combined manhole cover |
CN1760455A (en) * | 2005-11-15 | 2006-04-19 | 陈玉恒 | Method for treating collapsed road surface around inspection-pit for underground lines |
CN1876972A (en) * | 2006-07-19 | 2006-12-13 | 梁彬 | Inspection well mouth seat and inspection well with the same and construction, repair method thereof |
JP2008240425A (en) * | 2007-03-28 | 2008-10-09 | Teikoku Hume Kan Higashi Nippon Kk | Water-stopping construction method |
CN201762723U (en) * | 2010-07-23 | 2011-03-16 | 华瀚科技有限公司 | Plastic-steel winding pipe network inspection well |
Non-Patent Citations (1)
Title |
---|
李健: "道路检查井周围防止沉降的技术措施", 《山西建筑》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644295A (en) * | 2012-04-28 | 2012-08-22 | 江苏阳湖建设项目管理有限公司 | Construction method for preventing peripheral and local sedimentation of road surface inspection well |
CN104652238A (en) * | 2015-01-07 | 2015-05-27 | 南通大学 | Barrier-free base construction method for urban roads |
CN104652238B (en) * | 2015-01-07 | 2016-12-07 | 南通大学 | A kind of urban road accessible base layer construction method |
CN105569087A (en) * | 2016-01-13 | 2016-05-11 | 中国十九冶集团有限公司 | Construction method for inspection well |
CN107816060A (en) * | 2017-09-12 | 2018-03-20 | 浙江山海建设有限公司 | Prevent the structure of roadbed subsidence around inspection shaft |
CN110295628A (en) * | 2019-07-02 | 2019-10-01 | 广东源基建设工程有限公司 | A kind of pavement construction method with inspection shaft |
CN114855536A (en) * | 2022-05-31 | 2022-08-05 | 广州市交通设计研究院有限公司 | Method for preventing and treating highway pipeline diseases |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102433876B (en) | Multi-compartment casing composite pile and construction method thereof | |
CN204059124U (en) | A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure | |
CN103074891B (en) | Double-layer plastic sleeve bulk material and concrete stiffness core composite pile and construction method thereof | |
CN105672348A (en) | Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region | |
CN107604929B (en) | The anti-liquefaction friction pile of integrate draining and construction method | |
CN102322055A (en) | Construct and construction method of preventing pavement around manhole from subsiding | |
CN106351230B (en) | Soft clay area basement construction method for supporting | |
CN103174074B (en) | Sedimentation control structure of passable road highway roadbed and construction method | |
CN106884433A (en) | Control vibrations pile pulling causes the structure of underground structure depression and control depression method | |
CN107859062B (en) | The earth-filling method of underground pipe gallery | |
CN111677095A (en) | Construction method of drainage pipeline | |
CN202390857U (en) | Inspection wellhead reinforcement structure | |
CN105464074A (en) | Manual hole digging pile high polymer grouting protection structure and construction method thereof | |
CN105672450A (en) | Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure | |
CN113174958A (en) | Construction method for foundation pit of adjacent road under poor ground condition | |
CN110847207A (en) | Structure and construction method for newly-built bridge with subway tunnel passing through existing bridge piles | |
CN211258631U (en) | Loess tunnel basement reinforcement construction structure based on high pressure jet grouting pile | |
CN210826964U (en) | Dyke top highway embankment piece together wide structure | |
CN108035379A (en) | A kind of pipe gallery and its construction method | |
CN110055973B (en) | Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method | |
CN114575355A (en) | Soil protection and descent construction method | |
CN110552371A (en) | Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method | |
CN110306581A (en) | One kind new old pipeline connection well and its construction method in water rich strata | |
CN107740355A (en) | A kind of pipe culvert position roadbed construction method | |
CN210140850U (en) | Leachate collection and drainage guide structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120118 |