CN102295348A - Removing method of salt in recession of saline and alkaline land - Google Patents

Removing method of salt in recession of saline and alkaline land Download PDF

Info

Publication number
CN102295348A
CN102295348A CN2011101643993A CN201110164399A CN102295348A CN 102295348 A CN102295348 A CN 102295348A CN 2011101643993 A CN2011101643993 A CN 2011101643993A CN 201110164399 A CN201110164399 A CN 201110164399A CN 102295348 A CN102295348 A CN 102295348A
Authority
CN
China
Prior art keywords
water
wetland
saltings
drainage ditch
trash rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101643993A
Other languages
Chinese (zh)
Other versions
CN102295348B (en
Inventor
杨玉楠
康洪强
孙晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beihang University
Original Assignee
Beihang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beihang University filed Critical Beihang University
Priority to CN2011101643993A priority Critical patent/CN102295348B/en
Publication of CN102295348A publication Critical patent/CN102295348A/en
Application granted granted Critical
Publication of CN102295348B publication Critical patent/CN102295348B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The invention provides a removing method of salt in recession of a saline and alkaline land. The method comprises the following steps: constructing a subsidiary drain and a main drain; constructing a trash rack, a trash removing platform and a braiding channel; constructing a wetland pond; and planting and harvesting wetland plants, and the like. In the method, reed, cattails and other wetland plants grow under a condition of higher saline and alkaline degrees and absorb salt in recession of the saline and alkaline land; and the salt in the recession of the saline and alkaline land is removed by a mode of harvesting the reed, the cattail and other wetland aquatic plants. When the reed is adopted to absorb salt in the recession, the salt removal amount is 210 to 350g/m<2>; when the cattail is adopted to absorb the salt in the recession, the salt removal amount is 200 to 310g/m<2>. According to the removing method of salt in the recession of the saline and alkaline land provided by the invention, the salt content in the recession of the saline and alkaline land can be effectively reduced, the influence to the peripheral ecological environment is reduced, and generation of a secondary saline and alkaline land is avoided.

Description

The removal methods of salinity in the water-break of a kind of saltings
Technical field
The invention belongs to artificial swamp water treatment method and Technology field, be specifically related to the removal methods of salinity in the water-break of a kind of saltings.
Background technology
As the song-Nen plain area in one of range of distribution, three sodium thiosulfate salinization soil, the world, be the famous agricultural of China, animal husbandry base.1994-2000, country has carried out the test in modify-water field, saltings big peace paleo-streams bank, takes away soil salt by irrigating drip washing, improves soil regime, make the littoral regional grain realize volume increase, and progressively formed the Development patterns that the Northeast's increases in grain production are realized in modify-water field, saltings.Yet, owing to lack the measure of handling the saltings water-break of developing, modify-water field, song-Nen plain saline-alkaline ground has caused agriculture water-break pollution, the paddy field surrounding ground has produced the secondary salinization problem of soil, very big variation has taken place in soil property, nonsaline-alkali soil becomes saline-alkali soil, and the land yield that causes planting plant on every side descends.
Desalting method to the farmland water-break of saliferous saltings substantially all is some physical methods at present, mainly comprises methods such as electroosmose process, reverse osmosis method, sand filtration method.These method desalting efficiency height generally can be removed the salinity more than 30%, even can be up to 99.3%.But the shortcoming of these methods is processing cost height, and front-end investment is big, is not suitable for the farmland water-break that the water yield is big, saltiness is low.The lacustrine wetland of song-Nen plain and bottom land, bubble ground are more, and it is cattail and reed that the lacustrine wetland growth has a large amount of wetland plants, wherein maximum plants.The farmland water-break can be handled as the receiving water body of saltings water-break by the mode of building artificial swamp in the landlocked bubble ground that bottom land and some can not improve in restore vegetation, reparation ecotope.Reed is a kind of tall and big dogstail of aquatic for many years or humidogene, has the superpower acclimation ability and the characteristic of salt tolerant alkali.Being limited to about 9.0 in the tolerance of reed pH, is that the reed growth is not influenced by the salinity in the water body under the condition of 15g/L in saltiness.Cattail also is a kind of perennial very this plant of pasture and water, and vitality is strong, growth rapidly, but root system is more shallow, can with the reed miscegenation.PH through monitoring the water-break of most of saltings about 8.3, saltiness between 0.3~1.3g/L, cattail and reed all can be in the water-break of saltings normal growth.Cattail and reed have salt-tolerant trait preferably, and ash oontent is higher.As reference 1: Zhao Kefu, the model sea. halophytes and to the adaptation physiology [M] in salt marsh habitat. Beijing: Science Press, the wetland plants such as reed, rice grass, salt wormwood artemisia, Scirpus tabernaemontani, cattail that studies have shown that among the 2005:25-172 all have good salt-tolerant trait, can be used as the instrument of biological desalination.As reference 2: Ning Zulin, Chen Huijuan, Wang Zhuna, etc. several tall and big dogstail calorific values and ash content Dynamic variation [J]. the grass cultivation journal, 2010,19 (2): the ash content rate of having put down in writing reed among the 241-247 is about 7.89 ± 1.09%, greater than most of plant.Reference 3:Solano M.L, Soriano P., Ciria M.P..Constructed Wetlands as a Sustainable Solution for Wastewater Treatment in Small Villages[J] .Biosystems Engineering, 2004,87 (1): put down in writing cattail ash content rate among the 109-118 and reached as high as 12.3%.The planting technology of cattail and reed is very ripe at present, utilizes approach extensively also to form industrialization.The cattail purposes is very extensive, and except being used for papermaking, conduct braiding starting material, spire base portion and root stock tip can be made cooked food, and pollen also can be used as medicine, and female titbit can be made the weighting material of pillow and cushion.Reed quality exquisiteness, fibre-enrich, bamboo property is strong, and is of many uses.The reed stalk can be made papermaking and artificial silk, artificial cotton raw material, also can be used as to be good feed.Reed also can be made at home and be decorated, or for usefulness such as weaving mat, curtains.
China's saltings water-break water yield is very big, and only the annual water of Technique in Western Jilin Province just has 300,000,000 m 3, TDS is generally at 400~1200mg/L, and salt and alkali that this part is got off by drip washing if scientifically do not handled, As time goes on, certainly will cause the secondary salinization and the ecological problem in non-salinization soil.Because China that is to say not removing of salinity in the water-break of saltings required that therefore the processing to the agricultural water-break of this class of saltings does not cause enough attention present stage to the unqualified standard of the saltiness in the agricultural draining.Because waterplant such as cattail, reed have good desalting effect,, will be a measure that effectively removes salinity in the water-break of saltings by plantation in the wetland pool and results salt tolerant waterplant as plant results in addition.
Summary of the invention
The present invention proposes the removal methods of salinity in the water-break of a kind of saltings, the wetland plant that this method utilizes cattail and reed etc. to grow under higher saline and alkaline condition absorbs the salinity in the desalinization of soil by flooding or leaching water-break of farmland, saltings, and removes salinity in the water-break of saltings by the mode of gathering in wetland waterplant such as cattail and reed autumn.The method of utilizing the present invention to propose is carried out salinity when removing, and the contained ash content of cattail is 200g~310g/m 2, Ca wherein 2+21.1~31.1g/m 2, K +44.1~46.1g/m 2, Mg 2+8.7~9.3g/m 2, Na +18.8~19.9g/m 2, Cl -30.7~42.8g/m 2, SO 4 2-22.0~30.9g/m 2The contained ash content of reed is 210g~350g/m 2, Ca wherein 2+3.8~9.6g/m 2, K +5.0~15.3g/m 2, Mg 2+1.6~2.9g/m 2, Na +2.8~3.3g/m 2, Cl -13.5~17.1g/m 2, SO 4 2-20.0~25.7g/m 2Can remove in the desalinization of soil by flooding or leaching water-break of farmland, saltings 13~58% salinity by this method.Wherein, Na +Decreasing ratio is 1~18%, SO 4 2-Decreasing ratio is 27~100%, Ca 2+Decreasing ratio is 2~46%, Cl -Decreasing ratio is 11~100%, Mg 2+Decreasing ratio is 6~100%, K +Decreasing ratio is near 100%.The removal methods that the present invention proposes effectively reduces the saltiness in the water-break of saltings, reduces it to the influence of ecotope on every side, avoids the generation of secondary salinization of land, and the wetland plant of harvesting can be used for papermaking or is processed as artwork and obtains economic benefit.
The present invention proposes the removal methods of salinity in the water-break of a kind of saltings, specifically may further comprise the steps:
Step 1: construct discharge conduit:
(1) construct tributary drainage ditch according to the saltings area:
The upper surface furrow width of described tributary drainage ditch is 50~100cm, and the tributary drainage ditch degree of depth is 50~100cm; Tributary drainage ditch should be arranged in parallel according to landform, and the length of every tributary drainage ditch should not surpass 800m, and the spacing of adjacent two tributary drainage ditches should not surpass 200m, and the tributary drainage ditch bar number of constructing satisfies per 300~500m 2A tributary drainage ditch is constructed in the saltings.
(2) construct trunk drainage ditch, concentrate to flow into the saltings water-break in many tributary drainage ditches in the trunk drainage ditch after, flow into the wetland pool from the remittance mouth of the width on the wetland pool, the mode of connection on the described trunk drainage ditch and the wetland pool is that the water surface flushes.
The upper surface width of the channel of described trunk drainage ditch is 1/1000 * L~1/100 * L, and L is wetland pool width (this width of the channel needs to check through flow velocity); Slope coefficient 1~1.25, control trunk drainage ditch average depth be in the wetland pool average depth 1/2~4/5, the superelevation of trunk drainage ditch is 0.3~0.5m.
PP fiber concrete slab revetment is adopted on meet water side slope of described trunk drainage ditch, and the channel bottom is a low liquid limit clay.Canal subsoil matter can adopt the soil removal and replacement method or lay composite geo-membrane if can't reach requirement.The canal cross section pattern adopts trapezoidal.
Described superelevation is meant the distance of the upper surface of the horizontal plane trunk drainage ditch in the trunk drainage ditch.
Step 2: construct trash rack and the platform of removing contamination
On trunk drainage ditch, construct trash rack and the platform of removing contamination:
(1) constructs trash rack: import in mouthful trunk drainage ditch at 10~20m place on the distance wetland pool and arrange the first road trash rack, distance trash rack 3~20m place, first road away from the direction that imports mouthful on the layout second road trash rack, first trash rack and second trash rack bottom are embedded in the soil of trunk drainage ditch canal slope, the mounting inclination angle degree is 60 °~75 °, vergence direction is towards a remittance mouthful direction, and the top of first trash rack and the second road trash rack all is higher than the water surface 0.1~0.2m in the trunk drainage ditch.
(2) construct the platform of removing contamination:
Build the platform of removing contamination on the top of the first road trash rack and the second road trash rack and trunk drainage ditch respectively, the width of the platform of removing contamination is all more than or equal to 0.7m.
Step 3, construct the wetland pool:
Satisfy 9: 1~19: 1 relation according to the ratio of the area on the saltings and the wetland pool, construct the wetland pool, described wetland pool area is the port area of top, the wetland pool, the mean depth that the described wetland pool can hold water is 0.4~0.8m, the water superelevation is 0.6~0.8m, and deep water is deeply smaller or equal to 1.5m.Described wetland pool width is provided with and imports mouth, is used for the water-in of trunk drainage ditch water filling, and the wetland pool does not have water outlet.Being flat at the bottom of the pool on the wetland pool, is the slope from importing a mouthful end to importing a mouthful relative the other end at the bottom of the pool, and ramp slope is 0~1.5%, and imports a mouthful end and be higher than and import a mouthful relative the other end, and the slope coefficient on the wetland pool is 1: 2~1: 3.The dykes and dams on the wetland pool are higher than near ground, in order to avoid rainwater imports the wetland pool when raining.
Step 4: in the wetland pool, plant wetland plant, absorb the water-break salinity:
(1) water filling in the wetland pool, described water are that average depth is 0~2cm behind the common well water or river, plantation wetland plant (as waterplant such as cattail, reeds) when season, medial temperature was 15~25 ℃, and planting density is 8~15 strains/m 2, planting patterns is the root stock breeding.
When (2) treating that wetland plant grows into the center line average of 15~25cm, continue water filling in the wetland pool, it is 10~20cm that the depth of water satisfies water surface distance plant top mean distance.
(3) 1 year 50~90 days after-applied fertilizers of plantation, rate of fertilizer application is 100~200kg/ mu.
(4) plantation began to inject the saltings water-break after 100~180 days, the saltings water-break is flowed out from the saltings after tributary drainage ditch flows into trunk drainage ditch, flow in the wetland pool through trunk drainage ditch again, make that average depth satisfies the average depth requirement that designs in the step 1 in the wetland pool;
Step 5: harvesting wetland plant:
Plant and begin to gather in wetland plant after 180~240 days.Wetland plant harvesting position is more than the soil surface 20cm at the bottom of the pool, the wetland pool.After for the first time gathering in wetland plant, constantly supply with the saltings water-break in the wetland pool, average depth satisfies the average depth requirement that designs in the step 3 in the maintenance wetland pool, every wetland plant of harvesting in 330~380 days.
The advantage that the present invention has is:
1, the removal methods of salinity in a kind of saltings water-break of proposing of the present invention can effectively reduce the saltiness in the water-break of saltings, avoids salinity contained in the water-break that ecotope is on every side impacted;
2, the removal methods of salinity in a kind of saltings water-break of the present invention's proposition, the wetland plant of plantation harvesting can be repaired the degeneration wetland, improves local view, improves the ecological environment;
3, the removal methods of salinity in a kind of saltings water-break of the present invention's proposition, the wetland plant of harvesting can be used for papermaking or be processed as artwork, and economic benefit is considerable.
Description of drawings
Fig. 1: the removal methods schema of salinity in a kind of saltings water-break that the present invention proposes;
Fig. 2: the structure iron of the wetland pool, trunk drainage ditch and tributary drainage ditch in the removal methods of salinity in a kind of saltings water-break that the present invention proposes;
Fig. 3: trunk drainage ditch and trash rack structural representation in the removal methods of salinity in a kind of saltings water-break that the present invention proposes;
Fig. 4: the sectional view on the wetland pool in the removal methods of salinity in a kind of saltings water-break that the present invention proposes.
Among the figure: the 1-tributary drainage ditch; The 2-trunk drainage ditch; 3-first trash rack; 4-second trash rack;
The 5-platform of removing contamination; 6-imports mouth; The 7-wetland pool; 8-trash rack grizzly bar;
The 9-gauging line.
Embodiment
Below in conjunction with accompanying drawing the present invention is done and to describe in further detail:
The present invention proposes the removal methods of salinity in the water-break of a kind of saltings, as shown in Figure 1, specifically may further comprise the steps:
Step 1: construct tributary drainage ditch 1 and trunk drainage ditch 2, as shown in Figure 2:
(1) construct tributary drainage ditch 1 according to the saltings area:
The upper surface furrow width of described tributary drainage ditch 1 is 50~100cm, and tributary drainage ditch 1 degree of depth is 50~100cm; Tributary drainage ditch should be arranged in parallel according to landform, and length should not surpass 800m, and spacing should not surpass 200m, and the tributary drainage ditch bar number of constructing satisfies per 300~500m 2A tributary drainage ditch is constructed in the saltings.
(2) construct trunk drainage ditch 2, concentrate to flow into the saltings water-break in many tributary drainage ditches 1 in the trunk drainage ditch 2 after, flow into the wetland pools 7 from the remittance mouth 6 of the width on the wetland pool 7, described trunk drainage ditch 2 is that the water surface flushes with the mode of connection on the wetland pool 7.
The upper surface width of the channel of described trunk drainage ditch 2 is 1/1000 * L~1/100 * L, and L is the wetland pool 7 width (this width of the channel needs to check through flow velocity); The slope coefficient 1~1.25 of trunk drainage ditch 2, control trunk drainage ditch 2 in average depth be in the wetland pool 7 average depth 1/2~4/5, the superelevation 0.3~0.5m in the trunk drainage ditch 2.
PP fiber concrete slab revetment is adopted on meet water side slope of described trunk drainage ditch 2, and the channel bottom is a low liquid limit clay.Canal subsoil matter can adopt the soil removal and replacement method or lay composite geo-membrane if can't reach requirement.The canal cross section pattern adopts trapezoidal.
Described superelevation is meant the distance of upper surface of the horizontal plane trunk drainage ditch 2 of trunk drainage ditch 2.
Step 2: construct the trash rack 3,4 and the platform 5 of removing contamination:
On trunk drainage ditch 2, construct the trash rack 3,4 and the platform 5 of removing contamination, as shown in Figure 3:
(1) constructs trash rack 3,4: in the remittance mouth 6 on the distance wetland pool 7 is the trunk drainage ditch 2 at 10~20m place, arrange the first road trash rack 3, as Fig. 2, at the distance first road trash rack 3 is to arrange the second road trash rack 4 on the direction of 3~20m place away from remittance mouth 6, first trash rack 3 and second trash rack 4 are embedded in the soil of trunk drainage ditch 2 canals slope, the mounting inclination angle degree is 60 °~75 °, vergence direction is towards importing mouthful 6 directions, and it is 0.1~0.2m that the top of first trash rack 3 and the second road trash rack 4 all is higher than trunk drainage ditch 2 median water level lines 9, the distance that promptly is higher than gauging line 9 is 0.1~0.2m, as Fig. 3.
Described first trash rack 3 and second trash rack 4 are that some trash rack grizzly bars 8 are formed, the section form of each trash rack grizzly bar 8 is a square, the length of side is 10~15mm, trash rack grizzly bar 8 spacings are 15~20mm, and first trash rack 3 and second trash rack, 4 trash racks are embedded in the soil of trunk drainage ditch 2 canals slope.
(2) construct the platform 5 of removing contamination:
Build the platform 5 of removing contamination at the first road trash rack 3 and the second road trash rack 4 with the top of trunk drainage ditch 2 respectively, the width of the platform 5 of removing contamination is all more than or equal to 0.7m.
Step 3, construct the wetland pool 7:
Satisfy 9: 1~19: 1 relation according to the ratio of the area on the saltings and the wetland pool 7, construct the wetland pool 7, as shown in Figure 2, the average depth that the described wetland pool 7 can hold water is 0.4~0.8m, and superelevation is 0.6~0.8m, and deep water is deeply smaller or equal to 1.5m.Saltiness according to concrete pending saltings, determine the average depth on saltings and the wetland pool 7 area ratio and the wetland pool 7, various places salting of soil degree, rainfall amount, steam output difference, the area on the pairing wetland pool, unit surface saltings 7 are also different.The wetland pool area ratio that the saltings saltiness is less than or equal to 0.3% saltings and structure is about 12: 1~and 19: 1, saltings and the wetland pool area ratio of structure of saltiness between 0.3% and 0.5% be about 10: 1~13: 1, saltiness more than or equal to the wetland pool area ratio of 0.5% saltings and structure be about 9: 1~13: 1.The described wetland pool 7 widths are provided with and import mouth 6, are used for the water-in of trunk drainage ditch 2 water fillings, and the wetland pool 7 does not have water outlet.Be flat at the bottom of the pool on the wetland pool 7, it at the bottom of the pool normal soil, as shown in Figure 4, be the slope from importing a mouthful end to importing a mouthful relative the other end at the bottom of the pool, ramp slope is 0~1.5%, the slope coefficient on the wetland pool 7 is 1: 2~1: 3, and described slope coefficient is the vertical depth on the wetland pool 7 and the ratio of horizontal length/stand out.The dykes and dams on the wetland pool 7 are higher than near ground, in order to avoid rainwater imports the wetland pool 7 when raining.
The side slope position around the wetland pool 7 is not considered in the calculating of described average depth, only calculates the mean depth of pairing water at the bottom of 7 pools, the wetland pool.
Table 1 saltings saltiness, the wetland pool 7 average depths and saltings and the wetland pool 7 area ratio relation tables
Saltings saltiness (%) ?≤0.3 ?0.3~0.5 ≥0.5
Ratio ?12∶1~19∶1 10∶1~13∶1 9∶1~13∶1
Step 4: in the wetland pool 7, plant wetland plant, absorb the water-break salinity:
(1) water filling in the wetland pool 7, described water is the saltings water-break, and the average depth after the injection was planted wetland plant (as waterplant such as cattail, reeds) smaller or equal to 2cm when season, medial temperature was 15~25 ℃, planting density is 8~15 strains/m2, and planting patterns is the root stock breeding.When saltings water-break water shortage, well water that can be common or river are replaced.
When (2) treating that wetland plant grows into the center line average of 15~25cm, continue water filling in the wetland pool 7, it is 10~20cm that average depth satisfies water surface distance plant top mean distance.
(3) 50~90 days after-applied fertilizers of plantation, rate of fertilizer application is 100~200kg/ mu.
(4) plantation began to inject the saltings water-break after 100~180 days, the saltings water-break is flowed out from the saltings after tributary drainage ditch 1 flows into trunk drainage ditch 2, flow in the wetland pools 7 through trunk drainage ditch 2 again, make that average depth satisfies the average depth requirement that designs in the step 1 in the wetland pool 7;
Step 5: harvesting wetland plant:
Plant and begin to gather in wetland plant after 180~240 days.Wetland plant harvesting position is more than the soil surface 20cm at the bottom of 7 pools, the wetland pool.After for the first time gathering in wetland plant, constantly supply with water-break in the wetland pool 7, average depth satisfies the design requirements of average depth in the step 3 in the maintenance wetland pool 7, every wetland plant of harvesting in 330~380 days.
The removal methods of salinity in a kind of saltings water-break that the present invention proposes, when the saltings saltiness was less than or equal to 0.3%, the wetland of unit surface can be handled the water-break of the saltings generation of 12~19 times of areas; When the saltings saltiness was between 0.3% and 0.5%, the wetland of unit surface can be handled the water-break of the saltings generation of 10~13 times of areas; When the saltings saltiness more than or equal to 0.5% the time, the wetland of unit surface can be handled the water-break that the saltings of 9~13 times of areas produces.Can remove in the desalinization of soil by flooding or leaching water-break of farmland, saltings 13~58% salinity by this method.Wherein, Na +Decreasing ratio is 1~18%, S0 4 2-Decreasing ratio is 27~100%, Ca 2+Decreasing ratio is 2~46%, Cl -Decreasing ratio is 11~100%, Mg 2+Decreasing ratio is 6~100%, K +Decreasing ratio is near 100%.The corresponding saltings of wetland saltiness is less than or equal at 0.3% o'clock, the salinity that can remove by harvesting wetland pool plant behind 3-5 will account for total more than 70% of salinity in the desalinization of soil by flooding or leaching water-break of farmland, saltings, and the pairing saltings of wetland saltiness between 0.3% and 0.5% or saltiness can account in saltings farmland desalinization of soil by flooding or leaching water-break always salinity 70% or more more than or equal to the salinity that needed can to remove by harvesting wetland pool plant behind the 15-30 at 0.5% o'clock.This method to the salinity removal effect in the water-break of saltings preferably ion be K +, SO 4 2-, Ca 2+, Cl -, Mg 2+, to Na +Removal effect is not obvious, and 30% salinity that is not removed is in the majority with sodium ion.
Embodiment 1:
Step 1, construct tributary drainage ditch 1 and trunk drainage ditch 2 according to the saltings area:
(1) the upper surface furrow width of described tributary drainage ditch 1 is 50cm, and the degree of depth is 50cm; Tributary drainage ditch is arranged in parallel according to landform, and length is 400m, and spacing is 100m, and the bar number of constructing satisfies every 300m 2A tributary drainage ditch 1 need be constructed in the saltings.
(2) construct trunk drainage ditch 2, by trunk drainage ditch 2 width one side of the water-break in many tributary drainage ditches 1 from the wetland pool 7 imported the wetland pool 7, described trunk drainage ditch 2 is that the water surface flushes with the mode of connection on the wetland pool 7.
The upper surface width of the channel of described trunk drainage ditch 2 is 1/1000 * L, and L is the wetland pool 7 width; Slope coefficient 1, control trunk drainage ditch 2 in average depth be in the wetland pool 7 average depth 1/2, the superelevation 0.3m in the trunk drainage ditch 2.
PP fiber concrete slab revetment is adopted on meet water side slope of described trunk drainage ditch 2, and the canal cross section pattern adopts trapezoidal.
Step 2: construct the trash rack 3,4 and the platform 5 of removing contamination:
(1) constructs trash rack 3,4: import a mouthful 10m place apart from the trunk drainage ditch 2 and the wetland pool 7 and arrange the first road trash rack 3, on the direction of the 3m place of the distance first road trash rack 3, arrange the second road trash rack 4 away from remittance mouth 6, the first road trash rack 3 and the second road trash rack 4 are 60 ° along the water (flow) direction angle of inclination, vergence direction is towards a remittance mouthful direction, and the upper surface of first trash rack 3 and the second road trash rack 4 all is higher than water surface 0.1m in the trunk drainage ditch 2.
Described first trash rack 3 and second trash rack 4 are that some trash rack grizzly bars 8 are formed, the section form of each trash rack grizzly bar 8 is a square, the length of side is 10mm, and trash rack grizzly bar 8 spacings are 15mm, and first trash rack 3 and second trash rack, 4 trash racks are embedded in the soil of trunk drainage ditch 2 canals slope.
(2) construct the platform 5 of removing contamination: build the platform 5 of removing contamination at the first road trash rack 3 and the second road trash rack 4 with the upper surface of trunk drainage ditch 2 respectively, the width of the platform 5 of removing contamination is 0.7m.
Step 3, construct the wetland pool 7:
The saltiness in pending saltings is 0.20%, the ratio of constructing the area on the saltings and the wetland pool 7 is 19: 1, ramp slope is 0 at the bottom of the pool on the wetland pool 7, has the mouth of remittance on 7 widths of the wetland pool, the wetland pool 7 slope coefficients are 1: 2, the mean depth that the wetland pool 7 can hold water is 0.4m, and superelevation is 0.6m.
Step 4: the plantation cattail, the salinity of water-break in the absorption wetland pool 7:
(1) water filling in the wetland pool 7 makes in the wetland pool 7 Soil conservation at the bottom of the pool wetting, and then the water that injects rests on the soil at the bottom of the pool, make and do not form the water surface in the wetland pool, be that average depth is 0cm, begin to plant cattail when medial temperature is 15 ℃ in season, planting density is 8 strains/m 2, planting patterns is the root stock breeding.
When (2) treating that cattail grows into the center line average of 15cm, continue water filling in the wetland pool 7, it is 10cm that average depth satisfies water surface distance cattail top mean distance.
(3) 50 days after-applied fertilizers of plantation, rate of fertilizer application is a 100kg/ mu.
(4) plantation began to inject the saltings water-break according to the average depth that designs in the step 1 after 100 days, and the saltings water-break is flowed out from the saltings after tributary drainage ditch 1 flows into trunk drainage ditch 2, after in the trunk drainage ditch 2 inflow wetland pools 7;
Step 5: harvesting cattail:
Plant and begin to gather in cattail after 180 days, harvested position is the soil surface 20cm place at the bottom of 7 pools, the wetland pool.After for the first time gathering in cattail, constantly supply with the saltings water-break in the wetland pool 7, average depth is 0.4m in the maintenance wetland pool, and every harvesting in 330~365 days once.
Embodiment 2:
Step 1, construct tributary drainage ditch 1 and trunk drainage ditch 2 according to the saltings area:
(1) construct tributary drainage ditch 1: the upper surface furrow width of described tributary drainage ditch 1 is 50cm, and the degree of depth is 50cm; Tributary drainage ditch is arranged in parallel according to landform, and length is 800m, and spacing is 200m; The bar number of constructing satisfies every 500m 2A tributary drainage ditch 1 need be constructed in the saltings.
(2) construct trunk drainage ditch 2: by trunk drainage ditch 2 width one side of the water-break in many tributary drainage ditches 1 from the wetland pool 7 imported the wetland pool 7, described trunk drainage ditch 2 is that the water surface flushes with the mode of connection on the wetland pool 7.
The upper surface width of the channel of described trunk drainage ditch 2 is 1/100 * L, and L is the wetland pool 7 width; Slope coefficient 1.25, in the control trunk drainage ditch 2 mean depth of water-break be in the wetland pool 7 the water-break mean depth 2/3, the superelevation 0.5m in the trunk drainage ditch 2.PP fiber concrete slab revetment is adopted on meet water side slope of described trunk drainage ditch, and canal subsoil matter is laid composite geo-membrane, and the canal cross section pattern adopts trapezoidal.
Step 2, construct the trash rack 3,4 and the platform 5 of removing contamination
(1) construct trash rack 3,4:
The 20m place that imports mouth 6 apart from the trunk drainage ditch 2 and the wetland pool arranges the first road trash rack 3, on the direction of the 20m place of the distance first road trash rack 1, arrange the second road trash rack 4 away from remittance mouth 6, the first road trash rack 3 and the second road trash rack, 4 angles of inclination are 75 °, and the upper surface of first trash rack 3 and the second road trash rack 4 is higher than water-break water surface 0.2m in the trunk drainage ditch 2.
Described first trash rack 3 and second trash rack 4 are that some trash rack grizzly bars 8 are formed, the section form of each trash rack grizzly bar 8 is a square, the length of side is 15mm, and trash rack grizzly bar 8 spacings are 20mm, and first trash rack 3 and second trash rack, 4 trash racks are embedded in the soil of trunk drainage ditch 2 canals slope.
(2) construct the platform 5 of removing contamination:
Build the platform 5 of removing contamination at the upper surface of the first road trash rack 3 and the second road trash rack 4 respectively, the width of the platform 5 of removing contamination is 0.8m.
Step 3, construct the wetland pool 7:
The saltiness in pending saltings is 0.27%, the ratio of constructing the area on the saltings and the wetland pool 7 is 15: 1, has the mouth of remittance 6 on 7 widths of the wetland pool, at the bottom of the pool on the wetland pool, pool bottom sloping is 1.5%, slope coefficient is 1: 3, and the water-break superelevation is 0.8m in the wetland pool 7, and the water-break mean depth is 0.6m.
Step 4: the plantation cattail, the salinity in the stripping wetland pool:
(1) water filling in the wetland pool 7, average depth are 2cm, plantation cattail when season, medial temperature was 25 ℃, and planting density is 15 strains/m 2, planting patterns is the root stock breeding.
When (2) treating that cattail grows into the center line average of 25cm, continue water filling in the wetland pool 7, it is 20cm that the depth of water satisfies water surface distance cattail top mean distance.
(3) 90 days after-applied fertilizers of plantation, rate of fertilizer application is a 200kg/ mu.
(4) plantation began to inject the saltings water-break according to the average depth 0.6m that designs in the step 1 after 180 days, and the saltings water-break is flowed out from the saltings after tributary drainage ditch 1 flows into trunk drainage ditch 2, flows in the wetland pool 7 through trunk drainage ditch 2 again.
Step 5: harvesting cattail:
Plant and begin to gather in cattail after 240 days.The harvesting position of cattail is the soil surface 20cm at the bottom of 7 pools, the wetland pool.After for the first time gathering in cattail, constantly supply with the saltings water-break in the wetland pool 7, keeping in the wetland pool 7 average depth to satisfy the mean depth that designs in the step 1 is 0.6m, every harvesting in 365~380 days once.
Embodiment 3:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.30%, the ratio of constructing the area on the saltings and the wetland pool 7 is 12: 1, the pool, wetland pool bottom sloping is 0, be to be flat at the bottom of the pool, average depth is 0.8m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 4:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.38%, and the saltings is 13: 1 with the area ratio on the wetland pool 7, and average depth is 0.4m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 5:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.48%, and the saltings is 11: 1 with the area ratio on the wetland pool 7, and average depth is 0.5m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 6:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.50%, and the saltings is 10: 1 with the area ratio on the wetland pool 7, and average depth is 0.8m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 7:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.53%, and the saltings is 13: 1 with the area ratio on the wetland pool 7, and average depth is 0.4m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 8:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.60%, and the saltings is 9: 1 with the area ratio on the wetland pool 7, and average depth is 0.6m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 9:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.30%, and the saltings is 10: 1 with the area ratio on the wetland pool 7, and average depth is 0.8m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 10:
The difference of present embodiment and embodiment 2 only is that the saltiness in saltings in the step 3 is 0.50%, and the saltings is 13: 1 with the area ratio on the wetland pool 7, and average depth is 0.6m in the wetland pool 7, and other each steps and embodiment 3 are identical.
Embodiment 11:
The difference of present embodiment and embodiment 2 only is step 1, and the step 1 of present embodiment is specially:
Construct tributary drainage ditch 1 and trunk drainage ditch 2 according to the saltings area.The upper surface furrow width of constructed tributary drainage ditch 1 is 75cm, and the degree of depth is 80cm; Tributary drainage ditch is arranged in parallel according to landform, and length is 600m, and spacing is 150m, and the bar number of constructing satisfies every 400m 2A tributary drainage ditch 1 need be constructed in the saltings.
(2) construct trunk drainage ditch 2, by trunk drainage ditch 2 width one side of the water-break in many tributary drainage ditches 1 from the wetland pool 7 imported the wetland pool 7, described trunk drainage ditch 2 is that the water surface flushes with the mode of connection on the wetland pool 7.
The upper surface width of the channel of described trunk drainage ditch 2 is 1/500 * L, and L is the wetland pool 7 width; Slope coefficient 1, control trunk drainage ditch 2 in average depth be in the wetland pool 7 average depth 4/5, the superelevation 0.4m in the trunk drainage ditch 2.PP fiber concrete slab revetment is adopted on meet water side slope of described trunk drainage ditch, and canal subsoil matter adopts the soil removal and replacement method to be changed to low liquid limit clay.The canal cross section pattern adopts trapezoidal.
Embodiment 12:
The difference of present embodiment and embodiment 2 only is step 2, and the step 2 of present embodiment is specially:
Step 2: construct the trash rack 3,4 and the platform 5 of removing contamination
(1) construct trash rack 3,4:
The 15m place that imports mouth 6 apart from the trunk drainage ditch 2 and the wetland pool arranges the first road trash rack 3, on the direction of the 10m place of the distance first road trash rack 1, arrange the second road trash rack 4 away from remittance mouth 6, the first road trash rack 3 and the second road trash rack, 4 angles of inclination are 70 °, and the upper surface of first trash rack 3 and the second road trash rack 4 is higher than water-break water surface 0.15m in the trunk drainage ditch 2.
Described first trash rack 3 and second trash rack 4 are that some trash rack grizzly bars 8 are formed, the section form of each trash rack grizzly bar 8 is a square, the length of side is 12mm, and trash rack grizzly bar 8 spacings are 17mm, and first trash rack 3 and second trash rack, 4 trash racks are embedded in the soil of trunk drainage ditch 2 canals slope.
(2) construct the platform 5 of removing contamination:
Build the platform 5 of removing contamination at the upper surface of the first road trash rack 3 and the second road trash rack 4 respectively, the width of the platform 5 of removing contamination is 1.5m.
Embodiment 13:
The difference of present embodiment and embodiment 2 only is step 4, and the step 4 of present embodiment is specially:
Step 4: in the wetland pool, plant cattail, absorb the water-break salinity:
(1) water filling in the wetland pool, average depth are 1cm, plantation cattail when season, medial temperature was 20 ℃, and planting density is 10 strains/m 2, planting patterns is the root stock breeding.
When (2) treating that cattail grows into the center line average of 20cm, continue water filling in the wetland pool, it is 15cm that the depth of water satisfies water surface distance cattail top mean distance.
(3) 70 days after-applied fertilizers of plantation, rate of fertilizer application is a 120kg/ mu.
(4) plantation began to inject the saltings water-break after 120 days, and the saltings water-break is flowed out from the saltings after tributary drainage ditch flows into trunk drainage ditch, and again in the trunk drainage ditch inflow wetland pool, it is 0.6m that the average depth of injection satisfies the mean depth that step 1 designs.
Embodiment 14:
The difference of present embodiment and embodiment 2 only is step 5, and the step 5 of present embodiment is specially:
Step 5: harvesting cattail:
Plant and begin to gather in cattail after 210 days, harvested position is the soil surface 25cm place at the bottom of 7 pools, the wetland pool.Behind the cattail, constantly supply with the saltings water-break in the wetland pool 7 for the first time, average depth is 0.4m in the maintenance wetland pool, and every harvesting in 340~370 days once.
Embodiment 15:
The difference of present embodiment and embodiment 1 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 16:
The difference of present embodiment and embodiment 3 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 17:
The difference of present embodiment and embodiment 5 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 18:
The difference of present embodiment and embodiment 7 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 19:
The difference of present embodiment and embodiment 9 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 20:
The difference of present embodiment and embodiment 12 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 21:
The difference of present embodiment and embodiment 13 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.
Embodiment 22:
The difference of present embodiment and embodiment 14 only is that the plantation of step 4 and step 5 and the plant of harvesting are reed.

Claims (7)

1. the removal methods of salinity in the saltings water-break is characterized in that: specifically may further comprise the steps:
Step 1, construct tributary drainage ditch and trunk drainage ditch, the saltings be connected with the remittance mouth on the wetland pool with trunk drainage ditch through tributary drainage ditch:
(1) construct tributary drainage ditch: the upper surface furrow width of tributary drainage ditch is 30~50cm, and the degree of depth is 30~50cm; Length is no more than 800m, and spacing is no more than 200m, and the tributary drainage ditch bar number of constructing satisfies per 300~500m 2A tributary drainage ditch is constructed in the saltings;
(2) construct trunk drainage ditch: the upper surface width of the channel of trunk drainage ditch is 1/1000 * L~1/100 * L, and L is a wetland pool width; The slope coefficient 1~1.25 of trunk drainage ditch, control trunk drainage ditch in average depth be in the wetland pool average depth 1/2~2/3, the trunk drainage ditch superelevation is 0.3~0.5m;
Step 2: construct trash rack and the platform of removing contamination:
(1) construct trash rack: import in mouthful trunk drainage ditch at 10~20m place on the distance wetland pool and arrange the first road trash rack, distance trash rack 3~20m place, first road away from the direction that imports mouth on the layout second road trash rack;
(2) construct the platform of removing contamination:
Build the platform of removing contamination on the top of the first road trash rack and the second road trash rack and trunk drainage ditch respectively, the berm width of removing contamination is all more than or equal to 0.7m;
Step 3, construct the wetland pool:
Described wetland pool width is provided with and imports mouthful, and the average depth that the wetland pool holds water is 0.4~0.8m, and water surface superelevation is 0.6~0.8m, and deep water is deeply smaller or equal to 1.5m;
Step 4: plantation wetland plant:
(1) water filling in the wetland pool makes that average depth is 0~2cm in the wetland pool, when season, temperature on average was 15~25 ℃, begins to plant wetland plant, and planting density is 8~15 strains/m 2
When (2) wetland plant grows into the center line average of 15~25cm, continue water filling in the wetland pool, average depth satisfies water surface distance reed top 10~20cm in the wetland pool;
(3) 50~90 days after-applied fertilizers of plantation, rate of fertilizer application is 100~200kg/ mu;
(4) average depth of the water that holds according to the wetland pool of designing in the step 1 after 100~180 days of plantation begins to inject water-break, and water-break is flowed out from the saltings after the charge for remittance canal flows into braiding channel, flows in the wetland pool through braiding channel again;
Step 5: harvesting wetland plant:
Plant and begin to gather in wetland plant after 180~240 days, and after gather in wetland plant for the first time, keep that the depth of water satisfies the average depth that designs in the step 1 in the wetland pool, every wetland plant of harvesting in 330~380 days.
2. the removal methods of salinity in a kind of saltings water-break according to claim 1, it is characterized in that: be flat at the bottom of the pool on the described wetland pool, be the slope from importing a mouthful end to importing a mouthful relative the other end at the bottom of the pool, ramp slope is 0~1.5%, and the slope coefficient on the wetland pool is 1: 2~1: 3.
3. the removal methods of salinity in a kind of saltings water-break according to claim 1, it is characterized in that: the mounting inclination angle degree of the described first road trash rack and second trash rack is 60 °~75 °, vergence direction is towards a remittance mouthful direction, and the top of first trash rack and the second road trash rack all is higher than the braiding channel water surface 0.1~0.2m.
4. the removal methods of salinity in a kind of saltings water-break according to claim 1, it is characterized in that: the described first road trash rack and the second road trash rack are made up of some trash rack grizzly bars, the section form of each trash rack grizzly bar is a square, the length of side is 10~15mm, and the trash rack interval of grid strip is 15~20mm.
5. the removal methods of salinity in a kind of saltings water-break according to claim 1, it is characterized in that: described saltings saltiness was smaller or equal to 0.3% o'clock, the wetland pool area ratio of saltings and structure is about 12: 1~and 19: 1, the saltings saltiness is between 0.3% and 0.5% the time, the wetland pool area ratio of saltings and structure is about 10: 1~and 13: 1, the saltings saltiness is more than or equal to 0.5% o'clock, and the wetland pool area ratio of saltings and structure is about 9: 1~and 13: 1.
6. the removal methods of salinity in a kind of saltings water-break according to claim 1 is characterized in that: described trunk drainage ditch canal cross section pattern adopts trapezoidal, and PP fiber concrete slab revetment is adopted on the side slope that meets water, and the channel bottom is a low liquid limit clay.
7. according to the removal methods of salinity in any described a kind of saltings water-break in the claim 1~6, it is characterized in that: described wetland plant is cattail or reed.
CN2011101643993A 2010-12-20 2011-06-17 Removing method of salt in recession of saline and alkaline land Expired - Fee Related CN102295348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101643993A CN102295348B (en) 2010-12-20 2011-06-17 Removing method of salt in recession of saline and alkaline land

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201010595459 2010-12-20
CN201010595459.2 2010-12-20
CN2011101643993A CN102295348B (en) 2010-12-20 2011-06-17 Removing method of salt in recession of saline and alkaline land

Publications (2)

Publication Number Publication Date
CN102295348A true CN102295348A (en) 2011-12-28
CN102295348B CN102295348B (en) 2013-02-27

Family

ID=45356058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101643993A Expired - Fee Related CN102295348B (en) 2010-12-20 2011-06-17 Removing method of salt in recession of saline and alkaline land

Country Status (1)

Country Link
CN (1) CN102295348B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102845156A (en) * 2012-09-12 2013-01-02 中国科学院东北地理与农业生态研究所 Comprehensive restoration method for salt-alkali degraded marsh wetland in plain area
CN106045154A (en) * 2016-07-12 2016-10-26 山东胜伟园林科技有限公司 Process for treating wastewater generated after saline-alkali soil improvement
CN106358481A (en) * 2016-08-25 2017-02-01 江苏沿海地区农业科学研究所 Saline-alkali land treatment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5174897A (en) * 1991-09-24 1992-12-29 The United States Of America As Represented By The Secretary Of Agriculture Constructed wetlands to control nonpoint source pollution
CN101161944A (en) * 2006-10-12 2008-04-16 天津市环境保护科学研究院 Construction technique for beach saline land landscape water aquatic plant system
CN101734796A (en) * 2008-11-07 2010-06-16 杨磊 Artificial wetland for treating saline sewage
CN101836527A (en) * 2010-04-13 2010-09-22 启东建筑集团山水园林建设有限公司 Facility for improving landscaping water and soil in saline land
CN102057774A (en) * 2010-10-19 2011-05-18 新疆农业科学院土壤肥料与农业节水研究所 Draining and salt-removing method for newly-ploughed salinized farmland

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5174897A (en) * 1991-09-24 1992-12-29 The United States Of America As Represented By The Secretary Of Agriculture Constructed wetlands to control nonpoint source pollution
CN101161944A (en) * 2006-10-12 2008-04-16 天津市环境保护科学研究院 Construction technique for beach saline land landscape water aquatic plant system
CN101734796A (en) * 2008-11-07 2010-06-16 杨磊 Artificial wetland for treating saline sewage
CN101836527A (en) * 2010-04-13 2010-09-22 启东建筑集团山水园林建设有限公司 Facility for improving landscaping water and soil in saline land
CN102057774A (en) * 2010-10-19 2011-05-18 新疆农业科学院土壤肥料与农业节水研究所 Draining and salt-removing method for newly-ploughed salinized farmland

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102845156A (en) * 2012-09-12 2013-01-02 中国科学院东北地理与农业生态研究所 Comprehensive restoration method for salt-alkali degraded marsh wetland in plain area
CN106045154A (en) * 2016-07-12 2016-10-26 山东胜伟园林科技有限公司 Process for treating wastewater generated after saline-alkali soil improvement
CN106358481A (en) * 2016-08-25 2017-02-01 江苏沿海地区农业科学研究所 Saline-alkali land treatment method

Also Published As

Publication number Publication date
CN102295348B (en) 2013-02-27

Similar Documents

Publication Publication Date Title
CN104472176B (en) The construction method that mountain river riverbank vegetation ecological recovers
CN107347410B (en) Method for constructing multi-habitat three-dimensional vegetation in levee type lakeside zone
CN101874469B (en) Combined ecological floating bed for water planting plants and flowers
CN100398465C (en) Composite artificial marshland water quality clarification system in north low-temperature area
CN106277343A (en) A kind of artificial swamp advanced purification system
CN103125163B (en) Method for improving water quality of reservoir by utilizing space-time specificities of hydro-fluctuation belt
CN103081689B (en) Vegetation recovery method for water front hard protection slope
CN100526234C (en) Method for treating eutrophication water body by waterborne cultivated plant
CN104047263A (en) Terrace pond construction method and terrace pond structure applicable to hydro-fluctuation belt water bay slope
CN205472958U (en) Ecological bed in river course based on short nothing flower eel grass
CN204958529U (en) Pond, paddy field are from clean system
CN102976494A (en) Multi-habitat ecological pond system
CN105858898A (en) Water body ecological restoration method
CN107873607A (en) A kind of sulfate type saline-alkaline pond constructing system and ecologic breeding implantation methods
CN103609293A (en) Reconstruction and restoration method for high-water-table and unsteady sunken coal-mining-induced subsidence shallow-water wetland ecosystem
CN112441702A (en) Wet compound ecological clean system of agriculture and forestry
CN102295348B (en) Removing method of salt in recession of saline and alkaline land
CN106836113A (en) A kind of self-organizing formula ecology disappears unrestrained system
CN101985377A (en) Ecological ditch for sewage treatment, and construction method and use thereof
CN102633367B (en) Ecological restoration method for treating eutrophic water body by utilizing Nuphar sinensis
CN105794481B (en) A kind of aquatic dogstail float type propagation method and its application
CN108901663B (en) Ecological farming and pasture mode construction method for improving shore sea salt soil productivity
CN108911148A (en) A kind of basin agricultural non-point source pollution control method
CN102659248A (en) Ecological ditch for pollution control and salt resistance in northwest districts
CN104420676A (en) Method for solving agricultural non-point source pollution

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130227

Termination date: 20130617