CN102287211A - Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof - Google Patents

Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof Download PDF

Info

Publication number
CN102287211A
CN102287211A CN2011101173112A CN201110117311A CN102287211A CN 102287211 A CN102287211 A CN 102287211A CN 2011101173112 A CN2011101173112 A CN 2011101173112A CN 201110117311 A CN201110117311 A CN 201110117311A CN 102287211 A CN102287211 A CN 102287211A
Authority
CN
China
Prior art keywords
side entry
entry retaining
gob side
template
gob
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101173112A
Other languages
Chinese (zh)
Inventor
张守祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN2011101173112A priority Critical patent/CN102287211A/en
Publication of CN102287211A publication Critical patent/CN102287211A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a gob roadway end part hydraulic support frame and a gob roadway coal mining method thereof. The gob roadway end part hydraulic support frame comprises an end part support frame, wherein the outer side of the end part support frame is provided with a gob roadway template assembly, the gob roadway template assembly comprises an upper template and a lower template, the upper template is fixed on a top beam of the end part support frame, the lower template is fixed on the base of the end part support frame, and the upper template and the lower template are in movable lap joint. In the coal mining process, a roadway filling template is arranged in a roadway of a mining work plane, the filling is carried out between the gob roadway template assembly and the roadway filling template, and a new roadway is left along the gob region and is used as the roadway for mining a next work plane. The erection efficiency and the safety are high, coal posts preserved on the work plane are omitted, and the coal resource recovery rate and the work surface boosting efficiency are improved.

Description

Gob side entry retaining end hydraulic support and the method for carrying out gob side entry retaining coal mining thereof
Technical field
The present invention relates to the hydraulic support that a kind of coal mining is used, the method that relates in particular to a kind of gob side entry retaining end hydraulic support and carry out gob side entry retaining coal mining.
Background technology
In the prior art, in the process of coal mining, generally all be provided with the coal column that work plane is reserved, when a working face mining finishes, when carrying out next working face mining, driving face tunnel again all usually.
There is shortcoming at least in above-mentioned prior art:
Coal recovery rate is low, tunnelling rate height, cost of production height, advance of the face efficient are low.
Summary of the invention
The purpose of this invention is to provide a kind of formwork efficient and safe, can improve the gob side entry retaining end hydraulic support of coal recovery rate and advance of the face efficient and the method for carrying out gob side entry retaining coal mining thereof.
The objective of the invention is to be achieved through the following technical solutions:
Gob side entry retaining end hydraulic support of the present invention, comprise face end support, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
The method that above-mentioned gob side entry retaining end hydraulic support of the present invention carries out gob side entry retaining coal mining, in the process of coal mining, in the tunnel of exploitation work plane, the tunnel filling template is set, between described gob side entry retaining template assembly and described tunnel filling template, carry out filling, stay new tunnel along the goaf, described new tunnel is as the tunnel of exploiting next work plane.
As seen from the above technical solution provided by the invention, gob side entry retaining end hydraulic support provided by the invention and the method for carrying out gob side entry retaining coal mining thereof, because the outside of face end support is provided with the gob side entry retaining template assembly, propelling along with coal-face, adopt the roadside packing method, stay the tunnel along the goaf, as the tunnel of the next work plane of exploitation.Formwork efficient and safe has been saved the coal column that work plane is reserved, and has improved coal recovery rate and advance of the face efficient.
Description of drawings
The structural representation of the gob side entry retaining end hydraulic support that Fig. 1 provides for the embodiment of the invention;
The floor map that the gob side entry retaining end hydraulic support that Fig. 2 provides for the embodiment of the invention carries out gob side entry retaining coal mining.
Among the figure:
1, face end support back timber, 2, cope match-plate pattern, 3, middle template, 4, lower bolster, 5, the face end support base;
11, former tunnel center line, 12, the gob side entry retaining template assembly, 13, the tunnel filling template, 14, new tunnel, 15, obturator, 16, face end support, 17, the middle transition support.
The specific embodiment
Below in conjunction with accompanying drawing the embodiment of the invention is described in further detail.
Gob side entry retaining end hydraulic support of the present invention, its preferable specific embodiment be as shown in Figure 1 and Figure 2:
Comprise face end support, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
Be provided with middle template between described cope match-plate pattern and the described lower bolster, reach movable overlap joint between described middle template and the lower bolster between described cope match-plate pattern and the middle template.
Comprise three frame end head brackets, the outside of the face end support of outer end is provided with described gob side entry retaining template assembly in the three frame end head brackets.
Described three frame end head brackets are provided with the anti-skid device, and described anti-skid device comprises drag-line, and an end of described drag-line is fixed on the back timber of face end support of outer end, and the other end of described drag-line is fixed on the base of inner face end support.
Also comprise anchor device, on the fixing described lower bolster of an end of described anchor device, the other end tension of described anchor device is on the base of the face end support of the inner.
The method that the above-mentioned gob side entry retaining end hydraulic support of application of the present invention carries out gob side entry retaining coal mining, its preferable specific embodiment be as shown in Figure 2:
In the process of coal mining, in the tunnel of exploitation work plane, the tunnel filling template is set, carry out filling between described gob side entry retaining template assembly and described tunnel filling template, stay new tunnel along the goaf, described new tunnel is as the tunnel of exploiting next work plane.
The backfill of filling usefulness can form for ashes and the cement mixing from power plant, can adopt spoil to make the roadside support material.
The present invention is blended in filling process in the coal winning technology, at arranged outside cope match-plate pattern, middle template and the lower bolster of the face end support of outermost end, and three frame end head brackets design anti-skid device.Form the filling space after moving frame, improve formwork efficient and safety by the quick formwork erection of mechanization.
Use edge air gallery technology of the present invention, the colliery is along with the propelling of coal-face, adopt the roadside packing method, stay the tunnel along the goaf, all can be used as the crossheading of the next work plane of exploitation along the empty tunnel that stays, following crossheading will become the last crossheading of next work plane subsequently, can be maintained by the backfill of certain width (as 3 meters).One lane is dual-purpose, saves the expense of digging laneway, avoids debalance of preparation and winning work, anxiety continues;
Gob side entry retaining has saved the coal column that work plane is reserved, and raising coal recovery rate, reduction tunnelling rate, the digging tight relationship of alleviating, realization mine intensification production are had remarkable result.Reduce production costs, adapt to the needs that the high-yield and high-efficiency work plane advances fast.
In concrete the application, can select backfill pump or miscellaneous equipment for use, carry out edge the fast continuous filling in lane of leaving a blank.Backfill is for mixing by certain ratio from power plant's ashes (or other article) and cement.The siccative of backfill feed bin is delivered to down-hole transitional storehouse (surge bunker) by compressed air piping.Mix the station in emulsification, mix the back with water and be pumped to the back filled region by hydraulic concrete.The paste body filling material, pumps in the filling template under the effect of high-pressure pump by pressure piping, solidifies the back and forms filled wall; Can adopt spoil to make the roadside support material, can gather materials on the spot, both can reduce pick lane cost and spoil cost of transportation, can reduce soil, minimizing environment pollution that hillock takies again, have very extensive applicability.
The above; only for the preferable specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, and anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (7)

1. gob side entry retaining end hydraulic support, comprise face end support, it is characterized in that, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, and described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
2. gob side entry retaining end hydraulic support according to claim 1 is characterized in that, is provided with middle template between described cope match-plate pattern and the described lower bolster, reaches movable overlap joint between described middle template and the lower bolster between described cope match-plate pattern and the middle template.
3. gob side entry retaining end hydraulic support according to claim 2 is characterized in that, comprises three frame end head brackets, and the outside of the face end support of outer end is provided with described gob side entry retaining template assembly in the three frame end head brackets.
4. gob side entry retaining end hydraulic support according to claim 3, it is characterized in that, described three frame end head brackets are provided with the anti-skid device, described anti-skid device comprises drag-line, one end of described drag-line is fixed on the back timber of face end support of outer end, and the other end of described drag-line is fixed on the base of inner face end support.
5. gob side entry retaining end hydraulic support according to claim 4 is characterized in that, also comprises anchor device, and on the fixing described lower bolster of an end of described anchor device, the other end tension of described anchor device is on the base of the face end support of the inner.
6. an application rights requires the method that 1 to 5 each described gob side entry retaining end hydraulic support carries out gob side entry retaining coal mining, it is characterized in that, in the process of coal mining, in the tunnel of exploitation work plane, the tunnel filling template is set, between described gob side entry retaining template assembly and described tunnel filling template, carry out filling, stay new tunnel along the goaf, described new tunnel is as the tunnel of exploiting next work plane.
7. gob side entry retaining end hydraulic support according to claim 6 carries out the method for gob side entry retaining coal mining, it is characterized in that, the backfill of filling usefulness forms for ashes and cement mixing from power plant, adopts spoil to make the roadside support material.
CN2011101173112A 2011-05-06 2011-05-06 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof Pending CN102287211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101173112A CN102287211A (en) 2011-05-06 2011-05-06 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101173112A CN102287211A (en) 2011-05-06 2011-05-06 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof

Publications (1)

Publication Number Publication Date
CN102287211A true CN102287211A (en) 2011-12-21

Family

ID=45333934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101173112A Pending CN102287211A (en) 2011-05-06 2011-05-06 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof

Country Status (1)

Country Link
CN (1) CN102287211A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104895604A (en) * 2015-05-27 2015-09-09 四川川煤华荣能源股份有限公司小宝鼎煤矿 Construction method of lane filling retained roadway
CN105952453A (en) * 2016-06-30 2016-09-21 中煤北京煤矿机械有限责任公司 Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN105971648A (en) * 2015-09-30 2016-09-28 北京中矿创新联盟能源环境科学研究院 End support and equipment system of roadway-free and coal-pillar-free self-retained roadway mining method
US10494924B2 (en) 2015-06-24 2019-12-03 Manchao He Longwall mine construction method N00
CN111335893A (en) * 2020-03-14 2020-06-26 中国煤炭科工集团太原研究院有限公司 Segmented sealing device for strip partial filling mining and using method thereof
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770564A (en) * 1984-12-03 1988-09-13 Leon Dison Mining support pillars
CN200999614Y (en) * 2007-01-24 2008-01-02 沈阳天安矿山机械科技有限公司 Roadside filling side template support
CN101289939A (en) * 2008-06-10 2008-10-22 沈阳天安矿山机械科技有限公司 Comprehensive support device for gob-side entry retaining
CN202047853U (en) * 2011-05-06 2011-11-23 中煤北京煤矿机械有限责任公司 Gob-side entry retaining end hydraulic support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770564A (en) * 1984-12-03 1988-09-13 Leon Dison Mining support pillars
CN200999614Y (en) * 2007-01-24 2008-01-02 沈阳天安矿山机械科技有限公司 Roadside filling side template support
CN101289939A (en) * 2008-06-10 2008-10-22 沈阳天安矿山机械科技有限公司 Comprehensive support device for gob-side entry retaining
CN202047853U (en) * 2011-05-06 2011-11-23 中煤北京煤矿机械有限责任公司 Gob-side entry retaining end hydraulic support

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《矿山压力与顶板管理》 19910630 周华强 "灰渣应用于井下充填的研究"与"沿空留巷巷旁充填的试验研究"通过鉴定 43 7 , 第2期 *
> 20101231 闫琳等 巷道支护充填支架的开发利用 38、40 1-4 , 第6期 *
周华强: ""灰渣应用于井下充填的研究"与"沿空留巷巷旁充填的试验研究"通过鉴定", 《矿山压力与顶板管理》, no. 2, 30 June 1991 (1991-06-30), pages 43 *
闫琳等: "巷道支护充填支架的开发利用", <<山东煤炭科技>>, no. 6, 31 December 2010 (2010-12-31), pages 38 - 40 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104895604A (en) * 2015-05-27 2015-09-09 四川川煤华荣能源股份有限公司小宝鼎煤矿 Construction method of lane filling retained roadway
US10494924B2 (en) 2015-06-24 2019-12-03 Manchao He Longwall mine construction method N00
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN105971648A (en) * 2015-09-30 2016-09-28 北京中矿创新联盟能源环境科学研究院 End support and equipment system of roadway-free and coal-pillar-free self-retained roadway mining method
CN105971648B (en) * 2015-09-30 2018-07-06 北京中矿创新联盟能源环境科学研究院 End support and equipment system of roadway-free and coal-pillar-free self-retained roadway mining method
CN105952453A (en) * 2016-06-30 2016-09-21 中煤北京煤矿机械有限责任公司 Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN111335893A (en) * 2020-03-14 2020-06-26 中国煤炭科工集团太原研究院有限公司 Segmented sealing device for strip partial filling mining and using method thereof
CN111335893B (en) * 2020-03-14 2021-08-13 中国煤炭科工集团太原研究院有限公司 Use method of segmented sealing device for strip partial filling mining

Similar Documents

Publication Publication Date Title
CN103615285B (en) A kind of stope route arrangement and method being beneficial to Tight filling
CN108222938B (en) Combined grouting filling mining method for large-inclination-angle coal seam goaf
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent&#39;s spoil
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN104763434B (en) A kind of without coal column double lanes driving method
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN101942999A (en) Coal mining method for high-dipping low seam
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN101749020A (en) Forward coal mining by filling method
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN107829742A (en) Caving-filling-open stope-caving mining method
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN109630112B (en) N00 mining method of cut top filling
CN110259449A (en) A kind of super high seam strip-type filling mining method for relying on telescoping steel form
CN103161498B (en) Method for filling coal pillar beside roadway in steep coal seam section
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN202047853U (en) Gob-side entry retaining end hydraulic support
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN105649673A (en) Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams
CN102505949B (en) Support method for coal seam roadway to cross gob
CN109505604B (en) Slope ramp arrangement method applied to stope adopting upward layered filling mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111221