CN102208777A - V形串导线滑车并列悬挂施工方法 - Google Patents

V形串导线滑车并列悬挂施工方法 Download PDF

Info

Publication number
CN102208777A
CN102208777A CN2011100750945A CN201110075094A CN102208777A CN 102208777 A CN102208777 A CN 102208777A CN 2011100750945 A CN2011100750945 A CN 2011100750945A CN 201110075094 A CN201110075094 A CN 201110075094A CN 102208777 A CN102208777 A CN 102208777A
Authority
CN
China
Prior art keywords
lead
construction method
construction
shaped strings
trolleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100750945A
Other languages
English (en)
Inventor
李长贵
牛鑫
江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGHAI ELECTRIC POWER CO Ltd
Qinghai Transmission And Distribution Engineering Co Ltd
State Grid Corp of China SGCC
Original Assignee
Qinghai Transmission And Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Transmission And Distribution Engineering Co Ltd filed Critical Qinghai Transmission And Distribution Engineering Co Ltd
Priority to CN2011100750945A priority Critical patent/CN102208777A/zh
Publication of CN102208777A publication Critical patent/CN102208777A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明涉及电力工程输变电线路施工及维护检修施工方法。一种V形串导线滑车并列悬挂施工方法,其特征是:该方法一种V形串导线滑车并列悬挂施工方法,其特征是:该方法采用一个Φ22圆钢连接杆、两个-20三孔联板将合成绝缘子V形串和两个三轮导线放线滑车连接成一体。实施所述V形串导线滑车并列悬挂施工方法的挂具,其特征是:该挂具其中主要件包括有:V形串Φ22圆钢连接杆、两个-20三孔联板。本发明可广泛适用于660kV及以上大截面多***导线2ד一牵二”、2ד一牵2+一牵4”和2ד一牵四”张力架线施工中V形串导线滑车的悬挂施工方法。

Description

V形串导线滑车并列悬挂施工方法
 
技术领域
本发明涉及电力工程输变电线路施工及维护检修,V形串导线滑车并列悬挂施工方法。
背景技术
随着我国电力事业的发展,特高压架空输电线路的电压等级在不断地提高,架设的导线截面积也随着用电量的增加在不断增大,为减少导线在长期运行中出现的不均匀蠕变,根据《1000mm2导线架空送电线路张力架线施工工艺导则》的规定,在张力架线施工中,要求同相子导线同步展放、同时收紧的施工工艺要求。
在平原地区施工,由于电力线跨越较多且被跨越电力线路较高,宜采用2ד一牵二”张力放线施工技术,可避免因跨越线路高而增大牵引机的牵引力,增大了现有设备、器具的储备。
在以往750kV及以上电压等级、多***导线张力架线施工中,通常采用2ד一牵二”和2ד一牵2+一牵4”张力放线施工方法。此类施工方法,每相导线均需悬挂两个及以上的导线放线滑车,又因多数导线金具采用V形串,故对于此类导线放线滑车的悬挂,通常是选择用4根与V型金具串垂高相等长的钢丝绳套子(φ21.5),分别用2根钢丝绳套子顺线路方向V型悬挂1个导线放线滑车,两个导线滑车的间距1.5m-2m之间。此类导线滑车的悬挂方式在施工当中存在以下不足:
1、在导线滑车悬挂时,由于用钢丝绳套子呈V型悬挂,需购置加工大量的钢丝绳套子,增加了施工成本。
2、在导线展放过程中,向导线滑车槽内穿引绳时,由于导线滑车容易摆动,施工人员无着力点,施工难度大,不利于施工。
3、在导线展放过程中,此施工方式由于导线滑车的摆动易造成导线跳槽,增加了施工难度。
4、在导线展放过程中,由于两套牵张设备在牵引过程中不可避免的时间差,导致导线滑车的前后左右的不规则摆动,易造成导线的鞭击而损伤导线。
5、由于导线滑车采用钢丝绳套子悬挂方式,在架线完成后进行附件安装时,需将合成绝缘子串重新吊装,因导线已在空中悬挂且两个导线滑车间距1.5m-2m之间,在施工中需将导线合拢,这样就增加了施工难度,延长了施工工期,增加了施工成本,降低了施工效益。
发明内容
本发明的目的在于为了解决上述2ד一牵二”张力架线中,常规所采用的两个三轮导线滑车分开悬挂的不足,经项目部施工技术人员的研究和试验,提出了一种V形串导线滑车并列悬挂施工方法。
本发明的技术方案是:V形串导线滑车并列悬挂施工方法,其特征是:该方法采用一个Φ22圆钢连接杆、两个-20三孔联板将合成绝缘子V形串和两个三轮导线放线滑车连接成一体悬挂施工方法。
实施所述V形串导线滑车并列悬挂施工方法的挂具,其特征是:该挂具其中主要件包括有:V形串Φ22圆钢连接杆、两个-20三孔联板。
本发明优点和效果:采用V形串导线滑车并列悬挂施工方法后有效防止了放线过程中导线滑车迈步、前后左右不规则摆动、相互碰幢的现象,保持导线水平,走板过滑车平稳;有效地控制了同相滑车紧线时滑车迈步及子导线弧垂观测不一致问题;减少了附件安装的工作量,减少了施工难度、同时提高了施工工期及工作效率,在实际应用中效果非常好。
V形串导线滑车并列悬挂施工方法,通过施工现场的实际应用,有效地简化了多***导线同相两个导线滑车的悬挂问题;有效地控制了同极滑车紧线时滑车迈步及子导线弧垂观测不一致问题;规范了多***导线附件安装工艺。因此,本发明的V形串导线滑车并列悬挂施工方法与以往常规2ד一牵二”张力架线导线滑车的悬挂方式相比较:
1、解决了展放过程中由于各子导线承受放线张力差引起的子导线误差影响架线弧垂质量的问题;
2、避免了同步展放过程中由于外界因素(大风和导线舞动)引起的***导线磨损的可能,保证了放线过程中导线质量;
3、避免了同步展放后,附加安装过程中子导线就位时损伤导线的可能。
4、相应减少了施工人员的投入数量,降低了施工成本。
5、附件安装方便,大大提高了架线施工进度及施工工效。
本发明V形串导线滑车并列悬挂施工方法,节约了大量的时间、人力和物力,缩短了施工工期,提高了工作效率和经济效益。适用于660kV及以上大截面多***导线2ד一牵二” 、2ד一牵2+一牵4”和2ד一牵四”的张力架线施工。
附图说明
以下结合附图和具体实施方式对本发明作进一步详细说明。
图1是V形串导线滑车并列悬挂示意图;
图2是直线塔V型串导线滑车并列悬挂示意图;
图3是三孔联板2结构示意图;
图4是圆钢连接杆1结构示意图;
图5是V形串导线滑车并列悬挂受力分析图。
具体实施方式
参照附图1-5所示,本发明的一种V形串导线滑车并列悬挂施工方法,该方法采用一个Φ22圆钢连接杆1、两个-20三孔联板2将合成绝缘子V形串3和两个三轮导线放线滑车4连接成一体悬挂施工方法。
实施所述V形串导线滑车并列悬挂施工方法的挂具,该挂具其中主要件包括有:V形金具串Φ22圆钢连接杆1、两个-20三孔联板2。
参照图5所示,V形串导线滑车并列悬挂各受力点的受力计算分析,
以线路最大垂直档距的塔位为例进行受力分析:
以标段塔位最大垂直档距为611m,导线为1000mm2大截面4×JL/G3A-1000/45钢芯铝绞线,单位重量3.14kg/m,计算拉断力226.15kN,安全系数2.5,计算时考虑舞动系数1.02。
V型金具串滑车并列悬挂受力分析如下:
由附图?可得各分力:
最大垂直档距塔位单极下压力为G:
G=lD×m×n/1000×10×1.02
=611×3.14×4/1000×10×1.02=78.28  (kN)
式中:lD----垂直档距m
m ----导线单位重量kg/m
n ----相间子导线根数
单滑轮(三孔联板)下压力:
G1=G/2=39.14 (kN)
单侧合成绝缘子(三孔联板)的斜上拉力:
F1=G1/COS45°=55.36 (kN)
Φ22圆钢连接杆、三孔联板的水平拉力:
F2=F1×Sin45°=39.14 (kN)
Φ22圆钢连接杆和三孔联板经邢台市科信实验室拉力试验,拉力达到124.7kN 。
由此可见Φ22圆钢连接杆和三孔联板的拉力124.7(kN)远远大于最大垂直档距塔位单侧导线滑车的下压力39.14(kN)
安全系数(三孔联板):
K1=124.7/55.36=2.31
安全系数(Φ22连接杆):
K2=124.7/39.14=3.26
计算结果可知:对最大垂直档距塔位横担将产生78.28 kN的下压力, 单滑轮下压力及连接杆的水平拉力为39.14 kN,单侧合成绝缘子的斜上拉力为55.36 kN,安全系数:三孔联板K1为2.31、Φ2 2圆钢连接杆K2为3.26。所以发明创新的V形串导线滑车并列悬挂的各受力点均满足安全要求。
针对特高压架空输电线路架设的导线截面积增大,在现有牵引设备额定牵引力不能满足同时牵引一相(极)大截面导线要求时,宜采用2ד一牵二”张力放线施工技术。2ד一牵二”张力放线施工技术是由2套“一牵二”放线设备组合,分别用两个“一牵二”走板和三轮放线滑车配合放线。
采用2ד一牵二”张力放线施工技术,可有效解决大吨位牵引机、大规格牵引绳和配套器具的重新购置问题,使现有设备、器具得到充分利用;在山区施工中还能缓解大型牵张设备的运输问题。

Claims (2)

1.一种V形串导线滑车并列悬挂施工方法,其特征是:该方法采用一个Φ22圆钢连接杆(1)、两个-20三孔联板(2)将合成绝缘子V形串(3)和两个三轮导线放线滑车(4)连接成一体悬挂施工方法。
2.一种实施权利要求1所述V形串导线滑车并列悬挂施工方法的挂具,其特征是:该挂具其中主要件包括有:V形串Φ22圆钢连接杆(1)、两个-20三孔联板(2)。
CN2011100750945A 2011-03-24 2011-03-24 V形串导线滑车并列悬挂施工方法 Pending CN102208777A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100750945A CN102208777A (zh) 2011-03-24 2011-03-24 V形串导线滑车并列悬挂施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100750945A CN102208777A (zh) 2011-03-24 2011-03-24 V形串导线滑车并列悬挂施工方法

Publications (1)

Publication Number Publication Date
CN102208777A true CN102208777A (zh) 2011-10-05

Family

ID=44697486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100750945A Pending CN102208777A (zh) 2011-03-24 2011-03-24 V形串导线滑车并列悬挂施工方法

Country Status (1)

Country Link
CN (1) CN102208777A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593759A (zh) * 2012-02-16 2012-07-18 湖北省输变电工程公司 大截面导线一牵二展放施工工艺
CN106300129A (zh) * 2015-12-10 2017-01-04 国家电网公司 大跨越放线滑车悬挂装置
CN106786157A (zh) * 2016-12-31 2017-05-31 浙江省送变电工程公司 通航水面上方的输电线路大跨越拆旧方法
CN112320650A (zh) * 2020-11-18 2021-02-05 青海送变电工程有限公司 一种斜拉式绝缘子串超长型管型母线吊装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03198607A (ja) * 1989-12-27 1991-08-29 Sanwa Tekki Corp 送電線の架設方法
JP2004282984A (ja) * 2003-02-24 2004-10-07 Himeno Corp 電線の架線工法
CN101582572A (zh) * 2009-06-23 2009-11-18 湖南省送变电建设公司 一种特高压张力架线的方法
CN101789568A (zh) * 2010-02-23 2010-07-28 中国电力科学研究院 一牵三导线对称布置平衡受力型放线滑车及牵引走板

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03198607A (ja) * 1989-12-27 1991-08-29 Sanwa Tekki Corp 送電線の架設方法
JP2004282984A (ja) * 2003-02-24 2004-10-07 Himeno Corp 電線の架線工法
CN101582572A (zh) * 2009-06-23 2009-11-18 湖南省送变电建设公司 一种特高压张力架线的方法
CN101789568A (zh) * 2010-02-23 2010-07-28 中国电力科学研究院 一牵三导线对称布置平衡受力型放线滑车及牵引走板

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王剑峰: ""750kv线路六***导线一牵六张力放线"", 《宁夏电力》, no. 4, 31 August 2010 (2010-08-31) *
郑晓广等: ""特高压11标段8***导线并行分组同步牵引架线施工关键技术"", 《电网技术》, vol. 33, no. 10, 31 May 2009 (2009-05-31), pages 63 - 67 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593759A (zh) * 2012-02-16 2012-07-18 湖北省输变电工程公司 大截面导线一牵二展放施工工艺
CN102593759B (zh) * 2012-02-16 2015-07-01 湖北省送变电工程公司 大截面导线一牵二展放施工工艺
CN106300129A (zh) * 2015-12-10 2017-01-04 国家电网公司 大跨越放线滑车悬挂装置
CN106786157A (zh) * 2016-12-31 2017-05-31 浙江省送变电工程公司 通航水面上方的输电线路大跨越拆旧方法
CN112320650A (zh) * 2020-11-18 2021-02-05 青海送变电工程有限公司 一种斜拉式绝缘子串超长型管型母线吊装方法
CN112320650B (zh) * 2020-11-18 2022-04-22 青海送变电工程有限公司 一种斜拉式绝缘子串超长型管型母线吊装方法

Similar Documents

Publication Publication Date Title
CN102290742B (zh) 张力架线施工工艺
CN101582572B (zh) 一种特高压张力架线的方法
CN206128796U (zh) 一种猫头直线塔
CN102208777A (zh) V形串导线滑车并列悬挂施工方法
CN102403673A (zh) 新型2×一牵三张力架线施工工艺
CN203367865U (zh) 输电线路检修用辅助支架
CN201345512Y (zh) 220kv双回共塔线路高压强电场专用工具
CN203553749U (zh) 用于***导线作业的梯头飞车
CN103779809B (zh) 带电调整双***子导线间距作业方法
CN201260047Y (zh) 不对称放线滑车
CN201466574U (zh) 用于等电位更换输电线路铁塔绝缘子及附件的装置
CN206379675U (zh) 带电更换直线塔v串绝缘子导线的联板卡
CN109256721A (zh) 一种直升机带电检修作业吊篮
CN102709856B (zh) 一种特高压输电线路用十字形联板
CN203722136U (zh) 用于跨越铁路张力架线施工的绝缘绳网装置
CN207098443U (zh) 一种直升机带电检修作业吊篮
CN103296616A (zh) 架空输电线路施工用刚性跨越支架及跨越方法
CN104242142B (zh) 悬吊式管型母线的安装方法
CN203813330U (zh) 带电更换500kV耐张绝缘子串工具
CN201478732U (zh) 一种特高压输电线路中的放线滑车
CN102237654A (zh) 一种双角钢挂点更换跳线串的工具及方法
CN103515860A (zh) 一种适用于特高压多***导线同步展放双滑车悬挂的方法
CN203707674U (zh) 带电调整双***子导线间距专用工具
CN207218127U (zh) 一种高强度马道杆
CN204012462U (zh) 一种用于架设导线的吊具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: QINGHAI POWER TRANSMISSION + TRANSFORMATION ENGINEERING COMPANY

Effective date: 20130731

Owner name: QINGHAI ELECTRIC POWER CORPORATION QINGHAI POWER T

Effective date: 20130731

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 810001 XINING, QINGHAI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130731

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Qinghai Electric Power Co., Ltd.

Applicant after: Qinghai Transmission and Distribution Engineering Co., Ltd.

Address before: 810001 No. 25 Xiguan Street, Xining, Qinghai

Applicant before: Qinghai Transmission and Distribution Engineering Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111005