CN102191778A - 沉管式无挤土地下连续墙的施工方法 - Google Patents

沉管式无挤土地下连续墙的施工方法 Download PDF

Info

Publication number
CN102191778A
CN102191778A CN2011100945534A CN201110094553A CN102191778A CN 102191778 A CN102191778 A CN 102191778A CN 2011100945534 A CN2011100945534 A CN 2011100945534A CN 201110094553 A CN201110094553 A CN 201110094553A CN 102191778 A CN102191778 A CN 102191778A
Authority
CN
China
Prior art keywords
steel
punching block
construction
construction method
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100945534A
Other languages
English (en)
Inventor
傅健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011100945534A priority Critical patent/CN102191778A/zh
Publication of CN102191778A publication Critical patent/CN102191778A/zh
Priority to CN2012100992629A priority patent/CN102605764A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

沉管式无挤土地下连续墙的施工方法,属地基处理与基础工程的施工方法,先在钢模两侧装上排土管,起吊钢模,依次并排压入一组四个钢模,在钢模内放置钢筋笼,在第一个钢模内灌注混凝土,振动着拔出第一个钢模,拔除第一个钢模后,形成第一个桩,同时压入第五个钢模,如此重复,形成第二、三、……根桩,完成成段的地下连续墙的施工,该施工方法受力更加合理,材料利用上更加高效,同时,由于采用非钻井成孔,现场污染少,环境干净、整洁。

Description

沉管式无挤土地下连续墙的施工方法
技术领域
本发明属地基处理与基础工程的施工方法,尤其是指沉管式无挤土地下连续墙的施工方法。
背景技术
传统地下连续墙的施工方法是:通过专用的挖(冲)槽设备,沿着地下建筑物的周边,按预定的位置,开挖出或冲钻出具有一定宽度与深度的沟槽,用泥浆护壁,并在槽内设置具有一定刚度的钢筋笼;然后,用导管浇灌水下混凝土,筑成一个单元槽,如此逐段进行,分段施工,用特殊方法接头,使之形成地下连续的钢筋混凝土墙体。这种施工方法的缺点是工程量大,工期长,不环保,混凝土质量缺乏保障。
发明内容
本发明正是为了克服上述不足,提供一种工效高、施工周期短且保证质量的沉管式无挤土地下连续墙的施工方法,具体这样实施:沉管式无挤土地下连续墙的施工方法,其特征在于施工步骤如下:
1)在钢模两侧装上排土管;
2)起吊钢模,依次并排压入一组四个钢模;
3) 在钢模内放置钢筋笼;
4)在第一个钢模内灌注混凝土,振动着拔出第一个钢模;
5) 拔除第一个钢模后,形成第一个桩,同时压入第五个钢模;
6)重复4-5步,形成第二、三、……根桩,完成成段的地下连续墙的施工。
沉管式无挤土地下连续墙的施工方法从受力机理上来说与传统地下连续墙基本相同,由于改变了传统地下连续墙的施工工艺,使得其受力更加合理,材料利用上更加高效。同时,由于采用非钻井成孔,现场污染少,环境干净、整洁。
附图说明
图1为本发明施工过程示意图。
具体实施方式
沉管式无挤土地下连续墙的施工方法,施工步骤如下:
1)在钢模两侧装上排土管;
2)起吊钢模,依次并排压入一组四个钢模;
3) 在钢模内放置钢筋笼;
4)在第一个钢模内灌注混凝土,振动着拔出第一个钢模;
5) 拔除第一个钢模后,形成第一个桩,同时压入第五个钢模;
6)重复4-5步,形成第二、三、……根桩,完成成段的地下连续墙的施工。
这种施工方法中,混凝土采用干灌而不是一般的水下灌注,混凝土的塌落度较大,再加上混凝土采用振捣式灌注,混凝土的强度和搅捣质量可靠。
制成的连续墙为实心墙,抗弯、抗剪承载力高,结构刚度大、变形小,可减小基坑周边地面的沉降,降低对周围建筑物造成不良影响的风险;施工中无需支撑,方便挖土,加快基坑支护的挖土进程,缩短了工期;减少了土方开挖、外运、回填等工作,施工工序少,整个施工无泥浆产生,现场干净文明,质量检验、现场控制较为简便。
本施工方法适用范围广,还可用于水利工程建设。

Claims (1)

1.沉管式无挤土地下连续墙的施工方法,其特征在于施工步骤如下:
1)在钢模两侧装上排土管;
2)起吊钢模,依次并排压入一组四个钢模;
3) 在钢模内放置钢筋笼;
4)在第一个钢模内灌注混凝土,振动着拔出第一个钢模;     
5) 拔除第一个钢模后,形成第一个桩,同时压入第五个钢模;
6)重复4-5步,形成第二、三、……根桩,完成成段的地下连续墙的施工。
CN2011100945534A 2011-04-15 2011-04-15 沉管式无挤土地下连续墙的施工方法 Pending CN102191778A (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011100945534A CN102191778A (zh) 2011-04-15 2011-04-15 沉管式无挤土地下连续墙的施工方法
CN2012100992629A CN102605764A (zh) 2011-04-15 2012-04-08 沉管式无挤土地下连续墙的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100945534A CN102191778A (zh) 2011-04-15 2011-04-15 沉管式无挤土地下连续墙的施工方法

Publications (1)

Publication Number Publication Date
CN102191778A true CN102191778A (zh) 2011-09-21

Family

ID=44600576

Family Applications (2)

Application Number Title Priority Date Filing Date
CN2011100945534A Pending CN102191778A (zh) 2011-04-15 2011-04-15 沉管式无挤土地下连续墙的施工方法
CN2012100992629A Pending CN102605764A (zh) 2011-04-15 2012-04-08 沉管式无挤土地下连续墙的施工方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2012100992629A Pending CN102605764A (zh) 2011-04-15 2012-04-08 沉管式无挤土地下连续墙的施工方法

Country Status (1)

Country Link
CN (2) CN102191778A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561342A (zh) * 2012-02-10 2012-07-11 中国水利水电第五工程局有限公司 一种用于地下连续墙施工的多功能复合模管

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE790580A (fr) * 1971-10-26 1973-02-15 Vyzk Ustav Inzhenerskikh Procede et agencement de production de pieux et de palees souterraines
CN1296568C (zh) * 2002-01-04 2007-01-24 张国梁 混凝土桩的施工方法
CN1200178C (zh) * 2003-05-28 2005-05-04 姜贤放 筒桩和板桩联体施工方法及其专用设备
CN101560766B (zh) * 2009-05-13 2011-03-02 江苏东大鸿基科技有限公司 格栅状地下连续墙板及其制作方法
CN101979777B (zh) * 2010-09-29 2013-01-16 卫龙武 一种现浇空芯方桩的组合型地下连续墙板的施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561342A (zh) * 2012-02-10 2012-07-11 中国水利水电第五工程局有限公司 一种用于地下连续墙施工的多功能复合模管

Also Published As

Publication number Publication date
CN102605764A (zh) 2012-07-25

Similar Documents

Publication Publication Date Title
CN201883438U (zh) 一种坑中坑钢板桩基坑支护结构
CN202689008U (zh) 一种双排预制高强混凝土薄壁钢管桩基坑支护结构
CN106677205A (zh) 一种装配式异形钢管桩组合挡土墙
CN102817372A (zh) 地下深基础混凝土反模施工方法
CN108612086A (zh) 一种裂隙地质钻孔灌注桩施工方法
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN102359112A (zh) 利用钢箱桩进行基坑围护的方法
CN204825867U (zh) 一种作为暗挖车库立柱的复合桩结构
CN101666085B (zh) 预制构件复合水泥土墙及其施工方法
WO2017133373A1 (zh) 一种用于桩基的小直径桩簇及其施工方法
CN109972644B (zh) 顶推用沉井装置及其施工方法
CN208379572U (zh) 一种基于刃口式推进法的防沉降处理施工装置
CN201531021U (zh) 预制构件水泥土钻孔灌注桩
CN102191778A (zh) 沉管式无挤土地下连续墙的施工方法
CN215329921U (zh) 简易闭口式土钉连接节点
CN110004942A (zh) 一种大跨度组合支撑结构及其施工方法
CN110359525B (zh) 一种静压预制装配式水池及其建造方法
CN113756371A (zh) 防水砼水平缝处混凝土密实施工方法
CN210031875U (zh) 顶推用沉井装置
CN201908303U (zh) 方框形钢腔混凝土现浇沉井护壁
CN202247856U (zh) 地基处理用取土圆环桩及地下基础
CN201873990U (zh) 干取土咬合型矩形灌注桩成桩装置
CN202323934U (zh) 用于现浇三角形复合地基桩的成孔器
CN203905025U (zh) 一种异形钢筋混凝土与水泥土分列式基坑支护墙
CN201268857Y (zh) 清土铲

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20110921