CN102185380A CN2011101206864A CN201110120686A CN102185380A CN 102185380 A CN102185380 A CN 102185380A CN 2011101206864 A CN2011101206864 A CN 2011101206864A CN 201110120686 A CN201110120686 A CN 201110120686A CN 102185380 A CN102185380 A CN 102185380A
Authority
CN
China
Prior art keywords
module
communication
cpu
main frame
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101206864A
Other languages
Chinese (zh)
Inventor
王震
张辉
张淑杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Original Assignee
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fushun Power Supply Co of Liaoning Electric Power Co Ltd filed Critical Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority to CN2011101206864A priority Critical patent/CN102185380A/en
Publication of CN102185380A publication Critical patent/CN102185380A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to an analogue simulator with automated dispatching, mainly comprising an embedded CPU (central processing unit) module, a power supply module, a GPRS (general packet radio service)/CDMA (code division multiple access) data transmission module, a four-wire E/M modulation-demodulation module, a 2M module, a communication interface module and a display module. The simulator can correctly judge the position and type of an error in a short time so as to provide powerful basis for field staffs and realize dynamic integration of routing functions, exchange functions and longitudinal separation encryption functions for data networks. According to the simulator, real-time dynamic simulation of intelligent equipment of digital transformer substations such as telecontrol equipment, protection devices, metering equipment and the like can be implemented truly. A measurement and control technology is dynamically integrated with a wireless communication technology, thus greatly improving the extensibility of a product.

Description

The dispatching automation analogue simulation device
Technical field
The present invention relates to a kind of dispatching automation device, relate in particular to a kind of dispatching automation analogue simulation device, be particularly useful for the problem of electric power system day-to-day operation equipment and the appearance of data network passage is carried out fault location.
Background technology
Electric power is the lifeblood of national economy, continuous progress and China's rapid development of economy along with science and technology, electric power system just progressively develops to the direction of UHV transmission, interconnected, the unified automatic dispatching of big electrical network, and the accurately and timely property of transfer of data is to realize this developing direction important link.Data dispatching information is to pass through analog channel, the data dispatching net transmits, because the transmission course link complexity of schedule information, transmission range is far away, device category is more, on any one link, produced mistake, will cause the upward signal that scheduling station receives can't demodulation, the order that main website issues can not normally be carried out, when this type of problem frequently occurs, utilize existing means can only measure signal level and waveform, but can not locate rapidly and accurately for the fault point, often have no way of doing it when causing the professional and technical personnel to search failure cause, influence the transmission promptly and accurately of data dispatching.
Build the requirement of intelligent electrical network and along with the development of present automatic technology according to State Grid Corporation of China, Fu Za automation main website, substation equipment are had higher requirement to the day-to-day operation maintenance work of new equipment operation debugging and operational outfit day by day, it is not enough new equipment operation debug time to have occurred, does not have effective tool that the problem of day-to-day operation equipment and the appearance of data network passage is carried out fault location.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, a kind of dispatching automation analogue simulation device is provided, the problem that having solved electric power system in the prior art does not have effective tool that day-to-day operation equipment and data network passage are occurred is carried out the problem of fault location, and the present invention improved operating efficiency, and is easy to maintenance.
Technical scheme of the present invention is as follows:
Be provided with host module, be used to finish and other functional module interaction datas;
Be provided with the modulation module, by modulation pattern and CPU communication;
Be provided with digital transmission module, realize the data remote function, by bus and CPU communication;
Be provided with display module, show information, communication state, the parameter information of each functional module;
Be provided with power module, for all modules provide power supply, dual-host backup;
Be provided with ethernet module, realize that the network of equipment connects;
Be provided with communication module, by bus and CPU communication;
Be provided with switch module, insert in real time on-the-spot and the non real-time network equipment, by bus and CPU communication;
Be provided with router-module, on connect special line, connect down switch or vertically encrypt, by bus and CPU communication;
Be provided with encrypting module, communication data is encrypted, prevent that data are stolen, by bus and CPU communication.
Described modulation module is four line E/M modulation modules.
Described digital transmission module is the GPRS/CDMA digital transmission module.
Described communication module is 2 road RS485 interfaces.
Advantageous effect of the present invention is as follows:
1, the present invention can correct at short notice wrongheaded position, type, for the Field Force provides strong foundation, realized data network routing function, function of exchange and vertically isolated the combination of encryption function.
2, really finished the real Time Dynamic Simulation of smart machines such as digital transformer substation telecontrol equipment, protection equipment, measuring equipment.
3, project adopts cordwood system type, standardization, intelligentized design philosophy, and observation and control technology and wireless communication technique are organically combined, and has improved product ductility greatly.
4, the present invention puts into operation the electrical secondary system of national grid and primary system synchronously strong guarantee is provided, put into operation during equipment in that transformer station is newly-built like this, electrical secondary system and primary system just can be debugged simultaneously, save staff's debug time greatly, improved the operating efficiency that equipment puts into operation and the level of safety in production.This project not only can be used for actual production simultaneously, can also be used for automation personnel is carried out technical training, has saved training expense.
5, the present invention makes production get involved capital construction in advance becomes possibility, the on-the-spot debugging with main website under the situation that wouldn't satisfy the requirements become a reality, improve professional's technical merit, make it to adapt to the development of electrical network, adapt to the development of new technology, the particularly data network transferring electric power production real time information of State Grid Corporation of China's requirement, having solved capital construction in the past sets aside some time short and practical problem that the system that influences puts into operation to production, a kind of effective means of testing also is provided simultaneously, the express analysis schedule information, get rid of data dispatching net transmission fault, significantly reduce the faults analysis processing time, the operation management level of height power supply enterprise greatly, social image and user's electricity consumption reliability is power system security, continuously, stable operation plays a significant role.
Description of drawings
Fig. 1 is a structural representation block diagram of the present invention.
Embodiment
The present invention in conjunction with specific embodiments, is described in detail as follows with reference to accompanying drawing.
Embodiment
Be provided with PC/104 Series PC M-3350 plate and carry the low power consumption CPU module, be used to finish and other functional module interaction datas;
Be provided with four line E/M modulation modules, by modulation pattern and CPU communication;
Be provided with the GPRS/CDMA digital transmission module, realize the data remote function, by bus and CPU communication;
Be provided with display module, show information, communication state, the parameter information of each functional module;
Be provided with power module, for all modules provide power supply, dual-host backup; Input 220AC/DC.
Be provided with ethernet module, realize that the network of equipment connects;
Be provided with communication module, 2 road RS485 interfaces are by bus and CPU communication;
Be provided with switch module, insert in real time on-the-spot and the non real-time network equipment, by bus and CPU communication;
Be provided with router-module, on connect special line, connect down switch or vertically encrypt, by bus and CPU communication;
Be provided with encrypting module, communication data is encrypted, prevent that data are stolen, by bus and CPU communication;
Be provided with keyboard interface: external connection keyboard.
Be provided with USB interface: circumscribed USB equipment.
But the present invention's supporting interface mode is as follows:
2 road Ethernet communication interfaces.
1 tunnel four line E/M modem interface.
2 the tunnel isolate serial communication interface 2 tunnel.
1 road E1 interface.
1 USB interface.
1 keyboard interface.
1 mouse interface.
1 display interface.
Profile of the present invention adopts the portable apparatus cabinet, and the present invention mainly is achieved as follows function:
1, main website simulation
For newly-built transformer station or wait to debug responsible consumer transformer station, the present invention is the analog automatization main website temporarily, quickly and easily the substation at testing engineering initial stage.Dispose two network interfaces, a 2M mouth, 2 RS232 mouths, a MODEM mouth, under the situation that passage possesses, can be connected to field apparatus by data network or 2M analog channel; Do not having under the passage situation, can directly be placed on the factory station to the present invention, be directly connected on the equipment.
The present invention can insert multiple stipulations, the four remote control function of simulation main website, and online interpolation revises various parameters, intuitively shows and factory station side trend, on off state etc. show the action message of tested equipment, and can simulate and issue control command etc.
, substation simulation
The present invention can simulate the information of actual comprehensive automation system of transformer substation, the on-site maintenance personnel can be provided with the remote measurement amount, remote signalling amount, remote control amount, remote regulating amount at simulation factory station etc., the substation operation that simulation is actual comprises that frequency computation part, dynamic power flow calculatings, remote signalling displacement simulation, remote control are returned to school to carry out that simulation, AGC are simulated etc.
The present invention also provides abundant stipulations storehouse simultaneously, can provide IEC-101, IEC-104, CDT isotactic to ask to join one the communication of higher level main website simultaneously, but also can expand; Stipulations such as CDT or IEC-101 are provided for local function machine.
, tunnels analogy
For the station of newly founding the factory, on-the-spot telemechanical often appears and protection equipment has possessed the debugging condition, and the situation that passage does not often possess, the present invention then has this tunnels analogy function, greatly facilitates the equipment debugging in no passage situation.
The present invention carries GPRS equipment, only need simply be provided with, and just can be connected to the automation main website wirelessly.The present invention with wait to debug telecontrol system or smart machine carries out communication, with transparent mode data message rule schemata in accordance with regulations is sent to the automation main website by wireless network, thereby finishes the tunnels analogy function.
, data network simulation and detecting
A) under the situation of factory station end data net equipment paralysis, alternate data net equipment temporarily.
B) have functions such as emulation router, emulation real-time exchange machine, emulation non real-time switch, the protection of emulation actual time safety, the security protection of emulation non real-time.
C), can detect the unusual equipment that takes place by simulation respectively to router, switch, security protection system.
Protection scope of the present invention is as the criterion with claim, not limited by specific embodiment.

Claims (5)

1. the dispatching automation analogue simulation device is characterized in that being provided with main frame (CPU) module, is used to finish and other functional module interaction datas;
Be provided with the modulation module, by modulation pattern and main frame (CPU) communication;
Be provided with digital transmission module, realize the data remote function, by bus and main frame (CPU) communication;
Be provided with display module, show information, communication state, the parameter information of each functional module;
Be provided with power module, for all modules provide power supply, dual-host backup;
Be provided with ethernet module, realize that the network of equipment connects;
Be provided with communication module, by bus and main frame (CPU) communication;
Be provided with switch module, insert in real time on-the-spot and the non real-time network equipment, by bus and main frame (CPU) communication;
Be provided with router-module, on connect special line, connect down switch or vertically encrypt, by bus and main frame (CPU) communication;
Be provided with encrypting module, communication data is encrypted, prevent that data are stolen, by bus and main frame (CPU) communication.
2. dispatching automation analogue simulation device according to claim 1 is characterized in that described main frame (CPU) module is the embedded host module.
3. dispatching automation analogue simulation device according to claim 1 is characterized in that described modulation module is four line E/M modulation modules.
4. dispatching automation analogue simulation device according to claim 1 is characterized in that described digital transmission module is the GPRS/CDMA digital transmission module.
5. dispatching automation analogue simulation device according to claim 1 is characterized in that described communication module is 2 road RS485 interfaces.
CN2011101206864A 2011-05-11 2011-05-11 Analogue simulator with automated dispatching Pending CN102185380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101206864A CN102185380A (en) 2011-05-11 2011-05-11 Analogue simulator with automated dispatching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101206864A CN102185380A (en) 2011-05-11 2011-05-11 Analogue simulator with automated dispatching

Publications (1)

Publication Number Publication Date
CN102185380A true CN102185380A (en) 2011-09-14

Family

ID=44571473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101206864A Pending CN102185380A (en) 2011-05-11 2011-05-11 Analogue simulator with automated dispatching

Country Status (1)

Country Link
CN (1) CN102185380A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545917A (en) * 2012-07-12 2014-01-29 吉林省电力有限公司四平供电公司 Scheduling-automation sub-station simulation system
CN105576832A (en) * 2016-01-12 2016-05-11 国网安徽省电力公司宿州供电公司 Sub-station simulation and transmission system and method of substation automation system
CN107465182A (en) * 2016-06-03 2017-12-12 国网辽宁省电力有限公司大连供电公司 Province's ground county's integrated dispatching system test platform device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1850142A1 (en) * 2006-04-24 2007-10-31 Abb Research Ltd. System level testing for substation automation systems
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN202121376U (en) * 2011-05-11 2012-01-18 辽宁省电力有限公司抚顺供电公司 Scheduling automation analogue simulation device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1850142A1 (en) * 2006-04-24 2007-10-31 Abb Research Ltd. System level testing for substation automation systems
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN202121376U (en) * 2011-05-11 2012-01-18 辽宁省电力有限公司抚顺供电公司 Scheduling automation analogue simulation device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《北京电力高等专科学校学报》 20110131 巫志平 "纵向加密装置在电力调度数据网中的应用" , 第1期 *
巫志平: ""纵向加密装置在电力调度数据网中的应用"", 《北京电力高等专科学校学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545917A (en) * 2012-07-12 2014-01-29 吉林省电力有限公司四平供电公司 Scheduling-automation sub-station simulation system
CN105576832A (en) * 2016-01-12 2016-05-11 国网安徽省电力公司宿州供电公司 Sub-station simulation and transmission system and method of substation automation system
CN107465182A (en) * 2016-06-03 2017-12-12 国网辽宁省电力有限公司大连供电公司 Province's ground county's integrated dispatching system test platform device

Similar Documents

Publication Publication Date Title
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN202134144U (en) High voltage power distribution completely real load control training assessment system
CN202218067U (en) Automated intelligent information pointing system of electric power system
CN103412208B (en) The method of intelligent substation electric power telemechanical device closed loop test
CN103135019A (en) Power quality monitoring management system based on electric power wide-area network
CN103488835A (en) Simulation platform and method for dispatching automation system
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN104575200A (en) Low-voltage transformer district simulated practice training system based on rural power grid intelligent low-voltage distribution box
CN108257439A (en) A kind of distribution automation Training Methodology and analogue system for adapting to various modes
CN103427417A (en) Power distribution network fault processing method based on multi-source information fusion
CN204291050U (en) A kind of dispatching and monitoring information check system
CN103545917A (en) Scheduling-automation sub-station simulation system
CN201839095U (en) Intelligent transformer substation testing and simulation system
CN205354423U (en) Intelligent substation emulation training system
CN105403793A (en) Automatic transformer station digital relay protection tester
CN202121376U (en) Scheduling automation analogue simulation device
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN103259333A (en) Intelligent alarming and integrated fault analysis system
CN103823952A (en) Data flow design method for large grid control integrated full-process simulation training system
CN105137958A (en) Railway under-vehicle power supply main control board detection device and detection method
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN210244682U (en) Electric power marketing simulation training system
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN102185380A (en) Analogue simulator with automated dispatching
CN202276196U (en) Intelligent monitoring terminal device of intelligent switchhouse

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120919

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120919

Address after: 113008 West Xinfu Road, Liaoning, Fushun, No. 13

Applicant after: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 113008 West Xinfu Road, Liaoning, Fushun, No. 13

Applicant before: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110914