CN102184280A - Drawing and model integrated visual integration design method - Google Patents

Drawing and model integrated visual integration design method Download PDF

Info

Publication number
CN102184280A
CN102184280A CN2011101058877A CN201110105887A CN102184280A CN 102184280 A CN102184280 A CN 102184280A CN 2011101058877 A CN2011101058877 A CN 2011101058877A CN 201110105887 A CN201110105887 A CN 201110105887A CN 102184280 A CN102184280 A CN 102184280A
Authority
CN
China
Prior art keywords
model
design
file
artwork
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101058877A
Other languages
Chinese (zh)
Inventor
曹珍祟
黄伟
陈娟
陆以夫
陆忻
秦征
周哲
吴皓
李磊
任怀兵
陈明华
常红梅
潘济猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE
Original Assignee
GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE filed Critical GUANGXI ELECTRIC POWER INDUSTRY INVESTIGATION DESIGN AND RESEARCH INSTITUTE
Priority to CN2011101058877A priority Critical patent/CN102184280A/en
Publication of CN102184280A publication Critical patent/CN102184280A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Stored Programmes (AREA)

Abstract

The invention discloses a drawing and model integrated visual integration design method. A design institute and a system manufacturer take the responsibility of a system integrator together to finish the work of a designing a drawing for a transform substation and modeling all-station information. In the method, secondary development is performed on an Auto computer-aided design (CAD) by adopting an ActiveX Automation technology by taking the AutoCAD as an information interaction platform so as to establish a native XML database (NXD)-based model text storage database. By adopting the drawing and model integrated integration design, both a design drawing and a model file provided by the design institute can be identified; the bonding of information is finished by the design method so that a CAD file which is finally provided for a user can not only display connection information in the model in a visual mode, but also export the model file for a required unit, a manufacturer or a system to use, and realize the bidirectional switching of the drawing and the model.

Description

Artwork one volume visualization integral design method
Technical field
The invention belongs to the electric power system design field.The implementation method of the integrated design of artwork one volume visualization specifically.
Background technology
Digitizing, intelligent transformer station generally adopt IEC 61850 standards, and according to the definition of IEC 61850, the mutual file of transformer station's internal information is all kinds of model files of XML form.The method that digitizing station design is at present generally adopted is: by IED equipment vendors generator schematic diagram and group screen figure, first and second equipment and network connection figure draw according to engineering specifications in designing unit, in installation and equipment debugging process, device configuration tool, system configuration utility, engineering configuration effort etc. are many to be responsible for by equipment vendors, and the system integration is then finished by system manufacturer and SCD is provided file.As seen system manufacturer plays a part crucial in the model configuration flow, it be responsible for in the station each independently IED device description file (ICD) configuration help station description document (SCD), the key foundation that the SCD file that system manufacturer provides and the design drawing that is provided by designing unit all will become transformer station's construction, operation, safeguard.
The drawback that this method for designing exists: the function of (1) reduction designing unit.The digital transformer substation design too much relies on system manufacturer, designing unit's leading position weakens relatively in the implementation process of engineering, be unfavorable for the standardization and the standardization of the integrated work of transformer station secondary system, be unfavorable for that also the association that mode work is installed withers, more be unfavorable for the renewal of enlarging, transformation and the equipment of substation project from now on; (2) increased the not visible property of operation maintenance.Though the SCD file that system manufacturer provides has comprised the integrated information of total system, but relevant information is not simple and clear, the annexation and the data stream that can't intuitively embody each IED equipment room flow to, for equipment installation and operation maintainer, the information of Network Transmission is opaque, has brought great inconvenience for the Installation and Debugging and the operation maintenance of equipment.
Summary of the invention
The present invention provides a cover artwork one volume visualization integral design method in order to overcome the deficiencies in the prior art, utilizes this method to come the Aided Design personnel to finish the design effort of digitizing, intelligent transformer station.
The present invention is as follows for the technical scheme that solves the problems of the technologies described above.
1. artwork one volume visualization integral design method, step is as follows:
1) based on AutoCAD 2007-2009 version, adopt ActiveX Automation development technique that design software is carried out secondary development, obtain secondary development software, i.e. the integrated design software of AutoCAD artwork one volume visualization;
2) in the integrated design software of AutoCAD artwork one volume visualization, set up a model text storage database, realize the bi-directional conversion of figure and model based on NXD (nativeXML database);
3) be interaction platform with the integrated design software of AutoCAD artwork one volume visualization, the design drawing that model file that identification resolution system manufacturer provides and designing unit provide;
4) by this software model information and design configuration information are bound, realize that the cad file that finally provides can be with the wiring information in the visual way display model;
5) this software support function that imports and exports of information model of standing entirely, and carry out model checking.
2. the enforcement of artwork one volume visualization integral design method, step is as follows:
1) system manufacturer is responsible for to each IED equipment vendors collecting device model;
2) system manufacturer is responsible for each device model of collecting is carried out the distribution of verification and system configuration information, as: IP address, multicast address, Appid, VLAN;
3) each IED device model of providing of designing unit's receiving system manufacturer, carry out following work:
(1) utilize the integrated design platform of artwork one volume visualization to import the ICD model of each IED equipment;
(2) utilize design platform to generate empty terminal figure automatically according to the ICD file, designing unit is according to engineering specifications, on the empty terminal figure of IED equipment, carry out visual line operation, finish that transformer station is electric, optical fiber, network and empty circuit wiring diagram, and link information write model and add among the SCD, thereby finish the integrated file of transformer station's SCD electrical secondary system;
4) designing unit provides the SCD file that comprises SSD, ICD and have data stream trend and annexation simultaneously to the CAD construction drawing that the user provides each equipment connecting relation of visual representation;
5) designing unit provides transformer station's SCD electrical secondary system integrated file to system manufacturer, and system manufacturer is according to the SSD model file, finishes SCD the stand full system integration and uniting and adjustment work;
6) system manufacturer provides the instantiation model file to each IED equipment vendors, is derived the CID file of each IED equipment voluntarily by each IED equipment vendors.
The present invention has the following advantages:
1. the inventive method is a platform with the AutoCAD design software, utilize this platform with system manufacturer play a part in the master mould configuration flow key, the integrated work of system is finished in commentaries on classics jointly by designing unit and system manufacturer, shorten the design time of the system integration, reduce the message exchange repeatedly between designing unit and system integrator in the former method for designing, the disposable transformer station that improves constructs in the design phase, debugging, operation, safeguard required whole drawing datas, set up transformer station's panorama information model, really embody the uniqueness that digital transformer substation data source end generates.
2. the inventive method can coordinate design unit and the work of system manufacturer, finishes system integration work jointly.It not only improves design efficiency, be beneficial to the job schedule that guarantees project construction, " but can establish school, visual " in that design level realizes transformer station's design is " visual " figure of installing, move, the unit of maintenance providing IED equipment room annexation and data stream flows to.Adopt the integrated design of artwork one volume visualization, increased design department and got involved the integrated means of electrical secondary system, be beneficial to the integrated standardization of transformer station secondary system.
3.AutoCAD the graphical operation interface be beneficial to the design advantage of inheriting tradition transformer station, meet designer's design custom, can reduce the degree of understanding of designer to IEC 61850 standards systems.
Description of drawings
Fig. 1 is artwork one a volume visualization integral design method synoptic diagram.
Among the figure: the integrated design software 1 of AutoCAD artwork one volume visualization, the model text storage database 2 of NXD (native XMLdatabase), the model file 3-1 that system manufacturer provides, the design drawing 3-2 that designing unit provides.
Fig. 2 is the integrated design implementation process of artwork one a volume visualization synoptic diagram.
Among the figure: each equipment vendors provides device model 1, system manufacturer carries out model checking and system information distributes 2, designing unit carries out schematic diagram and empty loop connects design 3, the user obtains full station design drawing and SCD file 4, system manufacturer obtains full station design drawing and SCD file 5, and each equipment vendors obtains device instance model file 6.
Fig. 3 is the integrated design implementation process of the artwork one volume visualization synoptic diagram of embodiment 1.
Among the figure: the PSL603UW route protection; IED equipment vendors such as SGB750 bus protection provide this engineering required ICD model file 1 to system manufacturer; the correctness of all models of system manufacturer verification; carry out information distribution 2 such as IP address for this engineering equipment; designing unit carries out design according to the data that system manufacturer provides; as draw network structure; GOOSE net informational linkage schematic diagram; the empty loop connection of each IED equipment etc. 3; designing unit offers user and unit in charge of construction 4 with the CAD drawing file; system manufacturer receives the CAD drawing of designing unit and the system debug work 5 that the SCD file carries out project; the instantiation model file that 1ED equipment vendors provide according to system manufacturer is derived the CID file 6 of each IED equipment, and designing unit finishes the as-constructed drawing design and finally consigns to user 7.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
One. artwork one volume visualization integral design method is as shown in Figure 1, among the figure: the integrated design software 1 of AutoCAD artwork one volume visualization, the model text storage database 2 of NXD (native XML database), the model file 3-1 that system manufacturer provides, the design drawing 3-2 that designing unit provides.
Artwork one volume visualization integral design method, design procedure is as follows:
1. based on AutoCAD 2007-2009 version, adopt ActiveX Automation development technique that design software is carried out secondary development, obtain secondary development software, i.e. the integrated design software 1 of AutoCAD artwork one volume visualization;
2. in the integrated design software of AutoCAD artwork one volume visualization, set up a model text storage database 2, realize the bi-directional conversion of figure and model based on NXD (native XML database);
3. be interaction platform with the integrated design software 1 of AutoCAD artwork one volume visualization, the design drawing 3-2 that model file 3-1 that identification resolution system manufacturer provides and designing unit provide;
4. by this software 1 model information and design configuration information are bound, realize that the cad file that finally provides can be with the wiring information in the visual way display model;
5. this software 1 is supported the function that imports and exports of full station information model, and carries out model checking.
Two. the implementation process of the integrated design of artwork one volume visualization
The implementation process of visual integrated design is as shown in Figure 2:
1. system manufacturer is responsible for to each IED equipment vendors collecting device model.
2. system manufacturer is responsible for each device model of collecting is carried out the distribution (as: IP address, multicast address, Appid, VLAN etc.) of verification and system configuration information.
3. each IED device model of providing of designing unit's receiving system manufacturer, carry out following work:
(1) utilize the integrated design platform of artwork one volume visualization to import the ICD model of each IED equipment.
(2) utilize design platform to generate empty terminal figure automatically according to the ICD file, designing unit is according to engineering specifications, on the empty terminal figure of IED equipment, carry out visual line operation, finish that transformer station is electric, optical fiber, network and empty circuit wiring diagram, and link information write model and add among the SCD, thereby finish the integrated file of transformer station's SCD electrical secondary system.
4. designing unit provides the SCD file that comprises SSD, ICD and have data stream trend and annexation simultaneously to the CAD construction drawing that the user provides each equipment connecting relation of visual representation.
5. designing unit provides transformer station's SCD electrical secondary system integrated file to system manufacturer, and system manufacturer is according to the SSD model file, finishes SCD the stand full system integration and uniting and adjustment work.
6. system manufacturer provides the instantiation model file to each IED equipment vendors, is derived the CID file of each IED equipment voluntarily by each IED equipment vendors.
Embodiment 1
This method is applied to " setting up 500kV fully digitalization transformer station pilot " completion of works figure design.Be further elaborated below in conjunction with specific embodiment, design procedure is as follows, as shown in Figure 3:
1.IED equipment vendors provide the ICD model file of the required PSL603UW route protection of engineering, PSL602U route protection, PCS931 route protection, SGB750 bus protection, PSL632U breaker protection and PSR662U measure and control device etc. to system manufacturer.
2. the system manufacturer grammer standard whether of using all models of the integrated design software verification of artwork one volume visualization.According to the scale of this engineering, be the employed devices allocation IP of this engineering address, according to configuration controll block number assignment multicast address and the AppID in each mounted cast file, divide VLAN according to the requirement of network traffics;
3. system manufacturer will offer designing unit by the model of verification and the detail list of assignment information, and designing unit uses the integrated design platform of artwork one volume visualization to carry out design effort.
(1) at first draws 500kV Liu Gui second line digitizing pilot network structure at interval, equipment pel among the figure is related with corresponding model file, the attribute of finishing pel according to the detail list that is provided in the time of related is filled in, this moment, design can be revised the instantiation information of relevant device according to project situation, as IP address, multicast address etc., thereby finish the importing work of model;
(2) design GOOSE net informational linkage schematic diagram, according to schematic diagram, the empty loop of carrying out each IED equipment on the CAD graphical interfaces connects design effort, and saves as CAD drawing file and SCD model file simultaneously.
4. designing unit offers user and unit in charge of construction with the CAD drawing file as working drawing.
5. designing unit submits to system manufacturer with CAD drawing and the SCD file finished, is responsible for coordinating the system debug work of whole project by system manufacturer.According to the signal association of cad file relation, check the correctness of SCD file, promptly the uniting and adjustment of implement device and loop to a job, guarantee that defencive function satisfies design requirement.
6. system manufacturer provides the instantiation model file to each IED equipment vendors, is derived the CID file of each IED equipment voluntarily by each IED equipment vendors.
7. after engineering construction was finished and put into operation, the modification that designing unit makes according to work progress was revised CAD figure and SCD model file by this design platform, finished the establishment of completion of works drawing and SCD file and finally consigned to the user.

Claims (2)

1. artwork one volume visualization integral design method is characterized in that step is as follows:
1) based on AutoCAD 2007-2009 version, adopt ActiveX Automation development technique that design software is carried out secondary development, obtain secondary development software, i.e. the integrated design software of AutoCAD artwork one volume visualization;
2) in the integrated design software of AutoCAD artwork one volume visualization, set up a model text storage database, realize the bi-directional conversion of figure and model based on NXD (native XML database);
3) be interaction platform with the integrated design software of AutoCAD artwork one volume visualization, the design drawing that model file that identification resolution system manufacturer provides and designing unit provide;
4) by this software model information and design configuration information are bound, realize that the cad file that finally provides can be with the wiring information in the visual way display model;
5) this software support function that imports and exports of information model of standing entirely, and carry out model checking.
2. the enforcement of artwork one volume visualization integral design method as claimed in claim 1 is characterized in that step is as follows:
1) system manufacturer is responsible for to each IED equipment vendors collecting device model;
2) system manufacturer is responsible for each device model of collecting is carried out the distribution of verification and system configuration information, as: IP address, multicast address, Appid, VLAN;
3) each IED device model of providing of designing unit's receiving system manufacturer, carry out following work:
(1) utilize the integrated design platform of artwork one volume visualization to import the ICD model of each IED equipment;
(2) utilize design platform to generate empty terminal figure automatically according to the ICD file, designing unit is according to engineering specifications, on the empty terminal figure of IED equipment, carry out visual line operation, finish that transformer station is electric, optical fiber, network and empty circuit wiring diagram, and link information write model and add among the SCD, thereby finish the integrated file of transformer station's SCD electrical secondary system;
4) designing unit provides the SCD file that comprises SSD, ICD and have data stream trend and annexation simultaneously to the CAD construction drawing that the user provides each equipment connecting relation of visual representation;
5) designing unit provides transformer station's SCD electrical secondary system integrated file to system manufacturer, and system manufacturer is according to the SSD model file, finishes SCD the stand full system integration and uniting and adjustment work;
6) system manufacturer provides the instantiation model file to each IED equipment vendors, is derived the CID file of each IED equipment voluntarily by each IED equipment vendors.
CN2011101058877A 2011-04-27 2011-04-27 Drawing and model integrated visual integration design method Pending CN102184280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101058877A CN102184280A (en) 2011-04-27 2011-04-27 Drawing and model integrated visual integration design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101058877A CN102184280A (en) 2011-04-27 2011-04-27 Drawing and model integrated visual integration design method

Publications (1)

Publication Number Publication Date
CN102184280A true CN102184280A (en) 2011-09-14

Family

ID=44570457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101058877A Pending CN102184280A (en) 2011-04-27 2011-04-27 Drawing and model integrated visual integration design method

Country Status (1)

Country Link
CN (1) CN102184280A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102437655A (en) * 2012-01-11 2012-05-02 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102832715A (en) * 2012-09-14 2012-12-19 济南容弗科技有限公司 Virtual terminal, real fiber/optical cable integrative design method in design of intelligent substation
CN103116827A (en) * 2013-02-08 2013-05-22 冀北电力有限公司 Rural power grid engineering control system
CN103187801A (en) * 2011-12-31 2013-07-03 山东电力工程咨询院有限公司 Optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN103607051A (en) * 2013-11-25 2014-02-26 国家电网公司 Method and system for expanding transformer substation
CN103823839A (en) * 2013-12-20 2014-05-28 柳州腾龙煤电科技股份有限公司 AutoCAD symbol configuration showing method based on gallery integration
CN104008223A (en) * 2014-03-12 2014-08-27 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104063485A (en) * 2014-07-03 2014-09-24 上海自仪泰雷兹交通自动化***有限公司 Integration maintenance system for trackside line equipment data
CN104268346A (en) * 2014-09-30 2015-01-07 中国人民解放军国防科学技术大学 Implementation method for simulation application of visual integrated environment on basis of object class interaction diagrams
CN104281756A (en) * 2014-10-28 2015-01-14 国家电网公司 Analytic method of CAD wiring diagram
CN104951997A (en) * 2015-05-21 2015-09-30 北京科东电力控制***有限责任公司 Multidimensional graphic and model quality analysis method facing power distribution network
CN106528910A (en) * 2016-09-13 2017-03-22 北京金雨科创自动化技术股份有限公司 Electric design platform and method for same
CN106787184A (en) * 2016-12-13 2017-05-31 国网福建省电力有限公司 A kind of graphic representation method based on Analysis of Transmission
CN106793631A (en) * 2017-03-06 2017-05-31 南京泽宣自动化工程技术有限公司 A kind of electrically visualization installing plate
CN106844819A (en) * 2016-11-17 2017-06-13 福建省电力勘测设计院 The secondary artwork storehouse design tool database acquisition system of intelligent station
CN113138808A (en) * 2021-04-29 2021-07-20 上海阵量智能科技有限公司 Integration method, integration device, computer equipment and storage medium
CN113377708A (en) * 2021-06-09 2021-09-10 深圳须弥云图空间科技有限公司 Method and device for converting two-dimensional design drawing into three-dimensional design drawing

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103187801A (en) * 2011-12-31 2013-07-03 山东电力工程咨询院有限公司 Optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN103187801B (en) * 2011-12-31 2014-10-29 山东电力工程咨询院有限公司 Method of optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN102437655A (en) * 2012-01-11 2012-05-02 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102437655B (en) * 2012-01-11 2013-10-16 温州电力局 Analogue display method and system of virtual terminals of intelligent substation
CN102832715A (en) * 2012-09-14 2012-12-19 济南容弗科技有限公司 Virtual terminal, real fiber/optical cable integrative design method in design of intelligent substation
CN102832715B (en) * 2012-09-14 2016-01-20 山东容弗新信息科技有限公司 Empty terminal, real optical fiber/optical cable integrated design method in intelligent substation design
CN103116827A (en) * 2013-02-08 2013-05-22 冀北电力有限公司 Rural power grid engineering control system
CN103607051A (en) * 2013-11-25 2014-02-26 国家电网公司 Method and system for expanding transformer substation
CN103607051B (en) * 2013-11-25 2015-11-18 国家电网公司 A kind of transformer station's enlargement method and system
CN103823839A (en) * 2013-12-20 2014-05-28 柳州腾龙煤电科技股份有限公司 AutoCAD symbol configuration showing method based on gallery integration
CN104008223B (en) * 2014-03-12 2017-04-12 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104008223A (en) * 2014-03-12 2014-08-27 国家电网公司 Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN104063485A (en) * 2014-07-03 2014-09-24 上海自仪泰雷兹交通自动化***有限公司 Integration maintenance system for trackside line equipment data
CN104268346A (en) * 2014-09-30 2015-01-07 中国人民解放军国防科学技术大学 Implementation method for simulation application of visual integrated environment on basis of object class interaction diagrams
CN104268346B (en) * 2014-09-30 2018-06-22 中国人民解放军国防科学技术大学 A kind of implementation method of the Simulation Application visualization the integration environment based on object class interaction figure
CN104281756A (en) * 2014-10-28 2015-01-14 国家电网公司 Analytic method of CAD wiring diagram
CN104951997A (en) * 2015-05-21 2015-09-30 北京科东电力控制***有限责任公司 Multidimensional graphic and model quality analysis method facing power distribution network
CN106528910A (en) * 2016-09-13 2017-03-22 北京金雨科创自动化技术股份有限公司 Electric design platform and method for same
CN106844819A (en) * 2016-11-17 2017-06-13 福建省电力勘测设计院 The secondary artwork storehouse design tool database acquisition system of intelligent station
CN106787184A (en) * 2016-12-13 2017-05-31 国网福建省电力有限公司 A kind of graphic representation method based on Analysis of Transmission
CN106793631A (en) * 2017-03-06 2017-05-31 南京泽宣自动化工程技术有限公司 A kind of electrically visualization installing plate
CN106793631B (en) * 2017-03-06 2019-06-28 南京泽宣自动化工程技术有限公司 A kind of electrical visualization mounting plate
CN113138808A (en) * 2021-04-29 2021-07-20 上海阵量智能科技有限公司 Integration method, integration device, computer equipment and storage medium
CN113138808B (en) * 2021-04-29 2023-08-08 上海阵量智能科技有限公司 Integration method, device, computer equipment and storage medium
CN113377708A (en) * 2021-06-09 2021-09-10 深圳须弥云图空间科技有限公司 Method and device for converting two-dimensional design drawing into three-dimensional design drawing

Similar Documents

Publication Publication Date Title
CN102184280A (en) Drawing and model integrated visual integration design method
CN101989312B (en) Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN104133953B (en) Intelligent substation secondary design system
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN101873008B (en) Method for converting SCD (Substation Configuration Description) model into dispatching center CIM (Common Information Model)
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN102254074B (en) Automatic modeling method of intelligent transformer substation spacer
CN102270261B (en) Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN112765258B (en) Power distribution network graph model checking management system and method thereof
CN104200393B (en) Simplify version single line drawing generating method and system
CN102209108A (en) Method and system for realizing seamless communication between master scheduling station and substation of power grid
CN102411649B (en) Method for interchanging designs by using general model of intelligent device
CN103020360A (en) Integration design method of intelligent substation based on three-dimensional design platform and professional software
CN101877500A (en) Interconnected power system oriented hierachical decomposition space-time cooperative modeling method
CN104123271A (en) Secondary design system for intelligent substation on basis of Excel
CN101964542A (en) Method for accessing IEC61970 dispatching EMS system to IEC61850 digital transformer substation
CN204291050U (en) A kind of dispatching and monitoring information check system
CN110288176A (en) Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS
CN102916489B (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN103065217A (en) Digital model splicing method of electric power setting calculating system
CN104881737A (en) Control figure billing system
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN106910143A (en) Power distribution network artwork multi-edition control method and system
CN105071376A (en) Method for implementing integrated framework of main distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Cao Zhenchong

Inventor after: Ren Huaibing

Inventor after: Chen Minghua

Inventor after: Chang Hongmei

Inventor after: Pan Jimeng

Inventor after: Huang Wei

Inventor after: Chen Juan

Inventor after: Lu Yifu

Inventor after: Lu Xin

Inventor after: Qin Zheng

Inventor after: Zhou Zhe

Inventor after: Wu Hao

Inventor after: Li Lei

Inventor before: Cao Zhensui

Inventor before: Ren Huaibing

Inventor before: Chen Minghua

Inventor before: Chang Hongmei

Inventor before: Pan Jimeng

Inventor before: Huang Wei

Inventor before: Chen Juan

Inventor before: Lu Yifu

Inventor before: Lu Xin

Inventor before: Qin Zheng

Inventor before: Zhou Zhe

Inventor before: Wu Hao

Inventor before: Li Lei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CAO ZHENSUI HUANG WEI CHEN JUAN LU YIFU LU XIN QIN ZHENG ZHOU ZHE WU HAO LI LEI REN HUAIBING CHEN MINGHUA CHANG HONGMEI PAN JIMENG TO: CAO ZHENCHONG HUANG WEI CHEN JUAN LU YIFU LU XIN QIN ZHENG ZHOU ZHE WU HAO LI LEI REN HUAIBING CHEN MINGHUA CHANG HONGMEI PAN JIMENG

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110914