CN105071376A - Method for implementing integrated framework of main distribution network - Google Patents

Method for implementing integrated framework of main distribution network Download PDF

Info

Publication number
CN105071376A
CN105071376A CN201510383424.5A CN201510383424A CN105071376A CN 105071376 A CN105071376 A CN 105071376A CN 201510383424 A CN201510383424 A CN 201510383424A CN 105071376 A CN105071376 A CN 105071376A
Authority
CN
China
Prior art keywords
distribution
network
application
main
distribution network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510383424.5A
Other languages
Chinese (zh)
Other versions
CN105071376B (en
Inventor
石俊杰
宋英华
杜红卫
韩韬
王民昆
路轶
熊志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Sichuan Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Sichuan Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Sichuan Electric Power Co Ltd
Priority to CN201510383424.5A priority Critical patent/CN105071376B/en
Publication of CN105071376A publication Critical patent/CN105071376A/en
Application granted granted Critical
Publication of CN105071376B publication Critical patent/CN105071376B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for implementing the integrated framework of a main distribution network, and the method comprises the steps: hardware architecture design, software architecture design, and application coordination and function implementation design. With the help of a scheduling system supporting platform of an original main network, the method employs a mode of application separation and unified display to achieve the integration of the main distribution network through the sharing of data resources, technical resources, and equipment resources. The method achieves a monitoring function of main network equipment of a conventional main network scheduling control system in a main distribution network integrated system, and also achieves the functions of distribution network data collection, distribution network SCADA, distribution network base network analysis and feeder line automatic processing of a distribution network main station system. The method does not change the hardware architecture of an original system, makes the most of the equipment resources of an original automatic system, reduces the reconstruction cost of a system, and improves the monitoring efficiency of power grid equipment.

Description

A kind of main distribution Integrated Architecture implementation method
Technical field
The present invention relates to a kind of main distribution Integrated Architecture implementation method, belong to distribution network technology field.
Background technology
Electric power system is divided into major network and distribution two major parts usually.Major network refers to the electricity of 110kV kilovolt and above, plays transmission of electricity effect.Distribution mainly refers to the electrical network of 35kV and following electric pressure, and its effect is to each power distribution station and powers with electric charge.
Regulation mode of operation is United Dispatching, differentiated control, is divided into state's tune, province adjusts, mediation county of city adjusts different stage, is in charge of different electric pressure standby.
Operational management action comprises that equipment is repaiied, new equipment start put into operation, accident treatment etc., be responsible for ensureing operation of power networks stability and security, overhaul of the equipments, ensure that the reliability of user supplies.
In the operational management of electrical network in large scale, the management of power network wiring figure plays the important function of Base data platform, by Real time displaying power network wiring figure, Regulation personnel can understand the information such as the trend cloth of power network wiring mode, equipment line mode, device parameter and system clearly, can realize kind of a crucial application operating based on these information.
The actual condition of current China is, major network information automation system is from 20 century 70 acquisition and control system SCADA(SupervisoryControlAndDataAcquisition)) build, data acquisition and supervision; To 80 years 20th century by SCADA and automation Generation Control AGC(AutomaticGenerationControl) and network analysis integrated energy management system EMS(energymanagementsystem), each exhibition of later computer is all embodied on EMS, improve data acquisition and supervision gradually, the energy such as telemechanical operation, development comparative maturity; Distribution automation breath system Construction was opened from the nineties in 20th century, and development relatively lags behind.Which forms major network shape and distribution figure independently manages and protects, effective information is lacked mutual between main distribution, the deficiency of the distribution mode of connection and load etc. can not be checked, because being not suitable with the control integrated construction trend of the main distribution of China's electrical network from major network system.National grid is puted forth effort to solve the weak problem of power distribution network in recent years, realizes planning with main grid structure and the distribution of local township is planned and is effectively connected, and is joined by major network and includes Integrated Management System in.
Summary of the invention
The object of the present invention is to provide a kind of main distribution Integrated Architecture implementation method, can realize towards master in same set of system, join two-stage dispatching of power netwoks application continuum, realize unified monitoring, unified management, integrated analysis.
For achieving the above object, the technical solution adopted in the present invention is: a kind of main distribution Integrated Architecture implementation method, comprises the design of hard architecture design, Software Architecture Design, application coordination and functional realiey:
Described hardware structure designscomprise: a, front server and SCADA server dispose that major network is preposition, distribution is preposition and SCADA application simultaneously;
Described software Architecture Designcomprise: a, the public service of using in major network dispatching patcher common support platform; WAMS application in b, amendment original system, rename as DSCADA application, make it possess complete distribution data sampling and processing ability, on the flow chart of data processing on distribution basis, increase new application to distribution network function simultaneously, comprise winding diagram electronization function and feeder automation function; The distributed capture that c, data acquisition adopt major network collection and distribution collection to be separated, and distinguish public network and private network two kinds of acquisition modes;
Described application coordinationcomprise: a, the device model table that main distribution is correlated with by database bottom, trigger separate, wherein, the measurement class that distribution part is divided into distribution network model class and distribution network model to trigger; B, the preposition application of increase distribution, make it possess controller switching equipment data acquisition function; C, optimization distribution pre-process mode, be transformed into thread-level by data channel by process level and manage, improve data access ability; D, amendment WAMS are applied as distribution SCADA and apply, and major network SCADA applies completely independent, realizes distribution net equipment monitoring and controlling function;
Described functional realiey designscomprise: a, main application to distribution network set up independently warning system separately, distinguish the warning information handling process of different application, warning information stores respectively, unified displaying, application; B, figure are distinguished for the business characteristic of different dispatching patchers on showing, major network lays particular emphasis on plant stand figure, and business function is from plant stand, and distribution scheduling then emphasizes artwork management, thematic map management, distribution network feeder automation.
Further, described public service comprises database service, real-time database service, messenger service.
Further, described in hardware structure designsalso comprise: independently dispose distribution front server and distribution SCADA server according to hardware situation of having more than needed; When there is no public network data terminal, do not dispose public network data acquisition front server.
Further, described in software Architecture Designmiddle application adopts intersection deployment way, and the redundancy realizing application is for subsequent use.
Further, described in software Architecture Designmiddle Information issued great Qu shares original WEB delivery system, expansion distribution repairing dispatch application.
Further, described in application coordinationalso comprise: simplify flow chart of data processing, cancel the major network bypass replacement verification scheme in original system; During interacting message, the message of main distribution is transmitted with different message channels, is only needing the place of different application to carry out cross snoop.
Further, described in functional realiey designsalso comprise: coupling system zone of responsibility, respectively exhibition strategy is customized according to user role to main distribution warning information.
Further, described in functional realiey designsalso comprise: design main distribution integration, the system interface of county's integration, be convenient to different identity user and operate.
Compared with prior art, the present invention reaches beneficial effectbe: provide a kind of main distribution Integrated Architecture implementation method, in main distribution integral system, not only realize the master network equipment monitoring function of traditional major network Dispatching Control System, also realize the functions such as the distribution data collection of distribution main station system, distribution SCADA, the analysis of power distribution network basic network, feeder automation process simultaneously; Do not change original system hardware structure, make full use of the device resource of original automated system, decrease system Construction cost, improve grid equipment monitoring efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of main distribution Integrated Architecture.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.Following examples only for technical scheme of the present invention is clearly described, and can not limit the scope of the invention with this.
Main distribution integral system pattern is dispatching automation, power distribution automation service application realizes based on the unified platform, possesses identical compass of competency, distribution repairing scheduling conduct independently system is coupled with main distribution integral system by service bus, obtain real time operation mode and the network analysis service of automated system, three forms broad sense integral system.In base application, main distribution integral system provides the application such as data processing service, network analysis service, alerting service, man-machine interface by platform is unified; In system architecture, main distribution integral system has unified data and stores and platform service, and power distribution automation business can configure independently data acquisition service as required.As shown in Figure 1, be the structural representation of main distribution Integrated Architecture, comprise platform application, the application of major network dispatching services, distribution scheduling service application and the application of distribution repairing commander districts and cities.Platform application is equipped with database server and platform application server; The application of major network dispatching services is equipped with major network acquisition server, major network Analysis server, major network maintenance work station and dispatch application work station; Distribution scheduling service application configuration distribution acquisition server, distribution Analysis server, distribution maintenance work station and distribution scheduling work station; Distribution repairing commander districts and cities application configuration repairing commander's work station and provincial repairing commander server.
Solution Architecture need from the dispatching of power netwoks of traffic department, distribution scheduling two parts application demand, closely follows the tracks of the development of state-of-the-art technology, has functional software integration, a feature that resource-sharing, support function are constantly expanded.Functionally no longer pay close attention to major network scheduling controlling, only lay particular emphasis on the Function Construction of electrical power distribution automatization system, comprise power distribution network winding diagram electronization function, power dispatching data accesses, the major functions such as distribution operation monitoring, the process of distribution automatic fault, the application of distribution topology.Simultaneously also when considering the information integerated with other operation systems, as repairing scheduling, PMS, GIS etc.
One provided by the invention main distribution Integrated Architecture implementation method, comprises the design of hard architecture design, Software Architecture Design, application coordination and functional realiey.
hardware structure designscomprise: a, front server and SCADA server dispose that major network is preposition, distribution is preposition and SCADA application simultaneously; B, according to hardware, situation of having more than needed independently disposes distribution front server and distribution SCADA server; C, when there is no public network data terminal, do not dispose public network data acquisition front server.
software Architecture Designcomprise: a, the public service of using in major network dispatching patcher common support platform, comprise database service, real-time database service, messenger service; WAMS application in b, amendment original system, rename as DSCADA application, make it possess complete distribution data sampling and processing ability, on the flow chart of data processing on distribution basis, increase new application to distribution network function simultaneously, comprise winding diagram electronization function and feeder automation function; The distributed capture that c, data acquisition adopt major network collection and distribution collection to be separated, and distinguish public network and private network two kinds of acquisition modes; Application adopts intersection deployment way, and the redundancy realizing application is for subsequent use; Information issued great Qu shares original WEB delivery system, expansion distribution repairing dispatch application.
application coordinationcomprise: a, the device model table that main distribution is correlated with by database bottom, trigger separate, wherein, the measurement class that distribution part is divided into distribution network model class and distribution network model to trigger; B, the preposition application of increase distribution, make it possess controller switching equipment data acquisition function; C, optimization distribution pre-process mode, be transformed into thread-level by data channel by process level and manage, improve data access ability; D, amendment WAMS are applied as distribution SCADA and apply, and major network SCADA applies completely independent, realizes distribution net equipment monitoring and controlling function; E, simplify flow chart of data processing, cancel the major network bypass replacement verification scheme in original system; When f, interacting message, the message of main distribution is transmitted with different message channels, is only needing the place of different application to carry out cross snoop.
functional realiey designscomprise: a, main application to distribution network set up independently warning system separately, distinguish the warning information handling process of different application, warning information stores respectively, unified displaying, application; B, figure are distinguished for the business characteristic of different dispatching patchers on showing, major network lays particular emphasis on plant stand figure, and business function is from plant stand, and distribution scheduling then emphasizes artwork management, thematic map management, distribution network feeder automation; C, coupling system zone of responsibility, customize exhibition strategy to main distribution warning information respectively according to user role; D, design main distribution integration, the system interface of county's integration, be convenient to different identity user and operate.
The inventive method not only realizes the master network equipment monitoring function of traditional major network Dispatching Control System in main distribution integral system, also realizes the functions such as the distribution data collection of distribution main station system, distribution SCADA, the analysis of power distribution network basic network, feeder automation process simultaneously; Do not change original system hardware structure, make full use of the device resource of original automated system, decrease system Construction cost, improve grid equipment monitoring efficiency.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvement and distortion, these improve and distortion also should be considered as protection scope of the present invention.

Claims (8)

1. a main distribution Integrated Architecture implementation method, is characterized in that, comprises the design of hard architecture design, Software Architecture Design, application coordination and functional realiey:
Described hardware structure designscomprise: a, front server and SCADA server dispose that major network is preposition, distribution is preposition and SCADA application simultaneously;
Described software Architecture Designcomprise: a, the public service of using in major network dispatching patcher common support platform; WAMS application in b, amendment original system, rename as DSCADA application, make it possess complete distribution data sampling and processing ability, on the flow chart of data processing on distribution basis, increase new application to distribution network function simultaneously, comprise winding diagram electronization function and feeder automation function; The distributed capture that c, data acquisition adopt major network collection and distribution collection to be separated, and distinguish public network and private network two kinds of acquisition modes;
Described application coordinationcomprise: a, the device model table that main distribution is correlated with by database bottom, trigger separate, wherein, the measurement class that distribution part is divided into distribution network model class and distribution network model to trigger; B, the preposition application of increase distribution, make it possess controller switching equipment data acquisition function; C, optimization distribution pre-process mode, be transformed into thread-level by data channel by process level and manage, improve data access ability; D, amendment WAMS are applied as distribution SCADA and apply, and major network SCADA applies completely independent, realizes distribution net equipment monitoring and controlling function;
Described functional realiey designscomprise: a, main application to distribution network set up independently warning system separately, distinguish the warning information handling process of different application, warning information stores respectively, unified displaying, application; B, figure are distinguished for the business characteristic of different dispatching patchers on showing, major network lays particular emphasis on plant stand figure, and business function is from plant stand, and distribution scheduling then emphasizes artwork management, thematic map management, distribution network feeder automation.
2. main distribution Integrated Architecture implementation method according to claim 1, it is characterized in that, described public service comprises database service, real-time database service, messenger service.
3. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in hardware structure designsalso comprise: independently dispose distribution front server and distribution SCADA server according to hardware situation of having more than needed; When there is no public network data terminal, do not dispose public network data acquisition front server.
4. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in software Architecture Designmiddle application adopts intersection deployment way, and the redundancy realizing application is for subsequent use.
5. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in software Architecture Designmiddle Information issued great Qu, shares original WEB delivery system, expansion distribution repairing dispatch application.
6. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in application coordinationalso comprise: simplify flow chart of data processing, cancel the major network bypass replacement verification scheme in original system; During interacting message, the message of main distribution is transmitted with different message channels, is only needing the place of different application to carry out cross snoop.
7. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in functional realiey designsalso comprise: coupling system zone of responsibility, respectively exhibition strategy is customized according to user role to main distribution warning information.
8. main distribution Integrated Architecture implementation method according to claim 1, is characterized in that, described in functional realiey designsalso comprise: design main distribution integration, the system interface of county's integration, be convenient to different identity user and operate.
CN201510383424.5A 2015-07-03 2015-07-03 Method for implementing integrated framework of main distribution network Active CN105071376B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510383424.5A CN105071376B (en) 2015-07-03 2015-07-03 Method for implementing integrated framework of main distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510383424.5A CN105071376B (en) 2015-07-03 2015-07-03 Method for implementing integrated framework of main distribution network

Publications (2)

Publication Number Publication Date
CN105071376A true CN105071376A (en) 2015-11-18
CN105071376B CN105071376B (en) 2017-05-03

Family

ID=54500689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510383424.5A Active CN105071376B (en) 2015-07-03 2015-07-03 Method for implementing integrated framework of main distribution network

Country Status (1)

Country Link
CN (1) CN105071376B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105633970A (en) * 2016-03-15 2016-06-01 国家电网公司 Main network dispatching system based building method for standby dispatching control system of distribution network
CN107944661A (en) * 2017-10-26 2018-04-20 国电南瑞科技股份有限公司 A kind of main distribution integration regulator control system
CN108985601A (en) * 2018-07-03 2018-12-11 国网江西省电力有限公司经济技术研究院 A kind of main distribution integrated management system
CN109165833A (en) * 2018-08-14 2019-01-08 南京南瑞继保电气有限公司 Main distribution integration edge device management method and boundary library based on boundary library
CN109981536A (en) * 2017-12-28 2019-07-05 南京南瑞继保电气有限公司 A kind of transmission & distribution network data processing method based on more presence proxy mechanism
CN111093057A (en) * 2019-12-03 2020-05-01 安徽四创电子股份有限公司 Planning method for network architecture of urban video monitoring system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040260404A1 (en) * 2003-06-23 2004-12-23 Russell Thomas C. Method and apparatus for self-configuring supervisory control and data acquisition (SCADA) system for distributed control
CN102931726A (en) * 2012-10-22 2013-02-13 深圳供电局有限公司 Main network and distribution network integrated security power supply system
CN103715770A (en) * 2013-12-20 2014-04-09 国电南瑞科技股份有限公司 Wide-area-distributed city/county scheduling and monitoring integrated system subarea disconnection/connection operation method
CN103887775A (en) * 2014-03-19 2014-06-25 国电南瑞科技股份有限公司 Distribution network microcomputer protection system integrating distribution automation master station dynamic setting
CN204303017U (en) * 2014-12-15 2015-04-29 国网四川省电力公司巴中供电公司 Electric network intelligent scheduling real time execution visual analyzing early warning system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040260404A1 (en) * 2003-06-23 2004-12-23 Russell Thomas C. Method and apparatus for self-configuring supervisory control and data acquisition (SCADA) system for distributed control
CN102931726A (en) * 2012-10-22 2013-02-13 深圳供电局有限公司 Main network and distribution network integrated security power supply system
CN103715770A (en) * 2013-12-20 2014-04-09 国电南瑞科技股份有限公司 Wide-area-distributed city/county scheduling and monitoring integrated system subarea disconnection/connection operation method
CN103887775A (en) * 2014-03-19 2014-06-25 国电南瑞科技股份有限公司 Distribution network microcomputer protection system integrating distribution automation master station dynamic setting
CN204303017U (en) * 2014-12-15 2015-04-29 国网四川省电力公司巴中供电公司 Electric network intelligent scheduling real time execution visual analyzing early warning system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶键民,等: "动态SCADA原型***构建及其通信***的实现方法", 《电工电能新技术》 *
汪磊,等: "主配网调控一体化图形平台设计", 《电力***及其自动化学报》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105633970A (en) * 2016-03-15 2016-06-01 国家电网公司 Main network dispatching system based building method for standby dispatching control system of distribution network
CN105633970B (en) * 2016-03-15 2019-02-12 国家电网公司 Distribution back scheduling control system building method based on major network scheduling system
CN107944661A (en) * 2017-10-26 2018-04-20 国电南瑞科技股份有限公司 A kind of main distribution integration regulator control system
CN107944661B (en) * 2017-10-26 2021-12-28 国电南瑞科技股份有限公司 Integrated regulation and control system for main network and distribution network
CN109981536A (en) * 2017-12-28 2019-07-05 南京南瑞继保电气有限公司 A kind of transmission & distribution network data processing method based on more presence proxy mechanism
CN109981536B (en) * 2017-12-28 2021-07-27 南京南瑞继保电气有限公司 Transmission and distribution network data processing method based on multi-site agent mechanism
CN108985601A (en) * 2018-07-03 2018-12-11 国网江西省电力有限公司经济技术研究院 A kind of main distribution integrated management system
CN108985601B (en) * 2018-07-03 2022-03-18 国网江西省电力有限公司经济技术研究院 Integrated management system for main network and distribution network
CN109165833A (en) * 2018-08-14 2019-01-08 南京南瑞继保电气有限公司 Main distribution integration edge device management method and boundary library based on boundary library
CN111093057A (en) * 2019-12-03 2020-05-01 安徽四创电子股份有限公司 Planning method for network architecture of urban video monitoring system
CN111093057B (en) * 2019-12-03 2022-12-16 安徽四创电子股份有限公司 Planning method for network architecture of urban video monitoring system

Also Published As

Publication number Publication date
CN105071376B (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN105071376A (en) Method for implementing integrated framework of main distribution network
CN107832354B (en) Distribution network intelligence operation and maintenance management and control system of distributing type buffer memory
CN104348254B (en) Service-oriented monitoring system of electric substation framework
CN103972981B (en) A kind of intelligent monitor system of the low-tension switch cabinet based on cloud
CN103516051B (en) Wind energy turbine set centralized monitoring system platform
CN102545212B (en) Electrical energy quality centralized monitoring and auxiliary management decision support system
CN104091231A (en) Distribution network fault repairing commanding and processing system and method
CN102209108A (en) Method and system for realizing seamless communication between master scheduling station and substation of power grid
CN202159262U (en) Nuclear power plant balance of plant subitem instrument control system
CN104240139A (en) Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS
CN103366312A (en) Intelligent transformer substation cloud system
CN102518553A (en) Remote real-time monitoring system used for wind power station group
CN103632312A (en) Power grid resource module building method based on GIS (geographic information system)
CN106130189B (en) Construction site temporary power condition monitoring system and method
CN105260810A (en) Method for constructing distribution network standby scheduling and controlling system based on major network scheduling system
CN103595140A (en) Power generation, power distribution and intelligent optimization system and method based on cloud technology
CN104319886A (en) Power grid wide area protection and control system
CN102832708B (en) Intelligent transformer substation based on integrated multi-stage server framework
CN114139742A (en) Power distribution network management and control system and management and control method
CN108038332A (en) A kind of online artwork rapid generation for the state power grid that faces the future
CN104317868A (en) Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application
CN104333131A (en) Method for establishing prefecture and county power grid regulation data integration
CN103545805A (en) Modeling-based railway power supply arm monitoring method
CN202391650U (en) Real-time remote monitoring system for wind power station group
CN203883552U (en) Micro-grid group coordinated control communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Shi Junjie

Inventor after: Song Yinghua

Inventor after: Du Hongwei

Inventor after: Xiong Xiaofang

Inventor after: Han Tao

Inventor after: Wang Minkun

Inventor after: Lu Die

Inventor after: Xiong Zhijie

Inventor before: Shi Junjie

Inventor before: Song Yinghua

Inventor before: Du Hongwei

Inventor before: Han Tao

Inventor before: Wang Minkun

Inventor before: Lu Die

Inventor before: Xiong Zhijie