CN102182255A - Fireproof isolation belt for high-rise building - Google Patents

Fireproof isolation belt for high-rise building Download PDF

Info

Publication number
CN102182255A
CN102182255A CN2011100906084A CN201110090608A CN102182255A CN 102182255 A CN102182255 A CN 102182255A CN 2011100906084 A CN2011100906084 A CN 2011100906084A CN 201110090608 A CN201110090608 A CN 201110090608A CN 102182255 A CN102182255 A CN 102182255A
Authority
CN
China
Prior art keywords
fire
building
fire prevention
isolation strip
high buildings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100906084A
Other languages
Chinese (zh)
Other versions
CN102182255B (en
Inventor
倪红梅
樊晓虹
王辉
殷战稳
刘豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Urban Construction
Original Assignee
Henan University of Urban Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Urban Construction filed Critical Henan University of Urban Construction
Priority to CN201110090608.4A priority Critical patent/CN102182255B/en
Publication of CN102182255A publication Critical patent/CN102182255A/en
Application granted granted Critical
Publication of CN102182255B publication Critical patent/CN102182255B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a fireproof isolation belt for a high-rise building. The fireproof isolation belt is of a transverse strip shape, and is hopped on the outer wall of a building like a closed ring and arranged in a vertical direction of the high-rise building; multiple fireproof isolation belts are arranged according to the floors and height; in the case of fire, when flame soars to the outer side of the building and continuously go upwards, the fireproof isolation belts are started to retard flame and extinguish fire. The fireproof isolation belt provided by the invention has simple structure, low cost and good fireproof effect, is easy to manufacture, increases the probability of successful self-rescue and enhances the safety protection ability of high-rise buildings.

Description

The fire prevention to high buildings isolation strip
Technical field
The present invention relates to a fire fighting device, relate in particular to a kind of fire prevention to high buildings isolation strip.
Background technology
According to " high-rise civil building design fire protection regulation ", high-rise civil building is meant that residential building (comprising that the first floor is provided with the dwelling house of commerce services site) and the building height more than ten layers and ten layers surpasses 24 meters public building, development along with national economy and society, urbanization process is also come fast more, increasing people pours into the city, original built-up city, building covers higher and higher, suddenly, in big and medium-sized cities such as Beijing, Shanghai, a flickering high building is rised sheer from level ground like the mushrooms after rain.Profile new master fits up luxurious highrise building, when bringing people's amenities of life and saving the soil, and also under cover huge fire safety evaluating hidden danger." urban skyscraper continues to bring out, and for fire-fighting work, the fire extinguishing difficulty is increasing, and problem can not be ignored." Li Xiaodong chief fire marshal Tan Lin peak says in this way.In Beijing, present highrise building has building more than 18000, building surplus highly the super highrise building above hundred meters reaches 40.Shanghai has had all kinds of highrise buildings building more than 4000 at present, and wherein, more than 200 meter super highrise building building more than 200 becomes one of city that highrise building quantity is maximum in the world.The data that provide according to the Fire-Fighting Bureau under the Ministry of Public Security, at present, building surplus the total highrise building 19.18 ten thousand in the whole nation, Building 2154 of the highrise building more than 200 meters wherein, and in quick growth.Yet annual national highrise building catches fire and causes direct economic loss to reach surprising nearly 10,000,000,000 yuans, influence in these several years relatively major issue " CCTV's Xin Tai location BeiPeiLou fire ", " Shanghai apartment building fire ", " the big Ha fire in Jiahe, Mong Kok, Hong Kong " etc. are just arranged, but also cause great personnel casualty accidents.According to China's actual conditions, in fact, it all is by saving oneself that domestic construction surpasses more than 20 layers that building caught fire basically, and existing fire protection nearly all is powerless.When accident has taken place, it is not enough that we always introspect the measure of external rescue, and never consider the construction deficiency to " immunity " of fire of architecture-self, especially to the precautionary measures of outdoor naked light basic just do not consider.
People summed up the fire risk of highrise building in the past, were mainly reflected in four aspects:
1. fire spreading is fast.Vertical hoistway such as the staircase of highrise building, elevator shaft, piping shaft, cable shaft, bad if fire separation or fire prevention are handled, during breaking out of fire many towering chimneys, become the approach of The fire spreads quickly.According to surveying and determination, in the incipient fire stage, because of cross-ventilation, flue gas is 3 to 4 meters of per seconds along staircase or other vertical pipe well diffusion velocity.As 200 meters high buildings, under unobstructed situation, about nearly half a minute, flue gas just can be diffused into top layer along vertical pipe well.
2. evacuate difficulty.Owing to reason such as cut off the electricity supply shuts down, most high-rise building safe evacuations mainly are by stair to conventional lift when breaking out of fire, and in the staircase in case scurry into flue gas, will have a strong impact on evacuation.
3. the difficulty of putting out a fire to save life and property is big.Highrise building is up to tens meters even hundreds of rice, during breaking out of fire from the outdoor quite difficulty of putting out a fire to save life and property.For example: the fire consumption of highrise building is the economic and technique level present according to China, consider by general fire scale, when forming the large tracts of land fire, its fire consumption is obviously not enough, need utilize fire fighting truck to building water supply, if in the building fire lift is not installed, the fire fighter can not in time arrive fire bed and put out a fire to save life and property, fire-fighting equipment can not replenish at any time, all can influence and put out a fire to save life and property.
4. fire hidden danger is many.The building of some high-level synthesis, the function complexity, combustible is many, and management of fire safety is not tight.If any building be provided with commercial business hall, flammable warehouse, dining room etc.; The office building that has is hired out and is used for many units, the safety management disunity, in case on fire, cause the large tracts of land fire easily.
Cause the reason of this situation of highrise building massive losses a lot, above reason is no doubt important, still also have a large amount of high-rise fire event to occur after forefathers sum up and after trying out, we find to have an important phenomenon by a large amount of domestic analyses of cases: most fire all are room window building externals of scurrying out internally earlier, the intensity of a fire spreads fast and arrives the roof rapidly along building external, by way of the layer building interior that ignites by the window then, perhaps be exactly to ignite in the outside originally, and be not to burn the top internally always.The discovery of tracing it to its cause, domestic high-rise civil building as inhabitation usefulness, the resident always likes combustibles objects such as waste and old no thing or packing case are stacked on balcony, perhaps be used as the highrise building of hotel or office building in order to pursue appearance effect, often exterior wall employing curtain wall architecture is done and is gone along with sb. to guard him, the aluminium-plastic panel of curtain wall system inside, structure glue, members such as sealing joint strip all are the materials that can burn, also have is exactly in order to reach the standard of building energy conservation, and the product of heat insulating material present stage of exterior wall does not almost have incombustible, also can produce a large amount of toxic gases when common polyphenyl or polyurethane material burning, substance combustion needs a large amount of comburant oxygens in addition, outdoorly provide enough oxygen, sometimes also have wind, having encouraged flame wreaks havoc, and the outside do not stop, the place of flare scurries outward and burn the rapidly basic reason in whole building that Here it is.At this reality, we find that present stage highrise building interior fire protection measure does not have fire-retardant, the effect preventing fires, reduce to lose in whole building at all, often find one more than 200 meter super highrise building ten minutes less than, just burnt building top from firing point, the phenomenon that fire fighting truck is not also arrived in often takes place, and is not at all surprising.We know that ancient times, emblem formula building all had high " head of the horse wall ", play exactly to prevent a house whole courtyard that ignites that catches fire, and play and prevent that a family catches fire and bring disaster to the phenomenon in full village; We also know when forest fire except putting out the scene of a fire, also publish trees in the place that fire does not have to arrive and do the fire barrier one.If we are vertically doing some isolation strip as construction measure on the highrise building equally, the flare intensity of a fire that rises is carried out necessary stopping, flame is controlled in the zone of certain floor as far as possible, has won the time of a large amount of abundant fire extinguishing disaster relief, evacuation crowd, transfer property for us.
Summary of the invention
The purpose of this invention is to provide a kind of fire prevention to high buildings isolation strip, its principle is directly perceived, and is simple in structure, and it is easy for installation to design and construct, thereby overcome the shortcoming that the measure of prior art fire prevention to high buildings can not be satisfied actual needs.
The objective of the invention is to be achieved through the following technical solutions:
A kind of fire prevention to high buildings isolation strip, described fire barrier is laterally banded, the closed hoop of annular is on external wall, also can conceal into the curtain wall inboard, design and construction are installed on the highrise building vertical direction, according to story height fire barrier, some roads is set, described fire barrier can be fix or open after be the cover of mouth down.
The operating principle of fire prevention to high buildings of the present invention isolation strip: when fire takes place, flame is scurried out outdoor, and when upwards burning, described fire barrier unit starting is started working, at first, after the sense cigarette of unit, fire barrier or temperature pick up detect, open the isolation PLASTIC LAMINATED of unit, fire barrier rapidly, the further rising passway that above flame, stops flame, isolating the automatic fire shutter in the PLASTIC LAMINATED outside also opens simultaneously automatically, come vertically flame and smog being isolated from the outside, meanwhile the fire main tap on the unit, fire barrier is opened suitable wall flowing water down automatically, water in face of the duration and degree of heating flare, play best fire extinguishing effect, in addition carbon dioxide maker or powder fire extinguisher, the great amount of carbon dioxide that fire-extinguisher equipments such as foam fire extinguishing system produce is by the fire extinguisher shower nozzle, spray down, carbon dioxide can form cover on flame top and surround, and allows fiery body anoxic and extinguishes or weaken, thereby win chance for thorough extinguish open flame.
Beneficial effect of the present invention is: simple in structure, manufacturing is simple and easy, cost is low; Flameproof effect is good; Improve the probability of the success of saving oneself, improve the high-rise building safe protective capacities.
Description of drawings
With reference to the accompanying drawings the present invention is described in further detail below.
Fig. 1 is that schematic diagram is arranged in the described fire prevention to high buildings of embodiment of the invention isolation strip.
Fig. 2 is the described fire prevention to high buildings of an embodiment of the invention isolation strip structural representation.
Fig. 3 is unit, fire prevention to high buildings of the present invention isolation strip wherein a kind of scheme holding state schematic diagram
Fig. 4 is the wherein a kind of scheme working state schematic representation in unit, fire prevention to high buildings of the present invention isolation strip
Among the figure:
1, fire barrier; 2, highrise building body; 3, window; 4, flame; 5, highrise building body of wall; 6, sensor; 7, fire extinguishing system; 8, high temperature resistant cable; 9, automatic control system; 10, end face fire prevention isolated system; 11, seal connector (); 12, side fire prevention isolated system; 13, seal connector (two); 14, interior fire supply system; 15, carbon dioxide maker; 16, sense cigarette probe; 17, automatic sprinkler fire-extinguishing system; 18, Automatic Fire Extinguisher spout; 19, rotating shaft; 20, isolate PLASTIC LAMINATED; 21, automatic fire shutter system; 22, the fire curtain of open mode; 23, connector.
The specific embodiment
As shown in Figure 1, the described fire prevention to high buildings of embodiment of the invention isolation strip 1, annular is enclosed hoop in 2 one weeks of highrise building body, arranges that in highrise building body 2 vertical height some roads are arranged according to the height and the number of plies of highrise building body 2 in fire prevention to high buildings isolation strip 1.Fire prevention to high buildings isolation strip 1 position can be outside the body of wall, and curtain wall is inboard not to influence architectural appearance thereby perhaps hide, and can be arranged in the position of window 3 yet, preferably is arranged between the two-layer window 3.Vertical distance between fire prevention to high buildings isolation strip 1 and the fire prevention to high buildings isolation strip 1 is determined according to story height, the factors such as outer wall material, wind speed, shape of cross section, position, direction and building function of use of going along with sb. to guard him, consider economic problems, the proposed pitch floor is advisable reasonable Arrangement for three to ten layers.
As shown in Figure 2, the structural representation of the described fire prevention to high buildings of embodiment of the invention isolation strip 1 mainly is made up of main several parts such as sensor 6, fire extinguishing system 7, automatic control system 9, end face fire prevention isolated system 10, side fire prevention isolated systems 12.End face fire prevention isolated system 10 links together by seal connector () 11 and highrise building body of wall 5; Side fire prevention isolated system 12 is sealedly connected by seal connector (two) 13 and the end face fire prevention isolated system 10 outer ends of choosing, thus downward opening hood-like thing of the common formation of highrise building body of wall 5, end face fire prevention isolated system 10 and side fire prevention isolated system 12 threes.When the flame 4 of scurrying highrise building body of wall 5 outsides burns, stretch out wall outer sensor 6, survey at first to survey and find, by high temperature resistant cable 8 signal is conducted to automatic control system 9, automatic control system 9 is by 8 pairs of fire extinguishing systems 7 of high temperature resistant cable, end face fire prevention isolated system 10, side fire prevention isolated system 12 sends instruction simultaneously and starts working, by highrise building body of wall 5, the common hood-like thing that constitutes of end face fire prevention isolated system 10 and side fire prevention isolated system 12 threes, immediately flame 4 and extraneous the obstruct are come, form an independently space, because barrier effect, and owing to the oxygen of inner separate space runs low very much, burning lacks comburant oxygen, and flame 4 weakens and can not further burn up; Fire extinguishing system 7 rapidly from flame 4 tops sprays down the extinguish material knock down the flame or stops back indoor, thereby blocked the possibility of flame from whole building of building external conflagration, thereby be that the interior personnel's fire extinguishing of fire fighter and building, transfer etc. gain time.Sensor 6 can be aitiogenic inductors such as flame, temperature, sound, light, smog, and flame 4 can in time be found and survey; Fire extinguishing system 7 comprises fire-extinguisher equipments such as carbon dioxide maker or powder fire extinguisher, foam fire extinguishing system, and one or more of water for fire fire-extinguishing apparatus adopt simultaneously.
As shown in Figure 3, wherein a kind of concrete form of unit, the embodiment of the invention described fire prevention to high buildings isolation strip, it is made up of main several parts such as sense cigarette probe 16, isolation PLASTIC LAMINATED 20, automatic fire shutter systems 21, also be distributed with the automatic sprinkler fire-extinguishing system 17 that is connected with interior fire supply system 14 on the highrise building body of wall 5 on sense cigarette probe 16, isolate PLASTIC LAMINATED 20 and be articulated and connected by rotating shaft 19 and highrise building body of wall 5, automatic fire shutter system 21 is connected with isolation PLASTIC LAMINATED 20 tops by connector 23.In addition, with the Automatic Fire Extinguisher shower nozzle 18 that building interior carbon dioxide maker 15 is connected, be arranged in and isolate PLASTIC LAMINATED 20 lateral surfaces.
As shown in Figure 4, wherein a kind of concrete form of unit, the embodiment of the invention described fire prevention to high buildings isolation strip changes situation after the duty over to by the holding state of Fig. 3, after at first fire takes place, the smog of flame 4 is felt 16 perception of cigarette probe, sense cigarette probe 16 is passed to automatic control system 9 to information by high temperature resistant cable 8, automatic control system 9 can be given the drive unit of isolating PLASTIC LAMINATED 20 simultaneously, automatic fire shutter system 21, automatic sprinkler fire-extinguishing system 17 and Automatic Fire Extinguisher shower nozzle 18 send the corresponding work instruction, the drive unit of isolating PLASTIC LAMINATED 20 can drive isolates PLASTIC LAMINATED 20 around rotating shaft 19 rotations, isolate PLASTIC LAMINATED 20 is transferred to Fig. 4 by the vertical state of Fig. 3 transverse state thereby make, promptly be 90 degree, make it stop that from end face flame 4 further rises with highrise building body of wall 5; Meanwhile, also open automatically with isolating the automatic fire shutter system 21 that PLASTIC LAMINATED 20 upper ends are connected, launch the fire curtain 22 of back open mode by connector 23, with regard to vertically hang down around surrounded flame 4; And the automatic sprinkler fire-extinguishing system 17 that is connected with interior fire supply system 14 that distributes on the highrise building body of wall 5 is also opened simultaneously the flame 4 of water spray pouring down automatically; With the last while, also open simultaneously with the Automatic Fire Extinguisher shower nozzle 18 of carbon dioxide maker 15 and work, spray carbon dioxide down, thereby flame 4 temperature are reduced and lack comburant oxygen and extinguish.
Fire prevention to high buildings of the present invention isolation strip 1 can be made of a whole unit or several unit, forms a whole fire prevention isolated system, and is simple in structure, manufacturing is simple and easy, cost is low; Flameproof effect is good; Improve the probability of the success of saving oneself, improve the high-rise building safe protective capacities.
The present invention is not limited to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present invention; no matter but on its shape or structure, do any variation; every have identical with a application or akin technical scheme, all drops within protection scope of the present invention.

Claims (6)

1. fire prevention to high buildings isolation strip is characterized in that: described fire barrier is for laterally banded, and it is arranged on the high-rise building vertical direction and annular closed hoop outside the building on the wall.
2. fire prevention to high buildings according to claim 1 isolation strip is characterized in that: described fire barrier is fixed on the construction wall surface or is hidden in architectural exterior-protecting construction inside.
3. fire prevention to high buildings according to claim 1 and 2 isolation strip is characterized in that: described fire barrier be stationary state or duty be the hood-like of mouth down after opening.
4. fire prevention to high buildings according to claim 3 isolation strip is characterized in that: described fire barrier is an only banded closed system of unit's composition of one or more fire barrier.
5. fire prevention to high buildings according to claim 4 isolation strip is characterized in that: unit, described fire barrier mainly is made up of sensor (6), fire extinguishing system (7), automatic control system (9), end face fire prevention isolated system (10), side fire prevention isolated system (12).
6. unit, fire barrier according to claim 5 is characterized in that: fire extinguishing system (7) comprises carbon dioxide maker or powder fire extinguisher or foam fire extinguishing system.
CN201110090608.4A 2011-04-12 2011-04-12 Fireproof isolation belt for high-rise building Expired - Fee Related CN102182255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110090608.4A CN102182255B (en) 2011-04-12 2011-04-12 Fireproof isolation belt for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110090608.4A CN102182255B (en) 2011-04-12 2011-04-12 Fireproof isolation belt for high-rise building

Publications (2)

Publication Number Publication Date
CN102182255A true CN102182255A (en) 2011-09-14
CN102182255B CN102182255B (en) 2016-02-24

Family

ID=44568532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110090608.4A Expired - Fee Related CN102182255B (en) 2011-04-12 2011-04-12 Fireproof isolation belt for high-rise building

Country Status (1)

Country Link
CN (1) CN102182255B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995784A (en) * 2011-09-15 2013-03-27 吴咸宝 Nonelectric automatic fire damper for high residential buildings
CN107050718A (en) * 2016-12-30 2017-08-18 常熟南师大发展研究院有限公司 A kind of building fast fire-extinguishing apparatus
CN108316499A (en) * 2018-01-31 2018-07-24 重庆谦谦装饰工程有限公司 Fire prevention to high buildings structure
CN109711081A (en) * 2019-01-07 2019-05-03 广西科技大学 Wood house controls fire spread Virtual Simulative Experiment method
CN111001116A (en) * 2019-12-12 2020-04-14 徐州科睿安防科技有限公司 A isolated formula fire safety coefficient of wind wall for high-rise building
CN112727009A (en) * 2020-12-26 2021-04-30 杭州均正建筑设计有限公司 Decorative column structure
CN114613092A (en) * 2022-03-03 2022-06-10 河南城建学院 Intelligent building energy-saving environment monitoring device and method for fire prevention
CN115538662A (en) * 2022-08-31 2022-12-30 广东春文建设工程有限公司 Building wall structure and building wall construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2045869U (en) * 1988-07-06 1989-10-11 施天禄 Automatic surveying, alarming and fire-extinguishing device for fire in room
JPH10317846A (en) * 1997-05-22 1998-12-02 Nippon Gurasufuaibaa Kogyo Kk Fire resistive screen
CN1621650A (en) * 2004-12-15 2005-06-01 西南交通大学 Mechanism for automatically closing door and window under fire accident
US7048068B2 (en) * 2003-07-23 2006-05-23 Paulkovich Michael B Fire extinguishing system for large structures
CN101956432A (en) * 2010-08-17 2011-01-26 龙信建设集团有限公司 Fireproofing structure of polyphenyl plate outer-wall outer heat-insulating building system and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2045869U (en) * 1988-07-06 1989-10-11 施天禄 Automatic surveying, alarming and fire-extinguishing device for fire in room
JPH10317846A (en) * 1997-05-22 1998-12-02 Nippon Gurasufuaibaa Kogyo Kk Fire resistive screen
US7048068B2 (en) * 2003-07-23 2006-05-23 Paulkovich Michael B Fire extinguishing system for large structures
CN1621650A (en) * 2004-12-15 2005-06-01 西南交通大学 Mechanism for automatically closing door and window under fire accident
CN101956432A (en) * 2010-08-17 2011-01-26 龙信建设集团有限公司 Fireproofing structure of polyphenyl plate outer-wall outer heat-insulating building system and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995784A (en) * 2011-09-15 2013-03-27 吴咸宝 Nonelectric automatic fire damper for high residential buildings
CN107050718A (en) * 2016-12-30 2017-08-18 常熟南师大发展研究院有限公司 A kind of building fast fire-extinguishing apparatus
CN108316499A (en) * 2018-01-31 2018-07-24 重庆谦谦装饰工程有限公司 Fire prevention to high buildings structure
CN109711081A (en) * 2019-01-07 2019-05-03 广西科技大学 Wood house controls fire spread Virtual Simulative Experiment method
CN111001116A (en) * 2019-12-12 2020-04-14 徐州科睿安防科技有限公司 A isolated formula fire safety coefficient of wind wall for high-rise building
CN112727009A (en) * 2020-12-26 2021-04-30 杭州均正建筑设计有限公司 Decorative column structure
CN114613092A (en) * 2022-03-03 2022-06-10 河南城建学院 Intelligent building energy-saving environment monitoring device and method for fire prevention
CN114613092B (en) * 2022-03-03 2024-02-20 河南城建学院 Building intelligent energy-saving environment monitoring device and method for fire prevention
CN115538662A (en) * 2022-08-31 2022-12-30 广东春文建设工程有限公司 Building wall structure and building wall construction method

Also Published As

Publication number Publication date
CN102182255B (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN102182255B (en) Fireproof isolation belt for high-rise building
Norman Fire officer's handbook of tactics
CN104740790B (en) A kind of fire of high-rise building device for refuge and escape
CN108316499A (en) Fire prevention to high buildings structure
CN203400446U (en) Fire extinguishing system for ensuring fire rescue by means of outdoor dry-type spraying system
CN103883002A (en) High-rise building insulation board with water spraying function
CN204112402U (en) A kind of combined water supply system of fire system of quarters
CN203915808U (en) The accessible fire-fighting life-saving channel of a kind of design
CN212053923U (en) Building unit and fourth-generation medium-high-rise residence comprising same
Dunn Collapse of burning buildings: A guide to fireground safety
CN102145212B (en) High-pressure water curtain fire-extinguishing system with functions of smoke blocking, time delay and lifesaving
CN212053924U (en) Building unit and automobile upstairs medium and high-rise residence comprising same
Kim et al. Fire examination of Superhigh-rise apartment building “Wooshin Golden suites” in Busan, Korea
CN212593638U (en) Apartment fire safety system
Konecki et al. Flame transfer through the external walls insulation of the building during a fire
CN103908758B (en) A kind of production, manage, the anti-Ore-controlling Role of fire in three-in-one place of staying
CN114370194A (en) Fireproof and shockproof safety house
Shao et al. Prevention and control measures for vertical spread of fire along the external wall of high-rise buildings
CN108635717A (en) A kind of interior AI intelligent networks connection fire-fighting fire extinguishing principle and installation method
CN110327559A (en) Building resident's fire disaster refuge facility
Wu Fire protection system between Chinese and UK standard in Automotive engineering
Chow et al. hotel fires in Hong Kong
CN202086981U (en) High-pressure water curtain fire-extinguishing system with smoke-preventing, time-delaying and life-saving functions
Shibeika et al. Strategies for retrofitting an existing building to meet the new fire code in Dubai
CN110685463A (en) Building unit and fourth-generation medium-high-rise residential design comprising same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160224

Termination date: 20170412

CF01 Termination of patent right due to non-payment of annual fee