CN102082400A - Simple line spanning frame - Google Patents

Simple line spanning frame Download PDF

Info

Publication number
CN102082400A
CN102082400A CN 201010247622 CN201010247622A CN102082400A CN 102082400 A CN102082400 A CN 102082400A CN 201010247622 CN201010247622 CN 201010247622 CN 201010247622 A CN201010247622 A CN 201010247622A CN 102082400 A CN102082400 A CN 102082400A
Authority
CN
China
Prior art keywords
spanning
cross
elongated slot
over pole
over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010247622
Other languages
Chinese (zh)
Other versions
CN102082400B (en
Inventor
严君国
李勇刚
黄国玺
谢有刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN 201010247622 priority Critical patent/CN102082400B/en
Publication of CN102082400A publication Critical patent/CN102082400A/en
Application granted granted Critical
Publication of CN102082400B publication Critical patent/CN102082400B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a simple line spanning frame which comprises two stand columns and a spanning rod, wherein the spanning rod is connected with one stand column through a shaft and connected with the other stand column in a clamping manner, fixed bracing wires are arranged on the stand columns, the upper surface of the spanning rod is longitudinally provided with an elongated slot, a plurality of pulleys are arranged in the elongated slot, each pulley is provided with a draught line penetrating through the elongated slot of the spanning rod and extending out of the spanning rod, one end of the draught line is provided with a balance weight, and one end of the spanning rod, which is connected with the stand column through the shaft, is provided with a digging rope. The line is spanned by using the simple spanning frame, and requirements on various spanning environments can be met. The spanning frame has the advantages of simple structure, light weight, convenience and flexibility for operation, strong generality, safety in spanning, no hidden dangers, and convenience and simpleness for transportation and assembly. The working at height can be carried out by constructors without climbing up and down the spanning frames.

Description

Simple and easy circuit crossing frame
Technical field
The invention belongs to power construction auxiliary equipment technical field, particularly a kind of simple and easy circuit crossing frame.
Background technology
Cross over stringing at often running into highway in the line construction, the river course, the mountain area, environment such as dense population areas, as 35KV, 10KV, often run into highway in the 400V construction of line work progress, situations such as building and other alive circuits, existing crossing frame is set up and is subjected to landform, traffic environment, influences such as densely populated degree, set up difficulty, and make troubles to traffic and resident living, set up crossing frame in the work progress and need the long period, the necessary work high above the ground of workmen, before span line, must climb to the crossing frame top crossover track is carried out fastening work, crossover track must take off crossover track to the crossing frame top after by crossed line again, workmen's working strength is big, have potential safety hazard, the overall cost of constructing is higher.Crossing over distance when longer, have crossover track accidental to charged crossed line or crossover track radian do not reach more greatly with by the crossing live-line safe distance danger, cause serious accident.
Summary of the invention
The invention provides a kind of simple in structure, fail safe good, easy to use, need not work high above the ground, labor-saving simple and easy circuit crossing frame.
A kind of simple and easy circuit crossing frame, comprise two root posts and a cross-over pole, described cross-over pole is connected with a root post axle wherein, be connected with another root post cassette, fixedly backguy is set on the described column, on the described cross-over pole upper surface elongated slot is set vertically, a plurality of pulleys are set in the described elongated slot, a draught line is set on the described pulley passes the cross-over pole elongated slot and stretch out cross-over pole, draught line one end is provided with balancing weight, and the end that described cross-over pole is connected with the column axle is provided with stay cord.
Between described water column and cross-over pole support bar is set.
Use simple and easy crossing frame to carry out circuit and cross over, can satisfy various leap environment, crossing frame is simple in structure, and is in light weight, flexible to operation, and highly versatile is crossed over safety, no hidden danger, transports, assembles simple and convenient.Crossing frame was not carried out work high above the ground about the workmen did not need.The crossing frame structure can not impact construction environment, according to span line electric pressure, line-to-ground distance, can increase side lever height and cross-over pole length easily, enlarges job area.Because the recessed gyalectiform of cross-over pole upper shed, crossover track is limited in the groove, when span line (highway etc.) broad, can not cause electric shock accidents because of the circuit radian.Need not ascend a height before and after the crossover track and promptly finish leap work.Be specially adapted to cross over stringing, not only can realize not ascending a height crossing over and set up, and can reduce leap labour intensity, shorten greatly and cross over the activity duration, improved leap stringing construction safety coefficient and efficient greatly.
Description of drawings:
Below in conjunction with accompanying drawing the present invention is described further:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation in cross-over pole elongated slot of the present invention cross section.
Embodiment
As shown in Figure 1, a kind of simple and easy circuit crossing frame, comprise 11,12 and cross-over poles 2 of two root posts, described cross-over pole 2 is connected with 11 of root posts wherein, be connected with another root post 12 cassettes, on the described column 11,12 fixedly backguy 3 is set, on described cross-over pole 2 upper surfaces elongated slot 7 is set vertically, a plurality of pulleys 8 are set in the described elongated slot 7, a draught line 4 is set on the described pulley 8 to be passed cross-over pole elongated slot 7 and stretches out cross-over pole 2, draught line 4 one ends are provided with balancing weight 5, and described cross-over pole 2 is provided with stay cord 6 with the end that 11 on column is connected.
Described column 11,12 and 2 of cross-over poles are provided with support bar 9.
During use one heel post 11 and cross-over pole 2 are assembled, draught line 4 and the balancing weight 5 that connects are put in the elongated slot 7 of cross-over pole 2, balancing weight 5 is neat with the pulley of elongated slot 7 ends, column 11 is hammered into underground, is 120 with three backguys 3 and spends column 11 fixations; Be fixed in opposite side column 12, and column 12 is erected, also fixing with three backguys 3; Slowly loosen cross-over pole stay cord 6, cross-over pole steadily is positioned on the opposite side upright supports platform.Utilize balancing weight 5 deadweights to put down draught line 4, it is enough to put long enough in advance, will treat that crossover track is fixed on the draught line 4, and pulling draught line 4 drives crossover track to opposite side, and crossover track is fixed on the overhead line structures of both sides, just finishes the leap work on single line road.
Use simple and easy crossing frame to carry out circuit and cross over, can satisfy various leap environment, crossing frame is simple in structure, and is in light weight, flexible to operation, and highly versatile is crossed over safety, no hidden danger, transports, assembles simple and convenient.Crossing frame was not carried out work high above the ground about the workmen did not need.The crossing frame structure can not impact construction environment, according to span line electric pressure, line-to-ground distance, can increase side lever height and cross-over pole length easily, enlarges job area.Because the recessed gyalectiform of cross-over pole upper shed, crossover track is limited in the groove, when span line (highway etc.) broad, can not cause electric shock accidents because of the circuit radian.Need not ascend a height before and after the crossover track and promptly finish leap work.Be specially adapted to cross over stringing, not only can realize not ascending a height crossing over and set up, and can reduce leap labour intensity, shorten greatly and cross over the activity duration, improved leap stringing construction safety coefficient and efficient greatly.

Claims (2)

1. simple and easy circuit crossing frame, comprise two root posts and a cross-over pole, it is characterized in that: described cross-over pole is connected with a root post axle wherein, be connected with another root post cassette, fixedly backguy is set on the described column, on the described cross-over pole upper surface elongated slot is set vertically, a plurality of pulleys are set in the described elongated slot, a draught line is set on the described pulley passes the cross-over pole elongated slot and stretch out cross-over pole, draught line one end is provided with balancing weight, and the end that described cross-over pole is connected with the column axle is provided with stay cord.
2. simple and easy circuit crossing frame as claimed in claim 1 is characterized in that: between described water column and cross-over pole support bar is set.
CN 201010247622 2009-12-01 2010-08-09 Simple line spanning frame Expired - Fee Related CN102082400B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010247622 CN102082400B (en) 2009-12-01 2010-08-09 Simple line spanning frame

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200910227220.7 2009-12-01
CN200910227220 2009-12-01
CN 201010247622 CN102082400B (en) 2009-12-01 2010-08-09 Simple line spanning frame

Publications (2)

Publication Number Publication Date
CN102082400A true CN102082400A (en) 2011-06-01
CN102082400B CN102082400B (en) 2012-09-05

Family

ID=44088186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010247622 Expired - Fee Related CN102082400B (en) 2009-12-01 2010-08-09 Simple line spanning frame

Country Status (1)

Country Link
CN (1) CN102082400B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908740A (en) * 2009-12-01 2010-12-08 河南省电力公司南阳供电公司 Line crossing method and special crossing frame
CN103001149A (en) * 2012-12-04 2013-03-27 陕西送变电工程公司 Tool for dragging and crossing drainage object and method for crossing leading wire
AT515121B1 (en) * 2013-11-19 2015-06-15 Europ Trans Energy Gmbh protection bridge
CN106451200A (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 London tower bridge type non-powercut spanning system and spanning method of power transmission line
CN109560505A (en) * 2018-12-25 2019-04-02 宁波和泰电气有限公司 It is catchmented by moisture and collects the power grid construction highway crossing device of atomization wire body
CN110137849A (en) * 2019-05-27 2019-08-16 广东电网有限责任公司 A kind of docking facilities for block crossing frame

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2293141Y (en) * 1996-11-28 1998-09-30 烟台市牟平区电业局 Conductor overhead supporter for surmounting obstacle
JP2002262420A (en) * 2001-03-05 2002-09-13 Dainichi Denken:Kk Temporary arm equipment for power-transmission steel tower and installation method for the equipment
CN101908740A (en) * 2009-12-01 2010-12-08 河南省电力公司南阳供电公司 Line crossing method and special crossing frame

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2293141Y (en) * 1996-11-28 1998-09-30 烟台市牟平区电业局 Conductor overhead supporter for surmounting obstacle
JP2002262420A (en) * 2001-03-05 2002-09-13 Dainichi Denken:Kk Temporary arm equipment for power-transmission steel tower and installation method for the equipment
CN101908740A (en) * 2009-12-01 2010-12-08 河南省电力公司南阳供电公司 Line crossing method and special crossing frame

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908740A (en) * 2009-12-01 2010-12-08 河南省电力公司南阳供电公司 Line crossing method and special crossing frame
CN101908740B (en) * 2009-12-01 2012-09-19 河南省电力公司南阳供电公司 Line crossing method
CN103001149A (en) * 2012-12-04 2013-03-27 陕西送变电工程公司 Tool for dragging and crossing drainage object and method for crossing leading wire
CN103001149B (en) * 2012-12-04 2015-06-03 陕西送变电工程公司 Tool for dragging and crossing drainage object and method for crossing drainage object
AT515121B1 (en) * 2013-11-19 2015-06-15 Europ Trans Energy Gmbh protection bridge
AT515121A4 (en) * 2013-11-19 2015-06-15 Europ Trans Energy Gmbh protection bridge
EP2916405A1 (en) * 2013-11-19 2015-09-09 European Trans Energy GmbH Protective bridge
CN106451200A (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 London tower bridge type non-powercut spanning system and spanning method of power transmission line
CN109560505A (en) * 2018-12-25 2019-04-02 宁波和泰电气有限公司 It is catchmented by moisture and collects the power grid construction highway crossing device of atomization wire body
CN110137849A (en) * 2019-05-27 2019-08-16 广东电网有限责任公司 A kind of docking facilities for block crossing frame
CN110137849B (en) * 2019-05-27 2024-04-30 广东电网有限责任公司 Butt joint device for net sealing crossing frame

Also Published As

Publication number Publication date
CN102082400B (en) 2012-09-05

Similar Documents

Publication Publication Date Title
CN102082400B (en) Simple line spanning frame
CN102108788A (en) Method for constructing hanging in the air large-span support
CN101908740B (en) Line crossing method
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN111395184A (en) System and method for constructing high pier with gradually-changed section by using electric bridge type scaffold platform
CN103510718B (en) Automatic lifting Emergency Ladder is used in super high rise structure construction
AU2008227238B2 (en) Scaffold with handrail frames provided with post sections
CN206290066U (en) A kind of electric pole for being easy to climb
CN107059641B (en) Goods shelf type pier body outer scaffold
CN205591115U (en) Suspension type catwalk veil installing the system
CN108277972A (en) A kind of safety-type hanging basket of construction
CN214272911U (en) Hydraulic jacking protection frame for assembly type building
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN210177919U (en) Civil engineering construction support
CN217537758U (en) Assembled construction platform
CN111962957A (en) Assembling tool for erecting power line steel pipe pole
CN215858925U (en) Quick-mounting type insulating crossing frame
CN220364880U (en) Suspension bridge catwalk surface net gliding trolley
CN220377799U (en) Construction operation is with flexible cat ladder
CN210918152U (en) Civil engineering safety scaffold
CN214195456U (en) Construction foot rest for highway bridge
CN216109621U (en) Double-layer operation platform for truss installation and construction system
CN213683922U (en) Hang cage formula cat ladder suitable for big curved surface outer wall of height
CN212271565U (en) Sectional type integral lifting aluminum alloy climbing frame
CN216197128U (en) Civil engineering is with protection rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Hongju

Inventor after: Xiao Hong

Inventor after: Xie Yougang

Inventor after: Shi Chenyu

Inventor after: Yang Zhixin

Inventor after: Yu Shanhua

Inventor after: Zhao Xiao

Inventor after: Chu Songling

Inventor after: He Yiwen

Inventor before: Yan Junguo

Inventor before: Li Yonggang

Inventor before: Huang Guoxi

Inventor before: Xie Yougang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YAN JUNGUO LI YONGGANG HUANG GUOXI XIE YOUGANG TO: YANG HONGJU XIAO HONG XIE YOUGANG SHI CHENYU YANG ZHIXIN YU SHANHUA ZHAO XIAO CHU SONGLING HE YIWEN

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20170809