CN102024318A - Automatic adjustment method based on planned power utilization information collection terminal - Google Patents

Automatic adjustment method based on planned power utilization information collection terminal Download PDF

Info

Publication number
CN102024318A
CN102024318A CN2009103067604A CN200910306760A CN102024318A CN 102024318 A CN102024318 A CN 102024318A CN 2009103067604 A CN2009103067604 A CN 2009103067604A CN 200910306760 A CN200910306760 A CN 200910306760A CN 102024318 A CN102024318 A CN 102024318A
Authority
CN
China
Prior art keywords
terminal
main website
electric energy
energy meter
communication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009103067604A
Other languages
Chinese (zh)
Inventor
王伟峰
宣玉华
涂莹
唐健毅
金家红
陈玉敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Co
Original Assignee
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Co filed Critical Zhejiang Electric Power Co
Priority to CN2009103067604A priority Critical patent/CN102024318A/en
Publication of CN102024318A publication Critical patent/CN102024318A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Telephonic Communication Services (AREA)

Abstract

The invention discloses an automatic adjustment method based on a planned power utilization information collection terminal, relating to the field of electric system. Currently, the terminal installation and the electric energy meter replacement need to be adjusted manually, need more personnel allocation, are influenced by power off, and have high error rate. The method in the invention has the following steps: inputting the terminal to be installed and the electric energy meter information needing to be replaced to a management module of a master station; sending the completed event information to the master station by the terminal after the terminal is installed or the electric energy meter is replaced; testing the communication between the master station and the terminal, and between the terminal and the electric energy meter by an adjustment module of the master station; and calling the operation parameters of the management module by the adjustment module of the master station after the communication is normal, and sending the operation parameter to the terminal. After the adoption of the automatic adjustment, the manual adjustment process is simplified, the adjustment personnel number of the master station is reduced, the line-up waiting that multiple adjustment requests are launched simultaneously is avoided, the error is reduced, and the operating efficiency is improved.

Description

A kind of automatically debug method based on the power information acquisition terminal of planning
[technical field]
The present invention relates to field of power, refer to a kind of automatically debug method especially based on the power information acquisition terminal of planning.
[background technology]
At present, the debugging of power information acquisition terminal is mainly concerned with that terminal is installed and the electric energy meter that connects more changes jobs.During the terminal new clothes, need the communication situation of test terminal and main website, terminal and electric energy meter, test successfully after, also need operational factor with terminal, be handed down to terminal as address, CT and PT no-load voltage ratio, the data acquisition task dispatching of connecing electric energy meter.Electric energy meter that terminal connect also needs to do same test after changing, and issue with change after the relevant operational factor of electric energy meter.
Traditional power information acquisition system all needs the personnel of main website and does above-mentioned debugging work when doing this type of debugging.But this brings several problems:
1, when having a plurality of terminals to debug simultaneously, unless main website is equipped with enough personnel, otherwise the field personnel must wait in line.
2, during work on the spot, have a power failure, then can't carry out debugging work then and there if just in time run into terminal.Behind the debugging conditions being possessed (terminal caller), the personnel of main website are difficult in the very first time and grasp this information, and debug immediately.
3, manual debugging is also brought the probability that goes wrong accordingly except bringing the corresponding work amount.
[summary of the invention]
The technical assignment of the technical problem to be solved in the present invention and proposition is that the prior art scheme is improved and improved, and kind of the automatically debug method based on the power information acquisition terminal of planning is provided, and makes it finish debugging automatically, increases work efficiency, and reduces error rate.For this reason, the present invention takes following technical scheme:
A kind of automatically debug method based on the power information acquisition terminal of planning is characterized in that it comprises the steps:
(1) the electric energy meter information that terminal to be installed maybe need be substituted inputs to the administration module of main website, and the administration module of main website is with each user's terminal and the electric energy meter corresponding stored that is attached thereto and generate the terminal operating parameter;
(2) terminal installs or electric energy meter substitutes the back that finishes and is sent completely event information to main website by terminal;
(3) main website receives that terminal sends finish event information after, by between the debugging module test main website of main website and the terminal and the communication between terminal and the electric energy meter;
(4) if the communication that reaches between terminal and the electric energy meter between test main website and the terminal is normal, then the debugging module of main website calls the operational factor of administration module and is issued to terminal.
The administration module circulation of flow process between each work position that be in charge of the management, debugging module is responsible for the automatic debugging to terminal.Administration module can be located in the corresponding main website with debugging module, also administration module can be located in the data management server, and be stored the data of a plurality of main websites in administration module, is convenient to the centralized management of data; The administration module of being located at the debugging module of main website and being located at data management server makes both information transmission not be subjected to distance limit by the connection of Web service interface.
When debugging according to maintenance plan and main website in existing data, generate and issue the terminal necessary running parameters automatically.Adopt automatically simplified the manual debugging process after the debugging, reduced the commissioning staff of main website, waiting in line, having reduced mistake, improved work efficiency when having avoided a plurality of debugging requests to initiate simultaneously.
As the further of technique scheme improved and replenish, the present invention also comprises following additional technical feature:
The method of communication is between debugging module test main website and the terminal: the debugging module by main website issues one to terminal and order is set or calls together and survey order, if the main website debugging module is received terminal responds, judges that then the communication between main website and the terminal is normal.If can not get the normal response of terminal transmission, main website can show that then error message is known managerial personnel, in time to fix a breakdown.
The method of communication is between debugging module test terminal and the electric energy meter: under the normal prerequisite of communication between main website and the terminal, debugging module by main website sends the order of checking meter of a relaying under terminal, if electric energy meter is made correctly to main website by terminal and being replied, judge that then communication is normal between electric energy meter and the terminal.Relaying is checked meter and is comprised the order of terminal and the communication of table meter in the order.
The terminal operating parameter that main website issues comprises table address, table stipulations, CT no-load voltage ratio, PT no-load voltage ratio.
Main website uses the SMS notification field personnel with debug results after finishing debugging.Before debugging, in the contact method input manager module with the field personnel, debugging module sends to the field personnel with debug results by cell phone network, makes it in time understand debug results, and the fault that exists is in time got rid of, and effectively increases work efficiency.
Terminal is connected by digital communication interface with electric energy meter, passes through the GPRS wireless connections between terminal and the main website.When test terminal and electric energy meter communication, issue relaying by the main website debugging module and check meter order to terminal, terminal is transmitted to electric energy meter by digital communication interface after with command analysis, electric energy meter is replied after receiving the order of checking meter, after encapsulating by terminal, transmits this response message debugging module in main website, debugging module is resolved response message, if reply normally, judges that then communication is normal between electric energy meter and the terminal.
The method of finishing reporting events is: when the terminal installation and when beginning to switch on, terminal reports the service restoration incident by GPRS to main website, and this incident is the installation incident.Also can realize reporting of installation incident in the following ways: batch meter door switch contact is linked into terminal, and when waiting to shut the metering chamber door, terminal reports metering chamber door close event by GPRS to main website, and this incident is the installation incident.
Beneficial effect: when debugging according to maintenance plan and main website in existing data, generate and issue the terminal necessary running parameters automatically.Adopt automatically simplified the manual debugging process after the debugging, reduced the commissioning staff of main website, waiting in line, having reduced mistake, improved work efficiency when having avoided a plurality of debugging requests to initiate simultaneously.
[description of drawings]
Fig. 1 is a structure principle chart of the present invention.
Fig. 2 is a process flow diagram of the present invention.
[embodiment]
Below in conjunction with Figure of description technical scheme of the present invention is described in further detail.
As shown in Figure 1: the hardware that the present invention relates to has: electric energy meter, the terminal that is connected by the RS-485 interface with electric energy meter, the main website that is connected by GPRS with terminal, main website comprises administration module and debugging module, the administration module circulation of flow process between each work position that be in charge of the management, debugging module is responsible for the automatic debugging to terminal.Terminal can adopt one to one with electric energy meter or one-to-many is connected.
As shown in Figure 2, the present invention it comprise the steps:
The 1 electric energy meter information that terminal to be installed maybe need be substituted inputs to the administration module of main website, and the administration module of main website is with each user's terminal and the electric energy meter corresponding stored that is attached thereto and generate the terminal operating parameter;
2 terminals install or electric energy meter replacement finishing back is sent completely event information to main website by terminal;
3 main websites receive that terminal sends finish event information after, by between the debugging module test main website of main website and the terminal and the communication between terminal and the electric energy meter;
4 if the communication that reaches between terminal and the electric energy meter between test main website and the terminal is normal, and then the debugging module of main website calls the operational factor of administration module and is issued to terminal.
In step 1, in terminal debugging plan (corresponding relation of certain user installation terminal, terminal and table meter) typing administration module, and before debugging at the scene, program content is notified the debugging module of main website by administration module.Because address, CT and the PT no-load voltage ratio of having stored corresponding electric energy meter in the administration module are so the main website debugging module can generate the relevant terminal operational factor in view of the above.The workflow of terminal debugging is managed in administration module.
In step 2, terminal to report is finished incident can be in the following way: 1) when the terminal installation and when beginning to switch on, terminal reports the service restoration incident by GPRS to main website, and this incident is the installation incident; 2) batch meter door switch contact is linked into terminal, when shutting the metering chamber door, terminal reports metering chamber door close event by GPRS to main website, and this incident is the installation incident.
In step 3, the communication modes between test main website and the terminal is: the debugging module by main website issues one to terminal and order is set or calls together and survey order, if the main website debugging module is received terminal responds, judges that then the communication between main website and the terminal is normal.Under the normal prerequisite of communication between main website and the terminal, the debugging module by main website sends the order of checking meter of a relaying under terminal, if electric energy meter is made correctly to main website by terminal and being replied, judge that then communication is normal between electric energy meter and the terminal.
In step 4, the terminal operating parameter that main website issues comprises table address, table stipulations, CT no-load voltage ratio, PT no-load voltage ratio, and can assign the data acquisition task.
Debugging module is notified the field personnel with debug results in the mode of SMS, makes it in time understand debug results, and cellphone information has test, main website and terminal called failure, terminal and the table meter Communications failure of startup or debugs and successfully wait information indicating; Do not have in terminal and to report when finishing incident, mobile phone can not be received debug results, and no short message state also can be used as one of information.

Claims (8)

1. the automatically debug method based on the power information acquisition terminal of plan is characterized in that it comprises the steps:
(1) the electric energy meter information that terminal to be installed maybe need be substituted inputs to the administration module of main website, and the administration module of main website is with each user's terminal and electric energy meter corresponding relation storage that is attached thereto and generation terminal operating parameter;
(2) terminal installs or electric energy meter substitutes the back that finishes and is sent completely event information to main website by terminal;
(3) main website receives that terminal sends finish event information after, by between the debugging module test main website of main website and the terminal and the communication between terminal and the electric energy meter;
(4) if the communication that reaches between terminal and the electric energy meter between test main website and the terminal is normal, then the debugging module of main website calls the operational factor of administration module and is issued to terminal.
2. a kind of automatically debug method according to claim 1 based on the power information acquisition terminal of planning, the method that it is characterized in that communication between debugging module test main website and the terminal is: the debugging module by main website issues one to terminal and order is set or calls together and survey order, if the main website debugging module is received terminal responds, judge that then the communication between main website and the terminal is normal.
3. a kind of automatically debug method according to claim 1 based on the power information acquisition terminal of planning, the method that it is characterized in that communication between debugging module test terminal and the electric energy meter is: under the normal prerequisite of communication between main website and the terminal, debugging module by main website sends the order of checking meter of a relaying under terminal, if electric energy meter is made correctly to main website by terminal and being replied, judge that then communication is normal between electric energy meter and the terminal.
4. a kind of automatically debug method based on the power information acquisition terminal of planning according to claim 1 is characterized in that the terminal operating parameter that main website issues comprises table address, table stipulations, CT no-load voltage ratio, PT no-load voltage ratio.
5. a kind of automatically debug method based on the power information acquisition terminal of planning according to claim 1 is characterized in that main website uses the SMS notification field personnel with debug results.
6. according to the described a kind of automatically debug method of claim 1-5, it is characterized in that terminal is connected by digital communication interface with electric energy meter, pass through the GPRS wireless connections between terminal and the main website based on the power information acquisition terminal of planning.
7. a kind of automatically debug method according to claim 6 based on the power information acquisition terminal of planning, it is characterized in that the method for finishing reporting events is: when the terminal installation and when beginning to switch on, terminal reports the service restoration incident by GPRS to main website, and this incident is the installation incident.
8. a kind of automatically debug method according to claim 6 based on the power information acquisition terminal of planning, it is characterized in that the method for finishing reporting events is: batch meter door switch contact is linked into terminal, when shutting the metering chamber door, terminal reports metering chamber door close event by GPRS to main website, and this incident is the installation incident.
CN2009103067604A 2009-09-09 2009-09-09 Automatic adjustment method based on planned power utilization information collection terminal Pending CN102024318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103067604A CN102024318A (en) 2009-09-09 2009-09-09 Automatic adjustment method based on planned power utilization information collection terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103067604A CN102024318A (en) 2009-09-09 2009-09-09 Automatic adjustment method based on planned power utilization information collection terminal

Publications (1)

Publication Number Publication Date
CN102024318A true CN102024318A (en) 2011-04-20

Family

ID=43865571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103067604A Pending CN102024318A (en) 2009-09-09 2009-09-09 Automatic adjustment method based on planned power utilization information collection terminal

Country Status (1)

Country Link
CN (1) CN102024318A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608962A (en) * 2011-12-09 2012-07-25 绍兴电力局 Automatic maintenance method for bottom-up electricity-consumption information acquisition equipment
CN103345239A (en) * 2013-06-19 2013-10-09 深圳市国电科技通信有限公司 Broadband-used electrical information collection system field measuring tool based on Android platform
CN103915896A (en) * 2013-01-06 2014-07-09 上海电力通信有限公司 Debugging method for transformer substation comprehensive information acquiring system
CN104394020A (en) * 2014-12-04 2015-03-04 国家电网公司 Automatic fault processing and safety control system and method for power information collection device
CN104749473A (en) * 2015-04-21 2015-07-01 国家电网公司 Testing method capable of simulating field power utilization information collecting terminal power failure events
CN108037719A (en) * 2017-12-11 2018-05-15 日立楼宇技术(广州)有限公司 Buried bucket monitoring terminal installation and debugging method, apparatus, equipment and storage medium
CN109687591A (en) * 2019-02-01 2019-04-26 国网江苏省电力有限公司 A kind of net lotus terminal parameter processing method, main website and system
CN109686070A (en) * 2018-12-19 2019-04-26 积成电子股份有限公司 The automatic adjustment method of the terminal of power information acquisition system and its medium and equipment
CN109982284A (en) * 2019-02-21 2019-07-05 国网山东省电力公司临沂供电公司 Communication system and method for line data-logging
CN110572446A (en) * 2019-08-23 2019-12-13 国网山东省电力公司泗水县供电公司 Intelligent debugging method and system for power user information acquisition terminal
CN112216082A (en) * 2020-09-02 2021-01-12 国电南瑞科技股份有限公司 Remote electric energy terminal operation and maintenance management system based on Internet of things communication protocol
CN112230625A (en) * 2020-10-30 2021-01-15 北京汽车研究总院有限公司 Vehicle control method of intelligent driving controller, storage medium and computer equipment

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608962B (en) * 2011-12-09 2016-05-11 绍兴电力局 A kind of power information collecting device automatic maintenance method from bottom to top
CN102608962A (en) * 2011-12-09 2012-07-25 绍兴电力局 Automatic maintenance method for bottom-up electricity-consumption information acquisition equipment
CN103915896A (en) * 2013-01-06 2014-07-09 上海电力通信有限公司 Debugging method for transformer substation comprehensive information acquiring system
CN103915896B (en) * 2013-01-06 2016-04-20 上海电力通信有限公司 The adjustment method of a kind of transformer station comprehensive information acquisition system
CN103345239A (en) * 2013-06-19 2013-10-09 深圳市国电科技通信有限公司 Broadband-used electrical information collection system field measuring tool based on Android platform
CN103345239B (en) * 2013-06-19 2015-08-19 深圳市国电科技通信有限公司 Based on the broadband power information acquisition system field commissioning instrument of Android platform
CN104394020A (en) * 2014-12-04 2015-03-04 国家电网公司 Automatic fault processing and safety control system and method for power information collection device
CN104749473B (en) * 2015-04-21 2017-08-29 国家电网公司 A kind of power information acquisition terminal for simulating scene stops upper electric event testing method
CN104749473A (en) * 2015-04-21 2015-07-01 国家电网公司 Testing method capable of simulating field power utilization information collecting terminal power failure events
CN108037719A (en) * 2017-12-11 2018-05-15 日立楼宇技术(广州)有限公司 Buried bucket monitoring terminal installation and debugging method, apparatus, equipment and storage medium
CN109686070A (en) * 2018-12-19 2019-04-26 积成电子股份有限公司 The automatic adjustment method of the terminal of power information acquisition system and its medium and equipment
CN109686070B (en) * 2018-12-19 2020-08-11 积成电子股份有限公司 Terminal automatic debugging method of electricity consumption information acquisition system, medium and equipment thereof
CN109687591A (en) * 2019-02-01 2019-04-26 国网江苏省电力有限公司 A kind of net lotus terminal parameter processing method, main website and system
CN109982284A (en) * 2019-02-21 2019-07-05 国网山东省电力公司临沂供电公司 Communication system and method for line data-logging
CN110572446A (en) * 2019-08-23 2019-12-13 国网山东省电力公司泗水县供电公司 Intelligent debugging method and system for power user information acquisition terminal
CN112216082A (en) * 2020-09-02 2021-01-12 国电南瑞科技股份有限公司 Remote electric energy terminal operation and maintenance management system based on Internet of things communication protocol
CN112216082B (en) * 2020-09-02 2022-07-01 国电南瑞科技股份有限公司 Remote electric energy terminal operation and maintenance management system based on Internet of things communication protocol
CN112230625A (en) * 2020-10-30 2021-01-15 北京汽车研究总院有限公司 Vehicle control method of intelligent driving controller, storage medium and computer equipment
CN112230625B (en) * 2020-10-30 2022-04-01 北京汽车研究总院有限公司 Vehicle control method of intelligent driving controller, storage medium and computer equipment

Similar Documents

Publication Publication Date Title
CN102024318A (en) Automatic adjustment method based on planned power utilization information collection terminal
CN107450445B (en) Multi-station unified checking and accepting method for monitoring signals of electric power system
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
CN104678962B (en) A kind of electric power first-aid operation safe monitoring system and the operational method based on the system
CN104394020A (en) Automatic fault processing and safety control system and method for power information collection device
CN102739570B (en) Method for opening home gateway through wireless fidelity (WiFi) of smart phone
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
CN109472476B (en) Power failure identification analysis method and system
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN108848518B (en) Communication base station with self-test function
CN105427044A (en) Equipment failure repair management system
CN111885626A (en) Power consumption management method for Internet of things embedded equipment
CN101609407A (en) Detection method based on the full station model file coupling of publisher/subscriber's pattern
CN109618364B (en) Detection system and detection method for uplink communication module of terminal
CN109064140A (en) Internet of things equipment operation management system
CN112308246A (en) Power failure notification method and system
CN108123544A (en) For the power failure check method of supply line
CN109885592A (en) A kind of intelligent electric meter power-off fault processing unit and method based on NB-IoT
CN109840675B (en) Intelligent power transfer application system and method in power distribution network fault state
CN111193968A (en) Verification method, debugging verification host, monitoring host and system of remote signaling information
CN111435843B (en) High-speed carrier CCO communication method based on wireless interface
CN206097452U (en) GPRS signal conversion equipment
CN102291442A (en) Voice inquiry system and method for electricity data
CN110470875A (en) It is a kind of to realize the system and method for stopping powering on active reporting using Bluetooth technology
CN111639950A (en) Room temperature processing system and method with customer service function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110420