CN102010603B - Rubber powder modified emulsified asphalt and preparation method thereof - Google Patents

Rubber powder modified emulsified asphalt and preparation method thereof Download PDF

Info

Publication number
CN102010603B
CN102010603B CN2010105210046A CN201010521004A CN102010603B CN 102010603 B CN102010603 B CN 102010603B CN 2010105210046 A CN2010105210046 A CN 2010105210046A CN 201010521004 A CN201010521004 A CN 201010521004A CN 102010603 B CN102010603 B CN 102010603B
Authority
CN
China
Prior art keywords
rubber powder
emulsified bitumen
rubber
combined processing
emulsion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105210046A
Other languages
Chinese (zh)
Other versions
CN102010603A (en
Inventor
周乃承
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Rentai Traffic Technology Co., Ltd.
Original Assignee
周乃承
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周乃承 filed Critical 周乃承
Priority to CN2010105210046A priority Critical patent/CN102010603B/en
Publication of CN102010603A publication Critical patent/CN102010603A/en
Application granted granted Critical
Publication of CN102010603B publication Critical patent/CN102010603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention provides rubber powder modified emulsified asphalt. The rubber powder modified emulsified asphalt consists of emulsified asphalt, rubber powder and composite treatment fluid, and is characterized in that: the rubber powder modified emulsified asphalt contains macroscopic rubber powder particles, wherein the mass ratio of emulsified asphalt evaporation residues to the rubber powder is 5:2-10:1; and the mass ratio of the rubber powder to the composite treatment fluid is 1:1-2:1. A preparation method of the rubber powder modified emulsified asphalt comprises the following steps of: performing surface treatment on the rubber powder to substantially form dough-like fibers with rubber cores; and treating through the composite treatment fluid so as to make the dough-like fibers excellently compatible with the emulsified asphalt. Therefore, the rubber powder modified emulsified asphalt can be used at normal temperature, the evaporation residues of the rubber powder modified emulsified asphalt has the same performance as that of the rubber asphalt, and the rubber powder modified emulsified asphalt and the method has the advantages of simple and convenient process, low cost, energy conservation, emission reduction, environmental friendliness and resource recycling and the like.

Description

A kind of rubber powder modified emulsified bitumen and preparation method thereof
Technical field
The present invention relates to a kind of road-making material, a kind of rubber powder modified emulsified bitumen and preparation method thereof is provided especially.
Background technology
Rubber asphalt is with its good pavement performance; In bituminous pavement construction and maintenance project, be widely used, but rubber asphalt must carry out under hot conditions in making and use at present; It is bigger to have produced energy consumption thus; Performance is prone to decay, and construction is inconvenient, problems such as secondary environmental pollution.
Emulsified bitumen is with also widespread uses in bituminous pavement of characteristics such as its environmental protection, energy-conservation, easy constructions.But; Common emulsified asphalt exists the problem that aspects such as high-temperature stability, low-temperature cracking-resistance, anti-water damage property can not satisfy the road request for utilization fully; Especially in the volume of traffic bigger highway section or the bigger area of the temperature difference, be prone to cause that the road surface comes off, disease such as crack and hole groove.For reducing these diseases, at present in special area or the highway section all use emulsified modified asphalt, used material modified mostly of emulsified modified asphalt are SBS, SBR, still, the road that the low-temperature performance of these emulsified modified asphalts still can not satisfy low temp area fully is with requiring.In addition, these properties-correcting agent all exist cost an arm and a leg, the problem of manufacture craft more complicated.
Therefore, but people seeking always a kind of premium properties that can keep rubber asphalt have again advantage such as emulsified bitumen normal temperature use, non-environmental-pollution and cheap desirable road-making material.
Summary of the invention
The object of the present invention is to provide a kind of rubber powder modified emulsified bitumen and preparation method thereof; When having kept the rubber asphalt pavement performance; Solved the problem that rubber asphalt normal temperature can't be stored and use down; Overcome shortcomings such as the higher energy consumption of rubber asphalt, construction inconvenience, performance degradation, replenished the technological gap of rubber powder modified emulsified bitumen simultaneously.
We are through a large amount of discovering, the rubber grain in the rubber asphalt does not form reticulated structure, but relatively independent bulk structure.That is to say why rubber asphalt has good pavement performance mainly to be because rubber grain forms the bulk corpus fibrosum with rubbery core in pitch; The rubber particle surface fiber adsorbs a large amount of pitches; Form good the connection with pitch; When the condition of high temperature, it is mobile that the surface fiber of rubber grain has suppressed bituminous, makes rubber asphalt have higher high-temperature stability; When low-temperature condition, pitch is near vitreum, and the rubber grain of combining closely with it, rubbery core provide bigger deformability, make rubber asphalt have good low-temperature stability.Therefore, the performance quality of rubber asphalt depends on whether rubber grain has formed the bulk fiber with rubbery core in pitch.
Emulsified bitumen is that petroleum pitch and water are washed in backwash under the effects such as surfacant (emulsifying agent), stablizer, the bitumen emulsion that processes through emulsification.Wherein pitch particle is dispersed in the water medium, forms the grain pattern form of " water-in-oil " or " oil-in-water ", is emulsion state under the normal temperature condition.Will form oily water separation when this grain pattern breaks, after the loss of water, remainder is a residue after the evaporation of emulsified bitumen, has had original bituminous performance.Therefore, the performance of residue has determined the pavement performance of emulsified bitumen after the evaporation of emulsified bitumen.And, keep not breakdown of emulsion before use, can in specific time, breakdown of emulsion be the key of emulsified bitumen production technology after the use.
Rubber powder modified emulsified bitumen provided by the invention is exactly the intensity formation mechanism according to rubber asphalt and emulsified bitumen; At first rubber powder is carried out surface treatment; Make it basically form bulk fiber with rubbery core; Handle making itself and emulsified bitumen have good consistency again through Combined Processing liquid, make aspects such as its viscosity, stability, de-emulsification speed identical, behind the breakdown of emulsion with emulsified bitumen; Disperseed to have the bulk fiber of rubbery core in its evaporation back residue, made it have the performance identical with rubber asphalt.But use thereby reached rubber powder modified emulsified bitumen normal temperature, the performance of its evaporation back residue has the purpose with the identical performance of rubber asphalt.Since the rubber powder modified emulsified bitumen employed main material modified be waste-tyre rubber-powder, and can produce at normal temperatures and use.Therefore, reduced product cost, turned waste into wealth again, reduced pollution, reduced the energy, reduce the carbon emission amount, it has the superperformance of rubber asphalt again simultaneously, has satisfied the request for utilization of road.Therefore, good, the easy construction, cheap, energy-conservation, non-secondary pollution of rubber powder modified emulsified bitumen pavement performance.It is the road-making material of the excellent property of a kind of energy-conservation, reduction of discharging, environmental protection, resource circulation utilization.
Rubber powder modified emulsified bitumen provided by the invention; Form by emulsified bitumen, rubber powder and Combined Processing liquid; It is characterized in that: macroscopic rubber powder particle is arranged in the said rubber powder modified emulsified bitumen; Wherein, the mass ratio of Asphalt Emulsion Evaporation Residue and rubber powder is 5: 2~10: 1, and the mass ratio of rubber powder and Combined Processing liquid is 1: 1~2: 1
At normal temperatures, the En Gela viscosity of rubber powder modified emulsified bitumen is 2-30, and stable 5d attaches area greater than 2/3 with the adhesivity of gathering materials for wrapping up in less than 5%, de-emulsification speed for split soon, in a kind of in splitting or splitting slowly;
Behind the breakdown of emulsion, the correlation parameter of evaporation back residue is following: 5 ℃ of ductility>10cm, softening temperature>50 ℃, recovery of elasticity>50%, 180 ℃ rotary viscosity>0.5Pa.s;
Wherein, the emulsified bitumen that said emulsified bitumen should be satisfied " asphalt highway construction technique normalizing " requires, the penetration degree of its evaporation back residue in the time of 25 ℃ is 5mm~30mm; Ductility>40cm in the time of 15 ℃; Solubleness is greater than 97.5%; Residual components content is greater than 50%.
Said Combined Processing liquid is that in SBS emulsion, SBR emulsion, shoddy emulsion, the soap lye one or more are composited;
Said rubber powder be particle less than 20 orders, and through surface treatment, its treatment process is that one or more method synthesis in desulfurization, activation, the silication are handled.Find rubber powder granule is crossed influences the rubber powder modified emulsified bitumen greater than meeting stability after deliberation, also can bring bad influence the result of use of rubber powder modified emulsified bitumen.Therefore, the maximum particle diameter of rubber powder granule should not be greater than 20 orders.Rubber powder should adopt waste tyre rubber powder, characteristics such as impurity is less because waste tyre rubber powder has, natural gum content is higher, steady quality, sufficient material source, and be used to rubber asphalt production.So, utilize waste tyre rubber powder as properties-correcting agent, can make the pavement performance of rubber powder modified emulsified bitumen and the pavement performance basically identical of rubber asphalt.Reduced rubber powder modified emulsified bitumen cost simultaneously.
Rubber powder modified Preparation of Emulsification Asphalt method provided by the invention is characterized in that: the concrete preparation process of rubber powder modified emulsified bitumen is following:
---bitumen production is become emulsified bitumen;
---rubber powder is carried out surface treatment, adopt one or more method synthesis in desulfurization, activation, the silicification method to handle, rubber powder is basically formed have the bulk fiber of rubbery core;
---preparation Combined Processing liquid, said Combined Processing liquid is composited by in SBS emulsion, SBR emulsion, shoddy emulsion, the soap lye one or more;
---with rubber powder after the surface treatment and Combined Processing liquid, be 1: 1~2: 1 mixed and stir, obtain the rubber powder after the Combined Processing, let rubber powder and emulsified bitumen have good consistency according to the respective quality ratio;
---with the rubber powder after the Combined Processing with stir after the emulsified bitumen that has been prepared into mixes or overground 1~3 time of high speed shear after, promptly obtain the rubber powder modified emulsified bitumen.
The storing temp of said rubber powder modified emulsified bitumen is not more than 50 ℃.
Rubber powder modified emulsified bitumen provided by the invention can be widely used in being mainly used in the normal temperature asphalt in road construction and the maintenance, semi-flexible pavement mixture, stress absorbing layer, bridge surface waterproof layer, crushed stone sealing, engineerings such as slurry seal, little table place.Have high-temperature stability preferably, low-temperature cracking-resistance has the ability that rises on can the delayed reflex crack; Can play waterproof, antiskid, suppress the effect of crackle.
Rubber powder modified emulsified bitumen provided by the invention and preparation method thereof, it is easy to have technology, and cheap, energy-conservation, reduction of discharging, environmental protection, resource can obtain advantages such as recycle.
Embodiment
Embodiment below in conjunction with concrete further specifies the present invention:
Embodiment 1
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.3t, adds the acvator of rubber powder quality 0.3% again, in mixing tank; Stirring at low speed (300~1000 rev/mins) 5 minutes; Be warming up to 150 ℃, hold warm 60min, process the surface active rubber powder; The cooling back adds 50% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is by 2 mass parts SBR emulsions and 5 mass parts soap lye solution compositions, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 1 time, make rubber powder modified asphalt, its performance index are:
De-emulsification speed: in split;
En Gela viscosity 25:
5d is less than 5% for stability,
Attaches area greater than 2/3 with the adhesivity of gathering materials for wrapping up in;
(evaporation back residue) performance is behind the breakdown of emulsion:
Penetration degree: 86 (0.1mm)
5 ℃ of ductility: 14cm,
Softening temperature: 56 ℃,
Recovery of elasticity: 66%,
180 ℃ of rotary viscosity: 1.5Pa.s.
Embodiment 2
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.15t, adds that to account for the rubber powder massfraction be 1.2% coupling agent, adds the acvator of rubber powder quality 0.3% again; In mixing tank, stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃; Hold warm 60min; Cooling back adds and rubber powder Combined Processing liquid identical in quality, and wherein Combined Processing liquid is made up of 2 mass parts SBS emulsions and 2 mass parts shoddy solution and 6 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 2 times, make rubber powder modified asphalt, its performance index are:
En Gela viscosity is 30,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split slowly;
(evaporation back residue) performance index do behind the breakdown of emulsion,
Penetration degree: 80 (0.1mm);
5 ℃ of ductility: 20cm,
Softening temperature: 60 ℃,
Recovery of elasticity: 68%,
180 ℃ of rotary viscosity: 3.5Pa.s.
Embodiment 3
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.2t, adds that to account for the rubber powder massfraction be 1.2% coupling agent, adds the acvator of rubber powder quality 0.3% again; In mixing tank, stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃; Hold warm 60min; The cooling back adds 60% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is made up of 2 mass parts SBR emulsions, 2 mass parts SBS emulsions and 6 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 3 times, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 30,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed: split slowly;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree 78 (0.1mm),
5 ℃ of ductility: 20cm,
Softening temperature: 60 ℃,
Recovery of elasticity: 65%,
180 ℃ of rotary viscosity>2.5Pa.s.
Embodiment 4
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.5t, adds that to account for the rubber powder massfraction be 1.2% coupling agent, adds the acvator of rubber powder quality 0.3% again; In mixing tank, stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃; Hold warm 60min; The cooling back adds 70% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is that 2 mass parts SBS emulsions and 5 mass parts soap lyes are formed, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, stir, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 25,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed splits in being;
(evaporation back residue) performance index do behind the breakdown of emulsion,
Penetration degree: 89 (0.1mm)
5 ℃ of ductility: 15cm,
Softening temperature: 55 ℃,
Recovery of elasticity: 62%,
180 ℃ of rotary viscosity: 1.5Pa.s.
Embodiment 5
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.6t, adds that to account for the rubber powder massfraction be 1.5% coupling agent, adopts constant temperature oven to be warming up to 150 ℃; Hold warm 60min; The cooling back adds 80% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is 2 mass parts SBS emulsions and 5 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, stir, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 28,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split slowly;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 86 (0.1mm)
5 ℃ of ductility: 18cm,
Softening temperature: 55 ℃,
Recovery of elasticity: 63%,
180 ℃ of rotary viscosity: 1.8Pa.s.
Embodiment 6
Get No. 90 pitch 1.5t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.4t, accounts for the rubber powder massfraction and be 1.5% coupling agent, adopts constant temperature oven to be warming up to 150 ℃; Hold warm 60min, the cooling back adds 90% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is 2 mass parts shoddy emulsions and 5 mass parts soap lyes; Stirring at low speed (300~1000 rev/mins) is 5 minutes again, and the rubber powder after the Combined Processing is added in the emulsified bitumen, uses high-speed shearing machine more overground 3 times; Make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 23,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed can be soon split, in split and split slowly;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 84 (0.1mm)
5 ℃ of ductility: 13cm,
Softening temperature: 52 ℃,
Recovery of elasticity: 60%,
180 ℃ of rotary viscosity: 1.2Pa.s.
Embodiment 7
Get No. 90 pitch 2t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%, and the order number is less than 20 order waste-tyre rubber-powder 0.2t; Add that to account for the rubber powder massfraction be 1.2% coupling agent, add the acvator of rubber powder quality 0.3% again, in mixing tank; Stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃, holds warm 60min; The cooling back adds 55% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is soap lye, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 2 times, make rubber powder modified asphalt, its performance index are:
The En Gela viscosity of rubber powder modified emulsified bitumen is 20,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed: split slowly;
(evaporation back residue) performance is behind the breakdown of emulsion:
Penetration degree: 89 (0.1mm)
5 ℃ of ductility: 12cm,
Softening temperature: 53 ℃,
Recovery of elasticity: 55%,
180 ℃ of rotary viscosity: 1.1Pa.s.
Embodiment 8
Get No. 90 pitch 2t in the Liaohe River, adopt cationic emulsifier, be emulsified into companion and type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.8t, adds the acvator of rubber powder quality 0.3%, in mixing tank; Stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃, holds warm 60min; Add that to account for the rubber powder massfraction be 1.5% coupling agent, adopt constant temperature oven to be warming up to 150 ℃, hold warm 60min; The cooling back adds 65% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is made up of 2 mass parts SBR emulsions, 2 mass parts shoddy emulsions and 6 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 1 time, make rubber powder modified asphalt, its performance index are:
The En Gela viscosity of rubber powder modified emulsified bitumen is 26,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split slowly;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 89 (0.1mm)
5 ℃ of ductility: 15cm,
Softening temperature: 60 ℃,
Recovery of elasticity: 61%,
180 ℃ of rotary viscosity: 1.6Pa.s.
Embodiment 9
Get No. 90 pitch 2t in the Liaohe River, adopt cationic emulsifier, be emulsified into the spray-type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.6t, adds that to account for the rubber powder massfraction be 1.2% coupling agent, adds the acvator of rubber powder quality 0.3% again; In mixing tank, stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃; Hold warm 60min; The cooling back adds 75% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is made up of 2 mass parts SBR emulsions, 2 mass parts shoddy emulsions and 6 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, use high-speed shearing machine more overground 2 times, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 16,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split soon;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 87 (0.1mm)
5 ℃ of ductility: 18cm,
Softening temperature: 56 ℃,
Recovery of elasticity: 65%,
180 ℃ of rotary viscosity: 1.5Pa.s.
Embodiment 10
Get No. 90 pitch 2t in the Liaohe River, adopt cationic emulsifier, be emulsified into the spray-type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.4%, and ash oontent is less than 8%; The order number is 1.5% coupling agent for account for the rubber powder massfraction less than 20 order waste-tyre rubber-powder 0.4t; Adopt constant temperature oven to be warming up to 150 ℃, hold warm 60min, the cooling back adds 85% Combined Processing liquid of rubber powder quality; Combined Processing liquid is made up of 2 mass parts SBR emulsions and 5 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, stir, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 13,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split soon;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 90 (0.1mm)
5 ℃ of ductility: 18cm,
Softening temperature: 56 ℃,
Recovery of elasticity: 66%,
180 ℃ of rotary viscosity: 1.8Pa.s.
Embodiment 11
Get No. 90 pitch 2t in the Liaohe River, adopt cationic emulsifier, be emulsified into the spray-type emulsified bitumen; Water intaking divides less than 5%, and metal content is less than 0.3%, and ash oontent is less than 8%; The order number is less than 20 order waste-tyre rubber-powder 0.3t, adds that to account for the rubber powder massfraction be 1.2% coupling agent, adds the acvator of rubber powder quality 0.3% again; In mixing tank, stirring at low speed (300~1000 rev/mins) 5 minutes is warming up to 150 ℃; Hold warm 60min; The cooling back adds 95% Combined Processing liquid of rubber powder quality, and Combined Processing liquid is made up of 2 mass parts shoddy emulsions and 8 mass parts soap lyes, and stirring at low speed (300~1000 rev/mins) is 5 minutes again; Rubber powder after the Combined Processing is added in the emulsified bitumen, stir, make rubber powder modified asphalt, its performance index situation is:
The En Gela viscosity of rubber powder modified emulsified bitumen is 18,
5d is less than 5% for stability,
Attach area greater than 2/3 with the adhesivity of gathering materials for wrapping up in,
De-emulsification speed is for split soon;
(evaporation back residue) performance index are behind the breakdown of emulsion:
Penetration degree: 89 (0.1mm)
5 ℃ of ductility: 17cm,
Softening temperature: 52 ℃,
Recovery of elasticity: 68%,
180 ℃ of rotary viscosity: 1.8Pa.s.
Comparative Examples 1:
Adopt the rubber asphalt processing units, get No. 90 pitch 10t in the Liaohe River, water intaking divides less than 5%; Metal content is less than 0.4%, and ash oontent is less than 8%, and the order number is 20-30 order waste tyre rubber powder 2t; The rubber powder volume is 20%, and pitch is heated to 195 ℃, after the adding rubber powder fully stirs; Grew 1 hour, developmental temperature is 190 ℃.Make rubber asphalt, keep temperature to be 190 ℃ and store 4 days, its performance is shown in the table 1.
Table 1
Figure BSA00000320065500161
Comparative Examples 2
The rubber asphalt processing units is adopted in rubber asphalt production, gets No. 90 pitch 10t in the Liaohe River, and water intaking divides less than 5%; Metal content is less than 0.4%, and ash oontent is less than 8%, and the order number is 20-30 order waste tyre rubber powder 15t; The rubber powder volume is 15%, and pitch is heated to 195 ℃, after the adding rubber powder fully stirs; Grew 1 hour, developmental temperature is 190 ℃.Make rubber asphalt, keep temperature to be 190 ℃ and store 4 days, its performance is shown in the table 1.
Figure BSA00000320065500171

Claims (3)

1. rubber powder modified emulsified bitumen; Mainly form by emulsified bitumen, rubber powder and Combined Processing liquid; It is characterized in that: macroscopic rubber powder particle is arranged in the said rubber powder modified emulsified bitumen; Wherein, the mass ratio of Asphalt Emulsion Evaporation Residue and rubber powder is 5:2~10:1, and the mass ratio of rubber powder and Combined Processing liquid is 1:1~2:1; Said Combined Processing liquid is that several kinds in SBS emulsion, SBR emulsion, shoddy emulsion, the soap lye are composited;
At normal temperatures, the En Gela viscosity of rubber powder modified emulsified bitumen is 2-30, and stable 5d attaches area greater than 2/3 with the adhesivity of gathering materials for wrapping up in less than 5%, de-emulsification speed for split soon, in a kind of in splitting or splitting slowly;
Behind the breakdown of emulsion, the correlation parameter of evaporation back residue is following: 5 ℃ of ductility>10cm, softening temperature>50 ℃, recovery of elasticity>50%, 180 ℃ rotary viscosity>0.5 Pa.s.
2. according to the described rubber powder modified emulsified bitumen of claim 1, it is characterized in that: said rubber powder be particle less than 20 purpose waste tyre rubber powders, and through surface treatment, its treatment process is that one or more method synthesis in desulfurization, activation, the silication are handled.
3. one kind according to the described rubber powder modified Preparation of Emulsification Asphalt of claim 1 method, and it is characterized in that: the concrete preparation process of rubber powder modified emulsified bitumen is following:
---bitumen production is become emulsified bitumen;
---rubber powder is carried out surface treatment, adopt one or more comprehensive treating processs in desulfurization, activation, the silicification method;
---preparation Combined Processing liquid, said Combined Processing liquid is composited by several kinds in SBS emulsion, SBR emulsion, shoddy emulsion, the soap lye;
---with rubber powder after the surface treatment and Combined Processing liquid, than for the mixed of 1:1~2:1 and stir, obtain the rubber powder after the Combined Processing according to respective quality;
---with the rubber powder after the Combined Processing with stir after the emulsified bitumen that has been prepared into mixes or overground 1~3 time of high-speed shearing machine after, promptly obtain the rubber powder modified emulsified bitumen.
CN2010105210046A 2010-10-27 2010-10-27 Rubber powder modified emulsified asphalt and preparation method thereof Active CN102010603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105210046A CN102010603B (en) 2010-10-27 2010-10-27 Rubber powder modified emulsified asphalt and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105210046A CN102010603B (en) 2010-10-27 2010-10-27 Rubber powder modified emulsified asphalt and preparation method thereof

Publications (2)

Publication Number Publication Date
CN102010603A CN102010603A (en) 2011-04-13
CN102010603B true CN102010603B (en) 2012-07-04

Family

ID=43840941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105210046A Active CN102010603B (en) 2010-10-27 2010-10-27 Rubber powder modified emulsified asphalt and preparation method thereof

Country Status (1)

Country Link
CN (1) CN102010603B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104610766B (en) * 2014-12-30 2017-05-03 南通福伦利新材料有限公司 Efficient composite emulsion modifier
CN105670320B (en) * 2016-03-22 2018-11-06 杭州天翔新型建材股份有限公司 CA mortar anionic emulsified bitumens and preparation method thereof
CN108276911A (en) * 2018-02-01 2018-07-13 四川邑诚科技有限公司 Macromolecule waterproof adhesive powder, high polymer waterproof material and preparation method thereof
CN108559289B (en) * 2018-05-14 2021-03-30 重庆路维康交通科技有限公司 Nano modified emulsified asphalt and preparation and use methods thereof
CN109227999B (en) * 2018-09-03 2020-04-10 东莞市超业塑胶制品有限公司 Swelling development device for high-fracture-resistance SBS composite material and preparation process thereof
CN111057383B (en) * 2018-10-17 2022-03-11 北京路德永泰环保科技有限公司 Rubber modified emulsified asphalt and preparation method thereof
CN110372937A (en) * 2019-08-02 2019-10-25 王云莲 Organosilicon-emulsified asphalt glue powder material, Roof system and preparation method thereof
CN112394042A (en) * 2020-12-17 2021-02-23 华运通达(广东)道路科技有限公司 Method and system for measuring influence of rubber powder on demulsification speed of emulsified asphalt

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5308898A (en) * 1990-02-21 1994-05-03 Institut Francais Du Petrole Bituminous compositions including residues of thermoplastic polymers with polyurethane foams and thermoset resin, etc.
CN1213681A (en) * 1998-09-14 1999-04-14 中国科学院广州化学研究所 Regenerated rubber asphalt water-emulsion waterproof paint and its prepn. method
CN1528823A (en) * 2003-09-26 2004-09-15 沈阳三鑫公路工程有限公司 Method for preparing waste rubber-powder modified asphalt
CN101555354A (en) * 2008-04-11 2009-10-14 深圳市海川实业股份有限公司 Method for preparing waste rubber modified asphalt
CN101585969A (en) * 2009-06-10 2009-11-25 长沙理工大学 Thermoplastic styrene butadiene rubber+tire glue powder composite modified asphalt and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5308898A (en) * 1990-02-21 1994-05-03 Institut Francais Du Petrole Bituminous compositions including residues of thermoplastic polymers with polyurethane foams and thermoset resin, etc.
CN1213681A (en) * 1998-09-14 1999-04-14 中国科学院广州化学研究所 Regenerated rubber asphalt water-emulsion waterproof paint and its prepn. method
CN1528823A (en) * 2003-09-26 2004-09-15 沈阳三鑫公路工程有限公司 Method for preparing waste rubber-powder modified asphalt
CN101555354A (en) * 2008-04-11 2009-10-14 深圳市海川实业股份有限公司 Method for preparing waste rubber modified asphalt
CN101585969A (en) * 2009-06-10 2009-11-25 长沙理工大学 Thermoplastic styrene butadiene rubber+tire glue powder composite modified asphalt and preparation method thereof

Also Published As

Publication number Publication date
CN102010603A (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102010603B (en) Rubber powder modified emulsified asphalt and preparation method thereof
CN102304289B (en) Road asphalt prepared by adding plant asphalt to petroleum asphalt and production method thereof
CN102174267B (en) Asphalt cold recycling agent and preparation method thereof
CN103450692B (en) A kind of regeneration half-flexible pavement material and preparation method thereof
CN104387780A (en) High-permeability emulsion for cold regeneration of waste and old asphalt mixture and preparation method thereof
CN102911506B (en) Anion-modified emulsified bitumen of a kind of Thief zone and preparation method thereof
CN104788975A (en) Asphalt regenerating agent with modification function and preparation method thereof
CN105754358B (en) One vegetable oil base bitumen regenerant and preparation method thereof
CN101475746A (en) Waste asphalt reclaiming agent and preparation thereof
CN101519286B (en) Waste asphalt mixture regenerating agent with excellent penetrability and preparation method thereof
CN102351468A (en) Regenerative asphalt mixture and preparation method thereof
CN104003661B (en) A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof
CN104312173A (en) Rubber composite modified asphalt and preparation method thereof
CN102174217A (en) Synthetic resin and preparation method as well as application thereof
CN106396502A (en) Foamed warm mix recycled asphalt mixture and preparation method thereof
CN105419359A (en) Waste tyre powder modified asphalt and preparation method therefor
CN104211326A (en) Regenerated warm mix asphalt mixture and preparation method thereof
CN112694304B (en) Cold recycling and old asphalt pavement cold joint adhesive for pavement reconstruction and extension
CN103073239A (en) Asphalt mixture applied to micro-surfacing of asphalt pavement and preparation method thereof
CN105801011A (en) Hot-recycling asphalt mixture containing non-traditional oil and preparation method of hot-recycling asphalt mixture
CN105778525B (en) One vegetable oil regeneration asphalt and preparation method thereof
CN102051849A (en) Preparation method of stone matrix asphalt mixture
CN107815131A (en) A kind of heat regeneration asphalt mixture and preparation method thereof
WO2023231618A1 (en) Method for harmless utilization of oil shale residue and retorted drilling oil residue
CN102795807A (en) High-definition asphalt pavement waste regeneration technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIAONING RENTAI TRAFFIC TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ZHOU NAICHENG

Effective date: 20140813

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 110000 SHENYANG, LIAONING PROVINCE TO: 110005 SHENYANG, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140813

Address after: 110005, No. 10, No. 9-10, Changbai Road, Heping District, Liaoning, Shenyang

Patentee after: Liaoning Rentai Traffic Technology Co., Ltd.

Address before: 110000, No. 49, Lane 2, city hall, Heping District, Liaoning, Shenyang, 3-7-1

Patentee before: Zhou Naicheng