CN101986166B - Test vehicle for partial discharge of power equipment on site - Google Patents

Test vehicle for partial discharge of power equipment on site Download PDF

Info

Publication number
CN101986166B
CN101986166B CN2010102597803A CN201010259780A CN101986166B CN 101986166 B CN101986166 B CN 101986166B CN 2010102597803 A CN2010102597803 A CN 2010102597803A CN 201010259780 A CN201010259780 A CN 201010259780A CN 101986166 B CN101986166 B CN 101986166B
Authority
CN
China
Prior art keywords
partial discharge
test
trunk
office
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102597803A
Other languages
Chinese (zh)
Other versions
CN101986166A (en
Inventor
阎春雨
毕建刚
是艳杰
李炯
干元锋
缪中章
袁帅
杨圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd, China Electric Power Research Institute Co Ltd CEPRI filed Critical SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
Priority to CN2010102597803A priority Critical patent/CN101986166B/en
Publication of CN101986166A publication Critical patent/CN101986166A/en
Application granted granted Critical
Publication of CN101986166B publication Critical patent/CN101986166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses a test vehicle for partial discharge of power equipment on site, comprising a chassis, a cab and a rear carriage with a door at the tail, wherein the rear carriage is separated into an operation control chamber and a test equipment chamber by a separator; the operation control chamber is used for placing a partial discharge free test power supply, a partial discharge tester, a workbench and a PC for control; the test equipment chamber is used for placing a partial discharge free exciting transformer, a partial discharge free resonance reactor, a partial discharge free coupling capacitor, a signal transfer box and accessory appliances; a testing platform which can be pulled out of the rear carriage from the test equipment chamber is arranged in the test equipment chamber; and the partial discharge free exciting transformer, the partial discharge free resonance reactor and the partial discharge free coupling capacitor are placed on the testing platform. The vehicle arrives at the testing site, the rear door is opened, the testing platform automatically extends out by virtue of a drive mechanism, and then the vehicle completes partial discharge test under rate voltage by one step by only simply connecting lines and obtains the test data in the operation control chamber within short time. The vehicle can meet the test requirement of partial discharge at 220kV and below.

Description

Test vehicle for partial discharge of power equipment on site
Technical field
The present invention relates to a kind of power transmission and transforming equipment presence states checking experiment device, thereby relate in particular to, required instrument and equipment and the high-tension apparatus of the on-the-spot shelf depreciation of power equipment is installed on to the test vehicle for partial discharge of power equipment on site that is suitable for mobile operating on a motor vehicle.
Background technology
For newly-built and operating high voltage substation, need to carry out preventative test, overhaul of the equipments or repair based on condition of component to high-tension apparatus, as carry out Partial Discharge Testing on Site.Safe operation in order to ensure high-tension apparatus, when these high-tension apparatuses are tested, the mode in past is that various surveying instruments and equipment are transported to respectively to test site by vehicle, then tested device is carried out to the wiring measurement successively, after a whole set of the test, the staff is organized into report by all test datas again.This traditional method has following drawback: (1) whole process complexity, and employ vehicle and personnel are numerous: because the high-tension apparatus kind is many, kind of test is many, needs wiring repeatedly and change testing tool just can complete the test of all high-tension apparatuses.(2) work efficiency is very low: because the volume and weight of testing tool and equipment is all larger, cause certain difficulty to transportation.During test, also instrument and equipment to be carried from car, tested in rear carrying carriage return, time-consuming.(3) measuring accuracy is impacted: repeatedly carrying easily causes damage to instrument and equipment, can affect data precision; And test site is generally remoter, the weather complexity, make the degree of integration of test data low, and real-time is poor, the error that probably causes the staff to judge.
In order to overcome above-mentioned defect, in prior art, occurred a kind of various test apparatuses being incorporated into to the instruction carriage on car body, as the patent No., be 200620063964.1 disclosed instruction carriages, it is divided into car body to drive occupant area and master control district, in the master control district, be provided with various testing tools, as Insulation Resistance Tester, instrument for measuring DC resistance, the loop circuit tester, the high direct voltage controller, series resonance voltage and transformation shunting switch tester etc., and above-mentioned instrument all is connected with main control computer, in the process of test and test, by outside lead, pilot system is connected with tested equipment, by computing machine, complete experiment work.But this instruction carriage is built-in type, on frame, the outside tie of all test apparatuses all needs to be switched on the concentrated card extender that vehicle body right side band side opens the door, and draws wiring to facilitate to tested device, thereby makes troubles for execute-in-place, and easily make mistakes, work efficiency is lower.
Chinese patent Granted publication CN201382983 has announced a kind of " external mounted electric combined test car " for this reason, this instruction carriage comprises pilothouse, car door is opened in the trunk of afterbody, in the envelope of trunk, be provided with frame along the one side, on frame, be provided with many for power transmission and transforming equipment site test and the required various test apparatuses of State Overhaul Test, on the car body of frame and test apparatus place side, offer uncovered, on uncovered, be equipped with and the uncovered suitable sliding door that can outwards pull open, by opening sliding door, test apparatus directly is connected with tested device, when testing at the scene, only need be pulled outwardly open pull door, test apparatus directly is connected and gets final product with equipment under test.
Above-mentioned two kinds of power test vehicles have only loaded the conventional test instrument, and load, put exciting transformer, put resonance reactor, without office, put the required equipment of local discharge test such as coupling condenser without office without office, need send in addition means of transport will test putting exciting transformer, put resonance reactor, be transported to scene without high pressure testing equipments such as innings putting coupling condenser without office without office of use.After having arrived scene, without office, put exciting transformer, put resonance reactor, put coupling condenser and still will remove and unload, install just and can operate by crane or manpower without office without office, due to without the office put exciting transformer, without the office put resonance reactor, without the office put the coupling condenser volume and quality larger, the simple transportation of loading is easy to extruding or jolts and damage these equipment, and loads and unloads at the scene these equipment and also bring great inconvenience.
The highest trial voltage that also has above-mentioned two kinds of power test vehicles generally below 10kV, can't the finishing equipment rated voltage under local discharge test work.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of required test apparatus of local discharge test that both had been mounted with, be mounted with again the test vehicle for partial discharge of power equipment on site of the high-tension testing apparatus that local discharge test uses, to solve the existing existing many deficiencies of power test vehicle.
In order to realize the foregoing invention purpose, the technical solution adopted in the present invention is:
Test vehicle for partial discharge of power equipment on site, comprise chassis and be arranged on pilothouse and car door on chassis and open the trunk at afterbody, it is characterized in that, described trunk becomes in order to place non-local discharge test power supply by a baffle for separating, instrument for measuring partial discharge, worktable, control with the operation pulpit of PC and put exciting transformer in order to place without office, without office, put resonance reactor, without office, put coupling condenser, the testing equipment chamber of signal converting case and aid, be provided with one and can pull out the test platform outside trunk by the testing equipment chamber described testing equipment is indoor, described nothing innings is put exciting transformer, without office, put resonance reactor, without office, putting coupling condenser is placed on described test platform.
Described test platform is pulled out trunk by the trunk either side, and a side of pulling out test platform at trunk offers the sliding door outwards pulled open.
Described test platform is pulled out trunk by the trunk afterbody.
Described test platform comprises the track on being arranged at the bottom of the trunk railway carriage or compartment and mobilely is placed in the supporting plate on described track.
Described test platform also comprises that the described supporting plate of a driving shifts out the driving mechanism of shift-in trunk along described track.
Described driving mechanism comprise one on being fixed at the bottom of the trunk case reducing motor and be fixed on the gear on described reducing motor output shaft and be laid on the tooth bar on supporting plate, described gear meshes with described tooth bar, drives described supporting plate along track travel.
Described driving mechanism comprises the reducing motor that is fixed on the supporting plate bottom surface and is fixed on the road wheel on described reducing motor output shaft, and described road wheel is walked on described track, drive described test carrying platform along track travel.
In the bottom surface of described supporting plate, be provided with the supporting leg of turning folding.
The present invention is equipped with a signal converting case in the indoor side of described testing equipment, the wiring of described signal converting case faces outer setting, on the side carriage plate of trunk corresponding to signal converting case, offer first uncoveredly, described first is equipped with and first uncovered suitable the first sliding door that can outwards open on uncovered.
Described operation pulpit is communicated with pilothouse, and the side in described operation pulpit is provided with rack, and worktable is arranged on operation pulpit opposite side, in rack, is placed with non-local discharge test power supply and instrument for measuring partial discharge, controls and is placed on worktable with PC; Described non-local discharge test power supply and instrument for measuring partial discharge arrange outwardly, on the side carriage plate of trunk corresponding to rack, offer second uncoveredly, and described second is equipped with and second uncovered suitable the second sliding door that can outwards open on uncovered.
The present invention offers view window on described dividing plate, so that the situation in operating personnel's viewing test canyon.
The present invention is equipped with the turning supporting leg be folded in described chassis on chassis.
The present invention is provided with vehicle roof platform at the top of described pilothouse and trunk, on described vehicle roof platform, is provided with roof-mounted air-condition unit and turnover shooting and lighting device and loudspeaker.
Owing to having adopted as above design proposal, car of the present invention arrives testing ground, opens tail gate, by driving mechanism auto-extending test platform, then only need simple line, the once local discharge test task completed under rated voltage, the interior data that obtain test in the operation pulpit of short time.The present invention is put exciting transformer, is put resonance reactor, puts coupling condenser without office without office owing to being mounted with without office, has saved in current power test vehicle without office and has put exciting transformer, puts resonance reactor, without office, puts the coupling condenser manpower and remove and unload the inconvenience brought without office.Because the present invention will be put exciting transformer, and put resonance reactor, puts coupling condenser and move to outside trunk without office without office without office, can meet the high-potting requirement of 220kV and following grade, be an important breakthrough of electric combined test car high-potting aspect.The instrument that test vehicle for partial discharge of power equipment on site of the present invention overcomes is in the past at the trial repeatedly carried, the wiring complexity, required staff is many, time-consuming shortcoming of taking a lot of work, only need 2-4 staff in short-term, to complete the measurement of partial discharge task, alleviate working strength, improved the precision of measurement data.
The accompanying drawing explanation
Fig. 1 is the inner structure schematic diagram that test vehicle for partial discharge of power equipment on site of the present invention is seen from a side.
Fig. 2 is the inner structure schematic diagram that test vehicle for partial discharge of power equipment on site of the present invention is seen from another side.
Fig. 3 is the inner vertical view of test vehicle for partial discharge of power equipment on site of the present invention.
Fig. 4 is the vertical view of test platform of the present invention.
Fig. 5 is the side view of Fig. 4.
Embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the present invention.
Fig. 1 is to test vehicle for partial discharge of power equipment on site shown in Figure 3, comprise chassis 100 and be arranged on pilothouse 200 and car door 310 on chassis 100 and open the trunk 300 at afterbody, this trunk 300 by a dividing plate 320 be separated into to place non-local discharge test power supply, instrument for measuring partial discharge, worktable, control with the operation pulpit 330 of PC and in order to place without office put exciting transformer, without office put resonance reactor, without the testing equipment chamber 340 of innings putting coupling condenser, signal converting case and aid.
The turning supporting leg 110 be folded in chassis 100 is installed on chassis 100, when doing local discharge test, put down supporting leg 110, make whole test vehicle for partial discharge of power equipment on site be in a state stably, be difficult for vibrations, the test accuracy of the instrument for measuring partial discharge while testing to improve.
Top at pilothouse 200 and trunk 300 is provided with vehicle roof platform 400, on vehicle roof platform 400, be provided with roof-mounted air-condition unit 410, to regulate the air themperature in pilothouse 200 and operation pulpit 330, can guarantee that instrument for measuring partial discharge has good running environment, the accuracy of measurement data during with the assurance partial discharge test.Turnover shooting and lighting device 420 and loudspeaker (not shown) are set in addition on vehicle roof platform 400, can throw light on and monitor whole measuring process for the partial discharge test process provides, safeguard work personnel's personal safety, make whole partial discharge test process safety, efficient, convenient.
Operation pulpit 330 is communicated with pilothouse 200, a side in operation pulpit 330 is provided with rack 331, worktable 332 is arranged on operation pulpit 330 opposite sides, in rack 331, dispose non-local discharge test power supply and instrument for measuring partial discharge, control is placed on worktable 332 with PC333, control the integrated computer control system with PC333, direct control instrument for measuring partial discharge on computers, after partial discharge test completes, can automatically generate the partial discharge test report, facilitate staff's comparison and judgement.In space between rack 331 and worktable 332, be placed with tilting seat 334, personnel take with handled easily.
Non-local discharge test power supply in rack 331 and instrument for measuring partial discharge's guidance panel arrange to operation room 330, on the side carriage plate 350 of the trunk of rack 331 correspondences, offer uncovered (not shown), be equipped with and the uncovered suitable sliding door that can outwards open 351 on uncovered.On an angle in testing equipment chamber 340, signal converting case (not shown) is installed, the wiring of signal converting case faces outer setting, on the side carriage plate 350 of trunk corresponding to signal converting case, offer uncoveredly, be equipped with and this uncovered suitable sliding door that can outwards open 352 on uncovered.Pull open sliding door 351,352 and can complete easily wiring.
On dividing plate 320, offer view window 321, so that the situation in operating personnel's viewing test canyon 340.
In testing equipment chamber 340, be provided with one and can be pulled out by the testing equipment chamber test platform of trunk afterbody.In conjunction with referring to Fig. 4 and Fig. 5, this test platform comprises being laid on the base plate of trunk railway carriage or compartment two tracks 341 and a supporting plate 342 is installed abreast, in the both sides of supporting plate 342, be provided with the roller 343 of walking in orbit, this test platform also comprises a driving mechanism, this driving mechanism comprises a reducing motor 345 and is arranged on the tooth bar 346 of supporting plate 342 1 sides, reducing motor 345 is fixedly mounted on the base plate of trunk railway carriage or compartment, on the output shaft of reducing motor 345, be installed with a gear 347, gear 347 and tooth bar 346 engagements, just can drive supporting plate 342 along track 341 walkings, supporting plate 342 is sent to testing equipment chamber 340 or supporting plate 342 is drawn in to testing equipment chamber 340 by the trunk afterbody.On supporting plate 342, be equipped with without office and put exciting transformer 510, put resonance reactor 540, put coupling condenser 550 without office without office.In the bottom surface of supporting plate 342, be provided with the supporting leg (not shown) of turning folding, after supporting plate 342 is drawn out testing equipment chamber 340, can put down supporting leg, to support supporting plate 342, and, when supporting plate 342 needs propulsion trial canyon 340, supporting leg can be folded on supporting plate 342 bottom surfaces.
The required non-local discharge test power supply of instruction carriage of the present invention is integrated power equipment Partial Discharge Testing on Site, put exciting transformer, put resonance reactor, put coupling condenser, instrument for measuring partial discharge and corresponding aid without office without office without office.Car arrives testing ground, opens tail gate, by electric control system auto-extending platform, then only needs simple line, once local discharge test and the measurement task completed under rated voltage, the interior data that obtain partial discharge test in the operation pulpit of short time.Operation is equipped with air-conditioning system in pulpit, can guarantee that instrument for measuring partial discharge has good running status, to guarantee the accuracy of partial discharge test measurement data.This instruction carriage also is equipped with integrated computer control system, and direct control instrument for measuring partial discharge, can generate report after partial discharge test completes automatically on computers, facilitates staff's comparison and judgement.On car, be equipped with outer farm monitoring system and loudspeaker, can monitor whole partial discharge test process, safeguard work personnel's personal safety, make whole partial discharge test process safety, efficient, convenient.
Instrument when test vehicle for partial discharge of power equipment on site of the present invention overcomes Partial Discharge Testing on Site is in the past repeatedly carried, the wiring complexity, required staff is many, time-consuming shortcoming of taking a lot of work, only need 2-4 staff in short-term, to complete the partial discharge test task under rated voltage, alleviate working strength, improved the precision of measurement data.
Test vehicle for partial discharge of power equipment on site of the present invention utilizes the telescopic test platform of interior, during test, will put exciting transformer, and put resonance reactor, put coupling condenser and move to outside compartment without office without office without office, can meet the Partial Discharge Testing on Site of 220kV and following grade.It is an important breakthrough of electric combined test car high-potting aspect.
Above demonstration and described ultimate principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and instructions, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (2)

1. test vehicle for partial discharge of power equipment on site, comprise chassis and be arranged on pilothouse and car door on chassis and open the trunk at afterbody, it is characterized in that, described trunk becomes in order to place non-local discharge test power supply by a baffle for separating, instrument for measuring partial discharge, worktable, control with the operation pulpit of PC and put exciting transformer in order to place without office, without office, put resonance reactor, without office, put coupling condenser, the testing equipment chamber of signal converting case and aid, be provided with one and can pull out the test platform outside trunk by the testing equipment chamber described testing equipment is indoor, described nothing innings is put exciting transformer, without office, put resonance reactor, without office, putting coupling condenser is placed on described test platform, during test, will put exciting transformer, and put resonance reactor, put coupling condenser and move to outside compartment without office without office without office, meet the high-potting requirement of 220kV and following grade, described test platform comprises that track on being arranged at the bottom of the trunk railway carriage or compartment and the mobile supporting plate and be placed on described track drive described supporting plate and along described track, shift out the driving mechanism of shift-in trunk, in the bottom surface of described supporting plate, be provided with the supporting leg of turning folding, the turning supporting leg be folded in described chassis is installed on chassis,
In the indoor side of described testing equipment, one signal converting case is installed, the wiring of described signal converting case faces outer setting, on the side carriage plate of trunk corresponding to signal converting case, offer first uncoveredly, described first is equipped with and first uncovered suitable the first sliding door that can outwards open on uncovered;
Described operation pulpit is communicated with pilothouse, and the side in described operation pulpit is provided with rack, and worktable is arranged on operation pulpit opposite side, in rack, is placed with non-local discharge test power supply and instrument for measuring partial discharge, controls and is placed on worktable with PC; Described non-local discharge test power supply and instrument for measuring partial discharge arrange outwardly, on the side carriage plate of trunk corresponding to rack, offer second uncoveredly, and described second is equipped with and second uncovered suitable the second sliding door that can outwards open on uncovered.
2. test vehicle for partial discharge of power equipment on site as claimed in claim 1, is characterized in that, described test platform is pulled out trunk by the trunk either side, and a side of pulling out test platform at trunk offers the sliding door outwards pulled open.
3. test vehicle for partial discharge of power equipment on site as claimed in claim 1, is characterized in that, described test platform is pulled out trunk by the trunk afterbody.
4. test vehicle for partial discharge of power equipment on site as claimed in claim 1, it is characterized in that, described driving mechanism comprise one on being fixed at the bottom of the trunk case reducing motor and be fixed on the gear on described reducing motor output shaft and be laid on the tooth bar on supporting plate, described gear and the engagement of described tooth bar, drive described supporting plate along track travel.
5. test vehicle for partial discharge of power equipment on site as claimed in claim 1, it is characterized in that, described driving mechanism comprises the reducing motor that is fixed on the supporting plate bottom surface and is fixed on the road wheel on described reducing motor output shaft, described road wheel is walked on described track, drive described supporting plate along track travel.
6. test vehicle for partial discharge of power equipment on site as claimed in claim 1, is characterized in that, offers view window on described dividing plate.
CN2010102597803A 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site Active CN101986166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102597803A CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102597803A CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Publications (2)

Publication Number Publication Date
CN101986166A CN101986166A (en) 2011-03-16
CN101986166B true CN101986166B (en) 2013-11-27

Family

ID=43710530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102597803A Active CN101986166B (en) 2010-08-23 2010-08-23 Test vehicle for partial discharge of power equipment on site

Country Status (1)

Country Link
CN (1) CN101986166B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329063B (en) * 2017-08-10 2023-04-28 广州市恒力检测股份有限公司 Electric power safety tool removes test car
CN110837029A (en) * 2019-11-18 2020-02-25 国网上海市电力公司 Transformer partial discharge induction voltage-resistant box and use method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200962133Y (en) * 2006-08-31 2007-10-17 珠海南自电气***工程有限公司 Transformer station electrical test vehicle
CN201289515Y (en) * 2008-11-14 2009-08-12 上海沪光变压器有限公司 Mobile local discharge test device
CN201382983Y (en) * 2009-03-26 2010-01-13 苏州市华电电气技术有限公司 Outside-fitted type comprehensive power test vehicle
CN201800614U (en) * 2010-08-23 2011-04-20 中国电力科学研究院 On-site partial discharge test vehicle for power equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200962133Y (en) * 2006-08-31 2007-10-17 珠海南自电气***工程有限公司 Transformer station electrical test vehicle
CN201289515Y (en) * 2008-11-14 2009-08-12 上海沪光变压器有限公司 Mobile local discharge test device
CN201382983Y (en) * 2009-03-26 2010-01-13 苏州市华电电气技术有限公司 Outside-fitted type comprehensive power test vehicle
CN201800614U (en) * 2010-08-23 2011-04-20 中国电力科学研究院 On-site partial discharge test vehicle for power equipment

Also Published As

Publication number Publication date
CN101986166A (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN101986163B (en) Field high-voltage dielectric-loss test vehicle for power equipment
CN201754170U (en) On-site high voltage dielectric loss test vehicle for power equipment
CN101515012B (en) External mounted electric combined test car
CN102358266B (en) Emergency movable battery replacing vehicle and battery replacing method thereof
CN201383629Y (en) Comprehensive power test vehicle
CN102343854B (en) Alternating-current voltage-withstanding test vehicle for power cable
CN203094465U (en) Mechanical and electrical integration unmanned helicopter vehicle-mounted system
CN103754148A (en) Full-automatic extra-high voltage test vehicle
CN201800614U (en) On-site partial discharge test vehicle for power equipment
CN101561482A (en) Electric power transformer field calibration vehicle
CN103963991B (en) A kind of electromechanical integration unmanned plane onboard system
CN202911610U (en) Mutual inductor moving check trolley
CN201382983Y (en) Outside-fitted type comprehensive power test vehicle
CN101986166B (en) Test vehicle for partial discharge of power equipment on site
CN201413390Y (en) Electric power transformer field calibration vehicle
CN103592614B (en) A kind of van-type electric power mutual-inductor nigration platform
CN203720274U (en) Movable-type detection device for transformer-like equipment
CN207875481U (en) A kind of electric engineering car
CN104608779B (en) A kind of monomer track detection vehicle
CN205248885U (en) It is alert with synthesizing breakdown van
CN204488603U (en) A kind of combined power inspection vehicle of height integrated modular
CN202115411U (en) Ultrahigh voltage alternating current withstand voltage test vehicle
CN115487877B (en) Simulated environment test box
CN201633604U (en) Integrated radar repair vehicle
CN103630783A (en) Mobile detection device of transformer equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant