CN101967977A - Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion - Google Patents
Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion Download PDFInfo
- Publication number
- CN101967977A CN101967977A CN 201010272166 CN201010272166A CN101967977A CN 101967977 A CN101967977 A CN 101967977A CN 201010272166 CN201010272166 CN 201010272166 CN 201010272166 A CN201010272166 A CN 201010272166A CN 101967977 A CN101967977 A CN 101967977A
- Authority
- CN
- China
- Prior art keywords
- hole
- round
- tunnel
- explosion
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010272166 CN101967977B (en) | 2010-08-31 | 2010-08-31 | Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010272166 CN101967977B (en) | 2010-08-31 | 2010-08-31 | Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101967977A true CN101967977A (en) | 2011-02-09 |
CN101967977B CN101967977B (en) | 2012-10-31 |
Family
ID=43547187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010272166 Active CN101967977B (en) | 2010-08-31 | 2010-08-31 | Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101967977B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102937399A (en) * | 2012-11-20 | 2013-02-20 | 武汉大学 | Stress relief blasting method based on ground stress transient release |
CN103075936A (en) * | 2013-02-17 | 2013-05-01 | 中国水电顾问集团华东勘测设计研究院 | Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process |
CN103075935A (en) * | 2013-02-17 | 2013-05-01 | 中国水电顾问集团华东勘测设计研究院 | Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel |
CN103134402A (en) * | 2013-02-17 | 2013-06-05 | 中国水电顾问集团华东勘测设计研究院 | Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method |
CN103726851A (en) * | 2014-01-13 | 2014-04-16 | 中国科学院武汉岩土力学研究所 | Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area |
CN103742156A (en) * | 2014-01-13 | 2014-04-23 | 中国科学院武汉岩土力学研究所 | Method for determining timing and modes for changing opposite advancing into unidirectional advancing before deep hard rock tunnel holing-through |
CN104533428A (en) * | 2014-11-28 | 2015-04-22 | 大连市市政设计研究院有限责任公司 | Steep cliff tunnel hole excavation construction method |
CN104533430A (en) * | 2015-01-05 | 2015-04-22 | 中国电建集团华东勘测设计研究院有限公司 | Breakage and slippage type rockburst risk relieving high-pressure water injection device and construction method of breakage and slippage type rockburst risk relieving high-pressure water injection device |
CN106014428A (en) * | 2016-07-06 | 2016-10-12 | 中国电建集团华东勘测设计研究院有限公司 | Surrounding rock pre-treatment method for TBM passing through round-tunnel section with strong rockburst risk |
CN106089216A (en) * | 2016-07-19 | 2016-11-09 | 北京交通大学 | Rock tunnel breaks rock construction method |
CN108412504A (en) * | 2018-04-27 | 2018-08-17 | 杨丹 | The long buried circular tunnel rock burst stress relieving elder generation pilot tunnel type Internal explosions method of diversion |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07229386A (en) * | 1994-02-22 | 1995-08-29 | Shigeki Nagatomo | Excavation method for tunnel of flat and large cross section |
JPH0972185A (en) * | 1995-09-01 | 1997-03-18 | Fujita Corp | Construction method of tunnel |
CN101270967A (en) * | 2008-04-30 | 2008-09-24 | 中国水电顾问集团华东勘测设计研究院 | Stress-relief blasting method |
CN101363321A (en) * | 2008-09-24 | 2009-02-11 | 中国水利水电第五工程局有限公司 | Application method for horizontal V-shaped tunnel face for digging tunnel |
CN101368811A (en) * | 2008-09-25 | 2009-02-18 | 中国水利水电第五工程局有限公司 | Tunnel excavation smooth blasting method |
CN101493305A (en) * | 2009-03-02 | 2009-07-29 | 中国水利水电第五工程局有限公司 | Damping blasting method for tunnel diggin |
-
2010
- 2010-08-31 CN CN 201010272166 patent/CN101967977B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07229386A (en) * | 1994-02-22 | 1995-08-29 | Shigeki Nagatomo | Excavation method for tunnel of flat and large cross section |
JPH0972185A (en) * | 1995-09-01 | 1997-03-18 | Fujita Corp | Construction method of tunnel |
CN101270967A (en) * | 2008-04-30 | 2008-09-24 | 中国水电顾问集团华东勘测设计研究院 | Stress-relief blasting method |
CN101363321A (en) * | 2008-09-24 | 2009-02-11 | 中国水利水电第五工程局有限公司 | Application method for horizontal V-shaped tunnel face for digging tunnel |
CN101368811A (en) * | 2008-09-25 | 2009-02-18 | 中国水利水电第五工程局有限公司 | Tunnel excavation smooth blasting method |
CN101493305A (en) * | 2009-03-02 | 2009-07-29 | 中国水利水电第五工程局有限公司 | Damping blasting method for tunnel diggin |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102937399B (en) * | 2012-11-20 | 2014-12-03 | 武汉大学 | Stress relief blasting method based on ground stress transient release |
CN102937399A (en) * | 2012-11-20 | 2013-02-20 | 武汉大学 | Stress relief blasting method based on ground stress transient release |
CN103075936A (en) * | 2013-02-17 | 2013-05-01 | 中国水电顾问集团华东勘测设计研究院 | Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process |
CN103075935A (en) * | 2013-02-17 | 2013-05-01 | 中国水电顾问集团华东勘测设计研究院 | Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel |
CN103134402A (en) * | 2013-02-17 | 2013-06-05 | 中国水电顾问集团华东勘测设计研究院 | Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method |
CN103134402B (en) * | 2013-02-17 | 2015-01-28 | 中国水电顾问集团华东勘测设计研究院 | Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method |
CN103726851B (en) * | 2014-01-13 | 2015-07-15 | 中国科学院武汉岩土力学研究所 | Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area |
CN103726851A (en) * | 2014-01-13 | 2014-04-16 | 中国科学院武汉岩土力学研究所 | Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area |
CN103742156A (en) * | 2014-01-13 | 2014-04-23 | 中国科学院武汉岩土力学研究所 | Method for determining timing and modes for changing opposite advancing into unidirectional advancing before deep hard rock tunnel holing-through |
CN104533428A (en) * | 2014-11-28 | 2015-04-22 | 大连市市政设计研究院有限责任公司 | Steep cliff tunnel hole excavation construction method |
CN104533428B (en) * | 2014-11-28 | 2018-02-13 | 大连市市政设计研究院有限责任公司 | A kind of steep cliffs tunnel outlet engineering method |
CN104533430A (en) * | 2015-01-05 | 2015-04-22 | 中国电建集团华东勘测设计研究院有限公司 | Breakage and slippage type rockburst risk relieving high-pressure water injection device and construction method of breakage and slippage type rockburst risk relieving high-pressure water injection device |
CN106014428A (en) * | 2016-07-06 | 2016-10-12 | 中国电建集团华东勘测设计研究院有限公司 | Surrounding rock pre-treatment method for TBM passing through round-tunnel section with strong rockburst risk |
US9995139B2 (en) * | 2016-07-06 | 2018-06-12 | Powerchina Huadong Engineering Corporation Limited | Surrounding rock pretreatment method for TBM passing through round tunnel section with high rock-burst risk |
CN106089216A (en) * | 2016-07-19 | 2016-11-09 | 北京交通大学 | Rock tunnel breaks rock construction method |
CN106089216B (en) * | 2016-07-19 | 2019-01-04 | 北京交通大学 | Rock tunnel broken rock construction method |
CN108412504A (en) * | 2018-04-27 | 2018-08-17 | 杨丹 | The long buried circular tunnel rock burst stress relieving elder generation pilot tunnel type Internal explosions method of diversion |
Also Published As
Publication number | Publication date |
---|---|
CN101967977B (en) | 2012-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967977B (en) | Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion | |
CN103306687B (en) | Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method | |
CN110005434A (en) | A kind of constant resistance and large deformation anchor cable control method of soft rock tunnel country rock large deformation disaster | |
CN108533272A (en) | A kind of minimum clear-distance tunnel goes out cavity construction method | |
CN109339797B (en) | Extremely-small-clear-distance tunnel exit shock absorption construction method | |
CN109372555A (en) | A kind of fault disruption zone area tunnel 3 D stereo grouting support method | |
CN105781571A (en) | Construction method for soft rock deformation tunnel lining support dismantling-replacing arch | |
CN104061001B (en) | Gob side entry retaining exploitation support process method | |
CN102778182A (en) | Beside-roadway escribing pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure | |
CN101509395A (en) | The roof caving and tunnel protecting method | |
CN110374600A (en) | A kind of ultra close distance coal seam group stope drift active workings are error-free away from formula method for arranging | |
CN107965341A (en) | A kind of large-section underground pipe canopy pipe network concrete support method | |
CN109826628A (en) | Presplitting arching without pillar mining method under the conditions of a kind of tight roof | |
CN110529151A (en) | A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method | |
CN110454172A (en) | A kind of horizontal hole in tunnel and main tunnel intersection section constructing method and bench blasting method | |
CN102678126A (en) | Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections | |
CN107975383A (en) | Underground chamber tee T intersection excavation supporting construction method | |
CN104806249A (en) | Guiding and tunneling construction method of short silo | |
CN105649634B (en) | A kind of high ferro Tunnel Engineering hydraulic drill ring mechanization photoface exploision drivage method | |
CN109630168A (en) | Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern | |
CN111023930B (en) | Tunnel step excavation method | |
CN115012936A (en) | Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration | |
CN113605893B (en) | Control method for pre-filling full gob-side entry driving surrounding rock | |
CN112554888B (en) | Pressure relief-reinforcement cooperative maintenance method for roadway under boundary coal pillar | |
CN104790971B (en) | A kind of advanced pre-add solid method of steel tube shed of the small spacing ground constructing tunnel of shallow embedding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DES Free format text: FORMER NAME: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO.,LTD. Owner name: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INV Free format text: FORMER NAME: EAST CHINA SURVEY AND DESIGN INST., CHINA HYDROPOWER CONSULTING GROUP |
|
CP01 | Change in the name or title of a patent holder |
Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd. Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee before: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd. Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee after: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd. Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22 Patentee before: Hydrochina Hangzhou Engineering Corp. |