CN101967977A - Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion - Google Patents

Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion Download PDF

Info

Publication number
CN101967977A
CN101967977A CN 201010272166 CN201010272166A CN101967977A CN 101967977 A CN101967977 A CN 101967977A CN 201010272166 CN201010272166 CN 201010272166 CN 201010272166 A CN201010272166 A CN 201010272166A CN 101967977 A CN101967977 A CN 101967977A
Authority
CN
China
Prior art keywords
hole
round
tunnel
explosion
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010272166
Other languages
Chinese (zh)
Other versions
CN101967977B (en
Inventor
张春生
褚卫江
侯靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN 201010272166 priority Critical patent/CN101967977B/en
Publication of CN101967977A publication Critical patent/CN101967977A/en
Application granted granted Critical
Publication of CN101967977B publication Critical patent/CN101967977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a construction method for controlling rock pillar type rock burst in the process of double-head tunneling deep-buried tunnel transfixion, aiming to providing a construction method for controlling rock pillar type rock burst in the process of double-head tunneling deep-buried tunnel transfixion to pretreat surrounding rocks, eliminate risks of the rock pillar type rock burst and ensure the construction safety and progress. Based on the technical scheme for solving the problem, the construction method for controlling the rock pillar type rock burst in the process of double-head tunneling deep-buried tunnel transfixion comprises the following steps of: firstly, changing double-head tunneling into single-head tunneling; secondly, conventional tunneling blasting with the tunneling blasting footage of 1.8-2m/blasting cycle; thirdly, stress relief blasting; fourthly, discharging slag, finishing support to carry out next conventional tunneling blasting and stress relief blasting until transfixing a whole rock pillar. The invention is mainly used for double-head tunneling a deep-buried traffic tunnel and a deep-buried hydraulic tunnel.

Description

The job practices of control rock pillar type rock burst in two driving deep-lying tunnel perforation process
Technical field
The present invention relates to the method for preventing and treating of a kind of rock pillar type rock burst, the job practices of control rock pillar type rock burst mainly is applicable to buried traffic tunnel and buried hydraulic tunnel that two is tunneled in particularly a kind of two driving deep-lying tunnel perforation process.
Background technology
Observed and definition of rock pillar type rock burst as far back as buried mine, the violent type impact failure that the scope that the energy that refers to be accumulated owing to rock pillar inside can bear above country rock causes.Afterwards, the deep-lying tunnel of some two drivings is in the perforation process, two faces constantly approach, also formed the rock pillar that forms in the similar mines recovery process, when buried depth bigger, when quality of surrounding rock was better, rock pillar brought and threatens significantly and disturb for personal security, construction speed because stress is concentrated and energy accumulation might cause potential rock pillar type rock burst (Pillar burst).
With the silk screen auxiliary tunnel is example, and auxiliary tunnel connects the buried depth condition of position near 2400m.Formed rock pillar in two mutual approximate procedures of face, when the distance between two faces during near 60m, potential rock burst risk strengthens, bring very big risk to headwork, when the distance between two faces during near 45m, potential rock burst risk sharply increases, and normal drilling and blasting method can't be finished headwork smoothly, must adopt the special technique scheme to finish the perforation work of tunnel.
Summary of the invention
The technical problem to be solved in the present invention is: the job practices that control rock pillar type rock burst in a kind of two driving deep-lying tunnel perforation process is provided at the problem of above-mentioned existence, by country rock being carried out necessary preliminary treatment, to reach the purpose of eliminating the rock pillar type rock burst risk in the deep-lying tunnel perforation process, for the control of safe construction and construction speed is given security.
The technical solution adopted in the present invention is: the job practices of control rock pillar type rock burst in two driving deep-lying tunnel perforation process, and it is characterized in that: for the tunnel of footpath, excavation hole less than 8m, its step is as follows,
When the distance L between a, two faces is 50m, changes two driving and be only head driving;
B, carry out the explosion of routine driving, driving explosion drilling depth is 1.8m-2m/ explosion circulation;
C, carry out the stress relieving explosion, total upper, middle and lower three rows of stress relieving shot hole, four of every rows, wherein first round is apart from excavation outline line 1m, updip 15 degree, hole depth 4m; The second round horizontal arrangement, hole depth 6m; The 3rd round horizontal arrangement, and be 1/3 of footpath, excavation hole, hole depth 4m to the distance of excavation profile bottom surface; Equal flare 10 degree in the hole of the left and right sides in every round, and distance excavation outline line 1.5m; 2m length is adorned the powder stick of 10 volume φ 32mm at the bottom of the hole of first row and the 3rd round, remainder clay shutoff, and 4m length is adorned the powder stick of 20 volume φ 32mm, remainder clay shutoff at the bottom of the hole of second round;
D, slag tap and finish and carry out the next one conventional driving explosion circulation and stress relieving explosion circulation after the supporting, until connecting whole rock pillar.
For the tunnel of footpath, excavation hole greater than 8m, its step is as follows,
When the distance L between a, two faces is 80m, changes two driving and be only head driving;
B, at the only face top excavation pilot tunnel of head driving, carry out the routine driving explosion of pilot tunnel, driving explosion drilling depth is 1.8m-2m/ explosion circulation;
C, carry out the stress relieving explosion of pilot tunnel, the stress relieving shot hole has five rows from top to bottom, four of every rows, and the pitch-row that is positioned at the outer ring is left and is dug outline line 1m, the first round updip, 15 degree wherein, hole depth 4m; The second round horizontal arrangement, hole depth 6m; The 3rd round have a down dip 15 the degree, hole depth 8m; The 4th round have a down dip 30 the degree, hole depth 8m; The 5th round have a down dip 45 the degree, hole depth 8m; Equal flare 10 degree in the hole of the left and right sides in every round; 2m length is adorned the powder stick of 10 volume φ 32mm at the bottom of the hole of first round, and 4m length is adorned the powder stick of 20 volume φ 32mm at the bottom of the hole of second round, third and fourth, 6m length is adorned the powder stick of 30 volume φ 32mm, remainder clay shutoff at the bottom of the hole of five rounds;
D, slag tap and finish and carry out the next one conventional driving explosion circulation and stress relieving explosion circulation after the supporting, connect whole rock pillar until pilot tunnel;
E, the end of a year or month are expanded the perforation work of finishing whole rock pillar of digging.
The hole of described pilot tunnel directly is 5-7m, and its cross section is gateway opening shape.
The invention has the beneficial effects as follows: the present invention carries out necessary preliminary treatment to the rock pillar country rock: for the tunnel of footpath, hole less than 8m, change two driving and be only head driving, coupling stress is removed explosion in tunneling process simultaneously; For the tunnel of footpath, hole less than 8m, change two driving and be only head driving, on this driving face, excavate pilot tunnel, coupling stress is removed explosion in pilot tunnel driving blasting process simultaneously, the end of a year or month is expanded the perforation work of finishing of digging at last, effectively controlled even eliminated the rock pillar type rock burst risk in the deep-lying tunnel perforation process, not only improved safety of construction greatly, and guaranteed that construction speed is unaffected.
Description of drawings
Fig. 1 is that embodiment 1 tunnel connects the position longitudinal plan.
Fig. 2 is embodiment 1 face stress relieving shot hole arrangement figure.
Fig. 3 is embodiment 1 face truncation figure.
Fig. 4 is embodiment 1 a face longitudinal plan.
Fig. 5 is that embodiment 2 tunnels connect the position longitudinal plan.
Fig. 6 is embodiment 2 face stress relieving shot hole arrangement figure.
Fig. 7 is embodiment 2 face truncation figure.
Fig. 8 is embodiment 2 face longitudinal plans.
The specific embodiment
Embodiment 1: as shown in Figure 1, present embodiment is primarily aimed at the tunnel of footpath, excavation hole less than 8m, and the rock burst of rock pillar type can control effectively by following measure in its perforation process:
A, when the distance L between two faces is 50m, stop the headwork of a face, change two driving and be only head driving.
B, finish the boring work of explosion of conventional driving and stress relieving explosion successively, wait to hole and finish the powder charge and the shutoff work of each shot hole after finishing; Wherein conventional aperture, hole depth and explosive payload of tunneling shot hole should satisfy the requirement of driving explosion drilling depth for 1.8m-2m/ explosion circulation, and promptly the drilling depth of an explosion circulation is 1.8-2m (down together); The layout of stress relieving shot hole 1 such as Fig. 2-shown in Figure 4, stress relieving shot hole 1 total upper, middle and lower three rows, four of every rows, wherein (this distance refers to the distance of face upper stress releasing shot hole to the excavation outline line to first round apart from excavation outline line 1m, down together), updip 15 degree, aperture 42mm, hole depth 4m; The second round horizontal arrangement, aperture 42mm, hole depth 6m; The 3rd round horizontal arrangement, and be 1/3 of footpath, excavation hole, aperture 42mm, hole depth 4m to the distance of excavation profile bottom surface; (two holes that are positioned at both sides in first round are updip 15 degree not only for the equal flare in the hole of the left and right sides 10 degree in every round, need simultaneously along tunnel direction flare 10 degree), and distance excavation outline line 1.5m (this distance definition is the same, refers to the distance of face upper stress releasing shot hole to the excavation outline line); 2m length is adorned the powder stick (explosive type of stress relieving explosion is identical with the explosive that the explosion of conventional driving is used) of 10 volume φ 32mm at the bottom of the hole of first row and the 3rd round, remainder clay shutoff, 4m length is adorned the powder stick of 20 volume φ 32mm, remainder clay shutoff at the bottom of the hole of second round.
C, finish explosion of conventional driving and stress relieving explosion successively.
D, finish the work of slagging tap rapidly, and after 3~5 hours, finish the support work of face one band, the anchor pole that some anti-rock bursts are adopted in suggestion as the spray-up of regular screw threads steel anchor rod, expansion sleeve bolt, conical anchor rod and the quick-hardening of strengthening water swelling formula anchor pole, resinoid bond such as nanometer spray-up etc. as main supporting means.
E, carry out the next one conventional driving explosion circulation and stress relieving explosion circulation, until connecting whole rock pillar.
Embodiment 2: as shown in Figure 5, present embodiment is primarily aimed at the tunnel of excavation hole footpath greater than 8m, and the difference of itself and embodiment 1 is, the layout that has adopted pilot tunnel 2 and adjusted stress relieving shot hole 1, and concrete measure is as follows:
A, when the distance L between two faces is 80m, stop the headwork of a face, change two driving and be only head driving, and at the face top of this only head driving excavation pilot tunnel 2, the control of rock burst for the benefit of, pilot tunnel 2 cross sectional arrangement become gateway opening shape in this example, and the hole directly is 5m*5m.
B, finish the routine driving explosion of pilot tunnel 2 and the boring work of stress relieving explosion successively, wait to hole and finish the powder charge and the shutoff work of each shot hole after finishing; Aperture, hole depth and the explosive payload of wherein conventional driving shot hole should satisfy the requirement of driving explosion drilling depth for 1.8m-2m/ explosion circulation; The layout of stress relieving shot hole 1 such as Fig. 6-shown in Figure 8, stress relieving shot hole 1 has five rows from top to bottom, four of every rows, the pitch-row that is positioned at the outer ring is left and is dug outline line 1m (this distance refer to face upper stress remove the distance of shot hole to the excavation outline line), wherein the first round updip 15 is spent, aperture 42mm, hole depth 4m; The second round horizontal arrangement, aperture 42mm, hole depth 6m; The 3rd round have a down dip 15 the degree, aperture 42mm, hole depth 8m; The 4th round have a down dip 30 the degree, aperture 42mm, hole depth 8m; The 5th round have a down dip 45 the degree, aperture 42mm, hole depth 8m; Equal flare 10 degree in the hole of the left and right sides (promptly are positioned at two hole updips, 15 degree on both sides in every round in first round, simultaneously along tunnel direction flare 10 degree, the and two hole horizontals being positioned at both sides in the round are arranged, simultaneously along tunnel direction flare 10 degree, two holes that are positioned at both sides in the 3rd round, 15 degree that have a down dip, simultaneously along tunnel direction flare 10 degree, two holes that are positioned at both sides in the 4th round, 30 degree that have a down dip, simultaneously along tunnel direction flare 10 degree, two holes that are positioned at both sides in the 5th round, 45 degree that have a down dip are simultaneously along tunnel direction flare 10 degree); 2m length is adorned the powder stick of 10 volume φ 32mm at the bottom of the hole of first round, remainder clay shutoff, 4m length is adorned the powder stick of 20 volume φ 32mm at the bottom of the hole of second round, remainder clay shutoff, third and fourth, 6m length is adorned the powder stick of 30 volume φ 32mm, remainder clay shutoff at the bottom of the hole of five rounds.
C, finish explosion of conventional driving and stress relieving explosion successively.
D, finish the work of slagging tap rapidly, and after 3~5 hours, finish the support work of face one band, the anchor pole that some anti-rock bursts are adopted in suggestion as the spray-up of regular screw threads steel anchor rod, expansion sleeve bolt, conical anchor rod and the quick-hardening of strengthening water swelling formula anchor pole, resinoid bond such as nanometer spray-up etc. as main supporting means.
E, carry out the next one conventional driving explosion circulation and stress relieving explosion circulation, connect whole rock pillar fully until pilot tunnel 2.
F, the end of a year or month are expanded the perforation work of finishing whole rock pillar of digging.

Claims (3)

1. the job practices of controlling the rock burst of rock pillar type in the deep-lying tunnel perforation process is tunneled at two, it is characterized in that: for the tunnel of footpath, excavation hole less than 8m, its step is as follows,
When the distance L between a, two faces is 50m, changes two driving and be only head driving;
B, carry out the explosion of routine driving, driving explosion drilling depth is 1.8m-2m/ explosion circulation;
C, carry out the stress relieving explosion, total upper, middle and lower three rows of stress relieving shot hole (1), four of every rows, wherein first round is apart from excavation outline line 1m, updip 15 degree, hole depth 4m; The second round horizontal arrangement, hole depth 6m; The 3rd round horizontal arrangement, and be 1/3 of footpath, excavation hole, hole depth 4m to the distance of excavation profile bottom surface; Equal flare 10 degree in the hole of the left and right sides in every round, and distance excavation outline line 1.5m; 2m length is adorned the powder stick of 10 volume φ 32mm at the bottom of the hole of first row and the 3rd round, remainder clay shutoff, and 4m length is adorned the powder stick of 20 volume φ 32mm, remainder clay shutoff at the bottom of the hole of second round;
D, slag tap and finish and carry out the next one conventional driving explosion circulation and stress relieving explosion circulation after the supporting, until connecting whole rock pillar.
2. the job practices of controlling the rock burst of rock pillar type in the deep-lying tunnel perforation process is tunneled at two, it is characterized in that: for the tunnel of footpath, excavation hole greater than 8m, its step is as follows,
When the distance L between a, two faces is 80m, changes two driving and be only head driving;
B, at the only face top excavation pilot tunnel (2) of head driving, carry out the routine driving explosion of pilot tunnel (2), driving explosion drilling depth is 1.8m-2m/ explosion circulation;
C, carry out the stress relieving explosion of pilot tunnel (2), stress relieving shot hole (1) has five rows from top to bottom, four of every rows, and the pitch-row that is positioned at the outer ring is left and is dug outline line 1m, the first round updip, 15 degree wherein, hole depth 4m; The second round horizontal arrangement, hole depth 6m; The 3rd round have a down dip 15 the degree, hole depth 8m; The 4th round have a down dip 30 the degree, hole depth 8m; The 5th round have a down dip 45 the degree, hole depth 8m; Equal flare 10 degree in the hole of the left and right sides in every round; 2m length is adorned the powder stick of 10 volume φ 32mm at the bottom of the hole of first round, and 4m length is adorned the powder stick of 20 volume φ 32mm at the bottom of the hole of second round, third and fourth, 6m length is adorned the powder stick of 30 volume φ 32mm, remainder clay shutoff at the bottom of the hole of five rounds;
D, slag tap and finish and carry out the next one conventional driving explosion circulation and stress relieving explosion circulation after the supporting, connect whole rock pillar until pilot tunnel (2);
E, the end of a year or month are expanded the perforation work of finishing whole rock pillar of digging.
3. the job practices of control rock pillar type rock burst in driving deep-lying tunnel perforation process in two according to claim 2, it is characterized in that: the hole of described pilot tunnel (2) directly is 5-7m, and its cross section is gateway opening shape.
CN 201010272166 2010-08-31 2010-08-31 Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion Active CN101967977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010272166 CN101967977B (en) 2010-08-31 2010-08-31 Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010272166 CN101967977B (en) 2010-08-31 2010-08-31 Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion

Publications (2)

Publication Number Publication Date
CN101967977A true CN101967977A (en) 2011-02-09
CN101967977B CN101967977B (en) 2012-10-31

Family

ID=43547187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010272166 Active CN101967977B (en) 2010-08-31 2010-08-31 Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion

Country Status (1)

Country Link
CN (1) CN101967977B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937399A (en) * 2012-11-20 2013-02-20 武汉大学 Stress relief blasting method based on ground stress transient release
CN103075936A (en) * 2013-02-17 2013-05-01 中国水电顾问集团华东勘测设计研究院 Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN103075935A (en) * 2013-02-17 2013-05-01 中国水电顾问集团华东勘测设计研究院 Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel
CN103134402A (en) * 2013-02-17 2013-06-05 中国水电顾问集团华东勘测设计研究院 Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method
CN103726851A (en) * 2014-01-13 2014-04-16 中国科学院武汉岩土力学研究所 Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area
CN103742156A (en) * 2014-01-13 2014-04-23 中国科学院武汉岩土力学研究所 Method for determining timing and modes for changing opposite advancing into unidirectional advancing before deep hard rock tunnel holing-through
CN104533428A (en) * 2014-11-28 2015-04-22 大连市市政设计研究院有限责任公司 Steep cliff tunnel hole excavation construction method
CN104533430A (en) * 2015-01-05 2015-04-22 中国电建集团华东勘测设计研究院有限公司 Breakage and slippage type rockburst risk relieving high-pressure water injection device and construction method of breakage and slippage type rockburst risk relieving high-pressure water injection device
CN106014428A (en) * 2016-07-06 2016-10-12 中国电建集团华东勘测设计研究院有限公司 Surrounding rock pre-treatment method for TBM passing through round-tunnel section with strong rockburst risk
CN106089216A (en) * 2016-07-19 2016-11-09 北京交通大学 Rock tunnel breaks rock construction method
CN108412504A (en) * 2018-04-27 2018-08-17 杨丹 The long buried circular tunnel rock burst stress relieving elder generation pilot tunnel type Internal explosions method of diversion

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229386A (en) * 1994-02-22 1995-08-29 Shigeki Nagatomo Excavation method for tunnel of flat and large cross section
JPH0972185A (en) * 1995-09-01 1997-03-18 Fujita Corp Construction method of tunnel
CN101270967A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Stress-relief blasting method
CN101363321A (en) * 2008-09-24 2009-02-11 中国水利水电第五工程局有限公司 Application method for horizontal V-shaped tunnel face for digging tunnel
CN101368811A (en) * 2008-09-25 2009-02-18 中国水利水电第五工程局有限公司 Tunnel excavation smooth blasting method
CN101493305A (en) * 2009-03-02 2009-07-29 中国水利水电第五工程局有限公司 Damping blasting method for tunnel diggin

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07229386A (en) * 1994-02-22 1995-08-29 Shigeki Nagatomo Excavation method for tunnel of flat and large cross section
JPH0972185A (en) * 1995-09-01 1997-03-18 Fujita Corp Construction method of tunnel
CN101270967A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Stress-relief blasting method
CN101363321A (en) * 2008-09-24 2009-02-11 中国水利水电第五工程局有限公司 Application method for horizontal V-shaped tunnel face for digging tunnel
CN101368811A (en) * 2008-09-25 2009-02-18 中国水利水电第五工程局有限公司 Tunnel excavation smooth blasting method
CN101493305A (en) * 2009-03-02 2009-07-29 中国水利水电第五工程局有限公司 Damping blasting method for tunnel diggin

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937399B (en) * 2012-11-20 2014-12-03 武汉大学 Stress relief blasting method based on ground stress transient release
CN102937399A (en) * 2012-11-20 2013-02-20 武汉大学 Stress relief blasting method based on ground stress transient release
CN103075936A (en) * 2013-02-17 2013-05-01 中国水电顾问集团华东勘测设计研究院 Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN103075935A (en) * 2013-02-17 2013-05-01 中国水电顾问集团华东勘测设计研究院 Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel
CN103134402A (en) * 2013-02-17 2013-06-05 中国水电顾问集团华东勘测设计研究院 Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method
CN103134402B (en) * 2013-02-17 2015-01-28 中国水电顾问集团华东勘测设计研究院 Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method
CN103726851B (en) * 2014-01-13 2015-07-15 中国科学院武汉岩土力学研究所 Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area
CN103726851A (en) * 2014-01-13 2014-04-16 中国科学院武汉岩土力学研究所 Excavation method capable of lowering rockburst risk of deep tunnel in process of passing through fault area
CN103742156A (en) * 2014-01-13 2014-04-23 中国科学院武汉岩土力学研究所 Method for determining timing and modes for changing opposite advancing into unidirectional advancing before deep hard rock tunnel holing-through
CN104533428A (en) * 2014-11-28 2015-04-22 大连市市政设计研究院有限责任公司 Steep cliff tunnel hole excavation construction method
CN104533428B (en) * 2014-11-28 2018-02-13 大连市市政设计研究院有限责任公司 A kind of steep cliffs tunnel outlet engineering method
CN104533430A (en) * 2015-01-05 2015-04-22 中国电建集团华东勘测设计研究院有限公司 Breakage and slippage type rockburst risk relieving high-pressure water injection device and construction method of breakage and slippage type rockburst risk relieving high-pressure water injection device
CN106014428A (en) * 2016-07-06 2016-10-12 中国电建集团华东勘测设计研究院有限公司 Surrounding rock pre-treatment method for TBM passing through round-tunnel section with strong rockburst risk
US9995139B2 (en) * 2016-07-06 2018-06-12 Powerchina Huadong Engineering Corporation Limited Surrounding rock pretreatment method for TBM passing through round tunnel section with high rock-burst risk
CN106089216A (en) * 2016-07-19 2016-11-09 北京交通大学 Rock tunnel breaks rock construction method
CN106089216B (en) * 2016-07-19 2019-01-04 北京交通大学 Rock tunnel broken rock construction method
CN108412504A (en) * 2018-04-27 2018-08-17 杨丹 The long buried circular tunnel rock burst stress relieving elder generation pilot tunnel type Internal explosions method of diversion

Also Published As

Publication number Publication date
CN101967977B (en) 2012-10-31

Similar Documents

Publication Publication Date Title
CN101967977B (en) Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN110005434A (en) A kind of constant resistance and large deformation anchor cable control method of soft rock tunnel country rock large deformation disaster
CN108533272A (en) A kind of minimum clear-distance tunnel goes out cavity construction method
CN109339797B (en) Extremely-small-clear-distance tunnel exit shock absorption construction method
CN109372555A (en) A kind of fault disruption zone area tunnel 3 D stereo grouting support method
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN104061001B (en) Gob side entry retaining exploitation support process method
CN102778182A (en) Beside-roadway escribing pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN101509395A (en) The roof caving and tunnel protecting method
CN110374600A (en) A kind of ultra close distance coal seam group stope drift active workings are error-free away from formula method for arranging
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN109826628A (en) Presplitting arching without pillar mining method under the conditions of a kind of tight roof
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN110454172A (en) A kind of horizontal hole in tunnel and main tunnel intersection section constructing method and bench blasting method
CN102678126A (en) Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections
CN107975383A (en) Underground chamber tee T intersection excavation supporting construction method
CN104806249A (en) Guiding and tunneling construction method of short silo
CN105649634B (en) A kind of high ferro Tunnel Engineering hydraulic drill ring mechanization photoface exploision drivage method
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern
CN111023930B (en) Tunnel step excavation method
CN115012936A (en) Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration
CN113605893B (en) Control method for pre-filling full gob-side entry driving surrounding rock
CN112554888B (en) Pressure relief-reinforcement cooperative maintenance method for roadway under boundary coal pillar
CN104790971B (en) A kind of advanced pre-add solid method of steel tube shed of the small spacing ground constructing tunnel of shallow embedding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DES

Free format text: FORMER NAME: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO.,LTD.

Owner name: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INV

Free format text: FORMER NAME: EAST CHINA SURVEY AND DESIGN INST., CHINA HYDROPOWER CONSULTING GROUP

CP01 Change in the name or title of a patent holder

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: Hydrochina Hangzhou Engineering Corp.