CN101954377A - Full-floating mandrel tandem-rolling seamless steel pipe production process - Google Patents

Full-floating mandrel tandem-rolling seamless steel pipe production process Download PDF

Info

Publication number
CN101954377A
CN101954377A CN 201010290071 CN201010290071A CN101954377A CN 101954377 A CN101954377 A CN 101954377A CN 201010290071 CN201010290071 CN 201010290071 CN 201010290071 A CN201010290071 A CN 201010290071A CN 101954377 A CN101954377 A CN 101954377A
Authority
CN
China
Prior art keywords
frame
reducing
tandem rolling
full
seamless steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010290071
Other languages
Chinese (zh)
Inventor
胡顺珍
王彦飞
董丽君
曹康乐
解建波
Original Assignee
胡顺珍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡顺珍 filed Critical 胡顺珍
Priority to CN 201010290071 priority Critical patent/CN101954377A/en
Publication of CN101954377A publication Critical patent/CN101954377A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)
  • Forging (AREA)

Abstract

The invention discloses a full-floating mandrel tandem-rolling seamless steel pipe production process for solving the problem of low production efficiency, high consumption and high pollution in the traditional perforation, lube rolling mill and cold drawn seamless steel tube production process. The production process comprises the following steps of: heating, heating pipe blanks in a heating furnace; perforating, perforating the heated pipe blanks by a provided perforator; carrying out diameter reduction by utilizing six stand hollow billets: reducing diameter of the perforated tubular billets by a six-stand hollow billets diameter reducer; carrying out eight stand tandem rolling, extensively rolling the tubular billets after the diameter reduction by utilizing the six stand hollow billets by a tandem rolling pipe mill continuously provided with the eight stands; carrying out single stand mandrel removing, removing mandrels from pierced billets with mandrels after the eight stand tandem rolling by a single-stand mandrel removing machine; carrying out 28-stand tension diameter reducing, rolling the pierced billets after mandrel removing in an 28-stand tension diameter reducer to form hot finished-product steel pipes; and finishing, finishing the hot finished-product steel pipes to form finished-product steel pipes.

Description

Full-floating plug tandem rolling seamless steel tube production technology
Affiliated technical field
The present invention relates to a kind of full-floating plug tandem rolling seamless steel tube production technology, belong to metal rolled technical field.
Background technology
Traditional perforation+automatic tube rolling mill+solid drawn tube production technology, production efficiency is low, consumption is high, pollution is high.
Summary of the invention
The purpose of this invention is to provide a kind of high yield, high-quality, low consumption, free of contamination full-floating plug tandem rolling seamless steel tube production technology.
For achieving the above object, the present invention adopts following technical scheme: full-floating plug tandem rolling seamless steel tube production technology provided by the invention comprises the steps:
Heating is heated pipe in heating furnace;
Perforation is provided with a punch pipe after heating is bored a hole;
Hollow billet after 6 frame hollow ingot tube reducings will be bored a hole is tube reducing on 6 frame hollow ingot reducing mills.
The tandem rolling tube machine that the hollow billet of 8 frame tandem rollings after with 6 frame hollow ingot tube reducings arranged continuously by 8 frames extends rolling.
Single chassis is taken off rod and the hollow forging of cored bar behind the 8 frame tandem rollings is taken off on the excellent machine in single chassis is taken off rod.
28 frame stretch reducings dispose 28 frame stretch-reducing mills after single chassis is taken off excellent machine, take off hollow forging behind the rod and enter 28 frame stretch-reducing mills and be rolled, and form hot fished pipe.
Finishing forms fished pipe after with hot fished pipe finishing.
Further, described step adds pines for, with heating of pipe blank to 1100~1280 ℃.
Wherein, described heating furnace is Sloping Hearth Heating Furnace, rotary heating furnace, walking beam furnace.
In the described step perforation, utilize punch that pipe is bored a hole, described punch is vertical cone mill, the vertical punch of Diesel.
In the described step 6 frame hollow ingot tube reducing, with the hollow billet tube reducing on 6 frame hollow ingot reducing mills after the perforation, described hollow ingot reducing mill is three roller hollow ingot reducing mills.
In the described step 8 frame tandem rolling, the tandem rolling tube machine that the hollow billet behind the 6 frame hollow ingot tube reducings is arranged continuously by 8 frames extends rolling.Described tandem rolling tube machine is MPM tandem rolling tube machine, PQF three-roller tandem rolling tube machine.
Described step single chassis is taken off in the rod, and the hollow forging behind the 8 frame tandem rollings is shifted out roll line with plug, and the clamp constraint that hollow forging is opened and closed by axial force and hydraulic pressure is motionless, with taking off bar device plug is extracted out from hollow forging, and described to take off excellent machine be that single chassis is taken off excellent machine.
In the described step 28 frame stretch reducing, the hollow forging that will take off behind the rod enters 28 frame stretch reducings, and described stretch-reducing mill is 28 frame three-roller tension reducing mills.
Described step finishing, comprise blow ash, aligning, excision burr tail, hand inspection, defect detecting test, the water pressure test,, spray printing sign, corrosion-inhibiting coating, measure each operation or wherein any practical need the combination operation of operation.
The invention has the beneficial effects as follows: rolling rhythm fast (can reach 3.5~4/min), the output height; Use the product that the pipe of a kind of specification can the production plurality of specifications, saved the various production costs of conversion pipe, made things convenient for production management and control.
Description of drawings
Fig. 1 is technological process of production figure of the present invention
The specific embodiment
In order to make those skilled in the art person understand the present invention program better, and above-mentioned purpose of the present invention, feature and advantage can be become apparent more, the present invention is further detailed explanation below in conjunction with drawings and Examples.
As shown in Figure 1, full-floating plug tandem rolling seamless steel tube production technology provided by the invention comprises the steps:
Heating is heated pipe in heating furnace.
Described heating furnace can be selected Sloping Hearth Heating Furnace, rotary heating furnace, walking beam furnace for use, and the heating-up temperature scope is 1100~1280 ℃;
Perforation is provided with a punch pipe after heating is bored a hole.
Described punch can be selected vertical cone mill, the vertical punch of Diesel for use;
6 frame hollow ingot tube reducings are provided with 6 frame hollow ingot reducing mills behind punch, with the hollow billet tube reducing on 6 frame hollow ingot reducing mills after the perforation.
Described hollow ingot reducing mill can be selected three roller hollow ingot reducing mills for use;
8 frame tandem rollings are provided with 8 frame tandem rollings behind 6 frame hollow ingot reducing mills, the tandem rolling tube machine that the hollow billet behind the 6 frame hollow ingot tube reducings is arranged continuously by 8 frames extends rolling.
Described tandem rolling tube machine can be selected MPM tandem rolling tube machine, PQF three-roller tandem rolling tube machine for use;
Single chassis is taken off rod and behind 8 frame tandem rollings single chassis is set and takes off excellent machine, and the hollow forging behind the 8 frame tandem rollings is shifted out roll line with plug, and the clamp constraint that hollow forging is opened and closed by axial force and hydraulic pressure is motionless, with taking off bar device plug is extracted out from hollow forging.
Describedly take off excellent machine and can select for use single chassis to take off excellent machine;
28 frame stretch reducings dispose 28 frame stretch-reducing mills after single chassis is taken off excellent machine, take off hollow forging behind the rod and enter 28 frame stretch-reducing mills and be rolled, and form hot fished pipe.The frame quantity of using in the actual production is decided on product specification, and different product specifications are used the frame of different numbers, at most available 28 frames, maximum sizing reduction can reach 75%~80%, maximum wall thickness reducing amount can reach 35%~40%, and lengthening coefficient can reach 6~8, and muzzle velocity can reach 16m/s.
Described stretch-reducing mill can be selected 28 frame three-roller tension reducing mills for use;
Finishing forms fished pipe after with hot fished pipe finishing.
Finishing procedure is to the cooled further processing of hot fished pipe, comprise blow ash, aligning, excision burr tail, hand inspection, defect detecting test, the water pressure test,, spray printing sign, corrosion-inhibiting coating, measure each operation or wherein any practical need the combination operation of operation, finally obtain the commodity steel pipe.
Rolling described in this processing step, be that the total reducing rate by design carries out in the reducing pass system in definite deciding, and the reducing pass system that decides that determines designs according to production specification scope, product requirement, and the parameter of the equipment rack quantity in this processing step, inlet mill speed, frame and equipment is determined according to pass schedule.

Claims (10)

1. a full-floating plug tandem rolling seamless steel tube production technology is characterized in that, comprises the steps:
Heating is heated pipe in heating furnace;
Perforation is provided with a punch pipe after heating is bored a hole;
6 frame hollow ingot tube reducings are provided with 6 frame hollow ingot reducing mills behind punch, with the hollow billet tube reducing on 6 frame hollow ingot reducing mills after the perforation;
8 frame tandem rollings are provided with 8 frame tandem rolling tube machines behind 6 frame hollow ingot reducing mills, the tandem rolling tube machine that the hollow billet behind the 6 frame hollow ingot tube reducings is arranged continuously by 8 frames extends rolling;
Single chassis is taken off rod and behind 8 frame tandem rolling tube machines single chassis is set and takes off excellent machine, the hollow forging of cored bar behind the 8 frame tandem rollings is taken off on the excellent machine in single chassis take off rod;
28 frame stretch reducings are provided with 28 frame stretch-reducing mills after single chassis is taken off excellent machine, take off hollow forging behind the rod and enter 28 frame stretch-reducing mills and be rolled, and form hot fished pipe;
Finishing forms fished pipe after with hot fished pipe finishing.
2. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1 is characterized in that described step adds pines for, with heating of pipe blank to 1100~1280 ℃.
3. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1 and 2 is characterized in that described heating furnace can be selected Sloping Hearth Heating Furnace, rotary heating furnace, walking beam furnace for use.
4. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1 is characterized in that, in the described step perforation, utilizes punch that pipe is bored a hole, and described punch can be selected vertical cone mill, the vertical punch of Diesel for use.
5. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1, it is characterized in that, in the described step 6 frame hollow ingot tube reducing, with the hollow billet tube reducing on 6 frame hollow ingot reducing mills after the perforation, described hollow ingot reducing mill can be selected three roller hollow ingot reducing mills for use.
6. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1 is characterized in that described tandem rolling tube machine can be selected MPM tandem rolling tube machine, PQF three-roller tandem rolling tube machine for use.
7. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1, it is characterized in that, described step single chassis is taken off in the rod, hollow forging behind the 8 frame tandem rollings is shifted out roll line with plug, the clamp constraint that hollow forging is opened and closed by axial force and hydraulic pressure is motionless, with taking off bar device plug is extracted out from hollow forging, describedly taken off excellent machine and can select for use single chassis to take off excellent machine.
8. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1 is characterized in that described stretch-reducing mill can be selected 28 frame three-roller tension reducing mills for use.
9. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1, it is characterized in that, finishing procedure is to the cooled further processing of hot fished pipe, comprise blow ash, aligning, excision burr tail, hand inspection, defect detecting test, the water pressure test,, spray printing sign, corrosion-inhibiting coating, measure each operation or wherein any practical need the combination operation of operation, finally obtain the commodity steel pipe.
10. a kind of full-floating plug tandem rolling seamless steel tube production technology according to claim 1, it is characterized in that, rolling described in this processing step, be that the total reducing rate by design carries out in the reducing pass system in definite deciding, and the reducing pass system that decides that determines designs according to production specification scope, product requirement, and the parameter of the equipment rack quantity in this processing step, inlet mill speed, frame and equipment is determined according to pass schedule.
CN 201010290071 2010-09-13 2010-09-13 Full-floating mandrel tandem-rolling seamless steel pipe production process Pending CN101954377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010290071 CN101954377A (en) 2010-09-13 2010-09-13 Full-floating mandrel tandem-rolling seamless steel pipe production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010290071 CN101954377A (en) 2010-09-13 2010-09-13 Full-floating mandrel tandem-rolling seamless steel pipe production process

Publications (1)

Publication Number Publication Date
CN101954377A true CN101954377A (en) 2011-01-26

Family

ID=43482106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010290071 Pending CN101954377A (en) 2010-09-13 2010-09-13 Full-floating mandrel tandem-rolling seamless steel pipe production process

Country Status (1)

Country Link
CN (1) CN101954377A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699102A (en) * 2012-06-07 2012-10-03 重庆钢铁(集团)有限责任公司 Production process method of small-caliber cold-drawing seamless steel tube used for boiler
CN102974615A (en) * 2012-11-08 2013-03-20 聊城市开发区全运钢管制造有限公司 Rolling process method of punched lining core of steel rod
CN104826868A (en) * 2015-02-10 2015-08-12 长葛市一鸣机械有限公司 Small-diameter seamless steel pipe floating mandrel continuous mill unit and seamless steel pipe production process
CN107803411A (en) * 2017-09-19 2018-03-16 扬州诚德钢管有限公司 A kind of manufacture method of super austenitic stainless steel seamless large-diameter pipes
CN108971229A (en) * 2018-09-07 2018-12-11 无锡华贝钢管制造有限公司 A kind of tube reducing technique of efficient quick
CN109963664A (en) * 2016-10-14 2019-07-02 丹尼尔和科菲森梅克尼齐有限公司 The multi-frame roller mill of rolling system for oblique type or hot Pilger pipe mill type or automatic mill type finishing roller mill

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62227509A (en) * 1986-03-28 1987-10-06 Sumitomo Metal Ind Ltd Rolling method for seamless steel pipe
US6089066A (en) * 1998-03-04 2000-07-18 Mannesmann Ag Process for the production of seamless tubes
CN101077505A (en) * 2007-06-27 2007-11-28 杨泽 Seamless steel pipe restraint tandem rolling short flowpath roller milling process
CN101327492A (en) * 2008-07-30 2008-12-24 郝建庚 Process and system for manufacturing hot-rolled seamless tube
CN101337236A (en) * 2007-07-06 2009-01-07 中冶东方工程技术有限公司 Rolling mill technique of three-roller full-floating core rod tandem rolling tube
CN101722190A (en) * 2009-11-12 2010-06-09 无锡西姆莱斯石油专用管制造有限公司 Process for treating hot-rolled capillary pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62227509A (en) * 1986-03-28 1987-10-06 Sumitomo Metal Ind Ltd Rolling method for seamless steel pipe
US6089066A (en) * 1998-03-04 2000-07-18 Mannesmann Ag Process for the production of seamless tubes
CN101077505A (en) * 2007-06-27 2007-11-28 杨泽 Seamless steel pipe restraint tandem rolling short flowpath roller milling process
CN101337236A (en) * 2007-07-06 2009-01-07 中冶东方工程技术有限公司 Rolling mill technique of three-roller full-floating core rod tandem rolling tube
CN101327492A (en) * 2008-07-30 2008-12-24 郝建庚 Process and system for manufacturing hot-rolled seamless tube
CN101722190A (en) * 2009-11-12 2010-06-09 无锡西姆莱斯石油专用管制造有限公司 Process for treating hot-rolled capillary pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《现代无缝钢管生产技术》 20080131 双远华 《现代无缝钢管生产技术》 化学工业出版社 , 1 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699102A (en) * 2012-06-07 2012-10-03 重庆钢铁(集团)有限责任公司 Production process method of small-caliber cold-drawing seamless steel tube used for boiler
CN102699102B (en) * 2012-06-07 2015-06-03 重庆钢铁(集团)有限责任公司 Production process method of small-caliber cold-drawing seamless steel tube used for boiler
CN102974615A (en) * 2012-11-08 2013-03-20 聊城市开发区全运钢管制造有限公司 Rolling process method of punched lining core of steel rod
CN104826868A (en) * 2015-02-10 2015-08-12 长葛市一鸣机械有限公司 Small-diameter seamless steel pipe floating mandrel continuous mill unit and seamless steel pipe production process
CN109963664A (en) * 2016-10-14 2019-07-02 丹尼尔和科菲森梅克尼齐有限公司 The multi-frame roller mill of rolling system for oblique type or hot Pilger pipe mill type or automatic mill type finishing roller mill
CN109963664B (en) * 2016-10-14 2021-10-22 丹尼尔和科菲森梅克尼齐有限公司 Multi-stand rolling mill for a rolling system with a finishing rolling mill of the skew or hot pilger type or of the automatic type
CN107803411A (en) * 2017-09-19 2018-03-16 扬州诚德钢管有限公司 A kind of manufacture method of super austenitic stainless steel seamless large-diameter pipes
CN108971229A (en) * 2018-09-07 2018-12-11 无锡华贝钢管制造有限公司 A kind of tube reducing technique of efficient quick

Similar Documents

Publication Publication Date Title
CN101327492A (en) Process and system for manufacturing hot-rolled seamless tube
CN107052076B (en) A kind of method of collet plug hot rolling heavy caliber titanium or titanium alloy thin-wall seamless pipe
CN102294379B (en) Method for manufacturing seamless steel pipe for high-pressure gas cylinder with large caliber
CN103272845B (en) Hot rolling process of small-bore ultra-thin-wall seamless steel tube
CN102303065B (en) Method for manufacturing seamless steel tube for vehicle-mounted large-diameter high pressure gas cylinder
CN103128102B (en) Production method of titanium alloy oil well pipe
CN101954377A (en) Full-floating mandrel tandem-rolling seamless steel pipe production process
CN102284486A (en) Process for manufacturing seamless steel tubes by hot rolling
CN101020190A (en) Hot rolling process of seamless steel pipe
CN101337236A (en) Rolling mill technique of three-roller full-floating core rod tandem rolling tube
RU2008115393A (en) METHOD FOR PRODUCING PIPES OF INCREASED QUALITY FROM CORROSION-RESISTANT STEEL OF BRAND 08X18H10T-SH FOR ATOMIC ENERGY OBJECTS
CN101972776A (en) Hot rolling production process of automatic tube rolling mill
CN104874606A (en) Production method of high-chromium ferrite stainless steel seamless pipe
CN111589871A (en) Production line and production process of small-caliber thick-wall seamless steel pipe
CN102039313A (en) Method for producing large-diameter seamless steel pipe for gas cylinder
CN102009069A (en) Manufacturing process of small-caliber hot rolling seamless steel tubes
CN102228905A (en) Production process of hot continuous rolling seamless steel tube with small caliber
CN109663831A (en) A method of producing small-bore Steel Pipe For Bearing
CN101020191A (en) Hot rolling process of seamless steel pipe
CN201253641Y (en) Hot rolled seamless steel tube manufacturing system
CN104475451A (en) Rolling system of seamless steel tube and rolling technology thereof
CN101020192A (en) Hot rolling process of seamless steel pipe
CN204503756U (en) A kind of roll seamless steel tube system
CN104475453B (en) A kind of tandem rolling roll seamless steel tube technique and device
CN102581014A (en) Process for producing thin-wall seamless steel tubes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110126