CN101935986B CN201010501235A CN201010501235A CN101935986B CN 101935986 B CN101935986 B CN 101935986B CN 201010501235 A CN201010501235 A CN 201010501235A CN 201010501235 A CN201010501235 A CN 201010501235A CN 101935986 B CN101935986 B CN 101935986B
Authority
CN
China
Prior art keywords
steel plate
concrete foundation
pile
pipe pile
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010501235A
Other languages
Chinese (zh)
Other versions
CN101935986A (en
Inventor
王小平
任历文
郑策
何杰
蒋伟
姚天虹
李杨猛
吴刚强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority to CN201010501235A priority Critical patent/CN101935986B/en
Publication of CN101935986A publication Critical patent/CN101935986A/en
Application granted granted Critical
Publication of CN101935986B publication Critical patent/CN101935986B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses an overwater large-span steel tube pile cast-in-situ trestle, which comprises a plurality of rows of reinforced concrete foundation piles, wherein each row comprises a plurality of reinforced concrete foundation piles; the lower part of each reinforced concrete foundation pile is fixed underwater; the upper end of each reinforced concrete foundation pile is fixedly connected with a steel tube pile; a transverse distribution beam is placed on the upper end of each row of steel tube piles, Bailey sheets are arranged on the transverse distribution beams, sleepers are arranged on the Bailey sheets, and bowl button style brackets are arranged on the sleepers; and models of cast-in-situ continuous beams consist of square timbers and templates are arranged on the bowl button style brackets. The invention also discloses a building method of the overwater large-span steel tube pile cast-in-situ trestle. The Bailey trestle built by using the Bailey sheets has the characteristics of light weight, convenient disassembly and assembly, large load bearing capacity and the like, and has no safety hazards caused by factors such as inaccurate computation. Practices prove that the integrated in-situ coasting of the continuous beam with a span of 110 meters is realized and that the settlement is between 1 to 2 centimeters.

Description

A kind of large-span steel pile tube cast-in-place support waterborne and building method thereof
Technical field
The present invention relates to the bridge cast-in-place support, be specifically related to a kind of large-span steel pile tube cast-in-place support waterborne and building method thereof.
Background technology
Common bridge cast-in-place support in the construction mostly be to land scaffold building with full hall on land, and cast-in-situ concrete adopts Hanging Basket to construct piecemeal more on the water.When the bridge bottom surface is positioned at the waters, banket in water and build the island and set up full hall and land scaffold, very difficult assurance is banketed and is built the stability on island, exists problems such as differential settlement, constructional difficulties, polluted river channel, safety factor are low, when if the river course is darker, also can increase cost.Under the situation that is designed to bridge beam body integral cast-in-situ in water, cast-in-situ concrete construction waterborne can not be adopted Hanging Basket, and disposable concreting amount is bigger, when span is excessive, must guarantee the rigidity control of support, avoid the beam body more crack to occur because of the support sedimentation.So, need seek a kind of cast-in-place support that can adapt to large span waterborne.
Summary of the invention
The purpose of this invention is to provide a kind of large-span steel pile tube cast-in-place support waterborne, its structure is simple and clear, good integrity, and span is big, good rigidity, stable high, and installation and removal easily, is fit to large-span continuous beam integral cast-in-situ waterborne and constructs.
The present invention also provides a kind of building method of large-span steel pile tube cast-in-place support waterborne, and this method is easy to operation, safety factor is higher, can guarantee that sedimentation is less in the construction of continuous beam integral cast-in-situ, guarantees quality of concrete.
A kind of large-span steel pile tube cast-in-place support waterborne of the present invention, comprise many placing of reinforcements concrete foundation pile, every row is made up of many reinforced concrete foundation stakes, it is characterized in that: the bottom of every reinforced concrete foundation stake is fixed on below the bottom, be fixedly connected with a steel pipe pile in the upper end of every reinforced concrete foundation stake, upper ends at every row's steel pipe pile has a transverse distribution beam, shellfish thunder sheet be located at each transverse distribution beam above, each is arranged between the shellfish thunder sheet and connects with shellfish thunder sheet bracing frame, sleeper is located on the shellfish thunder sheet, bowl button be erected at sleeper above; The model of the cast-in-situ continuous beam of being made up of the lumps of wood and template is located at bowl to be buckled on the support.
This steel pipe pile cast-in-place support adopts the steel pipe pile of Φ 80cm as buttress, and as the transverse distribution beam, shellfish thunder sheet is laid on and forms the simply supported beam system on each transverse distribution beam with two limb I56 i iron.
Described a kind of large-span steel pile tube cast-in-place support waterborne is welded with a capital steel plate in the upper end of every steel pipe pile, is welded with polylith below the capital steel plate and between the outer wall of steel pipe pile and strengthens steel plate, and the transverse distribution beam is placed directly on the capital steel plate.
Described a kind of large-span steel pile tube cast-in-place support waterborne, steel plate at the bottom of the lower end of every steel pipe pile is welded with post is welded with polylith and strengthens steel plate on steel plate at the bottom of the post and between the outer wall of steel pipe pile.
The building method of a kind of large-span steel pile tube cast-in-place support waterborne of the present invention, its step is as follows:
The first step, the drilling construction that carries out the reinforced concrete foundation stake, a plurality of foundation piles of every gang drill hole, distance between borehole is 2.5m to 5m, row-to-row distance equates, is 18m; When the reinforced concrete foundation stake is built, steel plate at the bottom of the post is embedded in the end face of reinforced concrete foundation stake;
Second step, the steel pipe pile of welded and installed on steel plate at the bottom of the post, at the upper end of steel pipe pile welding capital steel plate, and between the outer wall of steel pipe pile and steel plate at the bottom of the post 6 reinforcements of welding steel plates;
The 3rd step, set up the transverse distribution beam of making of two limb I56 i iron at the top of every row's steel pipe pile, again shellfish thunder sheet vertically is laid on each transverse distribution beam, each is arranged between the shellfish thunder sheet and connects with shellfish thunder sheet bracing frame;
The 4th step laid railway sleepers on shellfish thunder sheet, directly set up a bowl button support on sleeper, and the model of the cast-in-situ continuous beam of being made up of the lumps of wood and template is installed at bowl button support.
Beneficial effect of the present invention: drilled pile basis and steel pipe pile are all stressed clear and definite, easy and simple to handle, have evaded the security risk of shining because of reasons such as calculating are inaccurate; With the Bei Leiliang that shellfish thunder sheet is set up, have in light weight, easy accessibility, characteristics such as the load ability to bear is big.Prove that by example the steel pipe pile cast-in-place support of this kind form can realize the continuous beam integral cast-in-situ of 110m span, settling amount belongs to uniform settlement at 1-2cm, has saved about 700,000 yuan of cost than other job practices.
Description of drawings
Fig. 1 is an elevation of the present invention.
Fig. 2 is a cross-sectional drawing of the present invention.
Fig. 3 is the enlarged drawing of the A portion among Fig. 2.
Fig. 4 is the enlarged drawing of the B portion among Fig. 2.
Fig. 5 is the steel bar concrete pile plan view.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
Referring to Fig. 1, Fig. 2, Fig. 3 and large-span steel pile tube cast-in-place support a kind of waterborne shown in Figure 4, comprise many placing of reinforcements concrete foundation pile (3 rows have only drawn among Fig. 5), every row is made up of the reinforced concrete foundation stake 1 of 8 Φ 120cm, the bottom of every reinforced concrete foundation stake 1 is fixed on below the bottom, be fixedly connected with a steel pipe pile 2 in the upper end of every reinforced concrete foundation stake, upper ends at every row's steel pipe pile has a transverse distribution beam 3, shellfish thunder sheet 4 be laid on each transverse distribution beam above, each is arranged between the shellfish thunder sheet and connects with shellfish thunder sheet bracing frame 5, sleeper 6 is mated formation on shellfish thunder sheet, and bowl button support 7 is set up on sleeper; The model that is used for cast-in-situ continuous beam 9 is made up of the lumps of wood and template 8, is laid on bowl button support 7.
This steel pipe pile cast-in-place support adopts the steel pipe pile of Φ 80cm as buttress, and as the transverse distribution beam, shellfish thunder sheet is laid on and forms the simply supported beam system on each transverse distribution beam with two limb I56 i iron.
Be welded with a capital steel plate 11 in the upper end of every steel pipe pile 2, be welded with 6 below the capital steel plate and between the outer wall of steel pipe pile and strengthen steel plate 10, transverse distribution beam 3 is placed directly on the capital steel plate 11.
Steel plate 12 at the bottom of the lower end of every steel pipe pile 2 is welded with post, are welded with 4 on steel plate at the bottom of the post and between the outer wall of steel pipe pile and strengthen steel plate 10.
The building method of a kind of large-span steel pile tube cast-in-place support waterborne of the present invention, its step is as follows:
The first step, referring to Fig. 5 (the 3 row's foundation pile holes of only having drawn), the drilling construction that carries out the reinforced concrete foundation stake 1 of Φ 120cm, every gang drill 8 foundation pile holes 1-1, distance between borehole is 2.5m to 5m, row-to-row distance equates, is 18m; When the reinforced concrete foundation stake is built, steel plate at the bottom of the post 12 is embedded in the end face of reinforced concrete foundation stake; Because laterally on the section, the position load of case web is bigger, so the distance between the foundation pile hole is horizontal does not wait, and is 2.5m to 5m.
Second step, the steel pipe pile 2 of welded and installed Φ 80cm on steel plate at the bottom of the post 12, at the upper end of steel pipe pile welding capital steel plate 11, and between the outer wall of steel pipe pile 2 and steel plate at the bottom of the post 6 reinforcements of welding steel plates 10;
The 3rd step, set up the transverse distribution beam of making of two limb I56 i iron 3 at every row's steel pipe pile 2 tops, again shellfish thunder sheet 4 vertically is laid on each transverse distribution beam, each is arranged between the shellfish thunder sheet 4 and connects with shellfish thunder sheet bracing frame 5;
The 4th step laid railway sleepers 6 on shellfish thunder sheet, directly set up a bowl button support 7 on sleeper, at bowl button support the model of the cast-in-situ continuous beam of being made up of the lumps of wood and template 89 was installed, and can carry out the concreting of cast-in-situ continuous beam.

Claims (3)

1. large-span steel pile tube cast-in-place support waterborne, comprise many placing of reinforcements concrete foundation pile, every row is made up of many reinforced concrete foundation stakes (1), it is characterized in that: the bottom of every reinforced concrete foundation stake (1) is fixed on below the bottom, be fixedly connected with a steel pipe pile (2) in the upper end of every reinforced concrete foundation stake, upper ends at every row's steel pipe pile has a transverse distribution beam (3), shellfish thunder sheet (4) be located at each transverse distribution beam above, each is arranged between the shellfish thunder sheet and connects with shellfish thunder sheet bracing frame (5), sleeper (6) is located on the shellfish thunder sheet, the bowl button support (7) be located at sleeper above; The model of the cast-in-situ continuous beam of being made up of the lumps of wood and template (8) (9) is located at bowl to be buckled on the support (7); Be welded with a capital steel plate (11) in the upper end of every steel pipe pile (2), be welded with polylith below the capital steel plate and between the outer wall of steel pipe pile and strengthen steel plate (10), transverse distribution beam (3) is placed directly on the capital steel plate (11).
2. a kind of large-span steel pile tube cast-in-place support waterborne according to claim 1, it is characterized in that: steel plate (12) at the bottom of the lower end of every steel pipe pile (2) is welded with post is welded with polylith and strengthens steel plate (10) on steel plate at the bottom of the post and between the outer wall of steel pipe pile.
3. the building method of a kind of large-span steel pile tube cast-in-place support waterborne as claimed in claim 1, its step is as follows:
The first step is carried out the drilling construction of reinforced concrete foundation stake (1), 8 foundation pile holes of every gang drill (1-1), and distance between borehole is 2.5m to 5m, row-to-row distance equates, is 18m; When the reinforced concrete foundation stake is built, steel plate at the bottom of the post (12) is embedded in the end face of reinforced concrete foundation stake;
In second step, steel plate at the bottom of post (12) is gone up the steel pipe pile (2) of welded and installed, at the upper end of steel pipe pile welding capital steel plate (11), and between the outer wall of steel pipe pile (2) and steel plate at the bottom of the post 6 reinforcements of welding steel plates (10);
The 3rd step, set up the transverse distribution beam of making of two limb I56 i iron (3) at the top of every row's steel pipe pile (2), again shellfish thunder sheet (4) vertically is laid on each transverse distribution beam, each is arranged between the shellfish thunder sheet (4) and connects with shellfish thunder sheet bracing frame (5);
The 4th step laid railway sleepers on shellfish thunder sheet (6), directly set up a bowl button support (7) above the sleeper, and the model of the cast-in-situ continuous beam of being made up of the lumps of wood and template (8) (9) is installed on bowl button support.
CN201010501235A 2010-10-09 2010-10-09 Overwater large-span steel tube pile cast-in-situ trestle and building method thereof Expired - Fee Related CN101935986B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010501235A CN101935986B (en) 2010-10-09 2010-10-09 Overwater large-span steel tube pile cast-in-situ trestle and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010501235A CN101935986B (en) 2010-10-09 2010-10-09 Overwater large-span steel tube pile cast-in-situ trestle and building method thereof

Publications (2)

Publication Number Publication Date
CN101935986A CN101935986A (en) 2011-01-05
CN101935986B true CN101935986B (en) 2011-12-28

Family

ID=43389538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010501235A Expired - Fee Related CN101935986B (en) 2010-10-09 2010-10-09 Overwater large-span steel tube pile cast-in-situ trestle and building method thereof

Country Status (1)

Country Link
CN (1) CN101935986B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995561A (en) * 2011-09-19 2013-03-27 曹新恒 Universal bridge cast-in-place support
CN102367653A (en) * 2011-12-02 2012-03-07 中铁五局(集团)有限公司 Support structure for large-span continuous beam construction
CN102605717A (en) * 2012-04-09 2012-07-25 中铁七局集团郑州工程有限公司 Pier-top longitudinal support scaffolding method
CN103233425B (en) * 2013-04-20 2015-07-22 中铁十六局集团第四工程有限公司 Method for observing support cast-in-place beam preloading by utilizing reflector
CN104018429B (en) * 2014-06-26 2016-04-06 中铁十九局集团第七工程有限公司 Cantilever beam straight-line segment construction support system at soft foundation and erection method thereof
CN104195956B (en) * 2014-09-11 2016-09-07 中铁八局集团第一工程有限公司 Falsework formula waters continuous beam cast-in-place support and building method thereof
CN107191001B (en) * 2016-11-22 2019-05-03 叶香菲 Tear down and build the strengthening of foundation construction method of house foundation
CN107905109B (en) * 2017-11-21 2021-04-16 重庆建工市政交通工程有限责任公司 Equal-load simulation segmented preloading construction method for crossing type bridge cast-in-place platform
CN108999085B (en) * 2018-07-20 2020-04-21 浙江交工宏途交通建设有限公司 Construction support and construction method for sea area cast-in-place box girder
CN109797662A (en) * 2019-03-29 2019-05-24 中铁建大桥工程局集团第四工程有限公司 Long span cast-in-situ box girder crosses over high-grade highway bracket and construction method
CN112982165A (en) * 2019-12-17 2021-06-18 中交路桥建设有限公司 Construction method for assembling steel box girder of river channel
CN112095439B (en) * 2020-09-07 2022-07-12 中国建筑第八工程局有限公司 Method for constructing transportation platform between canyon tunnels and structure of transportation platform
CN115369782A (en) * 2022-08-02 2022-11-22 中铁二十五局集团第二工程有限公司 Temporary support structure and support point conversion method for high-speed rail bridge

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4750562B2 (en) * 2006-01-25 2011-08-17 大成建設株式会社 Connection structure between pile head and precast girder
CN101736692A (en) * 2008-11-20 2010-06-16 中铁十六局集团有限公司 Construction technology for passenger railway line spanning existing railway cast-in-place box beam bracket
CN101446076B (en) * 2008-12-29 2010-10-27 中铁八局集团第一工程有限公司 Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method

Also Published As

Publication number Publication date
CN101935986A (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN101935986B (en) Overwater large-span steel tube pile cast-in-situ trestle and building method thereof
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN206721894U (en) Adjustable prestress device for foundation pit support
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN208815408U (en) Sea area construction of cast-in-situ box-beam bracket
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN204112346U (en) High slope massif grid beams under complex geological condition
CN104195956B (en) Falsework formula waters continuous beam cast-in-place support and building method thereof
CN210239246U (en) Wide flat beam type assembled concrete canopy for railway platform
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN214459689U (en) Cast-in-place box girder support of weak soil foundation
CN205024600U (en) A work platform that is used for bridge aquatic pile foundation to be under construction
CN203238950U (en) Concrete beam formwork supported by trusses suspended in air
CN211621782U (en) Roof support of ultra-deep large-span circular water taking pump house
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN205917726U (en) Stake girder construction integral type tower crane foundation structure
CN108951654A (en) Different cutting depth basement construction method for supporting
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN217479961U (en) Independent few support of cross-river variable cross-section cast-in-place box girder
CN205296206U (en) Tower cane foundation
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN203741727U (en) Cast-in-place support for zero section of long cantilever of extradosed cable-stayed bridge
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee