CN101922208B - Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection - Google Patents

Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection Download PDF

Info

Publication number
CN101922208B
CN101922208B CN2009100722863A CN200910072286A CN101922208B CN 101922208 B CN101922208 B CN 101922208B CN 2009100722863 A CN2009100722863 A CN 2009100722863A CN 200910072286 A CN200910072286 A CN 200910072286A CN 101922208 B CN101922208 B CN 101922208B
Authority
CN
China
Prior art keywords
wire mesh
steel wire
cylinder
mesh cylinder
wire cloth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100722863A
Other languages
Chinese (zh)
Other versions
CN101922208A (en
Inventor
刘文清
姜洪斌
闫红缨
耿伟常
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Yuhui New Building Materials Co Ltd
Original Assignee
Heilongjiang Yuhui New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Yuhui New Building Materials Co Ltd filed Critical Heilongjiang Yuhui New Building Materials Co Ltd
Priority to CN2009100722863A priority Critical patent/CN101922208B/en
Publication of CN101922208A publication Critical patent/CN101922208A/en
Application granted granted Critical
Publication of CN101922208B publication Critical patent/CN101922208B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a steel wire mesh cylinder with a preformed hole and a method for carrying out steel bar connection. The traditional anchoring of a steel bar is carried out by using method for pre-embedding a solid mold core, which needs a large quantity of mold cores. In the invention, the steel wire mesh cylinder with the preformed hole includes a steel wire mesh cylinder (1), wherein one end of the steel wire mesh cylinder is opened while the other end is enclosed; a spiral groove (2) is arranged outside the cylinder; the steel wire mesh cylinder is provided with an air outlet hole (4) which is communicated with the inner side of the cylinder and close to the enclosed end; the steel wire mesh cylinder is provided with a grouting hole (3) which is communicated with the inner side of the cylinder and close to the opening end; and the opening of the steel wire mesh cylinder is pre-embedded outwards in the inner side of precast concretes (5). When being used, the steel wire mesh cylinder with an outward opening is pre-embedded inside the precast concretes, the steel bar is inserted into the opening end and blocked, the grouting is carried out on a grouting hole, and the air outlet hole naturally exhausts the air so as to anchor the steel bar. The invention is used for carrying out steel bar anchoring and lap joint among structural members of the precast concretes.

Description

The gauze wire cloth cylinder that has preformed hole carries out the method that reinforcing bar connects
Technical field:
The present invention relates to a kind of reinforcing bar anchoring and overlap joint method of attachment of precast concrete member, be specifically related to a kind of method that has the gauze wire cloth cylinder of preformed hole and carry out the reinforcing bar connection.
Background technology:
In precast concrete; Preformed hole grouting bar splicing method of attachment is adopted in the anchor connection of reinforcing bar more; But traditional preformed hole method adopts the pre-buried method of core rod of entity more, because number of steel bars is more in the concrete component, so need a large amount of core rods to carry out manufacturing of preformed hole; And core rod can only be after the concrete coagulation sclerosis, just can withdraw from, and will have a strong impact on the process of production like this.
Summary of the invention:
The purpose of this invention is to provide a kind of method that has the gauze wire cloth cylinder of preformed hole and carry out the reinforcing bar connection; Make and do not need a large amount of core rods and complicated mold technique, with low cost, simple to operate, the dependable performance of this gauze wire cloth cylinder preformed hole method of removing when precast concrete is manufactured.
Above-mentioned purpose realizes through following technical scheme:
The gauze wire cloth cylinder that has preformed hole; Its composition comprises: the gauze wire cloth cylinder; Described gauze wire cloth cylinder one end opening, end sealing; Its cylinder has helical groove outward, has with barrel near blind end on the described gauze wire cloth cylinder to be communicated with venthole, has with barrel near openend on the described gauze wire cloth cylinder to be communicated with grout hole.
The gauze wire cloth cylinder that has preformed hole carries out the method that reinforcing bar connects; This activities is: the gauze wire cloth cylinder that opening is outside is pre-buried inner in precast concrete, reinforcing bar is inserted openend and shutoff after, be in the milk from grout hole; Venthole nature exhaust air, thus carry out the reinforcing bar anchoring.
Beneficial effect of the present invention:
1. the gauze wire cloth cylinder preformed hole method that the present invention realized; The mold technique of removing that does not need a large amount of core rods and complicacy; Gauze wire cloth cylinder interior rough surface also is suppressed with helical groove; Further reinforcing steel bar anchor connection effect, so switching performance is reliable, characteristics are built in the construction that is suitable for the housing industrialization precast concrete again.
2. simple, the construction quality of this product processing technique is easy to guarantee that work progress does not need complicated mechanical equipment and facility, does not need power consumption yet.The job site is to do operation basically, has fully avoided all disadvantages of traditional preformed hole mode.The building course environmental protection and energy saving, reduce cost, practice thrift construction fund.
3。Accelerate construction speed, improve the construction market more than 30%.
Description of drawings:
Accompanying drawing 1 is this product sketch map.
The specific embodiment:
Embodiment 1:
The gauze wire cloth cylinder that has preformed hole; Its composition comprises: gauze wire cloth cylinder 1; The sealing of described gauze wire cloth cylinder one end opening, an end, its cylinder has helical groove 2 outward, has near blind end on the described gauze wire cloth cylinder to be communicated with venthole 4 with barrel; Have near openend on the described gauze wire cloth cylinder to be communicated with grout hole 3 with barrel, described gauze wire cloth cylinder opening is outwards pre-buried in the inside of precast concrete 5.
Embodiment 2:
The gauze wire cloth cylinder that has preformed hole carries out the method that reinforcing bar connects; This activities is: the gauze wire cloth cylinder that opening is outside is pre-buried inner in precast concrete, reinforcing bar is inserted openend and shutoff after, be in the milk from grout hole; Venthole nature exhaust air, thus carry out the reinforcing bar anchoring.

Claims (1)

1. a kind of gauze wire cloth cylinder that has preformed hole carries out the method that reinforcing bar connects, and it is characterized in that: do not need the mold technique of removing of a large amount of core rods and complicacy, gauze wire cloth cylinder one end opening, end sealing; Its cylinder has helical groove outward; Have with barrel near blind end on the described gauze wire cloth cylinder to be communicated with venthole, have with barrel near openend on the described gauze wire cloth cylinder to be communicated with grout hole, the gauze wire cloth cylinder that opening is outside is pre-buried inner in precast concrete; After reinforcing bar inserted openend and shutoff; Be in the milk from grout hole, venthole nature exhaust air, thus carry out the reinforcing bar anchoring.
CN2009100722863A 2009-06-15 2009-06-15 Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection Active CN101922208B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100722863A CN101922208B (en) 2009-06-15 2009-06-15 Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100722863A CN101922208B (en) 2009-06-15 2009-06-15 Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection

Publications (2)

Publication Number Publication Date
CN101922208A CN101922208A (en) 2010-12-22
CN101922208B true CN101922208B (en) 2012-05-16

Family

ID=43337393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100722863A Active CN101922208B (en) 2009-06-15 2009-06-15 Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection

Country Status (1)

Country Link
CN (1) CN101922208B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900201B (en) * 2012-10-22 2015-07-08 沈阳建筑大学 Manufacture mold and manufacture method of grouting anchor reinforced bar connection sleeve

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2192210A (en) * 1986-06-26 1988-01-06 Tadashi Kadota Splice sleeve for reinforcing bars
EP0445377A1 (en) * 1990-03-05 1991-09-11 Kensetsu-Kiso Engineering Co., Ltd. Structure of anchor and construction method thereof
US5366672A (en) * 1993-03-18 1994-11-22 Erico International Corporation Method of forming concrete structures with a grout splice sleeve which has a threaded connection to a reinforcing bar
CN1455062A (en) * 2002-05-02 2003-11-12 东拓工业株式会社 Casing pipe with exhaust port
CN201217890Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Nested grouting reinforced steel coupling sleeve
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2192210A (en) * 1986-06-26 1988-01-06 Tadashi Kadota Splice sleeve for reinforcing bars
EP0445377A1 (en) * 1990-03-05 1991-09-11 Kensetsu-Kiso Engineering Co., Ltd. Structure of anchor and construction method thereof
US5366672A (en) * 1993-03-18 1994-11-22 Erico International Corporation Method of forming concrete structures with a grout splice sleeve which has a threaded connection to a reinforcing bar
CN1455062A (en) * 2002-05-02 2003-11-12 东拓工业株式会社 Casing pipe with exhaust port
CN201217890Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Nested grouting reinforced steel coupling sleeve
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component

Also Published As

Publication number Publication date
CN101922208A (en) 2010-12-22

Similar Documents

Publication Publication Date Title
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN2773312Y (en) Assembled slip-casting roofbolt
CN204551547U (en) Outer wall of basement vertical ater-casting plugging device
CN103614998B (en) Inwall pouring concrete based on diaphragm wall is inverse makes method
CN206780664U (en) A kind of cement mixing device for building
CN202391115U (en) Construction device taking air bag as foundation preformed hole
CN101812882A (en) Concrete shear wall with once-molded filling wall and manufacturing method thereof
CN101922208B (en) Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection
CN201292529Y (en) Mixing anchor rod
CN101812900A (en) Reinforced mortar pipe with reserved hole and method for steel bar connection
CN102928273A (en) Raw coal sample making method
CN204278207U (en) Concrete tubular pile material filling system
CN203188250U (en) Basement exterior wall post-cast strip construction structure
CN206173983U (en) Building foundation water -blocking weir
CN201362961Y (en) Split-type opposite-drawing screw rod
CN203145028U (en) Corrugated pipe water-collecting well
CN201460036U (en) Finned mortar pipe with preformed holes
CN203160704U (en) Hopper for pouring concrete
CN101037003B (en) Method and device for forecasting concrete anti-leaking U-shaped groove by using permeability formwork gasket
CN208950312U (en) A kind of reusable shuttering supporting component
CN204252337U (en) Assembled architecture wall body construction
CN205348170U (en) In dig method prestressed concrete pipe pile
CN203045951U (en) Prefabricated concrete cable working well mold
CN201169853Y (en) Integral hollow tube
CN102248591B (en) Prestressing pile tip prefabrication pouring mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Steel wire mesh cylinder with preformed hole and method for carrying out steel bar connection

Effective date of registration: 20150216

Granted publication date: 20120516

Pledgee: The Bank of Jinzhou Limited by Share Ltd Harbin Qunli branch

Pledgor: Heilongjiang Yuhui New Building Materials Co., Ltd.

Registration number: 2015230000003

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160905

Granted publication date: 20120516

Pledgee: The Bank of Jinzhou Limited by Share Ltd Harbin Qunli branch

Pledgor: Heilongjiang Yuhui New Building Materials Co., Ltd.

Registration number: 2015230000003

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model