CN101906878A - Material-distributing mechanism fixed on tower crane - Google Patents

Material-distributing mechanism fixed on tower crane Download PDF

Info

Publication number
CN101906878A
CN101906878A CN 201010236758 CN201010236758A CN101906878A CN 101906878 A CN101906878 A CN 101906878A CN 201010236758 CN201010236758 CN 201010236758 CN 201010236758 A CN201010236758 A CN 201010236758A CN 101906878 A CN101906878 A CN 101906878A
Authority
CN
China
Prior art keywords
pipe
cement paste
steel pipe
reel
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010236758
Other languages
Chinese (zh)
Other versions
CN101906878B (en
Inventor
曹光斗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG TRIOCIRCLE MACHINERY Corp
Original Assignee
SHENYANG TRIOCIRCLE MACHINERY Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG TRIOCIRCLE MACHINERY Corp filed Critical SHENYANG TRIOCIRCLE MACHINERY Corp
Priority to CN2010102367587A priority Critical patent/CN101906878B/en
Publication of CN101906878A publication Critical patent/CN101906878A/en
Application granted granted Critical
Publication of CN101906878B publication Critical patent/CN101906878B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a material-distributing mechanism fixed on a tower crane, which comprises a cement paste pump station device and a tower crane provided with a tower body, an up/down rotator, a counterweight arm, a lift arm and a hook trolley. The material-distributing mechanism is characterized in that a cement paste transfer steel pipe is fixed on a standard node main beam of the tower body and penetrates through the up/down rotator provided with a rotating joint; the counterweight arm is assembled with a reel device; a rotating joint is arranged in the position where the cement paste transfer steel pipe penetrates through the reel device; a reel of the reel device is wound by a transfer rubber pipe which is connected with the cement paste transfer steel pipe at the initial reel winding position; the lift arm and the counterweight arm are assembled with tracks; a plurality of pipe carriers are assembled on the tracks on both sides through the walking trolleys; pipe carrier wheels are arranged on the pipe carriers, and the transfer rubber pipe is arranged on the pipe carrier wheels; a movable trolley is assembled on the tracks of the hook trolley of the lift arm through trolley wheels; the movable trolley is provided with driving wheels, driven wheels and an electric motor; the driving wheels are connected with the electric motor; the transfer rubber pipe connected with an irrigating head is assembled between the driving wheels and the driven wheels in a penetration mode; and the hook trolley is connected with the movable trolley. The material-distributing mechanism has the advantages of high irrigating speed, thereby improving the working efficiency, reducing the labor intensity and greatly saving the cost.

Description

Be fixed on the material-feeding mechanism on the tower machine
Technical field
The invention belongs to a kind of construction project cement that is used for and carry and the equipment that waters, particularly a kind of material-feeding mechanism that is fixed on the tower machine can realize that cement is carried and pouring is once finished, and significantly improves operating efficiency, reduces equipment cost and labour intensity.
Background technology
Existing cement is carried and is watered generally in the following ways in construction project:
1, the hopper that cement slurry will be housed with crane hangs on the work plane, carries out the final grouting operation again, and this process has two steps: (1) is done the cement slurry suspension bucket of packing into lifting and is transported.(2) pouring.Each process all has the long period, and the weight of hanging is restricted.The speed of hanging is slow, and irrigation amount can not be well controlled.
2, the existing pouring mode main equipment that can also adopt special grouting car or have a cloth arm is realized.This car or equipment are to water cement slurry specially, its cost height, the height-limited system of pouring.
Summary of the invention
The purpose of this invention is to provide a kind of material-feeding mechanism that is fixed on the tower machine, with tower machine and movably cement carrier pipe combination, realize that water head reaches the place that will water and finishes direct pouring, water velocity is fast, the casting amount is controlled by pump, valve, significantly saves and carries the cloth cost, increases work efficiency, reduce labour intensity
The objective of the invention is to be achieved through the following technical solutions: it comprises the tower machine that is provided with body of the tower, goes up turning down, weight arm, boom and suspension hook dolly, the cement slurrypump station equipment, it is characterized in that: the cement paste conveying steel pipe is fixed on the body of the tower standard knot girder, the cement paste conveying steel pipe passes turning down, and in the last turn swivel joint is set; Assemble roll device on weight arm, the cement paste conveying steel pipe is provided with swivel joint entering the roll device place; Twine conveying rubber pipe on the reel of roll device, conveying rubber pipe twines the initial place at reel and is connected with the cement paste conveying steel pipe; Assemble track on boom, weight arm, several pipe carriers are assembled on two siding tracks by the steamboat of walking, and pipe carrier is provided with the conduit saddle wheel, and conveying rubber pipe is arranged on the conduit saddle wheel; Travelling car is contained in by the dolly set of wheels on the track of suspension hook dolly of boom, is provided with driving wheel, follower and motor on travelling car, the driving wheel motor that is in transmission connection, and the conveying rubber pipe that connects water head is installed between driving wheel and the follower; The suspension hook dolly connects travelling car.
Advantage of the present invention:
1, the improved pouring mode of the present invention is directly to carry cement slurry with carrier pipe on improved tower machine, directly utilize the revolution of the moving forward and backward of tower machine hook dolly, tower machine and the flexible water head that makes of carrier pipe to be poured onto on the engineering work planes all in the tower machine working diameter scope, not only water velocity is fast, and the casting amount can also be controlled by pump, valve.This mode has improved operating efficiency, has reduced labour intensity, can also be installed in vibrating spear on the water head in case of necessity and realize that pouring is vibrated and once finish.
2, the present invention replaces the effect of the car that is in the milk, in construction project pouring can be along with the lifting of tower machine hoisting depth, highly unrestricted, because the tower machine is an imperative equipment in the construction project, on the tower machine, increase and carry the cloth function, then saved cost greatly, improved operating efficiency, the labour intensity that fallen Go-to-and-fro.
Description of drawings
Fig. 1: be fixed on the material-feeding mechanism overall structure figure on the tower machine.
Fig. 2: conveying steel pipe scheme of installation from cement slurry to tower machine upper that carry.
Fig. 3: Wavy metal pipe schematic diagram.
Fig. 4: the swivel joint scheme of installation on the tower machine in the turning down.
Fig. 5: roll device structure chart.
Fig. 6: pipe carrier and riding wheel structure figure.
Fig. 7: travelling car structure chart.
Fig. 8: travelling car structure sectional view.
The specific embodiment
See Fig. 1-3, concrete structure of the present invention is as follows: the unit cement paste conveying steel pipe 3 usefulness clamps 16 that length and body of the tower standard knot 2 is highly consistent (the promptly general fixed connecting piece that uses) are fixed on the body of the tower mark joint girder 4, and a plurality of unit cement paste conveying steel pipe 3 is coupled together up and down by flange 17.Every one section corrugated metal pipe (see figure 3) that can be provided with certain stroke, conveying steel pipe 3 is connected with flange 17 with corrugated metal pipe.See Fig. 4, the last turning down 5 of body of the tower is provided with revolution 18 and turning down 19, between last revolution 18 and the turning down 19 pivoting support 20 is set, conveying steel pipe 3 passes turning down 5, and conveying steel pipe 3 is provided with swivel joint 6 (swivel joint adopts existing product structure) in the last turn; Conveying steel pipe 3 lower ends connect cement slurrypump station equipment 1,
See Fig. 5, by bearing 22 assembling roll devices 14, twine high pressure resistant wear-resisting cement paste conveying rubber pipe 15 on the reel of roll device 14 on weight arm 13, conveying rubber pipe 15 twines the initial place at reel and is connected with cement paste conveying steel pipe 3; Cement paste conveying steel pipe 3 is provided with swivel joint 21 (swivel joint adopts existing product structure) entering roll device 14 places; When tower machine rotary work, transfer pipeline is relatively rotated, can guarantee that cement paste normally carries.The inside of roll device 14 assembling brake holding motor 23 and reductor 24, reductor 24 be by the shaft coupling 27 change-speed gearing group 26 that is in transmission connection, change-speed gearing group 26 gyration gear ring 25 that is in transmission connection, and gyration gear ring 25 connects the reel of roll devices 14.During work, motor 23 rotates and drives 26 rotations of change-speed gearing group, and change-speed gearing group 26 drives gyration gear rings 25 and rotates, and gyration gear ring 25 drives reel and rotates, and makes conveying rubber pipe 15 realizations that are wrapped on the reel pull out or regain.
See Fig. 6, in the bottom of boom 12, weight arm 13 two siding tracks 8 are set, several pipe carriers 29 are assembled with on the steamboat 28 of walking on two siding tracks 8, assembling conduit saddle wheel 30 on pipe carrier 29, and conveying rubber pipe 15 is arranged on the conduit saddle wheel 30.29 of pipe carrier 29 and pipe carriers pass through flexible steel cable or collapsible rod (prior art structure, not shown) connects, and be at regular intervals during expansion.Pipe carrier 29 is advanced on the track 8 of the left and right sides by steamboat 28, and conveying rubber pipe 15 is supported by conduit saddle wheel 30 and advances in the above.
See Fig. 7, travelling car 9 is assembled in by wheel 34 on the track of boom hook dolly 11, and travelling car is provided with two driving wheels 31, three followers 32 and motors 36, motor 36 two driving wheels 31 that are in transmission connection.The conveying rubber pipe 15 that connects water head 10 is installed between driving wheel 31 and the follower 32.Suspension hook dolly 11 connects travelling car 9 by hook mechanism 33, and pulling travelling car 9 moves ahead.Travelling car 9 is by flexible steel wire or collapsible rod (prior art structure, not shown) tube connector carriage 29.Thereby pulling pipe carrier 29 moves, conveying rubber pipe 15 also can be along with travelling car 9 and pipe carrier 29 advance like this, move after when suspension hook dolly 11 is mobile backward, also can driving travelling car 9, and make 29 1 of pipe carriers push away one moving backward, unnecessary pipe carrier 29 is concentrated on the track 8 of both sides, roll device 14 back, make conveying rubber pipe 15 realize moving forward and backward.Also can make clamping device main, follower drive conveying rubber pipe 15 when travelling car 9 is motionless realizes moving up and down.
Operating principle: ground pump station equipment 1 is transported to cement slurry in the cement paste conveying steel pipe 3, enter conveying rubber pipe 15 then, utilize travelling car 9 on the tower machine boom move forward and backward and front and back that clamping device main, follower drives conveying rubber pipe 15 move up and down.Be that suspension hook dolly 11 drive travelling cars 9 move ahead, when conveying rubber pipe 15 moves forward thereupon, travelling car 9 pulling pipe carriers 29 move, conveying rubber pipe 15 also can be along with travelling car 9 and pipe carrier 29 advance like this, move after when suspension hook dolly 11 is mobile backward, also can driving travelling car 9, and make 29 1 of pipe carriers push away one moving backward, make conveying rubber pipe 15 realize moving forward and backward.When travelling car 9 is motionless, can drives conveying rubber pipe 15 by the clamping device of master, follower and move up and down.The operation that travelling car 9 front and back are moved up and down can be controlled in drivers' cab 7, also can control with remote control mode on the work plane of pouring.On water head 10, can install vibrating spear additional, finish the work of vibrating simultaneously.

Claims (5)

1. material-feeding mechanism that is fixed on the tower machine, it comprises the tower machine that is provided with body of the tower, goes up turning down, weight arm, boom and suspension hook dolly, the cement slurrypump station equipment, it is characterized in that: the cement paste conveying steel pipe is fixed on the body of the tower standard knot girder, the cement paste conveying steel pipe passes turning down, and in the last turn swivel joint is set; Assemble roll device on weight arm, the cement paste conveying steel pipe is provided with swivel joint entering the roll device place; Twine conveying rubber pipe on the reel of roll device, conveying rubber pipe twines the initial place at reel and is connected with the cement paste conveying steel pipe; Assemble track on boom, weight arm, several pipe carriers are assembled on two siding tracks by the steamboat of walking, and pipe carrier is provided with the conduit saddle wheel, and conveying rubber pipe is arranged on the conduit saddle wheel; Travelling car is contained in by the dolly set of wheels on the track of suspension hook dolly of boom, is provided with driving wheel, follower and motor on travelling car, the driving wheel motor that is in transmission connection, and the conveying rubber pipe that connects water head is installed between driving wheel and the follower; The suspension hook dolly connects travelling car.
2. the material-feeding mechanism that is fixed on the tower machine according to claim 1 is characterized in that: the inside of roll device assembling brake holding motor and speed reducer, the reductor change-speed gearing group that is in transmission connection, the change-speed gearing group gyration gear ring that is in transmission connection, gyration gear ring connects reel.
3. the material-feeding mechanism that is fixed on the tower machine according to claim 1 is characterized in that: the cement paste conveying steel pipe is provided with corrugated metal pipe every one section.
4. the material-feeding mechanism that is fixed on the tower machine according to claim 1 is characterized in that: connect by flexible steel cable or collapsible rod between travelling car and the pipe carrier, between each pipe carrier.
5. the material-feeding mechanism that is fixed on the tower machine according to claim 1 is characterized in that: install vibrating spear additional on the pouring tube head.
CN2010102367587A 2010-07-27 2010-07-27 Material-distributing mechanism fixed on tower crane Expired - Fee Related CN101906878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102367587A CN101906878B (en) 2010-07-27 2010-07-27 Material-distributing mechanism fixed on tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102367587A CN101906878B (en) 2010-07-27 2010-07-27 Material-distributing mechanism fixed on tower crane

Publications (2)

Publication Number Publication Date
CN101906878A true CN101906878A (en) 2010-12-08
CN101906878B CN101906878B (en) 2012-04-18

Family

ID=43262450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102367587A Expired - Fee Related CN101906878B (en) 2010-07-27 2010-07-27 Material-distributing mechanism fixed on tower crane

Country Status (1)

Country Link
CN (1) CN101906878B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352692A (en) * 2011-11-07 2012-02-15 中联重科股份有限公司 Concrete pouring equipment and concrete distributing device thereof
CN102815422A (en) * 2012-09-20 2012-12-12 德清县后坞药用材料厂 Automatic drum filling machine
CN103010966A (en) * 2012-12-14 2013-04-03 中国长江三峡集团公司 Multi-functional material conveying, distributing and hoisting equipment
CN104675179A (en) * 2015-03-02 2015-06-03 山东省路桥集团有限公司 Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN107097350A (en) * 2017-06-16 2017-08-29 无锡石油化工起重机有限公司 Possesses the crane device of high-altitude cement mixing function
CN108275579A (en) * 2018-01-31 2018-07-13 中铁隧道集团二处有限公司 Pipeline fast dismounting device in a kind of tunnel
CN114908975A (en) * 2022-05-31 2022-08-16 湖州众驰建材有限公司 Safe conveying device for concrete pouring

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2426870Y (en) * 2000-04-14 2001-04-18 中国建筑科学研究院建筑机械化研究分院 Lifting and distributing two-purpose tower crane
DE19952977A1 (en) * 1999-11-03 2001-05-10 Hudelmaier Joerg Liquid concrete delivery system has a device for measurement of concrete properties, such as density, and then adjustment of the properties to ensure the highest quality concrete is output
CN101338597A (en) * 2008-08-08 2009-01-07 郑州市第一建筑工程集团有限公司 Particle diameter selecting pouring procedure of concrete aggregate for thermal insulation wall
CN201747068U (en) * 2010-07-27 2011-02-16 沈阳三环机械厂 Distributing mechanism fixed on tower crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19952977A1 (en) * 1999-11-03 2001-05-10 Hudelmaier Joerg Liquid concrete delivery system has a device for measurement of concrete properties, such as density, and then adjustment of the properties to ensure the highest quality concrete is output
CN2426870Y (en) * 2000-04-14 2001-04-18 中国建筑科学研究院建筑机械化研究分院 Lifting and distributing two-purpose tower crane
CN101338597A (en) * 2008-08-08 2009-01-07 郑州市第一建筑工程集团有限公司 Particle diameter selecting pouring procedure of concrete aggregate for thermal insulation wall
CN201747068U (en) * 2010-07-27 2011-02-16 沈阳三环机械厂 Distributing mechanism fixed on tower crane

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352692A (en) * 2011-11-07 2012-02-15 中联重科股份有限公司 Concrete pouring equipment and concrete distributing device thereof
CN102352692B (en) * 2011-11-07 2013-06-19 中联重科股份有限公司 Concrete pouring equipment and concrete distributing device thereof
CN102815422A (en) * 2012-09-20 2012-12-12 德清县后坞药用材料厂 Automatic drum filling machine
CN103010966A (en) * 2012-12-14 2013-04-03 中国长江三峡集团公司 Multi-functional material conveying, distributing and hoisting equipment
CN103010966B (en) * 2012-12-14 2015-03-25 中国长江三峡集团公司 Multi-functional material conveying, distributing and hoisting equipment
CN104675179A (en) * 2015-03-02 2015-06-03 山东省路桥集团有限公司 Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN104675179B (en) * 2015-03-02 2016-11-16 山东省路桥集团有限公司 Jack up head tower installation hanger device and head tower construction method
CN107097350A (en) * 2017-06-16 2017-08-29 无锡石油化工起重机有限公司 Possesses the crane device of high-altitude cement mixing function
CN108275579A (en) * 2018-01-31 2018-07-13 中铁隧道集团二处有限公司 Pipeline fast dismounting device in a kind of tunnel
CN108275579B (en) * 2018-01-31 2024-04-02 中铁隧道集团二处有限公司 Quick dismantling device for pipeline in tunnel
CN114908975A (en) * 2022-05-31 2022-08-16 湖州众驰建材有限公司 Safe conveying device for concrete pouring

Also Published As

Publication number Publication date
CN101906878B (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN101906878B (en) Material-distributing mechanism fixed on tower crane
CN202808094U (en) Mining cable reel
CN106194060B (en) A kind of Cabon-fibre continuous sucker rod operating vehicles
CN103790114A (en) Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN105084218A (en) Pipeline construction straddle carrier and straddling method
CN105347188A (en) Traction type arch-bridge crane of crane carriage
CN107377550A (en) A kind of automated cleaning equipment of Rocket tank structure
CN207415657U (en) A kind of distribution device
CN108002229A (en) A kind of low clearance box culvert part loop wheel machine with turn over function
CN102359383A (en) Waterproof cloth laying trolley
CN201747068U (en) Distributing mechanism fixed on tower crane
CN106593327A (en) Taking-out and placing-in device used for carbon fiber continuous oil-sucking rod
CN201882805U (en) Underground self-moving type multifunctional assembling machine
CN202881952U (en) Automatic walking type drawbench
CN210599011U (en) Tunnel secondary lining vault pouring construction device
CN203394063U (en) Concrete spreader attached to tower crane
CN203728439U (en) Walking gantry crane
CN102817611A (en) Suspension type tunneling frontal dust removal device
CN203112386U (en) Tower type truss mounting structure without assistance of high altitude hoisting equipment
CN203404486U (en) Hydraulic pipeline installation machine
CN206468895U (en) A kind of conduit jacking
CN212425253U (en) Hoisting device for installing steel plate warehouse
CN108617475A (en) A kind of liquid automation spray casting machine
CN207469105U (en) A kind of hose suspention control system being fixed on Hanging Basket horizontal-associate
CN201264871Y (en) Hydraulic driven overhead travelling crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20210727

CF01 Termination of patent right due to non-payment of annual fee