CN101899827B - 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法 - Google Patents

乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法 Download PDF

Info

Publication number
CN101899827B
CN101899827B CN200910099163.9A CN200910099163A CN101899827B CN 101899827 B CN101899827 B CN 101899827B CN 200910099163 A CN200910099163 A CN 200910099163A CN 101899827 B CN101899827 B CN 101899827B
Authority
CN
China
Prior art keywords
immersed tube
pipe
foundation
pile
vibration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200910099163.9A
Other languages
English (en)
Other versions
CN101899827A (zh
Inventor
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nanlian Base Foundation Engineering Co., Ltd.
Original Assignee
严平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 严平 filed Critical 严平
Priority to CN200910099163.9A priority Critical patent/CN101899827B/zh
Publication of CN101899827A publication Critical patent/CN101899827A/zh
Application granted granted Critical
Publication of CN101899827B publication Critical patent/CN101899827B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明是一种针对土木工程中常见的乱堆石填土地基进行浅层和深层地基处理的方法。该方法是利用开发的沉管内带冲击锤破碎土振动挤扩桩机,利用管头的特殊构造,在遇地基中大块石等障碍无法振动冲击沉管时,启动管内自由落体冲击锤对块石进行冲击破碎,同时结合沉管振动锤的振动与冲击再次对块石进行破碎和挤扩;必要时在沉管中填入砼、碎石、砂、炉渣等,对填土地基的浅层和深层进行冲击、挤扩和挤密处理。也可根据需要在沉管过程中进行灌浆等加固处理;对要进行填土下卧层处理的地基,可直接施工工程桩,也可采用高压注浆或旋喷桩对软下卧层进行加固,以满足各种工程对地基的要求。

Description

乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法
技术领域
本发明涉及一种用于乱堆石填土地基处理技术——沉管内冲击锤破碎土振动挤密地基处理方法。这种技术主要针对开山填沟、开山填海(湖、河)形成的乱堆石填土地基的处理,为在此类地基上改造道桥、水利、市政管道及工业与民用建筑等工程项目时,提供了一种地基的处理方法。
背景技术
在如道桥工程、水利工程、市政管线工程、工业与民用建筑工程等土木工程建设中,根据需要常进行开山填沟、开山填海、填湖填河施工,由此形成了这类乱堆石填土地基。这种乱堆石填土地基的特点是:
1、填土层由颗粒大小很不均匀的乱石组成,颗粒的大小很不均匀,大的有直径超过1~2m的巨石;
2、填土层颗粒的排列骨架很不均匀,存在着很大的空隙及不稳定性,在外力下易产生颗粒重新排列而产生局部的塌陷;
3、填土层的厚薄和埋深及分布很不均匀,薄浅处是基岩外露,厚处可达几十米;
4、填土层下常有软下卧层,尤其是填湖海工程,地基在填土层作用下还处于下沉状态,变形远未达稳定。
由于这类乱堆石填土地基的颗粒及分布极不均匀,现行的各种桩型几乎无法穿越成桩,而唯一的冲抓成孔桩也存在成桩困难、施工速度慢、造价高等缺点。此外处理这类填土现行的强夯法和灌浆法由于其处理深度有限,而且无法解决软下卧层的强度、变形和稳定问题而受限制。因此如何处理好这类乱堆石填土地基,使在这类地基上安全的建造各类土木工程项目是目前岩土工程界的难题。
发明内容
本发明针对土木工程中常见的乱堆石填土地基,开发出一种能对其进行浅层和深层地基处理的技术,这种地基处理方法是利用开发的沉管内带冲击锤破碎土振动挤扩桩机,采用冲击锤破碎土结合沉管头振动挤扩和二次破碎方法,可以对乱堆石填土地基根据工程需要进行深层和浅层挤密置换地基处理,也可穿越乱堆石填土层进入设计持力层形成工程桩,使满足在此类地基上建造各种土木工程项目对地基基础的要求。
一种管内冲击锤破碎土振动挤扩沉管地基处理方法,使用振动沉管桩机加固地基时,利用管内冲击锤的冲击破碎和冲击锤带动沉管下沉的挤扩挤密作用,同时开动振动锤使沉管向下冲击与振动,达到对乱堆石填土层浅层和深层的加固目的;
振动沉管桩机上装备有振动锤和可以穿越振动锤进入管内的冲击锤;冲击锤为变直径台阶圆柱体,沉管头的内部有锤击管壁带动管下沉的凸加厚边缘,沉管头外有外凸曲线状的沉管冲击及振动挤扩头。
在设施的沉管过程中,在沉管内灌入碎石、砂或炉渣,利用管内锤的夯击作用对土层进行挤密充填,振动拔管后形成柔性桩复合地基。
在设施的沉管过程中,在沉管内灌入干硬性砼,利用管内锤的夯击作用对土层进行挤密充填,沉管到设计标高后,灌入砼,振动拔管后形成刚性桩复合地基。
在设施的沉管过程中,在管内灌砂冲水,对乱堆石填土层的空隙进行挤填,并进行灌水泥浆作业,对乱堆石填土层进行浅层和深层的注浆加固处理。
在设施的沉管过程中穿越填土层,进入设计要求的持力层,放入钢筋笼,灌入砼,振动拔管形成工程桩,作为建造在这类填土地基上工程项目的桩基础;或在沉管内灌入干硬性砼,利用管内锤的夯击沉管进入持力层并进行扩桩头,然后放入钢筋笼和灌入砼后上拔成为带扩头的刚性桩。
在设施的沉管穿越乱堆石填土层后,对填土层下的软下卧层进行压力注浆和旋喷桩加固,然后在沉管内灌入碎石、砂或炉渣,利用管内锤的夯击作用对土层进行挤密充填,振动拔管后形成柔性桩复合地基;也可以根据需要在沉管内灌入干硬性砼,利用管内锤的夯击作用对土层进行挤密充填,沉管到设计标高后,灌入砼,振动拔管后形成刚性桩复合地基;还可以在管内灌砂冲水,对乱堆石填土层的空隙进行挤填,并进行灌水泥浆作用,对乱堆石填土层进行浅层和深层的注浆加固处理,形成复合地基;
或在桩管内放入旋喷管后灌入砂石,在软卧层旋喷加固处理后,边拔沉管边旋喷至地面,形成全程旋喷桩的加固复合地基。
本发明解决其技术问题采用的技术方案
本发明解决其技术问题采用的技术方案是利用开发的沉管内带冲击锤破碎土振动挤扩桩机,利用管头的特殊构造,在遇地基中大块石等障碍无法振动冲击沉管时,启动管内自由落体冲击锤对块石进行冲击破碎,同时结合沉管振动锤的振动与冲击再次对块石进行破碎和挤扩;必要时在沉管中填入砼、碎石、砂、炉渣等,对填土地基的浅层和深层进行冲击、挤扩和挤密处理。也可根据需要在沉管过程中进行灌浆等加固处理;对要进行填土下卧层处理的地基,可直接施工工程桩,以满足各种工程对地基的要求。
附图说明
附图1:沉管振动锤与冲击锤及挤扩头的构造简图;
附图2:沉管破碎土挤扩挤密地基处理原理示意;
附图3:乱堆石填土层浅层和深层的柔性桩处理示意图;
附图4:乱堆石填土层浅层和深层的刚性桩处理示意图;
附图5:乱堆石填土层浅层和深层的高压注浆处理示意图;
附图6:穿过乱堆石填土层的刚性桩基础;
附图7:穿过乱堆石填土层对软下卧层进行高压注浆或旋喷桩加固形成的复合地基。
图中:1——桩沉管;2——沉管挤扩头;3——管内冲击锤;4——沉管振动锤;5——挤扩头侧向破碎合金凸出刀头;6——冲击锤头合金破碎刀头;7——沉管头破碎合金刀头。
具体实施方式
根据乱堆石填土层的厚度,填土下卧层的土性,以及建造在这类地基上土木工程项目对地基的要求,对此类乱堆石填土地基的处理可分为对填土层本身的处理和填土层下软下卧层的处理两个部分。根据建造的工程对这类乱堆石填土地基的要求,本发明方法对此类填土层的处理可有如下实施方式:
1、按桩位网格状平面布置,采用管内锤冲击振动沉管的挤扩挤密作用,使乱堆块石堆叠结构进行错位挤密。其中管内锤的冲击起到破碎大块石使管下沉和对地基的夯击挤密作用,振动锤带动沉管的振动与冲击起到对块石二次破碎挤扩和挤密作用,如此相结合可对此类填土层进行浅层和深层的挤密处理;
2、在上述“1”沉管挤密作用的同时,在沉管中投入碎石、砂或炉渣等,利用管内锤的夯击对填土层进行挤填作用,振动拔管后形成碎石桩、砂桩或炉渣桩等柔性桩复合地基:
3、在上述“1”沉管挤密作用的同时,在沉管内先投入干硬性砼,同样利用管内锤的夯击对填土层进行挤填。沉管到设计标高后灌入砼(必要时可放入钢筋笼)振动上拔形成刚性桩复合地基;
4、在上述“1”沉管挤密作用的同时,在管内灌砂冲水,对乱堆石空隙进行挤填,并可根据需要进行灌水泥浆作业,对乱填石地基进行注浆加固处理。
上述对乱堆石填土层的加固深度和加固程度可根据工程项目对地基的要求综合考虑采用。对填土层以下存在软下卧层的状态,根据工程项目对地基的要求,可采用如下处理方法:
1、采用管内锤冲击破碎土振动挤扩沉管穿过填土层后,直接振动沉管进入持力层,放入钢筋笼,灌入砼,振动上拔后形成工程桩,作为建造工程项目的桩基础。在穿过填土层后也可在管内灌入干硬性砼,利用管内锤夯击带动沉管进入持力层,并夯击扩桩头,然后放钢筋笼,灌砼后拔管形成带扩头的桩基础,使桩承载力大幅提高;
2、可按设计要求部分沉管穿过填土层,按上述“1”要求成桩,使这些桩起到控制沉降作用,与已处理过的填土层形成刚性长桩控制沉降的复合地基,满足工程项目对地基的要求;
3、沉管穿过填土层后,可对软下卧层进行高压注浆和旋喷桩加固,以满足工程项目对地基的要求,然后灌入碎石、砂、炉渣或砼、或灌砂注水泥浆拔管形成复合地基;也可在桩管内放入旋喷管后灌入砂石,在软卧层旋喷加固处理后,边拔沉管边旋喷至地面,形成全程旋喷桩的加固复合地基。
除上述实施方式之外,本发明还可以有其它的实施方式,凡采用等同替换或等效形式的技术方案,均落在本发明要求保护范围。

Claims (6)

1.一种管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:使用振动沉管桩机加固地基时,利用管内冲击锤的冲击破碎和冲击锤带动沉管下沉的挤扩挤密作用,同时开动振动锤使沉管向下冲击与振动,达到对乱堆石填土层浅层和深层的加固目的;
所述的振动沉管桩机上装备有振动锤和可以穿越振动锤进入管内的冲击锤;冲击锤为变直径台阶圆柱体,沉管头的内部有锤击管壁带动管下沉的凸加厚边缘,沉管头外有外凸曲线状的沉管冲击及振动挤扩头。
2.根据权利要求1所述的管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:在权利要求1设施的沉管过程中,在沉管内灌入碎石、砂或炉渣,利用管内锤的夯击作用对土层进行挤密充填,振动拔管后形成柔性桩复合地基。
3.根据权利要求1所述的管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:在权利要求1设施的沉管过程中,在沉管内灌入干硬性砼,利用管内锤的夯击作用对土层进行挤密充填,沉管到设计标高后,灌入砼,振动拔管后形成刚性桩复合地基。
4.根据权利要求1所述的管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:在权利要求1设施的沉管过程中,在管内灌砂冲水,对乱堆石填土层的空隙进行挤填,并进行灌水泥浆作业,对乱堆石填土层进行浅层和深层的注浆加固处理。
5.根据权利要求1所述的管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:在权利要求1设施的沉管过程中穿越填土层,进入设计要求的持力层,放入钢筋笼,灌入砼,振动拔管形成工程桩,作为建造在这类填土地基上工程项目的桩基础;或在沉管内灌入干硬性砼,利用管内锤的夯击沉管进入持力层并进行扩桩头,然后放入钢筋笼和灌入砼后上拔成为带扩头的刚性桩。
6.根据权利要求1所述的管内冲击锤破碎土振动挤扩沉管地基处理方法,其特征是:在权利要求1设施的沉管穿越乱堆石填土层后,对填土层下的软下卧层进行压力注浆和旋喷桩加固,然后按权利要求2、3或4的方法拔管形成复合地基;或在桩管内放入旋喷管后灌入砂石,在软卧层旋喷加固处理后,边拔沉管边旋喷至地面,形成全程旋喷桩的加固复合地基。
CN200910099163.9A 2009-06-01 2009-06-01 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法 Expired - Fee Related CN101899827B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910099163.9A CN101899827B (zh) 2009-06-01 2009-06-01 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910099163.9A CN101899827B (zh) 2009-06-01 2009-06-01 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法

Publications (2)

Publication Number Publication Date
CN101899827A CN101899827A (zh) 2010-12-01
CN101899827B true CN101899827B (zh) 2014-04-16

Family

ID=43225714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910099163.9A Expired - Fee Related CN101899827B (zh) 2009-06-01 2009-06-01 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法

Country Status (1)

Country Link
CN (1) CN101899827B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321203B (zh) * 2013-07-03 2016-05-04 李华伟 锥形夯锤强力冲扩桩法
CN105239567B (zh) * 2015-10-26 2017-01-25 高佰明 一种局部振动高压喷射搅拌桩机
CN112359815A (zh) * 2020-11-05 2021-02-12 浙江世润建创科技发展有限公司 用于软基处理的干式振冲碎石桩及其施工方法
CN113756288A (zh) * 2021-09-05 2021-12-07 华邦建投集团股份有限公司 一种钢管桩浅覆盖层入岩生根或深覆盖层孤石穿越工法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1039645A (en) * 1964-04-13 1966-08-17 Albert George Bodine Method and apparatus for creating a load bearing region in earthen material
CN1099448A (zh) * 1993-09-12 1995-03-01 黎应因 一种内击扩底桩的施工方法
WO2005090689A1 (en) * 2004-03-20 2005-09-29 Ext Co., Ltd. Pile with an extended head and working method of the same
CN1898445A (zh) * 2003-10-23 2007-01-17 土工技术强化公司 从土壤基质中形成的一个或连续层段而构造支墩的设备和方法
WO2007090566A1 (de) * 2006-02-03 2007-08-16 Vibroflotation, B.V. Rüttleranordnung und verfahren zur herstellung von materialsäulen im boden
CN101058111A (zh) * 2007-05-11 2007-10-24 张立新 落抓夯锤

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1039645A (en) * 1964-04-13 1966-08-17 Albert George Bodine Method and apparatus for creating a load bearing region in earthen material
CN1099448A (zh) * 1993-09-12 1995-03-01 黎应因 一种内击扩底桩的施工方法
CN1898445A (zh) * 2003-10-23 2007-01-17 土工技术强化公司 从土壤基质中形成的一个或连续层段而构造支墩的设备和方法
WO2005090689A1 (en) * 2004-03-20 2005-09-29 Ext Co., Ltd. Pile with an extended head and working method of the same
WO2007090566A1 (de) * 2006-02-03 2007-08-16 Vibroflotation, B.V. Rüttleranordnung und verfahren zur herstellung von materialsäulen im boden
CN101058111A (zh) * 2007-05-11 2007-10-24 张立新 落抓夯锤

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
夏长华.深厚杂填土地基处理应用研究.《中国优秀硕士论文全文数据库》.2008,第18-20页.
深厚杂填土地基处理应用研究;夏长华;《中国优秀硕士论文全文数据库》;20080711;第18-20页 *

Also Published As

Publication number Publication date
CN101899827A (zh) 2010-12-01

Similar Documents

Publication Publication Date Title
Smoltczyk Geotechnical Engineering Handbook, Procedures
WO2018210019A1 (zh) 潜孔冲击旋喷复合桩成桩方法
CN203174607U (zh) 管内冲击锤破碎土振动挤扩沉管桩机
CN105862861B (zh) 一种植桩施工方法
CN102888834B (zh) 一种大直径碎石桩的施工方法
CN105714834B (zh) 一种硬质地层预成孔后注浆h型钢桩的施工工艺
CN104963346A (zh) 复杂地质的深基坑围护施工方法
CN105714773A (zh) 一种地基处理方法
CN101629421A (zh) 利用全回转钻机拔除深桩基的方法
CN104329020B (zh) 一种加强型长螺旋嵌岩施工设备及其工艺
CN110984133A (zh) 一种深水浅覆盖层栈桥基础施工方法
CN106812149A (zh) 一种桩基的施工方法
CN111501781A (zh) 一种杂填土超深基坑固结注浆结合双排钢管桩支护方法及结构
CN106638579A (zh) 一种珊瑚砂地基膨胀水泥砂浆注浆桩的施工方法
CN101899827B (zh) 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法
CN203403404U (zh) 高效灌注桩设备
CN207904903U (zh) 潜孔锤后注浆预制复合桩
CN104018494A (zh) 一种气动快速成孔组合桩及其成桩方法
CN107938652B (zh) 一种嵌岩型钢水泥搅拌墙及其施工方法
CN205776216U (zh) 一种刚性桩的植入设备
CN204225100U (zh) 混凝土桩的施工装置
CN204252120U (zh) 混凝土桩的施工装置
CN104153355B (zh) 混凝土桩的施工装置及其施工方法
CN205776209U (zh) 混凝土桩的施工设备
CN211647984U (zh) 一种提高旋挖钻机入岩效率的设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Yan Ping

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The ancient Pier Road Hangzhou city Zhejiang province 310000 No. 673 Xihu District Ruibo International Building, B block 16 layer

Applicant after: Yan Ping

Address before: Hangzhou City, Zhejiang province 310013 Tianmushan Road No. 376 building, 10 floor, East Gate long auxiliary building

Applicant before: Yan Ping

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180620

Address after: 310058 104, room 6, 6 building, 553 ho Mu Road, Gongshu District, Hangzhou, Zhejiang.

Patentee after: Hangzhou Nanlian Base Foundation Engineering Co., Ltd.

Address before: 310000 16, B block, Rubo International Building, 673, Xihu District, Hangzhou, Zhejiang.

Patentee before: Yan Ping

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20200601