CN101845821B - 大型倾斜设备基础垫铁倾斜度控制方法 - Google Patents

大型倾斜设备基础垫铁倾斜度控制方法 Download PDF

Info

Publication number
CN101845821B
CN101845821B CN2009100480953A CN200910048095A CN101845821B CN 101845821 B CN101845821 B CN 101845821B CN 2009100480953 A CN2009100480953 A CN 2009100480953A CN 200910048095 A CN200910048095 A CN 200910048095A CN 101845821 B CN101845821 B CN 101845821B
Authority
CN
China
Prior art keywords
equipment
iron
backing plate
seat slurry
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100480953A
Other languages
English (en)
Other versions
CN101845821A (zh
Inventor
程建刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN2009100480953A priority Critical patent/CN101845821B/zh
Publication of CN101845821A publication Critical patent/CN101845821A/zh
Application granted granted Critical
Publication of CN101845821B publication Critical patent/CN101845821B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及设备安装,尤其涉及大型倾斜设备安装方法。一种大型倾斜设备基础垫铁倾斜度控制方法,包括垫板和垫铁,其特征在于,该方法主要包括下列步骤:准备步骤,主要包括座浆墩数量、位置的确定、座浆墩深度的确定以及配件准备;垫板制作步骤;设备就位步骤;和一次灌浆步骤:采用自流平灌浆料对每个垫板进行浇注并养护。本发明保证垫板与设备的底座良好接触为前提,降低人力、缩短时间。

Description

大型倾斜设备基础垫铁倾斜度控制方法
技术领域
本发明涉及设备安装,尤其涉及大型倾斜设备安装方法。
背景技术
大型倾斜设备安装过程中,传统的采用座浆法,该方法需花费大量人力、时间,同时还不能保证垫板与设备底座下平面的良好接触。
发明内容
本发明旨在解决所述传统倾斜设备座基础座浆法安装的缺陷,提供一种大型倾斜设备基础垫铁倾斜度控制方法。本发明保证垫板与设备的底座良好接触为前提,降低人力、缩短时间。
本发明是这样实现的:大型倾斜设备基础垫铁倾斜度控制方法包括垫板和垫铁,该方法主要包括下列步骤:
准备步骤,主要包括座浆墩数量、位置的确定、座浆墩深度的确定以及配件准备;
垫板制作步骤;
设备就位步骤;和
一次灌浆步骤:采用自流平灌浆料对每个垫板进行浇注并养护。
所述的大型倾斜设备基础垫铁倾斜度控制方法,所述准备步骤包括:
设备就位前,根据设备荷载情况确定好座浆墩的数量及位置;
测量基础标高确定基础与设备底座间二次灌浆层的高度;
加工木条,木条宽度为二次灌浆层高度减去成组斜垫铁厚度;
在设备基础上用墨线弹出座浆墩上表面垫板的位置并凿出座浆坑。
所述大型倾斜设备基础垫铁倾斜度控制方法,所述垫板制作还包括:木条用铁钉固定成模具,外侧一端暂不封堵以利垫板调整,用细石混凝土封堵木框与基础面间的缝隙并将木框定位。
所述的大型倾斜设备基础垫铁倾斜度控制方法,所述设备就位是通过设备自带的调整螺钉或临时设置几个临时支承点初步找正设备的中心、标高、水平以达到一次灌浆要求的。
所述的大型倾斜设备基础垫铁倾斜度控制方法,在进行设备一次灌浆的同时,将成组斜垫铁安设到座浆垫板上并调节调整螺钉将斜垫板与设备下底面完全接触。
本发明相对传统施工优点有:
使用自流灌浆料相比传统细石混凝土缩短初凝时间;
使用灌浆料浇灌相比传统搅拌细石混凝土后浇灌减少投入人力、机具,缩短制作时间,降低环境的污染,减小制作场地;
在一次浇灌的同时进行垫板浇灌相比传统先施工座浆墩后进行设备初调后一次浇灌缩短安装时间;
设备初调后利用设备底平面的倾斜度来保证每块垫块的倾斜度并完全接触,相比传统先施工座浆墩解决了混凝土凝固时座浆垫板的倾斜、消除设备制造偏差造成设备底面与垫板接触不良等因素。
附图说明:
图1为所述垫板示意图。
图2为模具在基础上布置示意图。
具体实施方式
本发明大型倾斜设备基础垫铁倾斜度控制方法包括:
一、准备
设备就位前,根据设备荷载情况确定好座浆墩的数量及位置;(参照图2)
测量基础标高确定基础与设备底座间二次灌浆层的高度;
加工木条,木条宽度为二次灌浆层高度减去成组斜垫铁厚度;
在设备基础上用墨线弹出座浆墩上表面垫板的位置并凿出座浆坑;
根据座浆墩的数量每个座浆墩准备二套调整螺钉;
二、实施
1、将木条用铁钉固定成形,外侧一端暂不封堵以利垫板调整,用细石混凝土封堵木框与基础面间的缝隙并将木框定位;(见图1)
2、将设备就位,通过设备自带的调整螺钉(或临时设置几个临时支承点)初步找正设备的中心、标高、水平,达到一次灌浆要求;
3、在进行设备一次灌浆的同时,将成组斜垫铁安设到座浆垫板2上并调节调整螺钉1将斜垫板与设备下底面完全接触,并使用自流灌浆料对每块座浆板进行浇灌;
三、结束
1、待座浆墩强度达到要求后,拆除木框并清除掉木屑等杂物。

Claims (2)

1.一种大型倾斜设备基础垫铁倾斜度控制方法,包括垫板和垫铁,其特征在于,该方法主要包括下列步骤:
准备步骤,主要包括座浆墩数量、位置的确定、座浆墩深度的确定以及配件准备;
垫板制作步骤;木条用铁钉固定成模具,外侧一端暂不封堵以利垫板调整,用细石混凝土封堵木框与基础面间的缝隙并将木框定位;
设备就位步骤;通过设备自带的调整螺钉初步找正设备的中心、标高、水平以达到一次灌浆要求;和
一次灌浆步骤:采用自流平灌浆料对每个垫板进行浇注并养护,同时,将成组斜垫铁安设到座浆垫板上并调节调整螺钉将斜垫铁与设备下底面完全接触。
2.根据权利要求1所述的大型倾斜设备基础垫铁倾斜度控制方法,其特征在于,所述准备步骤包括:
设备就位前,根据设备荷载情况确定好座浆墩的数量及位置;
测量基础标高确定基础与设备底座间二次灌浆层的高度;
加工木条,木条宽度为二次灌浆层高度减去成组斜垫铁厚度;
在设备基础上用墨线弹出座浆墩上表面垫板的位置并凿出座浆坑。
CN2009100480953A 2009-03-24 2009-03-24 大型倾斜设备基础垫铁倾斜度控制方法 Active CN101845821B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100480953A CN101845821B (zh) 2009-03-24 2009-03-24 大型倾斜设备基础垫铁倾斜度控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100480953A CN101845821B (zh) 2009-03-24 2009-03-24 大型倾斜设备基础垫铁倾斜度控制方法

Publications (2)

Publication Number Publication Date
CN101845821A CN101845821A (zh) 2010-09-29
CN101845821B true CN101845821B (zh) 2012-05-23

Family

ID=42770621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100480953A Active CN101845821B (zh) 2009-03-24 2009-03-24 大型倾斜设备基础垫铁倾斜度控制方法

Country Status (1)

Country Link
CN (1) CN101845821B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243913B (zh) * 2013-05-17 2015-09-09 中国建筑东北设计研究院有限公司 装配式剪力墙建筑上下层连接处灌浆层的封堵方法
CN103510536A (zh) * 2013-05-29 2014-01-15 洛阳天信矿山机械制造有限公司 一种锤式破碎机的安装及调整方法
CN114960737B (zh) * 2022-04-29 2024-06-04 中国华冶科工集团有限公司 设备安装垫铁座浆装置及方法
CN118087595A (zh) * 2024-04-24 2024-05-28 国网山东省电力公司禹城市供电公司 一种电力建设用土建基础连接结构

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073655C (zh) * 1996-09-26 2001-10-24 周振华 一种设备基础垫板的施工方法
JP2007327626A (ja) * 2006-06-09 2007-12-20 Suehiro System Kk アンカ一体型ライナおよび機器据付方法
CN101307605A (zh) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 高精度设备底座安装方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073655C (zh) * 1996-09-26 2001-10-24 周振华 一种设备基础垫板的施工方法
JP2007327626A (ja) * 2006-06-09 2007-12-20 Suehiro System Kk アンカ一体型ライナおよび機器据付方法
CN101307605A (zh) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 高精度设备底座安装方法

Also Published As

Publication number Publication date
CN101845821A (zh) 2010-09-29

Similar Documents

Publication Publication Date Title
CN101881031B (zh) 可调式灌浆料垫板装置的安装方法
CN101871265B (zh) 平垫板可调的座浆安装方法
CN101413249B (zh) 一种大型桥梁支座的定位及安装方法
CN101845821B (zh) 大型倾斜设备基础垫铁倾斜度控制方法
CN102758445A (zh) 风力发电机塔架基础调平装置、基础总成及基础成型方法
CN205676785U (zh) 一种桥梁支座更换梁底调平块浇筑模板装置
CN204780983U (zh) 筏板基础高精度整体预埋大直径螺栓群结构
CN101397799B (zh) 设备底座安装的流动灌浆方法
CN203452266U (zh) H型钢柱的固定和调平结构
CN204266225U (zh) 一种标准设备安装垫铁预埋装置
CN102286988A (zh) 灌浆法垫板施工方法
CN208138090U (zh) 一种风力发电机组混凝土塔架
CN202187285U (zh) 现浇桥梁盆式橡胶支座
CN103132538B (zh) 斜面基础砂墩垫铁找正找平辅助装置及垫铁安放方法
CN102650135A (zh) 烧结环冷机立柱柱底预埋件找平方法
CN207959249U (zh) 承台及其基坑垫层施工结构
CN110863652A (zh) 预制拼装双节立柱精定位安装方法
CN113293790B (zh) 一种预找平的塔基基础及其找平施工方法
CN102943484A (zh) 一种大中型设备安装斜铁坐浆快速找平法
CN110374130A (zh) 一种重型液压机基础及其安装制作工艺
CN204059864U (zh) 一种架空板材地面
CN113958080B (zh) 一种灌浆式块料铺贴方法
CN204343664U (zh) 一种无锚固螺栓防火墙整体施工模板搭建结构
KR100320153B1 (ko) 공설운동장용 기성철근콘크리트 좌석블록의 시공방법
CN108374425A (zh) 承台及其基坑垫层施工结构和浇筑方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant