CN101831914A - Method for protecting and greening rocky side slope - Google Patents

Method for protecting and greening rocky side slope Download PDF

Info

Publication number
CN101831914A
CN101831914A CN 201010160231 CN201010160231A CN101831914A CN 101831914 A CN101831914 A CN 101831914A CN 201010160231 CN201010160231 CN 201010160231 CN 201010160231 A CN201010160231 A CN 201010160231A CN 101831914 A CN101831914 A CN 101831914A
Authority
CN
China
Prior art keywords
side slope
greening
grade beam
rock side
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010160231
Other languages
Chinese (zh)
Other versions
CN101831914B (en
Inventor
姚海林
骆行文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201010160231A priority Critical patent/CN101831914B/en
Publication of CN101831914A publication Critical patent/CN101831914A/en
Application granted granted Critical
Publication of CN101831914B publication Critical patent/CN101831914B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a method for protecting and greening a rocky side slope, which relates to the field of side slope construction in highways, railways, hydroelectricity and municipal projects. The method is a combined method for protecting, reinforcing and greening the superficial layer of a rocky side slope, and comprises the following steps of: (1) smoothing the slope surface; (2) driving an anchor rod; (3) installing a water spray pipeline and a device; (4) excavating a pit groove for a ground beam, and laying a reinforcing cage for the ground beam; (5) pouring the whole ground beam by bundling the reserved reinforcing steel bar for the anchor rod and the reinforcing cage for the ground beam; (6) prefabricating and inserting a soil blocking plate; (7) filling farming soil; and (8) planting and maintaining rattan plants. The invention has the advantages of effectively conserving soil and providing the objective environment suitable for plant growth; pre-burying a water spray device, ensuring the humidity of soil and improving the survival rate of plants; and realizing the purpose of reinforcing and greening the superficial layer of the rocky side slope comprehensively, and the invention is suitable for the project for protecting and greening the rocky side slope in highways, railways, hydroelectricity and municipal projects.

Description

A kind of method for protecting and greening of rock side slope
Technical field
The present invention relates to highway, railway, water power and municipal slope project construction field, relate in particular to a kind of method for protecting and greening of rock side slope; This method is the method that a kind of shallow-layer protective reinforcing of rock side slope combines with greening.
Technical background
In the construction of infrastructure such as present highway, railway, water power, often to excavate a large amount of side slopes.If side slope is not carried out protecting and greening, cause a large amount of secondary barrens and produce serious soil erosion and shallow failure etc. through regular meeting.Existing engineering slope adopts stone, concrete, building block etc. that side slope surface is covered in a large number, though these ways can the reinforcing side slope shallow-layer, causes the pollution of ecological disruption and vision easily.
Can the objective environment that be suitable for plant growing is provided effectively be the greening side slope key of success.The existing greening method of rock side slope has that the spray of spray sowing technology, organic substrate is planted, cement eco-species phytyl, plant cover concrete slope protection greening technology etc.Though these method titles are different, all be to adopt the sprayed mortar soil retaining technology in fact.Because the slope angle of rock slope is bigger, injected plant is difficult to be fixed up on this rock side slope; Though the part plant can be fixed, owing to rock side slope soil depletion, poor water retention property are difficult to survive.
Summary of the invention
Purpose of the present invention just is to overcome the shortcoming and defect that prior art exists, and a kind of method for protecting and greening of rock side slope is provided.
The object of the present invention is achieved like this:
Physical feature at rock side slope, adopt the method for anchor pole and grade beam that rock side slope is carried out the shallow-layer protective reinforcing, on grade beam, insert simultaneously breast boards, compost is filled out on the breast boards upper berth, so just can effectively provide green plants required compost, compost upper seeding wheel rattan class plant side slope be afforested at last.The characteristics that rattan class plant has is drought-resistant, barren-resistant, well developed root system, coverage are good, be easy to survive can play good landscape effect.In order to regulate the humidity of compost, at default water pipeline in top, slope and sprinkler.
Specifically, the present invention includes the following step:
1. smooth domatic;
2. set anchor pole;
3. water pipeline and equipment are installed;
4. excavate grade beam hole groove, lay the grade beam reinforcing cage;
5. anchor pole reserved steel bar and the colligation of grade beam reinforcing cage, it is integrated poured to carry out grade beam;
6. prefabricated and insert breast boards;
7. compost is filled out in the shop;
8. the plantation, maintenance rattan class plant.
The present invention has following advantage and good effect:
1. carry out solid soil effectively, the objective environment that is suitable for plant growing is provided;
2. pre-buried sprinkler guarantees soil moisture, improves the survival rate of plant;
3. realize rock side slope is carried out shallow layer reinforcement and the purpose of afforesting integrated treatment, be applicable to the protecting and greening engineering of the rock side slope of highway, railway, water power and municipal engineering.
Description of drawings
Fig. 1 utilizes the design sketch of this method for rock side slope.
Among the figure:
The 1-breast boards, the 2-anchor pole, the 3-compost, the 4-grade beam,
5-rattan class plant, 6-sprinkler, top, 7-slope, 8-toe (road surface).
The specific embodiment
Describe in detail below in conjunction with drawings and Examples:
One, this method
1, step 1. in
Described smooth domatic be rock side slope domatic to be carried out smooth, remove float stone, boulder and the floating root on surface.
2, step 2. in
The described anchor pole that sets is to carry out measurement and positioning earlier, sets anchor pole again;
Requiring anchor pole 2 length is 4~6m, and the indented bars of anchor pole is reserved certain-length so that join with the grade beam colligation.
3, step 3. in
Described installation water pipeline and sprinkler are the avris raggle in side slope, and requiring the degree of depth is 10cm, pre-buried water pipeline, and water pipeline adopts coating steel pipe;
Sprinkler 6 is installed in top, slope 7;
Water pipeline is connected with sprinkler 6.
4, step 4. in
Described excavation grade beam hole groove, lay the grade beam reinforcing cage and be rock side slope vertically by default spacing excavation grade beam hole groove, requiring to cheat well width is 50cm, the degree of depth is 25cm, adopts thick 2~5 centimetres cement mortar to carry out the substrate leveling, lays the grade beam reinforcing cage.
5, step 5. in
Described anchor pole reserved steel bar and the colligation of grade beam reinforcing cage, carrying out grade beam integrated poured is that the screw-thread steel of anchor pole is reserved section and made return bend, with the reinforcing bar binding of grade beam, reserves breast boards 1 slot, carries out grade beam 4 concrete pourings.
6, step 6. in
Described prefabricated and to insert breast boards 1 be carry out breast boards 1 prefabricated, the length of breast boards 1 is determined according to the horizontal spacing of grade beam;
Breast boards 1 concrete inserts in the grade beam 4 reservation slots after reaching the length of time.
7, step 7. in
It is that place Min layers is filled out compost that compost is filled out in described shop, and compost lower floor is a gravelly soil, and the upper strata is a thick-layer greening base material mixture;
Thick-layer greening base material mixture is admixed according to a certain percentage and is formed by greening base material, string, planting soil;
Its percent by volume is:
The greening base material is 45%, and string is 30%, and planting soil is 25%;
Described greening base material is meant: mix according to a certain ratio by organic matter, fertilizer, water-loss reducer, stabilizing agent, an agent, acidity regulator and disinfectant etc., can adopt the field trial debugging fixed than.
Described string is meant: it is long that stalk or long straw are ground into 10~20mm.
Described planting soil is meant: farmland, engineering place ground surface soil is pulverized air-dry sieving, particle diameter≤10mm, water content≤25%.
8, step 8. in
Described plantation, maintenance rattan class plant be the select tape rattan plant such as ivy, reach the clouds, in the rose, Chinese wistaria, winter creeper one or several are sowed, maintenance.
Two, actual effect
As Fig. 1, on rock side slope, push up 7 to the slope from toe 8 and be equipped with grade beam 4, and fixing by anchor pole 2; Grade beam 4 is provided with some breast boardss 1, forms the terraced fields shape; Compost 3 shops are filled out on it, and rattan class plant 5 is planted on the compost 3; Top, slope 7 is provided with sprinkler 6, and sprinkler 6 is sprayed water to rattan class plant 5 in real time by water pipeline.

Claims (9)

1. the method for protecting and greening of a rock side slope is characterized in that comprising the following steps:
1. smooth domatic;
2. set anchor pole;
3. water pipeline and equipment are installed;
4. excavate grade beam hole groove, lay the grade beam reinforcing cage;
5. anchor pole reserved steel bar and the colligation of grade beam reinforcing cage, it is integrated poured to carry out grade beam;
6. prefabricated and insert breast boards;
7. compost is filled out in the shop;
8. the plantation, maintenance rattan class plant.
2. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 1. in, described smooth domatic be rock side slope domatic to be carried out smooth, remove float stone, boulder and the floating root on surface.
3. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 2. in, the described anchor pole that sets is to carry out measurement and positioning earlier, sets anchor pole again;
Requiring anchor pole 2 length is 6~8m, and the indented bars of anchor pole is reserved certain-length so that join with the grade beam colligation.
4. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 3. in, described installation water pipeline and sprinkler are the avris raggle in side slope, requiring the degree of depth is 10cm, pre-buried water pipeline, water pipeline adopt coating steel pipe;
Sprinkler 6 is installed in top, slope 7;
Water pipeline is connected with sprinkler 6.
5. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 4. in, described excavation grade beam hole groove is laid the grade beam reinforcing cage and is and vertically cheats groove by default spacing excavation grade beam at rock side slope, requiring the hole well width is 50cm, the degree of depth is 25cm, adopts thick 2~5 centimetres cement mortar to carry out the substrate leveling, lays the grade beam reinforcing cage.
6. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 5. in, described anchor pole reserved steel bar and the colligation of grade beam reinforcing cage, carrying out grade beam integrated poured is that the screw-thread steel of anchor pole is reserved section and made return bend, with the reinforcing bar binding of grade beam, reserves breast boards 1 slot, carries out grade beam 4 concrete pourings.
7. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 6. in, described prefabricated and to insert breast boards 1 be carry out breast boards 1 prefabricated, the length of breast boards 1 is determined according to the horizontal spacing of grade beam;
Breast boards 1 concrete inserts in the grade beam 4 reservation slots after reaching the length of time.
8. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 7. in, it is that place Min layers is filled out compost that compost is filled out in described shop, compost lower floor is a gravelly soil, the upper strata is a thick-layer greening base material mixture;
Thick-layer greening base material mixture is admixed according to a certain percentage and is formed by greening base material, string, planting soil;
Its percent by volume is:
The greening base material is 45%, and string is 30%, and planting soil is 25%.
Described greening base material is meant: mix according to a certain ratio by organic matter, fertilizer, water-loss reducer, stabilizing agent, an agent, acidity regulator and disinfectant etc., can adopt the field trial debugging fixed than;
Described string is meant: it is long that stalk or long straw are ground into 10~20mm;
Described planting soil is meant: farmland, engineering place ground surface soil is pulverized air-dry sieving, particle diameter≤10mm, water content≤25%.
9. according to the protection and the greening method of the described a kind of rock side slope of claim 1, it is characterized in that:
Step 8. in, described plantation, maintenance rattan class plant be the select tape rattan plant such as ivy, reach the clouds, in the rose, Chinese wistaria, winter creeper one or several are sowed, maintenance.
CN201010160231A 2010-04-23 2010-04-23 Method for protecting and greening rocky side slope Expired - Fee Related CN101831914B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010160231A CN101831914B (en) 2010-04-23 2010-04-23 Method for protecting and greening rocky side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010160231A CN101831914B (en) 2010-04-23 2010-04-23 Method for protecting and greening rocky side slope

Publications (2)

Publication Number Publication Date
CN101831914A true CN101831914A (en) 2010-09-15
CN101831914B CN101831914B (en) 2012-10-03

Family

ID=42716113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010160231A Expired - Fee Related CN101831914B (en) 2010-04-23 2010-04-23 Method for protecting and greening rocky side slope

Country Status (1)

Country Link
CN (1) CN101831914B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102165890A (en) * 2011-01-25 2011-08-31 河南希芳阁绿化工程有限公司 Three-dimensional greening structure for soilless lawn and construction method thereof
CN102369834A (en) * 2011-03-03 2012-03-14 袁彬鸿 Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN102704499A (en) * 2012-06-06 2012-10-03 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN103430731A (en) * 2013-07-30 2013-12-11 广州市设计院 Method and architectural structure for planting virescence on rock mountain body
CN103548516A (en) * 2013-10-24 2014-02-05 安吉绿源生态科技有限公司 Fast afforestation structure of rock slope
CN103711134A (en) * 2013-12-08 2014-04-09 青岛润国生态科技工程有限公司 Method of restoring mountain allowing for direct planting of plants
CN104521710A (en) * 2014-12-17 2015-04-22 广西壮族自治区农业科学院农业资源与环境研究所 Crop cultivation managing method for efficient resource utilization in stony desertification mountainous area
CN104594365A (en) * 2014-12-25 2015-05-06 贵州省交通规划勘察设计研究院股份有限公司 Modular big-gradient stone slope maintenance structure based on tapered vegetation components
CN106631616A (en) * 2017-01-04 2017-05-10 深圳市北林苑景观及建筑规划设计院有限公司 Formula and preparation method for planting soil on high and steep rock slope
CN106879415A (en) * 2016-12-21 2017-06-23 深圳市铁汉生态环境股份有限公司 A kind of method that side slope reparation is carried out using Martin fig
CN107989050A (en) * 2017-11-30 2018-05-04 三峡大学 A kind of device and construction method that moisture nutriment is fed for rock side slope greening vegetation and circulation
CN108040765A (en) * 2017-12-08 2018-05-18 安徽金联地矿科技有限公司 One kind answers green and construction method based on raw basin formula rock side slope is planted
CN108104141A (en) * 2018-01-22 2018-06-01 云南新创新交通建设股份有限公司 A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure and its engineering method
CN108513831A (en) * 2018-04-12 2018-09-11 辽宁大学 Green plant generator in extreme ecology region and preparation method thereof
CN110521441A (en) * 2019-09-10 2019-12-03 河南交院工程技术有限公司 A kind of green plant recovery basalt fibre slope protecting components in ramp
CN110622643A (en) * 2019-10-12 2019-12-31 中水东北勘测设计研究有限责任公司 Ecological restoration method for rock slope in high-latitude severe cold region
CN111279965A (en) * 2020-03-03 2020-06-16 南京安吉特矿山工程有限公司 Greening method for stepped mine
CN113404065A (en) * 2021-05-22 2021-09-17 山东高速工程建设集团有限公司 Cutting slope anchor rod frame beam rapid construction method
CN113711835A (en) * 2021-09-30 2021-11-30 棕榈生态城镇发展股份有限公司 Hillside land greening planting method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498952B (en) * 2016-11-18 2019-02-15 中国电建集团成都勘测设计研究院有限公司 High steep spray in arid area mixes slope ecological protective slope structure
CN108575649A (en) * 2018-03-21 2018-09-28 合肥雪立歆农业科技有限公司 A method of planting heartsease on slope of rock mass

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4190384A (en) * 1975-04-30 1980-02-26 Herwig Neumann Concrete construction element system for erecting plant accommodating walls
EP0031154A1 (en) * 1979-12-20 1981-07-01 Herwig Neumann Construction element system for erecting plant accommodating walls
CN1570292A (en) * 2003-07-15 2005-01-26 中国科学院地质与地球物理研究所 Surface afforestation method for anchor spraying construction slopes
CN2911014Y (en) * 2006-06-30 2007-06-13 浙江省交通规划设计研究院 Plantable ecological wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4190384A (en) * 1975-04-30 1980-02-26 Herwig Neumann Concrete construction element system for erecting plant accommodating walls
EP0031154A1 (en) * 1979-12-20 1981-07-01 Herwig Neumann Construction element system for erecting plant accommodating walls
CN1570292A (en) * 2003-07-15 2005-01-26 中国科学院地质与地球物理研究所 Surface afforestation method for anchor spraying construction slopes
CN2911014Y (en) * 2006-06-30 2007-06-13 浙江省交通规划设计研究院 Plantable ecological wall

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102165890B (en) * 2011-01-25 2013-03-13 河南希芳阁绿化工程有限公司 Three-dimensional greening structure for soilless lawn and construction method thereof
CN102165890A (en) * 2011-01-25 2011-08-31 河南希芳阁绿化工程有限公司 Three-dimensional greening structure for soilless lawn and construction method thereof
CN102369834A (en) * 2011-03-03 2012-03-14 袁彬鸿 Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN102704499B (en) * 2012-06-06 2014-06-18 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN102704499A (en) * 2012-06-06 2012-10-03 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN103430731A (en) * 2013-07-30 2013-12-11 广州市设计院 Method and architectural structure for planting virescence on rock mountain body
CN103548516B (en) * 2013-10-24 2016-07-06 安吉绿源生态科技有限公司 A kind of fast afforestation structure of rock slope
CN103548516A (en) * 2013-10-24 2014-02-05 安吉绿源生态科技有限公司 Fast afforestation structure of rock slope
CN103711134A (en) * 2013-12-08 2014-04-09 青岛润国生态科技工程有限公司 Method of restoring mountain allowing for direct planting of plants
CN104521710A (en) * 2014-12-17 2015-04-22 广西壮族自治区农业科学院农业资源与环境研究所 Crop cultivation managing method for efficient resource utilization in stony desertification mountainous area
CN104594365A (en) * 2014-12-25 2015-05-06 贵州省交通规划勘察设计研究院股份有限公司 Modular big-gradient stone slope maintenance structure based on tapered vegetation components
CN106879415A (en) * 2016-12-21 2017-06-23 深圳市铁汉生态环境股份有限公司 A kind of method that side slope reparation is carried out using Martin fig
CN106631616A (en) * 2017-01-04 2017-05-10 深圳市北林苑景观及建筑规划设计院有限公司 Formula and preparation method for planting soil on high and steep rock slope
CN107989050A (en) * 2017-11-30 2018-05-04 三峡大学 A kind of device and construction method that moisture nutriment is fed for rock side slope greening vegetation and circulation
CN108040765A (en) * 2017-12-08 2018-05-18 安徽金联地矿科技有限公司 One kind answers green and construction method based on raw basin formula rock side slope is planted
CN108104141A (en) * 2018-01-22 2018-06-01 云南新创新交通建设股份有限公司 A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure and its engineering method
CN108513831A (en) * 2018-04-12 2018-09-11 辽宁大学 Green plant generator in extreme ecology region and preparation method thereof
CN110521441A (en) * 2019-09-10 2019-12-03 河南交院工程技术有限公司 A kind of green plant recovery basalt fibre slope protecting components in ramp
CN110622643A (en) * 2019-10-12 2019-12-31 中水东北勘测设计研究有限责任公司 Ecological restoration method for rock slope in high-latitude severe cold region
CN111279965A (en) * 2020-03-03 2020-06-16 南京安吉特矿山工程有限公司 Greening method for stepped mine
CN113404065A (en) * 2021-05-22 2021-09-17 山东高速工程建设集团有限公司 Cutting slope anchor rod frame beam rapid construction method
CN113404065B (en) * 2021-05-22 2023-02-28 山东高速工程建设集团有限公司 Cutting slope anchor rod frame beam rapid construction method
CN113711835A (en) * 2021-09-30 2021-11-30 棕榈生态城镇发展股份有限公司 Hillside land greening planting method

Also Published As

Publication number Publication date
CN101831914B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN101831914B (en) Method for protecting and greening rocky side slope
CN104314087B (en) A kind of side-slope greening and protection structure and construction method thereof
CN105625443B (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101213910A (en) Method for using gridding plant biological bag to process greening slope
CN109723068B (en) Steep concrete sash Liang Hupo system beneficial to slope vegetation growth and construction method
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN107100176B (en) A kind of expressway slope greening system
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN110214634A (en) A kind of construction method suitable for steep rock side slope TBS greening
CN110552356B (en) Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof
CN114351733A (en) Rock slope vegetation system and vegetation planting construction method
CN111005393B (en) Slope protection structure for repairing landslide body by using live tree piles and construction method
CN109162286A (en) A kind of pair of opencut carries out the construction method of slope ecological protection
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN106480892A (en) Grass planting protective slope structure and construction method suitable for mountainous area highway rock side-slope
CN106958264A (en) A kind of highway greenbelt and its construction method
CN105625440A (en) Vegetation restoration method for rock slope and hard protection slope
CN207392215U (en) A kind of rock side slope ecological afforestation slope protection device
CN209816870U (en) Steep concrete frame beam slope protection system beneficial to growth of slope vegetation
CN209194550U (en) Side slope ecological protection structure
CN108575649A (en) A method of planting heartsease on slope of rock mass
CN105297746B (en) Greening system and greening method for prefabricated arch body bearing-type vegetation concrete side slope
CN205088694U (en) Prefabricated donor bearing formula vegetation concrete slope planting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20180423

CF01 Termination of patent right due to non-payment of annual fee