CN101824895A - 干挂瓷板墙面装饰***及其施工方法 - Google Patents
干挂瓷板墙面装饰***及其施工方法 Download PDFInfo
- Publication number
- CN101824895A CN101824895A CN201010301354A CN201010301354A CN101824895A CN 101824895 A CN101824895 A CN 101824895A CN 201010301354 A CN201010301354 A CN 201010301354A CN 201010301354 A CN201010301354 A CN 201010301354A CN 101824895 A CN101824895 A CN 101824895A
- Authority
- CN
- China
- Prior art keywords
- keel
- porcelain plate
- vitrolite
- bolt
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
一种干挂瓷板墙面装饰***及其施工方法,主体建筑物墙体与预埋件连接,预埋件经楼层连接件与竖龙骨连接,竖龙骨与横龙骨垂直连接,竖龙骨在每个楼层留一处伸缩缝,在伸缩缝处的上下两根竖龙骨之间***钢插芯,钢插芯的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓与另一根竖龙骨的长圆孔活动连接;瓷板的背面有至少一对燕尾槽,燕尾槽与锚固件嵌入式连接,锚固件的头部卡入瓷板背面的燕尾槽内,两锚固头之间的锚固板与瓷板的背面之间形成一个用于穿入和锚固T形挂件头部的腔体,T形挂件的头部伸入上述腔体内,腔体内填有环氧树脂锚固胶,T形挂件的腹板与横龙骨通过不锈钢螺栓固定连接。解决了在高层建筑物上干挂瓷板墙面装饰***的问题。
Description
技术领域
本发明涉及一种墙面装饰***,特别是一种干挂瓷板的墙面装饰***及其施工方法。
背景技术
墙面装饰早已是各个建筑的亮点部分,现今较流行的玻璃幕墙、石材幕墙、金属板幕墙等已经有了相对成熟的施工技术,得以在建筑施工中大量的运用。而干挂瓷板与传统的石材、玻璃或金属板幕墙技术相比,瓷板装饰色彩丰富,色泽均匀自然、无色差,经背涂复合层处理后具有良好的耐久性、抗冲击性以及抗冻性,而且价格更加低廉,该种幕墙的施工方法是将瓷板与主体建筑物的墙体固定挂接,由于主体建筑物通常为钢筋混凝土结构,而瓷板幕墙与主体建筑物连接固定的龙骨一般为钢材,钢材与混凝土的线膨胀系数不同,使得温差变化带来的龙骨自身伸缩变形与建筑主体结构不同步,导致主体建筑物与瓷板幕墙钢龙骨因热胀冷缩差异较大,而使结构构件产生裂缝变形。特别是在高层建筑物上,干挂瓷板墙面装饰***更难以实施。
发明内容
本发明的目的是提供一种干挂瓷板墙面装饰***及其施工方法,要解决主体建筑物与干挂瓷板墙面因热胀冷缩差异较大而产生裂缝变形的技术问题;并解决具体实现在高层建筑物上干挂瓷板墙面装饰***的施工工艺的问题。
为实现上述目的,本发明采用如下技术方案:
一种干挂瓷板墙面装饰***,包括与主体建筑物墙体连接的瓷板,其特征在于:所述主体建筑物墙体与预埋件连接,预埋件经每楼层的连接件与竖龙骨连接,竖龙骨与横龙骨垂直连接,所述竖龙骨在竖直方向留伸缩缝,每个楼层留一处,伸缩缝间隙为5~20mm,在伸缩缝处的上下两根竖龙骨之间***钢插芯,钢插芯的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓与另一根竖龙骨的长圆孔活动连接;瓷板的背面有至少一对燕尾槽,所述燕尾槽与锚固件嵌入式连接,所述锚固件有一对与瓷板的燕尾槽相吻合的锚固头,锚固头卡入瓷板背面的燕尾槽内,两锚固头之间的锚固板与瓷板背面之间形成一个用于穿入和锚固T形挂件头部的腔体,T形挂件的头部伸入瓷板背面的腔体内,腔体内填有环氧树脂锚固胶,T形挂件的腹板与横龙骨通过不锈钢螺栓固定连接。
所述横龙骨在水平方向也可留伸缩缝,伸缩缝的间隙为5~20mm,在伸缩缝处的两根横龙骨之间***钢插芯,钢插芯的一端与一根横龙骨用螺栓固定连接,另一端由螺栓与另一根横龙骨的长圆孔活动连接。
所述横龙骨可为等肢角钢或方钢,等肢角钢的规格不小于∠30×30×3。
所述竖龙骨可为方钢、槽钢或H型钢。
所述燕尾槽的底角角度可为45-60度之间。
干挂瓷板墙面装饰***的施工方法,其特征在于步骤如下:
步骤1、对主体建筑物墙体的水平轴线和竖向标高进行检查,复核其基线、控制线,确定后置预埋件的位置或复核预埋件位置,并弹瓷板分格线;
步骤2、根据实际测量的主体建筑物墙体的水平轴线和竖向标高,进行瓷板排版图设计;
步骤3、根据步骤2中确定的瓷板排版图进行竖龙骨定位与安装;安装时,首先用螺栓将每楼层的连接件与预埋件进行连接,然后再用螺栓将竖龙骨固定在每楼层的连接件上,所述竖龙骨在竖直方向留伸缩缝,每个楼层留一处,伸缩缝间隙为5~20mm,在伸缩缝处的上下两根竖龙骨之间***钢插芯,钢插芯的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓与另一根竖龙骨的长圆孔活动连接;
步骤4、根据步骤2中确定的瓷板排版图进行横龙骨定位与安装;先将横龙骨的位置线弹到竖龙骨上,然后根据弹线所确定的横龙骨位置,将横龙骨点焊在竖龙骨上;
步骤5、安装瓷板;先用不锈钢螺栓将T形挂件固定在横龙骨上,调整T形挂件的位置,使之与瓷板的板缝对正,然后将瓷板背面的锚固件的腔体内填满胶,将瓷板与锚固件通过瓷板背后的燕尾槽和锚固件的锚固头卡住,T形挂件的头部穿入锚固件的腔体内,与胶粘接牢固,拧紧连接T形挂件与横龙骨的不锈钢螺栓;
步骤6、安装完一个立面后,向瓷板板缝内打密封胶,打密封胶前将泡沫棒塞入瓷板板缝内,以控制密封胶的厚度;
步骤7、用清洗液清洁密封胶的接触面,然后沿同一方向用胶枪把密封胶均匀地注入板缝瓷板板缝内,并立即用胶筒或灰刀刮平,去除保护纸。
上述瓷板的安装自转角处开始,且按自下而上的顺序。
上述步骤4中所述横龙骨在水平方向也可留伸缩缝,伸缩缝的间隙为5~20mm,在伸缩缝处的两根横龙骨之间***钢插芯,钢插芯的一端与一根横龙骨用螺栓固定连接,另一端由螺栓与另一根横龙骨的长圆孔活动连接。
上述步骤5中所述瓷板背面的锚固件内所填胶可为环氧树脂锚固胶。
与现有技术相比本发明具有以下特点和有益效果:
本发明采用的龙骨按照一定范围内设置伸缩缝,并采用钢插芯在一端固定、另一端活动的连接方式,既便于施工中骨架变形调节需要,保证立柱中心线的垂直度,避免上、下立柱间产生较大错位,又能满足温差变化导致的龙骨自身伸缩变形和层间位移变化量的要求。解决了主体建筑物与干挂瓷板墙面因热胀冷缩差异较大而产生裂缝变形的技术问题,并解决了在高层建筑物上干挂瓷板墙面装饰***的施工工艺的问题。
本发明不仅能够采取厂家预加工现场调整安装方式,还缩短了钢插芯的总长,从而减少用材,节约成本。
本发明的干挂瓷板墙面装饰***的瓷板在出现破损时,可以只更换破损的一片,而不必大面积更换,节约生产成本。
本发明与石材幕墙相比,色彩丰富,色泽均匀自然、无色差,可以在加工厂生产,无需现场切割,施工速度更快。瓷板经背涂复合层处理后具有良好的耐久性、抗冲击性以及抗冻性,而且价格更加低廉。
本发明的应用范围广泛,可以应用于各种结构形式的墙体上,外墙、内墙均可以使用。既可以用于框架结构无填充墙的形式,也可以用于钢结构墙面以及空心砖、砌块等墙面。本发明可与保温材料配合使用,在美化建筑的同时能具有良好的保温、隔音功能。
附图说明
下面结合附图对本发明做进一步详细的说明。
图1是干挂瓷板安装节点的纵剖面示意图;
图2是竖龙骨纵向连接的结构示意图;
图3是干挂瓷板安装节点的横剖面示意图;
图4是本发明实施例的主视示意图;
图5是图4的A-A剖面示意图;
图6是图4的B-B剖面示意图。
附图标记:1-瓷板、2-T形挂件、3-锚固件、4-每楼层的连接件、5-不锈钢螺栓、6-横龙骨、7-竖龙骨、8-预埋件、9-主体建筑物墙体、10-保温层、11-环氧树脂锚固胶、12-伸缩缝、13-钢插芯、14-螺栓、15-长圆孔、16-密封胶、17-燕尾槽。
具体实施方式
实施例参见图1、图3所示,一种干挂瓷板墙面装饰***,包括与主体建筑物墙体9连接的瓷板1,其特征在于:所述主体建筑物墙体9与预埋件8连接,预埋件8通过位于每楼层的连接件4与竖龙骨7连接,每楼层的连接件可以是角钢或方钢,竖龙骨7与横龙骨6垂直连接,瓷板1的背面有至少一对燕尾槽,燕尾槽17的底角角度为45-60度之间。所述燕尾槽与锚固件3嵌入式连接,所述锚固件3有一对与瓷板的燕尾槽相吻合的锚固头,锚固头卡入瓷板背面的燕尾槽内,两锚固头之间的锚固板与瓷板背面之间形成一个用于穿入和锚固T形挂件头部的腔体,T形挂件2的头部伸入瓷板1背面的腔体内,腔体内填有环氧树脂锚固胶11,T形挂件2的腹板与横龙骨6通过不锈钢螺栓5固定连接。
所述两根横龙骨之间的接头可以为焊接连接。但遇墙面超长时,则需视实际情况,在水平方向上的两根横龙骨之间留置一对长圆孔,用螺栓活动连接。两根横龙骨在水平方向留伸缩缝,伸缩缝的间隙为20mm,在伸缩缝处的两根横龙骨之间***钢插芯,钢插芯的一端与一根横龙骨用螺栓固定连接,另一端由螺栓与另一根横龙骨的长圆孔活动连接。横龙骨6为等肢角钢或方钢,等肢角钢的规格不小于∠30×30×3。
参见图2所示,本发明的竖龙骨7可以为方钢、槽钢或H型钢。竖龙骨在竖直方向留伸缩缝12,每个楼层留一处,伸缩缝间隙为20mm,在伸缩缝处的上下两根竖龙骨之间***钢插芯13,钢插芯13的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓14与另一根竖龙骨的长圆孔15活动连接。
参见图3-图6所示,干挂瓷板墙面装饰***的施工方法,步骤如下:
步骤1、对拟安装主体建筑物墙体9的水平轴线和竖向标高进行检查,复核其基线、控制线,确定后置埋件8的位置或复核预埋件位置,并弹瓷板分格线;在弹线放样过程中,对照埋件的编号图,依次逐个进行检查,将每一编号处的结构偏差,与埋件的偏差值记录下来,反馈给设计人员进行分析,对偏位大于45mm以上的埋件必须进行处理。干挂瓷板墙面装饰***的拟安装墙体外还可设置保温层10。
步骤2、根据实际测量的拟安装主体建筑物墙体9的水平轴线和竖向标高,进行瓷板排版图设计。
步骤3、根据步骤2中确定的瓷板排版图进行竖龙骨7定位与安装;自转角处开始且自下向上的安装,建筑物转角部位布置钢丝线,首先用螺栓将每楼层的连接件与预埋件进行连接,然后再用螺栓将竖龙骨固定在每楼层的连接件上,每楼层的连接件可以是角钢、方钢或槽钢,主要视具体情况计算、深化设计后而定,螺栓都暂不完全拧紧,留下一些可以调整的余地。所述竖龙骨在竖直方向留伸缩缝,每个楼层留一处,伸缩缝间隙为5~20mm。在伸缩缝处的上下两根竖龙骨之间***钢插芯,钢插芯的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓与另一根竖龙骨的长圆孔活动连接;竖龙骨初步就位后,依据测量人员所布置的钢丝线进行调节,依据施工图进行安装检查,主要检查垂直度及大面平整度,确保竖龙骨的垂直偏差≤2mm,尽量将墙体误差调整到最小限度。在安装转角部位瓷板时,竖向标高用水平仪自始至终进行跟踪检查,垂直钢丝定位采用铅垂仪进行定位,确保转角部位的方正和垂直。进行每楼层的连接件与竖龙骨检查、调整后,再将所有螺栓拧紧,确保竖龙骨的安装质量。
步骤4、根据步骤2中确定的瓷板排版图进行横龙骨定位与安装;先将横龙骨6的位置线弹到竖龙骨7上,然后根据弹线所确定的横龙骨位置,将横龙骨点焊在竖龙骨上;横龙骨安装完一层的高度时应进行检查其大面垂直及平整度,调整校正使其符合质量标准后将横龙骨与竖龙骨焊牢。但遇墙面超长时,则需视实际情况,在水平方向上的两根横龙骨之间留置一对长圆孔,用螺栓活动连接。
步骤5、安装瓷板;先用不锈钢螺栓5将T形挂件2固定在横龙骨6上,调整T形挂件2的位置,使之与瓷板1的板缝对正,然后将瓷板背面的锚固件3的腔体内填满胶,瓷板背面的锚固件内所填胶为环氧树脂锚固胶,再将瓷板1与锚固件3通过瓷板燕尾槽和锚固件的锚固头卡住,T形挂件2的头部穿入锚固件的腔体内,与胶粘接牢固,拧紧连接T形挂件2与横龙骨6的不锈钢螺栓5。待一层瓷板全部安装就位后,检查瓷板表面的平整度和垂直度,如有高低不平则进行调整,然后检查瓷板板缝,板缝应横平竖直,宽度符合设计要求,缝宽均匀一致。
步骤6、安装完一个立面后,向瓷板板缝内打密封胶,打密封胶前将泡沫棒塞入瓷板板缝内,以控制密封胶的厚度;打胶时用力要均匀,走枪要稳而慢,胶缝应严密,宽度要均匀,严禁带水作业。
步骤7、用清洗液清洁密封胶的接触面,然后沿同一方向用胶枪把密封胶均匀地注入板缝瓷板板缝内,并立即用胶筒或灰刀刮平,去除保护纸。当立面的瓷板安装完成、板缝打密封胶后,还需对瓷板幕墙进行一次全面的检查、修补和清理。
上述实施例是本发明一个典型实施,本发明的实施不限于此。
Claims (9)
1.一种干挂瓷板墙面装饰***,包括与主体建筑物墙体(9)连接的瓷板(1),其特征在于:所述主体建筑物墙体(9)与预埋件(8)连接,预埋件(8)经楼层连接件(4)与竖龙骨(7)连接,竖龙骨(7)与横龙骨(6)垂直连接,所述竖龙骨在竖直方向留伸缩缝(12),每个楼层留一处,伸缩缝间隙为5~20mm,在伸缩缝处的上下两根竖龙骨之间***钢插芯(13),钢插芯(13)的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓(14)与另一根竖龙骨的长圆孔(15)活动连接;瓷板(1)的背面有至少一对燕尾槽,所述燕尾槽与锚固件(3)嵌入式连接,所述锚固件(3)有一对与瓷板的燕尾槽相吻合的锚固头,锚固头卡入瓷板背面的燕尾槽内,两锚固头之间的锚固板与瓷板背面之间形成一个用于穿入和锚固T形挂件头部的腔体,T形挂件(2)的头部伸入瓷板(1)背面的腔体内,腔体内填有环氧树脂锚固胶(11),T形挂件(2)的腹板与横龙骨(6)通过不锈钢螺栓(5)固定连接。
2.根据权利要求1所述的干挂瓷板墙面装饰***,其特征在于:所述横龙骨在水平方向留伸缩缝,伸缩缝的间隙为5~20mm,在伸缩缝处的两根横龙骨之间***钢插芯,钢插芯的一端与一根横龙骨用螺栓固定连接,另一端由螺栓与另一根横龙骨的长圆孔活动连接。
3.根据权利要求1或2所述的干挂瓷板墙面装饰***,其特征在于:所述横龙骨(6)为等肢角钢或方钢,等肢角钢的规格不小于∠30×30×3。
4.根据权利要求1或2所述的干挂瓷板墙面装饰***,其特征在于:所述竖龙骨(7)为方钢、槽钢或H型钢。
5.根据权利要求1或2所述的干挂瓷板墙面装饰***,其特征在于:所述燕尾槽(17)的底角角度为45-60度之间。
6.根据权利要求1-5所述的干挂瓷板墙面装饰***的施工方法,其特征在于:步骤如下:
步骤1、对主体建筑物墙体(9)的水平轴线和竖向标高进行检查,复核其基线、控制线,确定后置预埋件(8)的位置或复核预埋件位置,并弹瓷板分格线;
步骤2、根据实际测量的主体建筑物墙体(9)的水平轴线和竖向标高,进行瓷板排版图设计;
步骤3、根据步骤2中确定的瓷板排版图进行竖龙骨(7)定位与安装;安装时,首先用螺栓将楼层连接件(4)与预埋件(8)进行连接,然后再用螺栓将竖龙骨固定在楼层连接件上,所述竖龙骨在竖直方向留伸缩缝,每个楼层留一处,伸缩缝间隙为5~20mm,在伸缩缝处的上下两根竖龙骨之间***钢插芯(13),钢插芯(13)的一端与一根竖龙骨用螺栓固定连接,另一端由螺栓(14)与另一根竖龙骨的长圆孔(15)活动连接;
步骤4、根据步骤2中确定的瓷板排版图进行横龙骨定位与安装;先将横龙骨(6)的位置线弹到竖龙骨(7)上,然后根据弹线所确定的横龙骨位置,将横龙骨点焊在竖龙骨上;
步骤5、安装瓷板;先用不锈钢螺栓(5)将T形挂件(2)固定在横龙骨(6)上,调整T形挂件(2)的位置,使之与瓷板(1)的板缝对正,然后将瓷板背面的锚固件(3)的腔体内填满胶,将瓷板(1)与锚固件(3)通过瓷板背后的燕尾槽和锚固件的锚固头卡住,T形挂件(2)的头部穿入锚固件的腔体内,与胶粘接牢固,拧紧连接T形挂件(2)与横龙骨(6)的不锈钢螺栓(5);
步骤6、安装完一个立面后,向瓷板板缝内打密封胶(16),打密封胶前将泡沫棒塞入瓷板板缝内,以控制密封胶的厚度;
步骤7、用清洗液清洁密封胶的接触面,然后沿同一方向用胶枪把密封胶均匀地注入板缝瓷板板缝内,并立即用胶筒或灰刀刮平,去除保护纸。
7.根据权利要求4所述的干挂瓷板墙面装饰***的施工方法,其特征在于:上述瓷板的安装自转角处开始,且按自下而上的顺序。
8.根据权利要求4所述的干挂瓷板墙面装饰***的施工方法,其特征在于:上述步骤4中所述横龙骨在水平方向留伸缩缝,伸缩缝的间隙为5~20mm,在伸缩缝处的两根横龙骨之间***钢插芯,钢插芯的一端与一根横龙骨用螺栓固定连接,另一端由螺栓与另一根横龙骨的长圆孔活动连接。
9.根据权利要求8所述的干挂瓷板墙面装饰***的施工方法,其特征在于:上述步骤5中所述瓷板背面的锚固件内所填胶为环氧树脂锚固胶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010103013541A CN101824895B (zh) | 2010-02-08 | 2010-02-08 | 干挂瓷板墙面装饰***及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010103013541A CN101824895B (zh) | 2010-02-08 | 2010-02-08 | 干挂瓷板墙面装饰***及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101824895A true CN101824895A (zh) | 2010-09-08 |
CN101824895B CN101824895B (zh) | 2011-08-10 |
Family
ID=42689041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010103013541A Expired - Fee Related CN101824895B (zh) | 2010-02-08 | 2010-02-08 | 干挂瓷板墙面装饰***及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101824895B (zh) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287037A (zh) * | 2011-06-20 | 2011-12-21 | 山东宁建建设集团有限公司 | 大面积被栓式瓷砖干挂施工方法 |
CN102312497A (zh) * | 2011-09-09 | 2012-01-11 | 北京运特科技有限公司 | 太阳能与建筑一体化幕墙***及其安装施工方法 |
CN102535702A (zh) * | 2012-02-21 | 2012-07-04 | 沈阳远大铝业工程有限公司 | 一种单元幕墙横滑插芯结构 |
CN102839805A (zh) * | 2012-10-11 | 2012-12-26 | 北京建工集团有限责任公司 | 干挂树脂板墙面装饰***及其施工方法 |
WO2013040884A1 (zh) * | 2011-09-20 | 2013-03-28 | 沈阳远大铝业工程有限公司 | 分体夹持固定式瓷砖幕墙 |
CN103526866A (zh) * | 2013-11-06 | 2014-01-22 | 上海市建筑装饰工程集团有限公司 | 干挂石材幕墙及其安装方法 |
CN103541477A (zh) * | 2013-11-06 | 2014-01-29 | 上海市建筑装饰工程集团有限公司 | 用于干挂石材幕墙的龙骨及其安装方法 |
CN103758317A (zh) * | 2014-01-13 | 2014-04-30 | 新疆德力亚节能科技有限公司 | 一种超薄保温装饰一体板安装*** |
CN104563349A (zh) * | 2015-01-12 | 2015-04-29 | 上海卓欧建筑装饰工程有限公司 | 幕墙背附钢架安装于主体结构上的连接总成及安装方法 |
CN104746828A (zh) * | 2014-07-01 | 2015-07-01 | 李忠玉 | 燕尾销挂件及使用其装饰板干挂施工工艺 |
CN106351371A (zh) * | 2016-10-13 | 2017-01-25 | 北京港源幕墙有限公司 | 一种幕墙龙骨制造施工工艺 |
CN107518683A (zh) * | 2017-08-29 | 2017-12-29 | 许昌市建安区第实验学校 | 一种多功能儿童凳 |
CN107587635A (zh) * | 2017-10-10 | 2018-01-16 | 海天建设集团有限公司 | 外墙陶板竖向插销式安装施工工艺 |
CN107620442A (zh) * | 2017-08-21 | 2018-01-23 | 广州市名晋机电设备技术有限公司 | 一种新型单元式外墙板干挂*** |
CN110424642A (zh) * | 2019-07-01 | 2019-11-08 | 中国十七冶集团有限公司 | 一种异型金属屋面用承插式栓接龙骨的施工方法 |
CN110453925A (zh) * | 2019-09-07 | 2019-11-15 | 吉林建筑大学 | 装配式建筑pcf板与预制外墙板之间施工调节方法 |
CN110528721A (zh) * | 2019-07-31 | 2019-12-03 | 上海宝冶建筑装饰有限公司 | 石笼装饰墙的施工方法 |
CN111395680A (zh) * | 2020-03-24 | 2020-07-10 | 浙江世贸装饰股份有限公司 | 一种用于解决墙面陶瓷板安装缝隙的安装方法 |
CN113738050A (zh) * | 2021-10-08 | 2021-12-03 | 北京城建亚泰建筑装饰工程设计有限公司 | 一种内外墙装饰面板干挂施工方法 |
CN114876144A (zh) * | 2021-06-08 | 2022-08-09 | 上海牛元工贸有限公司 | 一种岩板干挂安装工艺 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2523825Y (zh) * | 2002-02-05 | 2002-12-04 | 海口南光幕墙装饰工程有限公司 | 石材幕墙干挂装置 |
CN201007050Y (zh) * | 2007-02-08 | 2008-01-16 | 沈英 | 陶土板幕墙的安装结构 |
CN201649524U (zh) * | 2010-02-08 | 2010-11-24 | 北京建工集团有限责任公司 | 干挂瓷板墙面装饰*** |
-
2010
- 2010-02-08 CN CN2010103013541A patent/CN101824895B/zh not_active Expired - Fee Related
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287037A (zh) * | 2011-06-20 | 2011-12-21 | 山东宁建建设集团有限公司 | 大面积被栓式瓷砖干挂施工方法 |
CN102312497A (zh) * | 2011-09-09 | 2012-01-11 | 北京运特科技有限公司 | 太阳能与建筑一体化幕墙***及其安装施工方法 |
CN102312497B (zh) * | 2011-09-09 | 2016-03-16 | 北京大运龙腾科技有限公司 | 太阳能与建筑一体化幕墙***及其安装施工方法 |
WO2013040884A1 (zh) * | 2011-09-20 | 2013-03-28 | 沈阳远大铝业工程有限公司 | 分体夹持固定式瓷砖幕墙 |
CN102535702A (zh) * | 2012-02-21 | 2012-07-04 | 沈阳远大铝业工程有限公司 | 一种单元幕墙横滑插芯结构 |
CN102839805B (zh) * | 2012-10-11 | 2014-06-18 | 北京建工集团有限责任公司 | 干挂树脂板墙面装饰***及其施工方法 |
CN102839805A (zh) * | 2012-10-11 | 2012-12-26 | 北京建工集团有限责任公司 | 干挂树脂板墙面装饰***及其施工方法 |
CN103526866B (zh) * | 2013-11-06 | 2016-03-09 | 上海市建筑装饰工程集团有限公司 | 干挂石材幕墙及其安装方法 |
CN103541477B (zh) * | 2013-11-06 | 2016-01-13 | 上海市建筑装饰工程集团有限公司 | 用于干挂石材幕墙的龙骨及其安装方法 |
CN103541477A (zh) * | 2013-11-06 | 2014-01-29 | 上海市建筑装饰工程集团有限公司 | 用于干挂石材幕墙的龙骨及其安装方法 |
CN103526866A (zh) * | 2013-11-06 | 2014-01-22 | 上海市建筑装饰工程集团有限公司 | 干挂石材幕墙及其安装方法 |
CN103758317B (zh) * | 2014-01-13 | 2016-04-13 | 新疆德力亚节能科技有限公司 | 一种超薄保温装饰一体板安装*** |
CN103758317A (zh) * | 2014-01-13 | 2014-04-30 | 新疆德力亚节能科技有限公司 | 一种超薄保温装饰一体板安装*** |
CN104746828A (zh) * | 2014-07-01 | 2015-07-01 | 李忠玉 | 燕尾销挂件及使用其装饰板干挂施工工艺 |
CN104746828B (zh) * | 2014-07-01 | 2018-05-15 | 李忠玉 | 燕尾销挂件及使用其装饰板干挂施工工艺 |
CN104563349A (zh) * | 2015-01-12 | 2015-04-29 | 上海卓欧建筑装饰工程有限公司 | 幕墙背附钢架安装于主体结构上的连接总成及安装方法 |
CN106351371A (zh) * | 2016-10-13 | 2017-01-25 | 北京港源幕墙有限公司 | 一种幕墙龙骨制造施工工艺 |
CN107620442A (zh) * | 2017-08-21 | 2018-01-23 | 广州市名晋机电设备技术有限公司 | 一种新型单元式外墙板干挂*** |
CN107518683A (zh) * | 2017-08-29 | 2017-12-29 | 许昌市建安区第实验学校 | 一种多功能儿童凳 |
CN107587635A (zh) * | 2017-10-10 | 2018-01-16 | 海天建设集团有限公司 | 外墙陶板竖向插销式安装施工工艺 |
CN110424642A (zh) * | 2019-07-01 | 2019-11-08 | 中国十七冶集团有限公司 | 一种异型金属屋面用承插式栓接龙骨的施工方法 |
CN110528721A (zh) * | 2019-07-31 | 2019-12-03 | 上海宝冶建筑装饰有限公司 | 石笼装饰墙的施工方法 |
CN110453925A (zh) * | 2019-09-07 | 2019-11-15 | 吉林建筑大学 | 装配式建筑pcf板与预制外墙板之间施工调节方法 |
CN111395680A (zh) * | 2020-03-24 | 2020-07-10 | 浙江世贸装饰股份有限公司 | 一种用于解决墙面陶瓷板安装缝隙的安装方法 |
CN114876144A (zh) * | 2021-06-08 | 2022-08-09 | 上海牛元工贸有限公司 | 一种岩板干挂安装工艺 |
CN113738050A (zh) * | 2021-10-08 | 2021-12-03 | 北京城建亚泰建筑装饰工程设计有限公司 | 一种内外墙装饰面板干挂施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101824895B (zh) | 2011-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101824895B (zh) | 干挂瓷板墙面装饰***及其施工方法 | |
CN108797847B (zh) | 一种装配式钢框架填充墙结构体系及其施工方法 | |
CN101302782B (zh) | 一种干挂保温装饰幕墙及其安装工艺 | |
CN109853800B (zh) | 一种组装式低耗能幕墙***及其施工方法 | |
CN111305410B (zh) | 一种防开裂墙体及其施工方法 | |
CN101775862A (zh) | 复合保温模板与建筑主体一体化施工保温体系 | |
CN105484391A (zh) | 轻质保温grc免拆模板制作保温防水墙体的施工方法 | |
CN110792204B (zh) | 三维可调装配式轻型条板外墙***及其施工方法 | |
CN114046041B (zh) | 一种清水混凝土墙体后浇带的模板加固结构及其施工方法 | |
CN208934190U (zh) | 一种装配式钢框架填充墙结构体系 | |
CN104499614B (zh) | 墙体保温一体化点挂***及其安装方法 | |
CN108457409A (zh) | 一种串挂陶土砖的外装饰立面及其安装方法 | |
CN201649524U (zh) | 干挂瓷板墙面装饰*** | |
CN102677858B (zh) | 一种氟碳装饰无机单板安装的背挂件及其施工方法 | |
CN202520153U (zh) | 门窗钢副框安装施工结构 | |
CN110805185A (zh) | 大跨度曲面异形石材幕墙安装工法 | |
CN103437440A (zh) | 建筑保温预制板固定装置及建筑保温逆作法施工方法 | |
CN116104224A (zh) | 一种外墙保温一体化缝隙拼装构造节点及施工方法 | |
CN115182496A (zh) | 一种横通竖断式多元组合幕墙***及其施工方法 | |
SA99190967B1 (ar) | درجة ( سلم ) لبركة سباحة | |
CN103015656B (zh) | 构件式外墙保温装饰板及其制作方法和外墙安装方法 | |
KR20190078792A (ko) | 건축용 다용도 시스템 브라켓 | |
CN114991469A (zh) | 一种墙柱模板的安装结构及其安装方法 | |
CN213297123U (zh) | 一种装配式免拆复合一体化模板 | |
JPH0768735B2 (ja) | 軽量気泡コンクリートパネル |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110810 Termination date: 20120208 |