CN101709476A - Production method and equipment for deburring aluminum workpieces by continuously alkali washing - Google Patents

Production method and equipment for deburring aluminum workpieces by continuously alkali washing Download PDF

Info

Publication number
CN101709476A
CN101709476A CN200910114500A CN200910114500A CN101709476A CN 101709476 A CN101709476 A CN 101709476A CN 200910114500 A CN200910114500 A CN 200910114500A CN 200910114500 A CN200910114500 A CN 200910114500A CN 101709476 A CN101709476 A CN 101709476A
Authority
CN
China
Prior art keywords
workpiece
degreasing
aluminium
aluminum
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910114500A
Other languages
Chinese (zh)
Other versions
CN101709476B (en
Inventor
徐本海
陈平
岑玉茉
李彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ALNAN ALUMINIUM Co Ltd
Original Assignee
ALNAN ALUMINIUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ALNAN ALUMINIUM Co Ltd filed Critical ALNAN ALUMINIUM Co Ltd
Priority to CN2009101145007A priority Critical patent/CN101709476B/en
Publication of CN101709476A publication Critical patent/CN101709476A/en
Application granted granted Critical
Publication of CN101709476B publication Critical patent/CN101709476B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a production method and equipment for deburring aluminum workpieces by continuously alkali washing. Surface burrs on the surfaces of aluminum or aluminum alloy workpieces (precision parts) with complicated shapes are removed by adopting relatively simple processes and relatively less equipment and a layer of passivation protective film is attached. The production method adopts a fully-automatic method and comprises the following steps of degreasing, alkali washing, neutralizing, soaking with pure water, surface passivating, washing, blowing and drying. The invention is characterized in that the aluminum workpieces are operated continuously on a stable conveyor belt, and the invention has the advantages of high deburring efficiency, damage free to parts surfaces, surface passivation, discoloration free, easy treatment with cleanout fluid and the like.

Description

The production method of aluminum workpieces by continuously alkali washing fin cutting and equipment
Technical field
The present invention relates to a kind of production method and equipment of aluminum or aluminum alloy workpiece fin cutting, particularly remove aluminium and Al alloy parts surface burr (base substrate) and adhere to the production method and the equipment of one deck passivation protection film by full-automatic alkali cleaning continuously.
Background technology
The precision work that is used for precision component along with aluminum or aluminum alloy more and more widely, deburring in the precision work and passivation protection top layer are another directly to be the obstacle that is difficult to overcome in the precision component production full-automation.The finely finished article of various aluminium alloys and aluminium; valve body comprising automobile; the hydraulic machine axle; gear; computer hard disc; scatterer; the rocking arm of lathe; precision screws etc. all need burr is removed in precision work; also more and more high to the requirement of processing the back deburring; the user has proposed very high requirement to the deburring of such part; when under 10 power microscopes, checking after the customer requirements part deburring that has without any projection; burr; and piece surface not damaged; no variable color; therefore, deburring and passivation protection have become to influence the key factor of part quality and part processing productivity.So the precision work expense of precision component reaches 15% of total cost of production in production.
At present, several different methods is arranged, 1, the manual burr removal of scraping for complex-shaped precision component cleaning, fin cutting and passivation, 2, vibration or rolling burr removal, 3, the thermochemistry deburring, 4, the abrasive jet deburring, 5, electrochemical machining burr removal, 6, the ultrasonic wave burr removal.All there is weak point in this several method, and 1, the manual burr removal of scraping.Because part is little, the deburring position is many, and the workman operates at microscopically, and production efficiency is very low, and the part quality is influenced by human factor and be difficult for assurance.2, vibropolish deburring and drum polishing deburring.Part and abrasive particle are put into shake cylinder or drum together, add entry or other liquid medium, cylinder body vibration or drum roll, by the collision of abrasive particle and part, the purpose that rubbing effect reaches deburring.But this method can the fin cutting part to precision component, but simultaneously also can the defective work piece structure and change workpiece size.3, thermochemistry deburring.Usually be referred to as " thorn of singing ", its principle is that part is put into an airtight pressurized vessel, feed blended inflammable gas by a certain percentage, use the spark ignitor inflammable gas, by the instantaneous high temperature of inflammable gas detonation (optional 2500~3000 ℃ of the local temperature of formation) with the burr burn off.Because the material of this part is an aluminium, its thermal conductivity is fine, and the effect of deburring is undesirable in this way.High temperature when in addition, singing thorn can make the piece surface variable color and make the material deliquescing.So precision component can not adopt the method for thermochemistry deburring.4, abrasive jet deburring.Its principle is to utilize pressurized air that abrasive particle is sprayed to part burr position at a high speed from jet hole, by bump, the rubbing effect fin cutting of abrasive particle.Because this part is little and complicated, many positions abrasive particle injection less than, burr is removed unclean, and productivity is lower.5, electrochemical machining burr removal.Utilize the principle of electrochemical machining to hit burr removal. promptly utilize metal that the principle of anode dissolution can take place in electrolytic solution.During deburring, tool-electrode is connect dc power cathode, part connects dc power anode, makes tool-electrode alignment element burr root, feeds mobile electrolytic solution between part burr and tool-electrode.Like this, burr will come off from root is dissolved.Adopt the method for electrochemical deburring can hit the burr that removes this part effectively.Because the chemical property of aluminium is active, and the part of user after to deburring require very highly, makes the electrochemical deburring of this part be different from general steel components.It does not produce dispersion corrosion when requiring to guarantee the part deburring on technology, and surfaceness is good, and piece surface nondiscoloration after the deburring.So this method facility investment is big, efficient is too low, energy consumption is high, and waste electrolyte is handled comparatively complicated, is difficult to be fit to the production of extensive multiplex's part.6, ultrasonic wave burr removal.This method is with vacuum decompression ultrasonic wave unhairing acupuncture manipulation cleaning object (comprising deburring object, corrosion object) to be positioned in the vacuum (decompression), removes its inner air, leads then and carries out ultrasonic cleaning after people's clean-out system soaks.But this method is difficult to remove greater than the burr more than the 50 μ m, and the burr that aluminium workpiece cutting process is produced generally all can be greater than 100 μ m.
Summary of the invention
The purpose of this invention is to provide a kind of comparatively simple technology and relatively less equipment just can realize the complex-shaped surperficial burr of aluminum or aluminum alloy workpiece (precision parts) is removed and adhered to one deck passivation protection film and make aluminium piece surface not damaged, no variable color, advantages such as the easy processing of scavenging solution.
Technical scheme of the present invention is to adopt the method for similar full-automatic alkali cleaning aluminium alloy, its technology comprise workpiece degreasing degreasing, alkali cleaning, neutralization, pure water immersion, surface passivation, clean, the step of blowing and oven dry, be characterized in operate continuously in having stable travelling belt, process is as follows:
1, degreasing degreasing, the king-sized burr of artificial removal after the aluminum or aluminum alloy workpiece cuts or shapes, transmit then and enter the degreasing degreasing operation, described degreasing degreasing process be with aluminium and Al alloy parts on automatic conveying belt with deoil, stain remover spray workpiece, or immerse automatically by transport unit in the liquid of groove, make workpiece cleaning, adopted deoil, stain remover is the mixture of alkalescence, acidity or neutral pharmaceutical chemicals and water, 30~60 ℃ of spray temperature.
2, alkali cleaning, continue to be sent to the workpiece of degreasing degreasing in the alkaline bath, immerse alkaline wash, 70~110 ℃ of alkali cleaning temperature, 1~6 minute time, alkaline wash is made up of the SODIUMNITRATE of 5~10% (wt%) and the aqueous solution of sodium hydroxide or potassium hydroxide, and the mass ratio of SODIUMNITRATE and sodium hydroxide or potassium hydroxide is 0.5~1: 3~4, and alkaline wash is provided with outer circulation, liquid level height control system.
3, neutralization, the workpiece after the alkali cleaning continues to be sent to neutralization chamber, soaks 2~4 minutes with nitric acid, sulfuric acid and the neutralization additive of 1~5% (wt%), uses the clear water spray irrigation clean then.
4, pure water soaks, because workpiece needs surface passivation, so the clean workpiece of clear water spray irrigation need soak with deionized water, guarantees neutral pH value.
5, surface passivation, workpiece is continued to send into deactivation slot along automatic conveying belt, passivation is 3~5 minutes in the passivation liquid medicine of being made up of deionized water, water glass, Sunmorl N 60S, benzotriazole and tensio-active agent, the mass ratio of water, water glass, Sunmorl N 60S, benzotriazole and tensio-active agent is 50~90: 0.5~1: 0.2~0.6: 0.4~1: 0.05~0.1, and described tensio-active agent is anion surfactants such as Sodium dodecylbenzene sulfonate or Ye Gui a, famous physician of the Qing Dynasty alcohol sodium sulfate.
6, clean, the back of coming out of the workpiece after the passivation is clean with the clear water spray irrigation, cleans and can divide two sections to carry out, and first section with the flushing of normal temperature tap water, uses the heat water-spraying for second section, and the temperature of hot water is 80-95 ℃, helps next step drying like this.
7, blowing and oven dry enter the hot blast drying chamber with workpiece along travelling belt, and air blast dries up, and rolls off the production line, and dispatches from the factory after the assay was approved.
The equipment that production method adopted that aluminium and Al alloy parts surface burr are removed in above-mentioned full-automatic alkali cleaning continuously comprises travelling belt, degreasing degreasing chamber, alkaline bath, deactivation slot and heating blowing chamber, described alkaline bath and deactivation slot are deep-slotted chip breaker, aluminium and Al alloy parts enter deep-slotted chip breaker contact alkaline wash or passivating solution along travelling belt, described deep-slotted chip breaker also can be that the bottom is for flat, both sides are the slope, and slope and travelling belt planar angle a are between 15~60 °; In addition, alkaline cleaning procedure is because alkali lye and aluminum metal temperature of reaction raise, so will establish external circulating system and liquid level control device, suitably heating or cooling guarantee the temperature of alkali cleaning, and control suitable liquid level.Described heating blowing chamber is to be provided with heating tube and the chest that can dry of four sides, can be by hot blast drying after aluminium and Al alloy parts are entered.
The invention has the beneficial effects as follows:
1, adopt on travelling belt, once finish degreasing degreasing, alkali cleaning, neutralization, pure water immersion, surface passivation, clean, the operation of blowing and oven dry, guaranteed operating continuity, alleviated workman's stagewise operation in the past, saved the space and the energy.
2, degreasing tank, neutralizing well, alkaline bath and deactivation slot are deep-slotted chip breaker, have controlled the time and the effect of degreasing, alkali cleaning, neutralization and passivation well.
3, heat water-spraying's temperature is 80-95 ℃, helps the drying of workpiece like this.
4, the alkaline wash that disposes voluntarily of the inventor has guaranteed effective removal of workpiece surface burr and to the effective protection and the control of Workpiece structure and size.
5, the passivator that disposes voluntarily of the inventor has guaranteed that workpiece surface has anti-oxidant preferably and corrosion resistance nature, and workpiece is subjected to user's welcome, and particularly some precision instrument parts have guaranteed quality product.
Description of drawings
Fig. 1 is the production unit structural representation that aluminum or aluminum alloy workpiece surface burr is removed in the full-automatic alkali cleaning continuously of the present invention.
Fig. 2 is the synoptic diagram of the production process of embodiment 1 continuous alkali cleaning fin cutting.
Fig. 3 is the synoptic diagram of the production process of embodiment 2 continuous alkali cleaning fin cuttings.
See among the figure that the equipment of aluminum workpieces by continuously alkali washing fin cutting comprises frame 1, live roll 2, travelling belt 3, cover body 4, degreasing degreasing chamber 5, alkaline bath 6, neutralization chamber 7, deactivation slot 8 and hot blast drying chamber 9, live roll 2 is installed on the frame 1, live roll 2 has travelling belt 3, degreasing degreasing chamber 5, alkaline bath 6 and neutralization chamber 7, deactivation slot 8 and hot blast drying chamber 9 are all in cover body 4.
Embodiment
Embodiment 1
As shown in Figure 2, the inventor produces a collection of desktop cpu scatterer 10 in September, 2008 for certain computer enterprise, the king-sized burr of artificial removal after cutting or shaping, transmission enters degreasing degreasing chamber 5 and carries out the degreasing degreasing operation, that adopts deoils, stain remover is the alkali electroless medicine, 55 ℃ of temperature, sprayed 4 minutes, continue to be sent in the alkaline bath 6 again, immerse alkaline wash, 80~100 ℃ of alkali cleaning temperature, 2 minutes time, alkaline wash is made up of the SODIUMNITRATE of 7.5% (wt%) and the aqueous solution of sodium hydroxide or potassium hydroxide, and the mass ratio of SODIUMNITRATE and sodium hydroxide or potassium hydroxide is 0.8: 3, and alkaline wash is provided with outer circulation and liquid level height control system; Workpiece after the alkali cleaning continues to be sent to neutralization chamber 7, with the nitric acid dousing of 4.5% (wt%) 4 minutes, use the clear water spray irrigation clean then, soak with deionized water, guarantee neutral pH value, again workpiece is continued to send into deactivation slot 8 along automatic conveying belt, by water glass, Sunmorl N 60S, passivation is 3 minutes in the passivator that benzotriazole and tensio-active agent are formed, water, water glass, Sunmorl N 60S, the mass ratio of benzotriazole and Sodium dodecylbenzene sulfonate is 1: 0.5: 0.2: 0.4: 0.05, it is clean after workpiece after the passivation comes out with the clear water spray irrigation, clean and can divide two sections to carry out, first section with the flushing of normal temperature tap water, uses the heat water-spraying for second section, the temperature of hot water is 90 ℃, at last workpiece is entered hot blast drying chamber 9 along travelling belt, air blast dries up, and rolls off the production line, dispatch from the factory after the assay was approved, after the user used, it was fine to feed back this batch part quality in January, 2009, and durability is higher.
Embodiment 2
As shown in Figure 3, accept 11 hundreds of in certain mobile communication company base station trunking scatterer in February, 2009, the king-sized burr of artificial removal after cutting or shaping, transmission enters degreasing degreasing chamber 5 and carries out the degreasing degreasing operation, adopt deoiling of embodiment 1, stain remover is the alkali electroless medicine, 35~50 ℃ of temperature, sprayed 3 minutes, continue to be sent in the alkaline bath 6 again, immerse alkaline wash, 70~90 ℃ of alkali cleaning temperature, 4 minutes time, alkaline wash is made up of the SODIUMNITRATE of 7% (wt%) and the aqueous solution of sodium hydroxide or potassium hydroxide, and the mass ratio of SODIUMNITRATE and sodium hydroxide or potassium hydroxide is 0.7: 3, and alkaline wash is provided with outer circulation and liquid level height control system; Workpiece after the alkali cleaning continues to be sent to neutralization chamber 7, with the nitric acid dousing of 4% (wt%) 3 minutes, use the clear water spray irrigation clean then, soak with deionized water, guarantee neutral pH value, again workpiece is continued to send into deactivation slot 8 along automatic conveying belt, by water glass, Sunmorl N 60S, passivation is 4 minutes in the passivator that benzotriazole and tensio-active agent are formed, water, water glass, Sunmorl N 60S, the mass ratio of benzotriazole and Sodium dodecylbenzene sulfonate is identical with embodiment 1, and is clean with the clear water spray irrigation after the workpiece after the passivation comes out, and cleans and can divide two sections to carry out, first section is washed with the normal temperature tap water, use the heat water-spraying for second section, the temperature of hot water is 85 ℃, at last workpiece is entered hot blast drying chamber 9 along travelling belt, air blast dries up, roll off the production line, dispatch from the factory after the assay was approved, more satisfied during user acceptance.

Claims (5)

1. the production method of aluminium or aluminum workpieces by continuously alkali washing fin cutting and surface passivation protection; adopt full-automatic caustic washing method to carry out; its technology comprise workpiece degreasing degreasing, alkali cleaning, neutralization, pure water immersion, surface passivation, clean, the step of blowing and oven dry; it is characterized in that: the aluminium workpiece is operate continuously in having stable travelling belt, and process is as follows:
1). degreasing degreasing, the king-sized burr of artificial removal after aluminium and Al alloy parts cut or shape, transmit then and enter the degreasing degreasing operation, described degreasing degreasing process be with aluminium and Al alloy parts on automatic conveying belt with deoil, stain remover spray workpiece or immerse in the groove in the liquid, make the workpiece cleaning, adopted deoil, stain remover is alkalescence, acid or neutral chemical industry solutions, the spray temperature is 30~60 ℃;
2). alkali cleaning, continue to be sent to the workpiece of degreasing degreasing in the alkaline bath, immerse alkaline wash, 70~110 ℃ of alkali cleaning temperature, 1~6 minute time, alkaline wash is made up of the SODIUMNITRATE of 5~10%wt and the aqueous solution of sodium hydroxide or potassium hydroxide, and the mass ratio of SODIUMNITRATE and sodium hydroxide or potassium hydroxide is 0.5~1: 3~4, and alkaline wash is provided with outer circulation and liquid level control and temperature controlling system;
3). neutralization, the workpiece after the alkali cleaning continues to be sent to neutralization chamber, and the neutralization solution of forming with nitric acid, sulfuric acid and the neutralization additive of 1~5%wt soaked 2~4 minutes, used the clear water spray irrigation clean then;
4). pure water soaks, because workpiece needs surface passivation, so the clean workpiece of clear water spray irrigation need soak with deionized water, guarantees neutral pH value;
5). surface passivation, workpiece is continued to send into deactivation slot along automatic conveying belt, passivation is 3~5 minutes in the passivator of being made up of water glass, Sunmorl N 60S, benzotriazole and tensio-active agent, the mass ratio of water, water glass, Sunmorl N 60S, benzotriazole and tensio-active agent is 50~90: 0.5~1: 0.2~0.6: 0.4~1: 0.05~0.1, and described tensio-active agent is anion surfactants such as Sodium dodecylbenzene sulfonate or Ye Gui a, famous physician of the Qing Dynasty alcohol sodium sulfate;
6). clean, the back of coming out of the workpiece after the passivation is clean with the clear water spray irrigation, cleans and can divide two sections to carry out, and first section with the flushing of normal temperature tap water, uses the heat water-spraying for second section, and the temperature of hot water is 60-95 ℃;
7). blowing and oven dry, workpiece is entered hot blast drying chamber (9) along travelling belt, air blast dries up, and rolls off the production line, and dispatches from the factory after the assay was approved;
2. the equipment that production method adopted of aluminium as claimed in claim 1 or aluminum workpieces by continuously alkali washing fin cutting, it is characterized in that: this equipment comprises frame (1), live roll (2), travelling belt (3), degreasing degreasing chamber (5), alkaline bath (6), neutralizing well, deactivation slot (8) and hot blast drying chamber (9), live roll (2) is installed on the frame (1), live roll (2) has travelling belt (3), alkaline bath (6) and deactivation slot (8) are deep-slotted chip breaker, deactivation slot (8) and hot blast drying chamber (9) are installed in the cover body (4), and the aluminum or aluminum alloy workpiece enters deep-slotted chip breaker contact alkaline wash or passivating solution along travelling belt.
3. the production unit of aluminium according to claim 1 or aluminum workpieces by continuously alkali washing fin cutting, it is characterized in that: described equipment also comprises external circulating system, liquid level control device, be provided with heating or cooling temperature control device, guarantee the temperature of alkali cleaning, and control suitable liquid level.
4. the production unit of aluminium according to claim 2 or aluminum workpieces by continuously alkali washing fin cutting is characterized in that: described deep-slotted chip breaker bottom is for flat, and both sides are the slope, and slope and travelling belt planar angle are between 15~60 °.
5. the production unit of aluminium according to claim 2 or aluminum workpieces by continuously alkali washing fin cutting is characterized in that: the chest that described hot blast drying chamber (9) is provided with heating tube and can dries on four sides.
CN2009101145007A 2009-10-30 2009-10-30 Production method and equipment for deburring aluminum workpieces by continuously alkali washing Expired - Fee Related CN101709476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101145007A CN101709476B (en) 2009-10-30 2009-10-30 Production method and equipment for deburring aluminum workpieces by continuously alkali washing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101145007A CN101709476B (en) 2009-10-30 2009-10-30 Production method and equipment for deburring aluminum workpieces by continuously alkali washing

Publications (2)

Publication Number Publication Date
CN101709476A true CN101709476A (en) 2010-05-19
CN101709476B CN101709476B (en) 2012-06-13

Family

ID=42402282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101145007A Expired - Fee Related CN101709476B (en) 2009-10-30 2009-10-30 Production method and equipment for deburring aluminum workpieces by continuously alkali washing

Country Status (1)

Country Link
CN (1) CN101709476B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101962780A (en) * 2010-09-26 2011-02-02 西安煤航印刷材料有限责任公司 Solution tank for PS-version continuous production and degreasing method thereof
CN102389909A (en) * 2011-11-24 2012-03-28 南南铝业股份有限公司 Method and equipment for separating aluminum and aluminum alloy from extrusion mold by alkali washing
CN102580951A (en) * 2012-03-02 2012-07-18 山东常林机械集团股份有限公司 Cleaning process of hydraulic parts
CN102634782A (en) * 2011-02-15 2012-08-15 广西柳州市龙发金属表面处理技术有限公司 Automatic soft membrane passivation production line
CN103454133A (en) * 2013-08-20 2013-12-18 航天科工防御技术研究试验中心 Macroscopic corrosion test device
CN104099590A (en) * 2014-06-19 2014-10-15 锐展(铜陵)科技有限公司 Surface treating agent for aluminum alloy after degreasing and water washing
CN104451744A (en) * 2014-12-02 2015-03-25 张家港市广川电子有限公司 Method and device for cleaning aluminum rod in linear motion and aluminum rod forming and cleaning apparatus with device
CN104480489A (en) * 2015-01-04 2015-04-01 麻城市天安纳米化工材料有限公司 Environment-friendly efficient train cleaning agent and preparation method thereof
CN104618507A (en) * 2015-02-25 2015-05-13 南京阖云骥联信息科技有限公司 System and method for managing social networking service ecological organization under Internet of Vehicles environment
CN104639304A (en) * 2015-02-05 2015-05-20 南京阖云骥联信息科技有限公司 Dual-controller communication system based on internet of vehicles and dual-controller communication method based on internet of vehicles
CN104674231A (en) * 2013-11-29 2015-06-03 北京有色金属研究总院 Aluminum alloy and surface reinforcing method of composite material of aluminum alloy
CN104930159A (en) * 2015-07-08 2015-09-23 盐城市禾鼎机械有限公司 High-stability and high-energy-saving oil pump driven gear and surface processing method thereof
CN105382674A (en) * 2013-11-27 2016-03-09 天广消防股份有限公司 Surface treatment process of aluminum product workpiece
CN106350811A (en) * 2016-11-25 2017-01-25 遵义恒佳铝业有限公司 Aluminum pipe passivation technology
CN106521528A (en) * 2016-11-25 2017-03-22 遵义恒佳铝业有限公司 Surface treatment process for aluminum rods
CN108085707A (en) * 2017-11-18 2018-05-29 浙江金航钢管科技有限公司 A kind of seamless steel pipe continuous pickling device and its acid washing method
CN108237112A (en) * 2017-12-25 2018-07-03 温州万虹阀门有限公司 A kind of environment-friendly type stainless cast steel part table plane polarizedl ight and ultrasonic cleaning process
CN109550905A (en) * 2018-12-21 2019-04-02 重庆虎溪电机工业有限责任公司 A method of it removing mold aluminium and flies skin
CN112064043A (en) * 2020-09-07 2020-12-11 北京首钢吉泰安新材料有限公司 Method for removing oxide film on surface of iron-chromium-aluminum wire rod and heating container
CN112975595A (en) * 2021-04-20 2021-06-18 江苏珀然股份有限公司 Automobile hub surface processing method
CN115254739A (en) * 2022-07-26 2022-11-01 湖州中云机械制造股份有限公司 Ultrasonic cleaning, passivation and drying integrated assembly line and process
CN115572964A (en) * 2022-11-21 2023-01-06 河北宇天材料科技有限公司 Conductive oxidation treatment method for aluminum alloy cavity

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101962780B (en) * 2010-09-26 2012-06-27 西安煤航印刷材料有限责任公司 Solution tank for PS-version continuous production and degreasing method thereof
CN101962780A (en) * 2010-09-26 2011-02-02 西安煤航印刷材料有限责任公司 Solution tank for PS-version continuous production and degreasing method thereof
CN102634782A (en) * 2011-02-15 2012-08-15 广西柳州市龙发金属表面处理技术有限公司 Automatic soft membrane passivation production line
CN102389909A (en) * 2011-11-24 2012-03-28 南南铝业股份有限公司 Method and equipment for separating aluminum and aluminum alloy from extrusion mold by alkali washing
CN102389909B (en) * 2011-11-24 2014-06-04 南南铝业股份有限公司 Method and equipment for separating aluminum and aluminum alloy from extrusion mold by alkali washing
CN102580951A (en) * 2012-03-02 2012-07-18 山东常林机械集团股份有限公司 Cleaning process of hydraulic parts
CN103454133A (en) * 2013-08-20 2013-12-18 航天科工防御技术研究试验中心 Macroscopic corrosion test device
CN103454133B (en) * 2013-08-20 2016-06-22 航天科工防御技术研究试验中心 Macroscopic corrosion test device
CN105382674A (en) * 2013-11-27 2016-03-09 天广消防股份有限公司 Surface treatment process of aluminum product workpiece
CN104674231A (en) * 2013-11-29 2015-06-03 北京有色金属研究总院 Aluminum alloy and surface reinforcing method of composite material of aluminum alloy
CN104674231B (en) * 2013-11-29 2018-04-27 北京有色金属研究总院 The surface reinforcing method of aluminium alloy and its composite material
CN104099590A (en) * 2014-06-19 2014-10-15 锐展(铜陵)科技有限公司 Surface treating agent for aluminum alloy after degreasing and water washing
CN104451744B (en) * 2014-12-02 2015-12-09 张家港市广川电子有限公司 A kind of to the method and apparatus that cleans of aluminium bar in rectilinear movement and the shaping cleaning equipment of aluminium bar that adopts this device
CN104451744A (en) * 2014-12-02 2015-03-25 张家港市广川电子有限公司 Method and device for cleaning aluminum rod in linear motion and aluminum rod forming and cleaning apparatus with device
CN104480489A (en) * 2015-01-04 2015-04-01 麻城市天安纳米化工材料有限公司 Environment-friendly efficient train cleaning agent and preparation method thereof
CN104639304A (en) * 2015-02-05 2015-05-20 南京阖云骥联信息科技有限公司 Dual-controller communication system based on internet of vehicles and dual-controller communication method based on internet of vehicles
CN104618507A (en) * 2015-02-25 2015-05-13 南京阖云骥联信息科技有限公司 System and method for managing social networking service ecological organization under Internet of Vehicles environment
CN104930159A (en) * 2015-07-08 2015-09-23 盐城市禾鼎机械有限公司 High-stability and high-energy-saving oil pump driven gear and surface processing method thereof
CN106350811A (en) * 2016-11-25 2017-01-25 遵义恒佳铝业有限公司 Aluminum pipe passivation technology
CN106521528A (en) * 2016-11-25 2017-03-22 遵义恒佳铝业有限公司 Surface treatment process for aluminum rods
CN108085707B (en) * 2017-11-18 2019-06-04 浙江金航钢管科技有限公司 A kind of seamless steel pipe continuous pickling device and its acid washing method
CN108085707A (en) * 2017-11-18 2018-05-29 浙江金航钢管科技有限公司 A kind of seamless steel pipe continuous pickling device and its acid washing method
CN108237112A (en) * 2017-12-25 2018-07-03 温州万虹阀门有限公司 A kind of environment-friendly type stainless cast steel part table plane polarizedl ight and ultrasonic cleaning process
CN109550905A (en) * 2018-12-21 2019-04-02 重庆虎溪电机工业有限责任公司 A method of it removing mold aluminium and flies skin
CN109550905B (en) * 2018-12-21 2020-08-11 重庆虎溪电机工业有限责任公司 Method for removing aluminum flying skin of die
CN112064043A (en) * 2020-09-07 2020-12-11 北京首钢吉泰安新材料有限公司 Method for removing oxide film on surface of iron-chromium-aluminum wire rod and heating container
CN112975595A (en) * 2021-04-20 2021-06-18 江苏珀然股份有限公司 Automobile hub surface processing method
CN115254739A (en) * 2022-07-26 2022-11-01 湖州中云机械制造股份有限公司 Ultrasonic cleaning, passivation and drying integrated assembly line and process
CN115254739B (en) * 2022-07-26 2024-02-06 湖州中云机械制造股份有限公司 Ultrasonic cleaning, passivating and drying integrated assembly line and process
CN115572964A (en) * 2022-11-21 2023-01-06 河北宇天材料科技有限公司 Conductive oxidation treatment method for aluminum alloy cavity

Also Published As

Publication number Publication date
CN101709476B (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN101709476B (en) Production method and equipment for deburring aluminum workpieces by continuously alkali washing
CN102154655B (en) Normal temperature spraying detergent for aluminum alloy and preparation method thereof
CN106283075A (en) Water-solube and biodegradable abluent and Cleaning application method
CN104674263A (en) Metal surface cleaning method
CN108950644B (en) 7-series aluminum product anodic oxide film remover and film removing method
CN105177545A (en) Cold-rolled steel sheet surface treatment technique
CN105970242A (en) Cleaning technology for changing metal surface activity
CN102125914A (en) Ultrasonic surface cleaning process for forged workpiece
CN108624946B (en) Electrolytic paint stripping agent and paint stripping method
CN108166012A (en) The metal works that the cleaning of metal works and cleaning obtain
CN106637167A (en) Stainless steel passivation technology
CN105567459B (en) A kind of green alkaline cleaning solution and preparation method
CN102337545A (en) Rust remover for ultrasonically cleaning metal mould and preparation method thereof
CN105671541A (en) Stainless steel passivating technique
CN103966616B (en) A kind of chemical deburring technique for spring surface
CN102962290A (en) High-efficiency production process capable of improving surface accuracy of cold-drawn seamless steel tube
CN104357862A (en) Metal surface cleaning method
CN107338449A (en) A kind of titanium alloy surface aoxidizes skin laser cleaning method
KR102532527B1 (en) Method for descaling of steel material
CN110813901A (en) Workpiece cleaning method
CN103924054A (en) Antirust method for 20A steel tube for aviation
CN102978597A (en) Spraying type comprehensive phosphate treating agent for cold-rolled sheet workpiece spraying coating and preparation method of spraying type comprehensive phosphate treating agent
CN103132095B (en) Degreasing, the method for purifying treatment and special hot alkaline solution are carried out to metallic surface
CN113214915A (en) Oil removing agent and preparation method thereof
CN107988593A (en) Metal surface treating method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120613

Termination date: 20171030

CF01 Termination of patent right due to non-payment of annual fee