CN101550695B - 预应力钢绞束置换注浆法加固病桩的施工方法 - Google Patents

预应力钢绞束置换注浆法加固病桩的施工方法 Download PDF

Info

Publication number
CN101550695B
CN101550695B CN2009100961313A CN200910096131A CN101550695B CN 101550695 B CN101550695 B CN 101550695B CN 2009100961313 A CN2009100961313 A CN 2009100961313A CN 200910096131 A CN200910096131 A CN 200910096131A CN 101550695 B CN101550695 B CN 101550695B
Authority
CN
China
Prior art keywords
slip casting
stake
sick
reinforced
steel twist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100961313A
Other languages
English (en)
Other versions
CN101550695A (zh
Inventor
朱奎
叶长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Kechuang Jiasi Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100961313A priority Critical patent/CN101550695B/zh
Publication of CN101550695A publication Critical patent/CN101550695A/zh
Application granted granted Critical
Publication of CN101550695B publication Critical patent/CN101550695B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种预应力钢绞束置换注浆法加固病桩的施工方法,包括以劲性钢绞束置换松散混凝土,补偿桩混凝土缺陷导致的强度损失,并采用高压灌浆法使钢绞束与桩身混凝土形成一个整体,其施工步骤包括:a)钻孔,b)清孔,c)孔底埋设锚具及钢绞束,d)预应力张拉,e)注浆封孔。由于本发明提供的病桩加固方法中采用劲性钢绞束置换松散混凝土,补偿桩混凝土缺陷导致的强度损失,并采用高压灌浆法使钢绞束与桩身混凝土形成一个整体,因此可以将病桩整合成为一个整体,增强其强度。

Description

预应力钢绞束置换注浆法加固病桩的施工方法
技术领域
本发明涉及一种预应力钢绞束置换注浆法加固病桩的施工方法。
背景技术
大直径桩混凝土因施工不当会造成孔洞、严重离析等不良现象。这类病桩桩芯混凝土强度很低,导致了混凝土抗压强度不够,从而承载力降低较大。而这类桩在承载方面作用较大,一般为一桩一柱或两桩一柱等,此类情况在出现质量缺陷后很难处理。
发明内容
本发明解决的技术问题是提供一种能够解决大直径桩桩芯混凝土强度不高导致承载力不够问题的预应力钢绞束置换注浆法加固病桩的施工方法。
为此,本发明提供的预应力钢绞束置换注浆法加固病桩的施工方法,包括以劲性钢绞束置换松散混凝土,补偿桩混凝土缺陷导致的强度损失,并采用高压灌浆法使钢绞束与桩身混凝土形成一个整体,其施工步骤包括:
a)钻孔。
b)清孔。
c)孔底埋设锚具及钢绞束。
d)预应力张拉。
e)注浆封孔。
由于本发明提供的病桩加固方法中采用劲性钢绞束置换松散混凝土,补偿桩混凝土缺陷导致的强度损失,并采用高压灌浆法使钢绞束与桩身混凝土形成一个整体,因此可以将病桩整合成为一个整体,增强其强度。
附图说明
图中为经预应力钢绞束置换注浆法加固病桩的施工方法处理后的桩
各附图中:1、钢绞束,2注浆体,3、混凝土。
具体实施方式
以下对本发明进行详细描述,其发明施工步骤如下:
a)钻孔
钻孔要注意垂直度的要求,钻孔的垂直度控制在0.8%以内,避免钻孔偏出桩身,引起串孔,导致对桩身的破坏。
b)清孔
采用花管冲洗桩底沉渣,冲洗压力控制在1.5~3MPa,待返清水后停止冲孔。
c)孔底埋设锚具及钢绞束。
锚具采用锥型锚具,用50cm高强水泥浆封闭。待高强水泥浆强度达到100%后进行预应力张拉,如图所示钢绞束1外露长度不小于400mm,以满足张拉要求,
钢绞束1的面积计算公式如下:
Figure G2009100961313D00021
式中fc为混凝土抗压强度;A为桩截面面积;fc1为注浆体抗压强度;Ac1为钻孔截面面积;
Figure G2009100961313D00022
为协同工作系数,取0.85~0.95;fy为钢筋抗压强度;As为钢筋截面面积。
d)预应力张拉
预应力钢绞束1张拉施工时实施“双控”,即以张拉伸长值校核张拉控制应力,实测伸长值与理论值之间的误差应控制在6%以内,否则应暂停张拉,待查明原因并采取相应调整措施后,方可继续张拉。
张拉程序为:0→初始应力0.1σk→103%σk(持荷2min)→σk,σk为预应力控制应力。
e)注浆封孔。
注浆封孔包括埋管、试水压、注浆、封孔四个过程,具体如下:
1)埋设注浆管是关系注浆质量的重要环节,埋设一定要牢靠,以防漏浆。基本作法为:将注浆管与钢绞束的间隙用纺织袋堵塞密实;注浆管露出桩面约20~30cm,在桩面采用电打膨胀螺丝并用横向钢筋将注浆管与其点焊联结,管内与钢绞束之间用钢筋头电焊搭接,然后用高标号水泥砂浆(掺加适量早强剂)将管外包裹起来(仅露出管口丝扣);3d后进行注浆。注浆管距孔底10cm,避免下端注浆管出口被堵塞。
2)试水压
为了了解孔内贯通孔隙、压力和吸浆量等情况,注入清水试水压。
3)注浆
注浆分两个阶段,先为压力上升阶段,再为相对稳压阶段,待进浆量达到设计最终吸浆量时停止注浆。在灌浆施工过程中,灌浆压力总体上能逐步上升,并能够维持稳压,说明浆液始终在桩体内以及桩尖部位进行扩散和渗透,灌浆效果能满足使用要求。如发现注浆泵上压力表指针指示压力数突然大幅度下跌等不正常现象,采取了如下处理措施:1)间歇注浆:停2~3h,待浆液初凝后重新开始注浆。2)减小浆液水灰比,增大浆液浓度。3)在浆液中掺入水泥用量5%的膨润土。
4)封孔
注浆结束后,关闭阀掣,维持孔内压力,待压力逐步消散,水泥完成初凝后拆除阀掣,用水泥掺加化学浆封闭孔口。
评价注浆效果可用下式:
n=V/V1
式中n为充盈系数;V为灌入浆液的体积;V1为钻孔的体积。
正常情况下充盈系数控制在2~3。
如图所示经预应力钢绞束置换注浆法加固病桩的施工方法处理后的桩中心设置钢绞束1,钢绞束1依次***包裹注浆体2和混凝土3。

Claims (10)

1.一种预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:以劲性钢绞束(1)置换松散混凝土,补偿桩混凝土缺陷导致的强度损失,并采用高压灌浆法使钢绞束(1)与桩身混凝土形成一个整体,其施工步骤包括:
a)钻孔,
b)清孔,
c)孔底埋设锚具及钢绞束(1),
d)预应力张拉,
e)注浆封孔。
2.根据权利要求1所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:钻孔的垂直度控制在0.8%以内。
3.根据权利要求1或2所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:清孔时冲洗压力控制在1.5~3MPa,待返清水后停止冲孔。
4.根据权利要求1或2所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:孔底埋设锚具时采用锥型锚具,用50cm高强水泥浆封闭。
5.根据权利要求3所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:孔底埋设锚具时采用锥型锚具,用50cm高强水泥浆封闭。
6.根据权利要求1或2所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:预应力张拉时以张拉伸长值校核张拉控制应力。
7.根据权利要求5所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:对钢绞束实施预应力张拉时以张拉伸长值校核张拉控制应力。
8.根据权利要求1或2所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:注浆封孔包括埋管、试水压、注浆、封孔四个过程。
9.根据权利要求7所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:注浆封孔包括埋管、试水压、注浆、封孔四个过程。
10.根据权利要求8所述的预应力钢绞束置换注浆法加固病桩的施工方法,其特征是:埋管时注浆管距孔底10cm。
CN2009100961313A 2009-02-10 2009-02-10 预应力钢绞束置换注浆法加固病桩的施工方法 Active CN101550695B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100961313A CN101550695B (zh) 2009-02-10 2009-02-10 预应力钢绞束置换注浆法加固病桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100961313A CN101550695B (zh) 2009-02-10 2009-02-10 预应力钢绞束置换注浆法加固病桩的施工方法

Publications (2)

Publication Number Publication Date
CN101550695A CN101550695A (zh) 2009-10-07
CN101550695B true CN101550695B (zh) 2013-11-13

Family

ID=41155166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100961313A Active CN101550695B (zh) 2009-02-10 2009-02-10 预应力钢绞束置换注浆法加固病桩的施工方法

Country Status (1)

Country Link
CN (1) CN101550695B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345292B (zh) * 2011-07-21 2016-01-27 从卫民 一种带有扩大头的复合预应力抗拔桩
CN103174135B (zh) * 2011-12-23 2015-06-03 五冶集团上海有限公司 不达标后注浆灌注桩的修补方法
CN103225300B (zh) * 2013-04-18 2015-03-18 贵州建工集团第二建筑工程有限责任公司 混凝土灌注桩补强加固工艺及设备
CN109680737B (zh) * 2017-10-18 2021-05-07 中车株洲电力机车研究所有限公司 一种风力发电机组基础偏差修正施工方法
CN111945716A (zh) * 2020-06-22 2020-11-17 广东省建筑科学研究院集团股份有限公司 一种夹泥断裂灌注桩加固施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483707A (en) * 1968-03-11 1969-12-16 Homayoun Joe Meheen Method for reinforcing steel pipe piling in situ and the resultant piling
CN1137088A (zh) * 1996-04-10 1996-12-04 李宪奎 土体支护结构的施工方法
CN2365264Y (zh) * 1998-12-23 2000-02-23 刘冀豪 一种注浆插筋桩
CN1619063A (zh) * 2004-12-08 2005-05-25 重庆交通科研设计院 后张法桩身预应力抗滑桩及施工方法
CN1837469A (zh) * 2006-03-30 2006-09-27 中铁八局集团有限公司 轨道板预应力张拉方法
CN101070702A (zh) * 2007-06-14 2007-11-14 北京科技大学 一种单孔复合锚固桩

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3245669B2 (ja) * 1995-05-02 2002-01-15 株式会社大阪防水建設社 基礎杭の補修工法
JP3289085B2 (ja) * 1995-05-02 2002-06-04 株式会社大阪防水建設社 基礎杭の補修工法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483707A (en) * 1968-03-11 1969-12-16 Homayoun Joe Meheen Method for reinforcing steel pipe piling in situ and the resultant piling
CN1137088A (zh) * 1996-04-10 1996-12-04 李宪奎 土体支护结构的施工方法
CN2365264Y (zh) * 1998-12-23 2000-02-23 刘冀豪 一种注浆插筋桩
CN1619063A (zh) * 2004-12-08 2005-05-25 重庆交通科研设计院 后张法桩身预应力抗滑桩及施工方法
CN1837469A (zh) * 2006-03-30 2006-09-27 中铁八局集团有限公司 轨道板预应力张拉方法
CN101070702A (zh) * 2007-06-14 2007-11-14 北京科技大学 一种单孔复合锚固桩

Also Published As

Publication number Publication date
CN101550695A (zh) 2009-10-07

Similar Documents

Publication Publication Date Title
CN101550695B (zh) 预应力钢绞束置换注浆法加固病桩的施工方法
CN103967036B (zh) 用于海上风电的桩与套筒灌浆连接结构及其施工方法
KR101069815B1 (ko) 현장타설 콘크리트말뚝 선단부 포스트그라우팅 장치 및 이를 이용한 현장타설 콘크리트말뚝 선단보강 그라우팅 방법
CN102828509B (zh) 预应力管桩桩底桩侧联合注浆方法
CN201722685U (zh) 一种无粘结预应力及桩侧后注浆冲孔桩结构
JP2008150774A (ja) 高・低濃度2ステップグラウト工法
CN104846810A (zh) 自循环后注浆钻孔灌注桩施工方法
CN104976424B (zh) 一种矩形顶管管节连接加固的锚索施工方法
CN103541359A (zh) 灌注桩质量缺陷补救处理方法
CN105887886A (zh) 一种强岩溶发育地层帷幕灌浆施工方法
CN102828498B (zh) 一种加固软弱地基的沉管筋箍碎石桩施工方法
CN103410182A (zh) 桩基单侧卸荷水平顶拉纠偏及断桩补强加固施工方法
CN101200897A (zh) 注浆帷幕结合钢筋混凝土护圈施工方法
CN104005404A (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN109208631A (zh) 一种重力式挡土墙倾斜纠偏复位与加固方法
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
CN102808413A (zh) 代筋内活塞分段注浆管及其施工方法
CN112012749A (zh) 一种隧道超前注浆小导管及施工方法
CN105714827A (zh) 钻孔灌注桩后注浆施工方法
CN102094421A (zh) 一种预应力锚杆和使用该锚杆的施工方法
CN101793027A (zh) 一种桩心注浆静压锚杆桩
CN104032738B (zh) 一种预应力锚杆和使用该锚杆的施工方法
CN111350310B (zh) 一种灌浆前发现全灌浆套筒内下段钢筋被截断的加固方法
CN104018499A (zh) 一种节约预应力锚索张拉段灌浆量的灌浆方法
CN212583692U (zh) 一种隧道超前注浆小导管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHU KUI

Effective date: 20150604

Owner name: LAI BIN

Free format text: FORMER OWNER: YE CHANGQING

Effective date: 20150604

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325000 WENZHOU, ZHEJIANG PROVINCE TO: 330000 NANCHANG, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150604

Address after: 330000 Jiangxi city of Nanchang province Xihu District Xinyu garden 11 Building 2 unit 801 room

Patentee after: Lai Bin

Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39

Patentee before: Ye Changqing

Patentee before: Zhu Kui

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20091007

Assignee: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Assignor: Lai Bin

Contract record no.: 2015360000076

Denomination of invention: Construction method of reinforcing broken stump by using prestress steel twist-beam replacement grouting method

Granted publication date: 20131113

License type: Exclusive License

Record date: 20150610

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151125

Address after: 330000 Jiangxi city of Nanchang Province in the Tang Nan Town Nanchang County Street No. 28

Patentee after: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Address before: 330000 Jiangxi city of Nanchang province Xihu District Xinyu garden 11 Building 2 unit 801 room

Patentee before: Lai Bin

DD01 Delivery of document by public notice

Addressee: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Document name: Notification of Passing Examination on Formalities