CN101413251B - 高墩大跨连续刚构桥0号块防裂施工方法 - Google Patents
高墩大跨连续刚构桥0号块防裂施工方法 Download PDFInfo
- Publication number
- CN101413251B CN101413251B CN2008101978092A CN200810197809A CN101413251B CN 101413251 B CN101413251 B CN 101413251B CN 2008101978092 A CN2008101978092 A CN 2008101978092A CN 200810197809 A CN200810197809 A CN 200810197809A CN 101413251 B CN101413251 B CN 101413251B
- Authority
- CN
- China
- Prior art keywords
- concrete
- temperature
- time
- web
- water pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开一种高墩大跨连续刚构桥0号块防裂施工方法,在墩顶平台上分两次灌筑混凝土,第一次灌注至0.3~0.6倍腹板高度,第二次灌注剩余部分,两层混凝土龄期控制在15天之内,包括以下步骤:a、施工准备,b、安装冷却水管及温度感应器,c、搭设保温棚,d、灌注混凝土,灌注混凝土通过冷却水管通水降温,保温棚保温进行温度控制,使用低热水泥灌注,e、张拉临时预应力束,灌注第二仓混凝土时,设置临时预应力束,本发明采取温度控制与临时预应力束联合使用的施工方法,可以有效控制混凝土中的温度应力,防止有害裂缝产生。
Description
[技术领域]
本发明涉及一种大体积混凝土兼三向预应力混凝土施工方法,尤其是高墩大跨连续刚构桥0号块防裂施工方法。
[背景技术]
随着我国交通事业的迅猛发展,高墩大跨连续刚构桥已在桥梁工程领域得到推广和应用,高墩大跨连续刚构桥0号块属于大体积混凝土兼三向预应力混凝土范畴,实际施工中由于温度应力的影响极易产生裂缝,如果裂缝扩展影响到预应力束的工作,该桥运营时将存在很大的安全隐患,防止0号块有害裂缝的产生是一项重大的技术难题。裂缝产生的机理:裂缝主要由混凝土内外温差引起,在混凝土升温期,应力分布规律是混凝土内部是压应力,外部是拉应力,由于混凝土龄期较小,抗拉强度也较小,混凝土很容易从表面开裂。在混凝土降温期,内部温度下降幅度远大于外部混凝土温度下降的幅度,在混凝土内部产生拉应力,混凝土易从内部开裂,继而很容易扩散到表面形成贯穿有害裂缝。
[发明内容]
本发明的目的是通过温度控制与临时预应力束联合使用,来控制混凝土中的温度应力,提供一种高墩大跨连续刚构桥0号块防裂施工方法。
本发明的目的是这样实现的:一种高墩大跨连续刚构桥0号块防裂施工方法,在墩顶平台上分二次灌筑混凝土,第一次灌注至0.3~0.6倍腹板高度,第二次灌注剩余部分,二层混凝土龄期控制在15天之内,包括以下步骤:
a、施工准备,模板安装,预应力筋安装、固定,
b、冷却水管及温度感应器安装,第一次灌注时,底板的中间位置布置一层冷却水管(4),冷却水管安装:冷却水管采用薄壁管,间距为50~80cm,底板的中间位置布置一层,注意使用前试压,防止漏水,第二次灌注时腹板和横隔板均设置1~3层冷却水管,温度感应器埋设:主要布置在底板正中心、横隔板以及腹板底板三者交界处、腹板中间的中心、以及腹板表面的位置,
c、搭设保温棚,保温棚包含底模全封闭,保温棚覆盖材料用一层土工布外加一层彩条布覆盖,土工布和彩条布均缝接牢固不透风,进出人和需要临时材料运输的地方能随时密封,保温棚高度能满足第二次灌注混凝土,
d、灌注混凝土,使用低水化热水泥灌注,混凝土浇筑入仓后,在上层混凝土覆盖前,距混凝土表面10~15cm处的温度为该层混凝土的浇筑温度,混凝土浇筑温度最低不得小于10℃,最高不得大于30℃,
e、温控与养护,在混凝土升温阶段,通过移动便携测温仪器与温度感应器外露的接线头分别测量其温度,浇筑混凝土覆盖住冷却水管后即通水降温,混凝土内表温差不超过25℃,主要比较埋设在腹板表面的温度感应器的读数和其他温度感应器读数差,如果快超过25℃,立即加大通水的频率和流量,将温差控制在25℃以下,该控制方法体现升温时降温的控制要点,当测量温度感应器的温度开始下降时,注意控制降温速率不超过1.5~2.0℃/d,混凝土在降温阶段,保证棚内温度18~20度,主要采用生火炉加热和碘钨灯远距离加热等措施,该措施符合降温时保温的控制要点,对于混凝土浇完后,四周用土工布覆盖保温,内腔利用冷却水管出水口的热水进行蓄水养生,特别注意箱梁内腔通风,用鼓风机在隔板的人洞处向外排热空气,顶板处留直径为20~40cm的透气孔,保证内腔温度不高于20℃,内腔空气温度来不及排出时,可以将水管接莲蓬头将水变为水雾来冷却热空气,箱梁顶面初凝后洒水养护,覆盖一层土工布保湿,并且适当延长拆模时间到7~10天,拆模时间选择一天中温度较高时段,以减小内表温差,防止出现温度裂缝,
f、张拉临时预应力束,第二次灌注混凝土时,临时预应力束设置:在每道腹板中间处纵桥向离第一次混凝土面往上50cm处和顶板往下150cm处通长设置钢铰线束,每束钢铰线由12~22根高强度低松弛钢绞线组成,预应力束的锚下张拉应力最大为1395MPa,应力测试采用智能式振弦应变计和配套的振弦检测仪,强度达到50%后开始张拉,施工时按先下后上的顺序张拉,应变计在张拉前后分别读数,通过测量振弦应变计的读数值计算出张拉产生的压应力,压应力控制在1~2MPa即停止张拉,临时预应力束在混凝土龄期20天后进行放张灌浆处理。
由于采取温度控制与临时预应力束联合使用的施工方法,所以本发明能有效地控制混凝土中的温度应力,防止有害裂缝产生。湖北沪蓉西高速公路双河口特大桥成功地运用了温控加临时预应力束防裂的施工方法,取得了很好的效果。
[附图说明]
下面结合附图和实施例对本发明做进一步说明。
图1是本发明的施工布置图。
图2是图1的侧视图。
图3是保温棚示意图。
图4是第1次灌注底板冷却水管与温度感应器布置俯视图。
图5是第2次灌注底板冷却水管与温度感应器布置俯视图。
图6是0号块施工平台布置图。
其中,图1兼作摘要附图。
[具体实施方式]
如图1、图2、图3、图4、图5、图6所示的一种高墩大跨连续刚构桥0号块防裂施工方法,在图6施工平台上分二次灌筑混凝土,第一次灌注至分仓线5(0.3~0.6倍腹板高度),第二次灌注剩余部分,二层混凝土龄期控制在15天之内,包括以下步骤:
第一次灌注混凝土。a、施工准备,底模安装,外侧模安装固定,腹板、横隔板竖向预应力筋安装、固定。b、安装冷却水管及温度感应器。冷却水管安装:冷却水管4采用Φ50*3.0mm的薄壁管,横桥向的间距为50cm,底板的中间位置布置一层,注意使用前试压,防止漏水。注意进水口要求安装到同一侧为方便通水。温度感应器埋设:温度感应器3埋设4个,主要布置在底板正中心、横隔板21以及和腹板13底板交界处、腹板中间的中心、以及腹板表面的位置。c、搭设保温棚,保温棚包含底模全封闭,保温棚覆盖材料用一层350克/平米的土工布外加一层彩条布覆盖,土工布和彩条布均缝接牢固不透风,进出人和需要临时材料运输的地方能随时密封。保温棚高度能满足第二次灌注混凝土。保温棚支撑材料用Φ48*3.5mm脚手架钢管以80*100cm距离搭设,脚手架钢管支撑在底模24桁架及悬臂段托架上。d、灌注第一次混凝土,使用低热水泥灌注,混凝土浇筑入仓后,在上层混凝土覆盖前,距混凝土表面10~15cm处的温度为该层混凝土的浇筑温度。混凝土浇筑温度最低不得小于10℃,最高不得大于30℃。e、温控与养护,在混凝土升温阶段,通过移动便携测温仪器与温度感应器外露的接线头分别测量其温度,浇筑混凝土覆盖住冷却水管后即通水降温。混凝土内表温差不超过25℃。主要比较埋设在腹板表面的温度感应器的读数和其他3个温度感应器读数差,如果快超过25℃,立即加大通水的频率和流量,将温差控制在25℃以下,该控制方法体现升温时降温的控制要点。当测量温度感应器的温度开始下降时,注意控制降温速率不超过2.0℃/d。混凝土在降温阶段,保证棚内温度20度左右。主要采用生火炉加热和碘钨灯远距离加热等措施,该措施符合降温时保温的控制要点。混凝土浇完后,四周用土工布覆盖保温,并且适当延长拆模时间到7天,拆模时间选择一天中温度较高时段,以减小内表温差,防止出现温度裂缝。内腔利用冷却水管出水口的热水进行蓄水养生。
第二次灌注混凝土。a、施工准备,绑扎腹板和横隔板钢筋,腹板、横隔板竖向预应力筋安装、固定,腹板波纹管安装、固定,安装内模及端头模、顶板底模,绑扎顶板钢筋,顶板横向预应力筋安装、固定。第二次灌注混凝土时在箱梁腹板易开裂处如腹板1/2处和腹板内腔倒角处内外加防裂钢筋网片。b、安装第二次灌注冷却水管及温度感应器。冷却水管安装:冷却水管采用Φ50*3.0mm的薄壁管,腹板和横隔板均设置3层,注意使用前试压,防止漏水。注意进水口安装到顶板平台上为方便通水。温度感应器埋设:温度感应器埋设3个,主要布置在第二层混凝土腹板中间的中心、横隔板以及腹板底板交界处、以及腹板表面的位置。c、第二次灌注混凝土,使用低水化热水泥灌注,混凝土浇筑入仓后,在上层混凝土覆盖前,距混凝土表面10~15cm处的温度为该层混凝土的浇筑温度。混凝土浇筑温度最低不得小于10℃,最高不得大于30℃。d、温控与养护,在混凝土升温阶段,通过移动便携测温仪器与温度感应器外露的接线头分别测量其温度,浇筑混凝土覆盖住冷却水管后即通水降温。混凝土内表温差不超过25℃。主要比较埋设在腹板表面的温度感应器的读数和其他2个温度感应器读数差,如果快超过25℃,立即加大通水的频率和流量,将温差控制在25℃以下,同时加强内腔排气降温,该控制方法体现升温时降温的控制要点。当测量温度感应器的温度开始下降时,注意控制降温速率不超过2.0℃/d。混凝土在降温阶段,保证棚内温度20度左右。主要采用生火炉加热和碘钨灯远距离加热等措施,该措施符合降温时保温的控制要点。混凝土浇完后,四周用土工布覆盖保温。特别注意箱梁内腔通风,用鼓风机在隔板的人洞7处向外排热空气,顶板8处留30*30cm透气孔,保证内腔温度不高于20℃。内腔空气温度来不及排出时,将水管接莲蓬头将水变为水雾来冷却热空气。箱梁顶面初凝后洒水养护,覆盖一层土工布保湿。并且适当延长拆模时间到7天,拆模时间选择一天中温度较高时段,以减小内表温差,防止出现温度裂缝。e、张拉临时预应力束。第二次灌注混凝土时,临时预应力束设置:在每道腹板中间处纵桥向离第一次混凝土面往上50cm处和顶板往下150cm通长各设置钢绞线束2,每束钢铰线由19~22根Φ15.24cm高强度低松弛钢绞线组成,应力测试采用智能式振弦应变计1和配套的振弦检测仪,强度达到50%后张拉临时预应力,具体施工时如C55混凝土在强度达到30MPa时张拉临时预应力,先张拉底部钢绞线,后张拉上部钢绞线。应变计在张拉前后分别读数,通过测量振弦应变计的读数值计算出张拉产生的压应力,压应力范围控制在1~2MPa即停止张拉。临时预应力束在混凝土龄期20天后进行放张灌浆处理。
Claims (1)
1.一种高墩大跨连续刚构桥0号块防裂施工方法,在墩顶平台上分二次灌筑混凝土,第一次灌注至0.3~0.6倍腹板高度,第二次灌注剩余部分,二层混凝土龄期控制在15天之内,包括以下步骤:
a、施工准备,模板安装,预应力筋安装、固定;
b、冷却水管及温度感应器安装,第一次灌注时,底板的中间位置布置一层冷却水管(4),第二次灌注时腹板和横隔板均设置1~3层冷却水管,冷却水管采用薄壁管,间距为50~80cm,温度感应器布置在底板正中心、横隔板(21)以及腹板(13)底板三者交界处、腹板中间的中心、以及腹板表面的位置;
c、搭设保温棚,保温棚包含底模全封闭,保温棚覆盖材料用一层土工布外加一层彩条布覆盖,土工布和彩条布均缝接牢固不透风,进出人和需要临时材料运输的地方能随时密封;
d、灌注混凝土,使用低水化热水泥灌注,混凝土浇筑入仓后,在上层混凝土覆盖前,距混凝土表面10~15cm处的温度为该层混凝土的浇筑温度,混凝土浇筑温度最低不得小于10℃,最高不得大于30℃;
e、温控与养护,浇筑混凝土覆盖住冷却水管后即通水降温,混凝土内表温差不超过25℃,温度正在升高时,立即加大通水的频率和流量,将温差控制在25℃以下,该控制方法体现升温时降温的控制要点,注意控制降温速率不超过1.5~2.0℃/d,混凝土在降温阶段,要求保证棚内温度18~20度,主要采用生火炉加热和碘钨灯远距离加热等措施,该措施符合降温时保温的控制要点,对于混凝土浇完后,四周用土工布覆盖保温,箱梁顶面初凝后洒水养护,覆盖一层土工布保湿,并且适当延长拆模时间到7~10天,拆模时间选择一天中温度较高时段,以减小内表温差,防止出现温度裂缝;
f、张拉临时预应力束,第二次灌注混凝土时,临时预应力束设置:在每道腹板中间处纵桥向离第一次混凝土面往上50cm处和顶板往下150cm处通长设置钢铰线束,每束钢铰线由12~22根高强度低松弛钢绞线组成,预应力束的锚下张拉应力最大为1395MPa,应力测试采用智能式振弦应变计(1)和配套的振弦检测仪,强度达到50%后开始张拉,施工时按先下后上的顺序张拉,应变计在张拉前后分别读数,通过测量振弦应变计的读数值计算出张拉产生的压应力,压应力范围控制在1~2MPa即停止张拉,临时预应力束在混凝土龄期20天后进行放张灌浆处理。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101978092A CN101413251B (zh) | 2008-11-21 | 2008-11-21 | 高墩大跨连续刚构桥0号块防裂施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101978092A CN101413251B (zh) | 2008-11-21 | 2008-11-21 | 高墩大跨连续刚构桥0号块防裂施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101413251A CN101413251A (zh) | 2009-04-22 |
CN101413251B true CN101413251B (zh) | 2011-12-28 |
Family
ID=40593969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101978092A Expired - Fee Related CN101413251B (zh) | 2008-11-21 | 2008-11-21 | 高墩大跨连续刚构桥0号块防裂施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101413251B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963294A (zh) * | 2015-07-26 | 2015-10-07 | 中铁十一局集团第一工程有限公司 | 一种铁路薄壁空心墩循环滴灌养护*** |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101660296B (zh) * | 2009-09-08 | 2011-01-26 | 中铁九局集团有限公司 | 连续梁悬臂浇筑混凝土0#块支撑方法 |
CN102094528B (zh) * | 2010-12-09 | 2012-01-18 | 中国葛洲坝集团股份有限公司 | 一种大体积混凝土冷却水管布置方法 |
CN102505636B (zh) * | 2011-10-28 | 2014-09-10 | 中铁十六局集团有限公司 | 一种双薄壁墩连续刚构桥0号块施工方法 |
CN102561194B (zh) * | 2011-12-30 | 2016-05-04 | 邵旭东 | 安全型智能钢绞线二次张拉*** |
CN102518048B (zh) * | 2012-01-17 | 2014-03-19 | 广西交通科学研究院 | 零号块腹板分层浇筑非荷载裂缝预防方法 |
CN103898838A (zh) * | 2014-04-09 | 2014-07-02 | 中交隧道工程局有限公司 | 一种0号块箱梁临时预应力钢束体系 |
CN104195937B (zh) * | 2014-08-21 | 2016-02-03 | 四川金锋建设有限公司 | 一种防开裂桥梁结构 |
CN104805935B (zh) * | 2015-04-08 | 2017-02-22 | 中国建筑第八工程局有限公司 | 基于温度监控的墙体裂缝控制方法 |
CN105649108B (zh) * | 2015-12-24 | 2018-01-12 | 中交上海三航科学研究院有限公司 | 管廊箱型隧道侧墙裂缝控制方法 |
CN106197783A (zh) * | 2016-06-20 | 2016-12-07 | 湖北大学 | 一种直接测试大体积混凝土温度应力的试验方法 |
CN106945158A (zh) * | 2017-03-09 | 2017-07-14 | 蒋春阳 | 一种混凝土预制构件自动养生装置 |
CN107663833A (zh) * | 2017-10-26 | 2018-02-06 | 北京科技大学 | 一种箱梁合龙段混凝土的水冷却施工装置及温度控制方法 |
CN109812370A (zh) * | 2017-11-21 | 2019-05-28 | 钟炽昌 | 水塔坡水道多级回泵累积无限水量扩大装机容量持久稳定发电站 |
CN108360381A (zh) * | 2018-02-10 | 2018-08-03 | 北京工业大学 | 混凝土连续箱梁桥0号块腹板大体积混凝土降温装置 |
CN109299498B (zh) * | 2018-08-07 | 2020-05-08 | 山东大学 | 拉脱法检测结果时间及温度效应修正的判别方法及*** |
CN110258340A (zh) * | 2019-06-11 | 2019-09-20 | 中铁一局集团有限公司 | 一种槽型连续梁的分段式高效施工方法 |
CN110359456A (zh) * | 2019-08-16 | 2019-10-22 | 中国电建集团成都勘测设计研究院有限公司 | 应用于冷却水管周边温度缝的组装灌浆装置 |
CN111287095A (zh) * | 2020-04-03 | 2020-06-16 | 中国铁建大桥工程局集团有限公司 | 下拖特大桥主梁专项施工工法 |
CN113009943A (zh) * | 2021-02-25 | 2021-06-22 | 中国三峡建设管理有限公司 | 一种薄壁结构衬砌混凝土四阶段温控及砌衬方法 |
CN114481840A (zh) * | 2021-12-28 | 2022-05-13 | 交通运输部公路科学研究所 | 一种双受力体系分段浇筑超高超大墩顶零号块的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3477080A (en) * | 1962-06-01 | 1969-11-11 | Dyckerhoff & Widmann Ag | Elevated highway structures of prestressed concrete |
WO1983004274A1 (en) * | 1982-06-01 | 1983-12-08 | O^/Stlandske Spennbetong A-S | Arrangement for casting in sections of a prestressed concrete bridge in accordance with the cantilever construction method |
CN101117791A (zh) * | 2007-08-22 | 2008-02-06 | 中铁大桥局股份有限公司 | 异型钢箱与正交异性板底模组合式移动模架及其施工方法 |
CN101289834A (zh) * | 2008-06-06 | 2008-10-22 | 南通华新建工集团有限公司 | 大跨度后张法现浇箱梁面板的施工方法 |
-
2008
- 2008-11-21 CN CN2008101978092A patent/CN101413251B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3477080A (en) * | 1962-06-01 | 1969-11-11 | Dyckerhoff & Widmann Ag | Elevated highway structures of prestressed concrete |
WO1983004274A1 (en) * | 1982-06-01 | 1983-12-08 | O^/Stlandske Spennbetong A-S | Arrangement for casting in sections of a prestressed concrete bridge in accordance with the cantilever construction method |
CN101117791A (zh) * | 2007-08-22 | 2008-02-06 | 中铁大桥局股份有限公司 | 异型钢箱与正交异性板底模组合式移动模架及其施工方法 |
CN101289834A (zh) * | 2008-06-06 | 2008-10-22 | 南通华新建工集团有限公司 | 大跨度后张法现浇箱梁面板的施工方法 |
Non-Patent Citations (1)
Title |
---|
严泽洪等.双河口大桥承台砼施工阶段温控有限元分析.《水利水电施工》.2005,第12-13页. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963294A (zh) * | 2015-07-26 | 2015-10-07 | 中铁十一局集团第一工程有限公司 | 一种铁路薄壁空心墩循环滴灌养护*** |
Also Published As
Publication number | Publication date |
---|---|
CN101413251A (zh) | 2009-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101413251B (zh) | 高墩大跨连续刚构桥0号块防裂施工方法 | |
CN101109227B (zh) | 单跨悬臂双预应力劲性钢筋砼梁施工方法 | |
CN106437142A (zh) | 一种现浇坡屋面双层模板结构及坡屋面施工方法 | |
CN102900162B (zh) | 保温防火整体墙板及其制作方法 | |
CN107083817A (zh) | 一种现浇混凝土竹芯楼板结构及其施工工艺 | |
CN102828468B (zh) | 高温干燥环境下高强薄壁箱梁预制裂缝控制施工方法 | |
CN110080454A (zh) | Lpm轻质填充体现浇混凝土空心楼盖施工方法 | |
CN103806659B (zh) | 超厚预应力转换板单层综合支撑与控裂控温施工工艺 | |
CN109235891A (zh) | 一种大跨度预应力梁混凝土坡屋面跳仓法施工方法 | |
CN110939051A (zh) | 一种地铁隐盖梁施工方法 | |
CN104264678A (zh) | 大体积混凝土防裂纹施工工艺 | |
CN106121236A (zh) | 楼板钢筋保护层及结构标高综合控制方法 | |
CN105297956A (zh) | 一种现浇复合保温混凝土剪力墙及其制造方法 | |
CN103835523A (zh) | 一种超长超大钢筋混凝土结构工程防裂工艺 | |
CN102296570A (zh) | 大型现浇钢筋混凝土进水道施工方法 | |
CN103866789A (zh) | 一种地下室底板施工期间裂缝控制方法 | |
CN205444590U (zh) | 一种现浇复合保温混凝土剪力墙 | |
CN106351129B (zh) | 紧临既有线大跨度连续梁施工方法 | |
CN101555709B (zh) | 一种复合保温隔热混凝土剪力墙的安装工艺 | |
CN110239157A (zh) | 一种高性能装配式组合外挂墙板 | |
CN106245770A (zh) | 宽体变截面环形劲性梁施工方法 | |
CN206245730U (zh) | 一种现浇坡屋面双层模板结构 | |
CN104846745A (zh) | 一种城市高墩无支架翻模施工方法 | |
CN206917031U (zh) | 一种现浇混凝土竹芯楼板结构 | |
CN106827207A (zh) | 一种简易混凝土柱养护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111228 Termination date: 20191121 |