CN101403613A - 一种高程测量的新方法 - Google Patents

一种高程测量的新方法 Download PDF

Info

Publication number
CN101403613A
CN101403613A CNA2008102187591A CN200810218759A CN101403613A CN 101403613 A CN101403613 A CN 101403613A CN A2008102187591 A CNA2008102187591 A CN A2008102187591A CN 200810218759 A CN200810218759 A CN 200810218759A CN 101403613 A CN101403613 A CN 101403613A
Authority
CN
China
Prior art keywords
measuring instrument
height
elevation
measured
tracking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008102187591A
Other languages
English (en)
Inventor
周远文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Design Institute
Original Assignee
Guangzhou Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Design Institute filed Critical Guangzhou Design Institute
Priority to CNA2008102187591A priority Critical patent/CN101403613A/zh
Publication of CN101403613A publication Critical patent/CN101403613A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

本发明公开了一种高程测量的新方法,其特征在于包括以下步骤:1)首先分别将测量仪和跟踪棱镜杆置于高程为HA的位置A和高程为HB的位置B上;用测量仪测出位置A和位置B之间的水平距离DAB、测量仪和跟踪棱镜杆顶端连线与水平线的夹角α;2)再将测量仪置于高程为HC=HA+i-v=HB-DAB·tanα的位置C上,将跟踪棱镜杆置于待测高程的位置D上;用测量仪测出位置C和位置D之间的水平距离、测量仪和棱镜顶端连线与水平线的夹角θ;3)根据公式HD=HC+DCD·tanθ得出待测位置D的高程HD;其中,i为测量仪的高度,v为跟踪棱镜杆的高度,B位置高程HB为已知高程。本发明简化了操作步骤和减少了误差源,大大地提高了工作效率和提高了测量精度。

Description

一种高程测量的新方法
技术领域
本发明涉及一种高程测量的新方法,适用于要求精高的小范围工程测量。属于工程测量技术领域。
背景技术
在工程的施工测量中,常常涉及到高程测量,高程测量是根据一点的已知高程与另一点的高差,然后按高差的定义,求出未知点的高程。现阶段高程测量按使用的仪器和测量方法分为水准测量、三角高程测量、GPS测高、气压计测高法等。水准测量是采用水准仪和水准尺依据水平视线测定两点间的高差,用水准测量法在小区域范围内可得到较高精度的高程数据,但受视线短、高差小等限制,适用范围较窄。GPS测高是直接测定地面点的地心三维坐标,通过坐标转换为地面高程,它有两点间不需通视,距离不受限制等优点,但其观测费用较高,测量时间较长,数据延后,所以它不太适用于小范围的工程测量。气压计测高是根据高程面每上升11m,气压约下降1mm来测定地面高程,该法适用性较窄,不太适用于工程测量。现有技术中的三角高程测量是采用经纬仪和测距仪测定两点间的竖直角和距离,按三角学原理,计算两点间的高差,该方法是一种间接测高法,可以不受地形起伏的限制,且施测速度较快,尤其是随着全站仪的出现,及其测角、测距精度的不断提高,该法更是被广泛应用于地形图测绘、线型工程、管网工程等工程测量中,但该方法也有其缺点:该测量方法精度较低,而且每次测量时都需量取仪器高和棱镜高,操作麻烦,且增加了误差来源。
发明内容
本发明的目的,是为了克服现有工程中三角高程测量方法不能解决精度低的缺点,提供一种高程测量的新方法。
本发明的目的可以通过采取以下技术方案予以实现:
一种高程测量的新方法,包括以下步骤:
1)首先分别将测量仪和跟踪棱镜杆置于高程为HA的位置A和高程为HB的位置B上;2)用测量仪测出位置A和位置B之间的水平距离DAB、测量仪和跟踪棱镜杆顶端连线与水平线的夹角α;
2)再将测量仪置于高程为HC=HA+i-v=HB-DAB·tanα的位置C上,将跟踪棱镜杆置于待测高程的位置D上;用测量仪测出位置C和位置D之间的水平距离、测量仪和棱镜顶端连线与水平线的夹角θ;
3)根据公式HD=HC+DCD·tanθ得出待测位置D的高程HD;其中,i为测量仪的高度,v为跟踪棱镜杆的高度,B位置高程HB为已知高程。
当位置C和位置D的距离较远时,考虑地球曲率和大气折光的影响,对所测量到位置D的高程HD进行修正。根据球差和气差修正公式,可以得位置D的高程 H D = H C + D CD · tan θ + ( 1 - k ) D CD 2 2 R , 其中,k=1/7,R为地球半径。
本发明的目的还可以通过采取以下技术方案予以实现:
本发明的测量过程中使用同一测量仪和同一跟踪棱镜杆,因此测量仪高度i和跟踪棱镜杆高度v是固定的,而测量仪为工程测量中常用的全站仪。
与现有技术相比较,本发明具有以下优点:
本发明的利用已知高程计算出一个适当位置来避免测量仪和跟踪棱镜杆的高度对测量结果的影响,从而避免了测量仪和跟踪棱镜杆高度的测量,简化了操作步骤和减少了误差源,大大地提高了工作效率和提高了测量精度。另外,由于本发明只要选定了适当位置后不受高差的制约,可以更方便地在地形起伏较大的区域进行高程测量和对精度要求较低的沉降变形监测,如软基处理中沉降板的监测等,用本发明的测量方法代替三、四等水准测量来测量高程,大大加快了测量速度。
附图说明
图1是本发明的一个具体实施例的测量方法示意图。
具体实施方式
本发明的测量原理如下:
如图1所示,由图中的关系可以知道,位置B的高程为
HB=HA+DAB·tanα+i-v    (1)
假设B点高程为已知高程,A点高程为未知高程,通过在A点摆站,来测得其它待测点高程。由(1)式可得
HA=HB-(DAB·tanα+i-v)    (2)
上式除了DAB·tgα的值可以用全战仪直接测得外,测量仪高度i和跟踪棱镜杆高度v都是未知的,但只要仪器整平架好后,仪器高i值是固定不变的,在观测过程采用同一跟踪棱镜杆,其高度v也是不变的,因此(2)式可化为
HA+i-v=HB-DAB·tanα=H(3)
由上面假设分析可知,HA+i-v的值在仪器摆好后是固定不变的,即H值不变,也是可以计算得出的。因此,只要测量出待测位置点与高程为H点的水平距离DAB、测量仪和棱镜顶端连线与水平线的夹角α就可以得到待测位置的高程。
具体实施例1
本发明的测量方法包括如下步骤:
1)分别将测量仪和跟踪棱镜杆置于高程为HA的位置A和高程为HB的位置B上;
2)用测量仪测出位置A和位置B之间的水平距离DAB、测量仪和跟踪棱镜杆顶端连线与水平线的夹角α;
3)重新将测量仪置于高程为HC=HA+i-v=HB-DAB·tanα的位置C上,将跟踪棱镜杆置于待测高程的位置D上;
4)用测量仪测出位置C和位置D之间的水平距离、测量仪和棱镜顶端连线与水平线的夹角θ;
5)根据公式HD=HC+DCD·tanθ得出待测位置D的高程HD
其中,i为测量仪的高度,v为跟踪棱镜杆的高度,B位置高程HB为已知高程。
具体实施例2
在本实施例中,将位置C设置在离待测位置D较远距离,考虑地球曲率和大气折光的影响,对所测量到位置D的高程HD进行修正,其他与实施例1相同。根据球差和气差修正公式,可以得位置D的高程 H D = H C + D CD · tan θ + ( 1 - k ) D CD 2 2 R , 其中,k=1/7,R为地球半径。
具体实施例3
除将位置C设置在离待测位置D较近距离外,其他与实施例1相同。

Claims (2)

1、一种高程测量的新方法,其特征在于包括以下步骤:
1)首先分别将测量仪和跟踪棱镜杆置于高程为HA的位置A和高程为HB的位置B上;用测量仪测出位置A和位置B之间的水平距离DAB、测量仪和跟踪棱镜杆顶端连线与水平线的夹角α;
2)再将测量仪置于高程为HC=HA+i-v=HB-DAB·tanα的位置C上,将跟踪棱镜杆置于待测高程的位置D上;用测量仪测出位置C和位置D之间的水平距离、测量仪和棱镜顶端连线与水平线的夹角θ;
3)根据公式HD=HC+DCD·tanθ得出待测位置D的高程HD;其中,i为测量仪的高度,v为跟踪棱镜杆的高度,B位置高程HB为已知高程。
2、根据权利要求1所述的测量方法,其特征在于:当位置C和位置D的距离较远时,考虑地球曲率和大气折光的影响,对所测量到位置D的高程HD进行修正,根据球差和气差修正公式,得位置D的高程 H D = H C + D CD · tan θ + ( 1 - k ) D CD 2 2 R , 其中,k=1/7,R为地球半径。
CNA2008102187591A 2008-10-30 2008-10-30 一种高程测量的新方法 Pending CN101403613A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008102187591A CN101403613A (zh) 2008-10-30 2008-10-30 一种高程测量的新方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008102187591A CN101403613A (zh) 2008-10-30 2008-10-30 一种高程测量的新方法

Publications (1)

Publication Number Publication Date
CN101403613A true CN101403613A (zh) 2009-04-08

Family

ID=40537695

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008102187591A Pending CN101403613A (zh) 2008-10-30 2008-10-30 一种高程测量的新方法

Country Status (1)

Country Link
CN (1) CN101403613A (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305617A (zh) * 2011-08-09 2012-01-04 天津二十冶建设有限公司 全站仪在工程中精确测高程的方法
CN103322973A (zh) * 2012-03-21 2013-09-25 五冶集团上海有限公司 大面积场地平面控制网的布设方法
CN103399362A (zh) * 2013-07-23 2013-11-20 河海大学 一种基于三角高程网的大气折光系数反演方法
CN103542836A (zh) * 2013-11-07 2014-01-29 大连市勘察测绘研究院有限公司 一种测量地铁车站控制点沉降变形的方法
CN103983245A (zh) * 2014-05-04 2014-08-13 华侨大学 一种坡度高差测量仪
CN105043342A (zh) * 2015-07-03 2015-11-11 中国电建集团西北勘测设计研究院有限公司 单向精密测距三角高程测量方法
CN105066954A (zh) * 2015-07-31 2015-11-18 桂林理工大学 一种测量经纬仪高度的方法
CN105352459A (zh) * 2015-11-19 2016-02-24 武汉大学 一种测边前方交会测点的方法
CN110118546A (zh) * 2019-05-17 2019-08-13 中国一冶集团有限公司 一种测量独立构筑物高程的方法
CN110260840A (zh) * 2019-06-28 2019-09-20 中铁大桥局集团有限公司 跨海长桥桥墩绝对沉降量的测量方法及***
CN111076705A (zh) * 2020-01-21 2020-04-28 吉林通钢矿业有限责任公司 利用全站仪优化三角高程测量的方法
CN111504264A (zh) * 2020-04-30 2020-08-07 中铁二局第一工程有限公司 一种测量两个对中杆相等高度及验证其精度的方法
CN113324516A (zh) * 2021-05-25 2021-08-31 东南大学 一种水中墩垂直位移精密三角高程监测方法
CN114964143A (zh) * 2021-02-18 2022-08-30 福建汇川物联网技术科技股份有限公司 一种高程测量装置及高程测量方法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305617A (zh) * 2011-08-09 2012-01-04 天津二十冶建设有限公司 全站仪在工程中精确测高程的方法
CN103322973A (zh) * 2012-03-21 2013-09-25 五冶集团上海有限公司 大面积场地平面控制网的布设方法
CN103399362A (zh) * 2013-07-23 2013-11-20 河海大学 一种基于三角高程网的大气折光系数反演方法
CN103399362B (zh) * 2013-07-23 2015-07-29 河海大学 一种基于三角高程网的大气折光系数反演方法
CN103542836A (zh) * 2013-11-07 2014-01-29 大连市勘察测绘研究院有限公司 一种测量地铁车站控制点沉降变形的方法
CN103542836B (zh) * 2013-11-07 2015-09-30 大连市勘察测绘研究院有限公司 一种测量地铁车站控制点沉降变形的方法
CN103983245A (zh) * 2014-05-04 2014-08-13 华侨大学 一种坡度高差测量仪
CN105043342B (zh) * 2015-07-03 2017-05-24 中国电建集团西北勘测设计研究院有限公司 单向精密测距三角高程测量方法
CN105043342A (zh) * 2015-07-03 2015-11-11 中国电建集团西北勘测设计研究院有限公司 单向精密测距三角高程测量方法
CN105066954A (zh) * 2015-07-31 2015-11-18 桂林理工大学 一种测量经纬仪高度的方法
CN105352459A (zh) * 2015-11-19 2016-02-24 武汉大学 一种测边前方交会测点的方法
CN105352459B (zh) * 2015-11-19 2017-12-15 武汉大学 一种测边前方交会测点的方法
CN110118546A (zh) * 2019-05-17 2019-08-13 中国一冶集团有限公司 一种测量独立构筑物高程的方法
CN110260840A (zh) * 2019-06-28 2019-09-20 中铁大桥局集团有限公司 跨海长桥桥墩绝对沉降量的测量方法及***
CN110260840B (zh) * 2019-06-28 2021-06-29 中铁大桥局集团有限公司 跨海长桥桥墩绝对沉降量的测量方法及***
CN111076705A (zh) * 2020-01-21 2020-04-28 吉林通钢矿业有限责任公司 利用全站仪优化三角高程测量的方法
CN111504264A (zh) * 2020-04-30 2020-08-07 中铁二局第一工程有限公司 一种测量两个对中杆相等高度及验证其精度的方法
CN114964143A (zh) * 2021-02-18 2022-08-30 福建汇川物联网技术科技股份有限公司 一种高程测量装置及高程测量方法
CN114964143B (zh) * 2021-02-18 2023-06-06 福建汇川物联网技术科技股份有限公司 一种高程测量装置及高程测量方法
CN113324516A (zh) * 2021-05-25 2021-08-31 东南大学 一种水中墩垂直位移精密三角高程监测方法

Similar Documents

Publication Publication Date Title
CN101403613A (zh) 一种高程测量的新方法
CN101614127B (zh) 盾构贯通施工中过江水准测量方法
CN101666738B (zh) 一种光电式摩擦系数测定仪
CN101464163B (zh) 全站仪校验用平台标准点的平直度检定方法
CN107607934A (zh) 一种时差、频差、频差变化率联合估计方法
CN110260840B (zh) 跨海长桥桥墩绝对沉降量的测量方法及***
CN101140164A (zh) 全站仪精确测量高程方法
CN102080960A (zh) 基于gps的超高层建筑物垂直度测控方法
EP3524931A1 (en) Method for verifying accuracy of rtk tilt compensation measurement
CN102506895A (zh) 测量仪器三维形变精度检验装置
CN110044326A (zh) 山区高速公路应用三角高程测量方法
CN102207380A (zh) 一种高精度横轴倾斜误差补偿方法
CN206223144U (zh) 一种基于超声波测距仪的隧道拱顶沉降的监测装置
CN205449052U (zh) 一种激光测量建筑物倾斜角的装置
CN104181571A (zh) 实现弱或无cors信号区地面点的精密坐标与高程快速测量的方法
CN101539411A (zh) 一种测量林木胸高形率的方法
CN102865853B (zh) 一种基于倾斜基面光电跟踪测量设备的快速高精度引导方法
CN111749285A (zh) 一种锤击沉桩贯入度及桩顶标高自动监测装置
CN111076705A (zh) 利用全站仪优化三角高程测量的方法
CN203148424U (zh) 一种自动测量仪器高度的全站仪
CN209927089U (zh) 一种车高测量仪器
CN108827232A (zh) 大跨度结构起拱值快速测量装置及方法
CN207991553U (zh) 一种用于闸门门槽安装过程中的测量装置
CN101556144A (zh) 激光经纬多功能快速测拱仪及其测量计算方法
CN110567448A (zh) 一种全站仪测量标高坐标的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090408