CN101333875A - Brick wall reinforced concrete wall stud structure - Google Patents
Brick wall reinforced concrete wall stud structure Download PDFInfo
- Publication number
- CN101333875A CN101333875A CNA2007102009316A CN200710200931A CN101333875A CN 101333875 A CN101333875 A CN 101333875A CN A2007102009316 A CNA2007102009316 A CN A2007102009316A CN 200710200931 A CN200710200931 A CN 200710200931A CN 101333875 A CN101333875 A CN 101333875A
- Authority
- CN
- China
- Prior art keywords
- brick wall
- pilaster
- wall
- reinforced concrete
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a brick wall reinforced concrete pilaster structure which includes a brick wall (1) and an old foundation (3); a cast new foundation (4) is combined with the old foundation (3); a hole is excavated on the brick wall (1); a reinforced steel bar is arranged in the hole; the reinforced steel bar is connected with the reinforced steel frames on both sides of the brick wall (1); the concrete is cast to form a reinforced concrete pilaster (5); the reinforced concrete pilaster (5) is combined with the brick wall (1). The brick wall reinforced concrete pilaster structure overcomes the defects that when the traditional method is adopted to mount a pilaster, the effective connection between the new and old masonry body structures is needed; the new and old masonry bodies is unable to have meshing effect and form an integral operating situation as a whole; the newly-added brick pilaster has insufficient intensity; the appearance and application of the building are influenced by the larger section of the reinforcing component so that the reinforced steel bar in the newly-added reinforced concrete pilaster is enabled to be tightly connected with the existed brick wall; the post-cast concrete is able to operate together with the existed masonry body wall; the integral stability and the local compression bearing capability of the wall body are improved greatly.
Description
Technical field
The present invention relates to a kind of brick wall structure, this structure can improve the resistance to overturning and the local compression bearing capacity of existing brick wall to greatest extent.
Background technology
Masonry structure is as one of building structure pattern of maturation, be widely used in civilian and industrial construction in, allowable ratio of height to sectional thickness of masonry wall or column (being brick wall) is formed by mortar is bonding by monolithic brick or building block, it is one of of paramount importance vertical applied force member in the masonry structure, during when the length of brick wall and highly greater than certain numerical value, or the concentrated force that transmits of the beam of brick wall upper support is when big, for resistance to overturning or the brick wall local compression bearing capacity that guarantees brick wall can meet the demands, just need pilaster be set on brick wall according to relevant national regulation and by calculating.Therefore, whether the position is provided with pilaster in masonry structure rationally, cross-sectional sizes whether can satisfy wall stability and requirement for bearing capacity just seems particularly important, the safety that these factors will directly have influence on masonry structure whether, sometimes because design, artificial deviation appears in the construction, or the construction finish after building increased extra load again, or the height of wall is checked without authorization without design and is increased, and when finding these problems, brick wall has often been constructed and has been finished, this moment is not owing to be provided with necessary pilaster, will cause the resistance to overturning of body of wall not enough, or brick wall local compression bearing capacity can not meet the demands, if this brick wall is not carried out necessary reinforcement, will the safety of full wafer body of wall be caused a hidden trouble, even the destruction that whole building takes place, threaten the person and property safety.Generally, reinforcement measure to above-mentioned situation often is simply to increase to build brick wall stud structure by laying bricks or stones on existing brick wall, but because the not disposable fissure of displacement is built by laying bricks or stones and is formed between the old and new's masonry, therefore can't produce interlocking, so just can't form the one co-operation, newly-installed brick wall stud structure does not play corresponding effect, also easily produces the crack between the old and new's masonry, and its consolidation effect is not ideal enough.
Figure 1 shows that and adopt the full-page proof of traditional structure after setting up brick wall stud structure on the existing brick wall, (1) brick wall for having constructed and finished, (2) set up the brick wall stud structure of building by laying bricks or stones after being.As can be seen, owing to lack effective connection measure between the old and new's masonry structure, newly add between brick wall stud structure and existing brick wall and can't produce interlocking, can not form the one co-operation, also can produce the crack gradually in actual use, the effect of adding brick wall stud structure is not ideal enough.
Summary of the invention
The technical problem to be solved in the present invention is: press newly adding between brick wall stud structure and existing brick wall of existing when not enough can't produce interlocking at traditional structure solving brick wall monolithic stability or office, can not form the one co-operation, also can produce the crack gradually in actual use, the dissatisfactory weak point of reinforcing effect, a kind of new brick wall reinforced concrete wall stud structure is proposed, this structure can be set up the steel concrete pilaster easily on existing brick wall, to improve the resistance to overturning and the local compression bearing capacity of existing brick wall to greatest extent, and because component strength improves greatly, the cross section of steel concrete pilaster can reduce, and makes the building after the reinforcing more beautiful and applicable.
The present invention constitutes like this: it comprises brick wall (1), old basis (3), building new basis (4) combines with old basis (3), go up the cutting hole at brick wall (1), reinforcing bar is set in the hole, this reinforcing bar is connected with the cage of reinforcement of brick wall (1) both sides, concreting forms steel concrete pilaster (5), and steel concrete pilaster (5) combines with brick wall (1).
Going up the spacing a that digs the hole at brick wall (1) is 1000mm.
It is 120mm that width b is dug at the hole, and hole height d is 60mm.
The every side thickness e of steel concrete pilaster (5) is 100mm.
The concrete class of steel concrete pilaster (5) is not less than C20.
The invention has the beneficial effects as follows: the reinforcing bar in the newly-increased steel concrete pilaster closely is connected with existing brick wall, make the concrete and the existing allowable ratio of height to sectional thickness of masonry wall or column of after-pouring form the one co-operation, the resistance to overturning and the local compression bearing of body of wall have been improved to a greater degree, and the member section that newly adds is littler, makes building more beautiful and applicable.
Description of drawings
Fig. 1 is the traditional structure schematic diagram, i.e. drawing, vertical view after setting up brick wall stud structure on the existing brick wall;
Fig. 2 is a structural representation of the present invention;
Fig. 3 is the C Pi sectional view among Fig. 2;
Fig. 4 is the D Ban sectional view among Fig. 2.
The specific embodiment
Embodiments of the invention: can carry out as follows when adopting the inventive method to set up the steel bar concrete pilaster:
The first, by calculating definite steel bar concrete pilaster 5 areas that must set up, position, quantity being set, can meet the demands to guarantee the stable and local compression of setting up the pilaster back wall;
The second, building increases the required new basis 4 of plain concrete bar base after the steel bar concrete pilaster, should be before building earlier with the plain concrete bar base basis 3 edge hackings of original brick wall 1, be beneficial to that the old and new basis is better to be connected;
The 3rd, on existing brick wall 1, dig the hole, the hole should begin to be provided with from the brick wall bottommost, and the center distance of hole on brick wall is 1m, and width is 120mm, highly is 60mm;
The 4th, in each hole, insert diameter and be 2 of the reinforcing bars of φ 8mm, the vertical applied force muscle diameter that sets up then in the concrete pilaster is φ 10mm@100, and horizontal distribution muscle diameter is φ 6mm@100;
Employing is not less than the concreting concrete pilaster and the hole cementation of fissures of C20, and the thickness of steel concrete pilaster 5 is 100mm, and width is determined by calculating.
Claims (5)
1. brick wall reinforced concrete wall stud structure, it comprises brick wall (1), old basis (3), it is characterized in that: new basis (4) combines with old basis (3), the hole that cutting is arranged on brick wall (1), reinforcing bar is arranged in the hole, this reinforcing bar is connected with the cage of reinforcement of brick wall (1) both sides, and the steel concrete pilaster (5) that forms by concreting combines with brick wall (1).
2. brick wall reinforced concrete wall stud structure according to claim 1 is characterized in that: going up the spacing of digging the hole at brick wall (1) is 1000mm.
3. brick wall reinforced concrete wall stud structure according to claim 1 and 2 is characterized in that: width of cave entrance is 120mm, and the hole height is 60mm.
4. brick wall reinforced concrete wall stud structure according to claim 1 is characterized in that: the every side thickness of steel concrete pilaster (5) is 100mm.
5. brick wall reinforced concrete wall stud structure according to claim 1 is characterized in that: the concrete class of steel concrete pilaster (5) is higher than C20.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007102009316A CN101333875A (en) | 2007-06-28 | 2007-06-28 | Brick wall reinforced concrete wall stud structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007102009316A CN101333875A (en) | 2007-06-28 | 2007-06-28 | Brick wall reinforced concrete wall stud structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101333875A true CN101333875A (en) | 2008-12-31 |
Family
ID=40196717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007102009316A Pending CN101333875A (en) | 2007-06-28 | 2007-06-28 | Brick wall reinforced concrete wall stud structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101333875A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102889004A (en) * | 2012-11-04 | 2013-01-23 | 西安建筑科技大学 | Method for increasing ring beam for brick masonry wall |
CN102889003A (en) * | 2012-11-04 | 2013-01-23 | 西安建筑科技大学 | Method for increasing constructional column for brick masonry wall |
CN103255927A (en) * | 2012-02-15 | 2013-08-21 | 天津三春科技有限公司 | Repair technique for brick wall eroded by salt and alkali |
CN105888282A (en) * | 2016-05-03 | 2016-08-24 | 国网上海市电力公司浦东供电公司 | Seismic strengthening structure and method for enlarging opening of substation masonry wall |
CN106677431A (en) * | 2015-11-05 | 2017-05-17 | 中国华冶科工集团有限公司 | Outer wall modeling column construction method |
-
2007
- 2007-06-28 CN CNA2007102009316A patent/CN101333875A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255927A (en) * | 2012-02-15 | 2013-08-21 | 天津三春科技有限公司 | Repair technique for brick wall eroded by salt and alkali |
CN102889004A (en) * | 2012-11-04 | 2013-01-23 | 西安建筑科技大学 | Method for increasing ring beam for brick masonry wall |
CN102889003A (en) * | 2012-11-04 | 2013-01-23 | 西安建筑科技大学 | Method for increasing constructional column for brick masonry wall |
CN102889003B (en) * | 2012-11-04 | 2014-09-17 | 西安建筑科技大学 | Method for increasing constructional column for brick masonry wall |
CN102889004B (en) * | 2012-11-04 | 2014-12-31 | 西安建筑科技大学 | Method for increasing ring beam for brick masonry wall |
CN106677431A (en) * | 2015-11-05 | 2017-05-17 | 中国华冶科工集团有限公司 | Outer wall modeling column construction method |
CN105888282A (en) * | 2016-05-03 | 2016-08-24 | 国网上海市电力公司浦东供电公司 | Seismic strengthening structure and method for enlarging opening of substation masonry wall |
CN105888282B (en) * | 2016-05-03 | 2018-02-02 | 国网上海市电力公司浦东供电公司 | A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735325B (en) | A kind of intensive permanent support assembled basement structure system and construction method | |
CN201217898Y (en) | Concrete prefabricated stairs | |
CN109723085B (en) | Deep foundation pit division construction rib wall support replacing structure and construction method thereof | |
CN109083320A (en) | Combine prefabricated panel and laminated floor slab structure and laminated floor slab construction method | |
CN103953114B (en) | Steel frame-reinforced masonry shear wall combinative structure and construction method thereof | |
CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN105155724A (en) | Construction method of structural column for simultaneous construction with frame-structured filled wall | |
CN101333875A (en) | Brick wall reinforced concrete wall stud structure | |
CN203821591U (en) | Steel frame-reinforcement brickwork shear wall combined structure | |
CN208251372U (en) | A kind of assembled steel reinforced concrete shear force wall | |
CN111236416A (en) | Prefabricated reinforced concrete structure house and installation method thereof | |
CN108060789A (en) | A kind of wall support and change method of existing masonry structure base isolation reinforcement | |
CN206769200U (en) | First wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
CN206769199U (en) | After wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
CN207348318U (en) | A kind of EPS modules steel bar positioning plate | |
CN211848867U (en) | Tooth groove type prefabricated bridge pier and bearing platform connecting structure | |
CN210459279U (en) | Bolt connection type precast concrete assembled retaining wall unit and assembled retaining wall thereof | |
CN208884808U (en) | Combine prefabricated panel and laminated floor slab structure | |
CN109267578B (en) | Inclined plane plain concrete structure and construction method thereof | |
CN107100322A (en) | Post stretching vertical prestressing cast-in-place concrete rod structure and construction method | |
CN106337512A (en) | The bottom reinforced concrete-filled steel tubular frame high-strength concrete composite shear wall and manufacturing method | |
CN215907293U (en) | Rendering-free exhaust flue and assembly type flue mounting structure | |
JP2011069151A (en) | Concrete panel form | |
CN108343234A (en) | It can be used as modification module and its application of the cast-in-place ring beam template of hollowed-block masonry | |
CN105113662A (en) | Assembled constructional column constructed together with frame structure infilled wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20081231 |