CN101333812B - Grouter for back side grouting and its construction method - Google Patents
Grouter for back side grouting and its construction method Download PDFInfo
- Publication number
- CN101333812B CN101333812B CN 200810041358 CN200810041358A CN101333812B CN 101333812 B CN101333812 B CN 101333812B CN 200810041358 CN200810041358 CN 200810041358 CN 200810041358 A CN200810041358 A CN 200810041358A CN 101333812 B CN101333812 B CN 101333812B
- Authority
- CN
- China
- Prior art keywords
- grouting
- pile
- pressure
- pile body
- grouting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810041358 CN101333812B (en) | 2008-08-04 | 2008-08-04 | Grouter for back side grouting and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810041358 CN101333812B (en) | 2008-08-04 | 2008-08-04 | Grouter for back side grouting and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101333812A CN101333812A (en) | 2008-12-31 |
CN101333812B true CN101333812B (en) | 2013-06-12 |
Family
ID=40196664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810041358 Active CN101333812B (en) | 2008-08-04 | 2008-08-04 | Grouter for back side grouting and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101333812B (en) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102535452A (en) * | 2010-12-15 | 2012-07-04 | 王云艇 | Novel engineering pile |
CN103174135B (en) * | 2011-12-23 | 2015-06-03 | 五冶集团上海有限公司 | Repair method of unqualified post-grouting bored concrete pile |
CN103184737A (en) * | 2011-12-28 | 2013-07-03 | 上海市基础工程有限公司 | Grouting machine for post grouting under embedded rock geological condition |
CN103114576A (en) * | 2013-02-05 | 2013-05-22 | 山西太行建设开发有限公司 | Post grouting construction method for cast-in-place concrete pile |
CN104060613B (en) * | 2013-03-22 | 2016-04-20 | 上海市城市建设设计研究总院 | The directed slip casting structure of interlocking pile and interlocking pile directed grouting and reinforcing soil body method |
CN103321214A (en) * | 2013-07-10 | 2013-09-25 | 南通华新建工集团有限公司 | Cast-in-place pile later slip casting construction method |
CN104452746A (en) * | 2013-09-23 | 2015-03-25 | 中国建筑股份有限公司上海分公司 | Construction method for bored pile |
CN105625303A (en) * | 2014-11-28 | 2016-06-01 | 大连市市政设计研究院有限责任公司 | Post-grouting technology for cast-in-situ bored pile |
CN104631452A (en) * | 2015-01-14 | 2015-05-20 | 刘林松 | Device for regulating and controlling contact and interaction between pile and earth |
CN105386453A (en) * | 2015-10-16 | 2016-03-09 | 上海市基础工程集团有限公司 | Grouting process for preventing secondary settlement of open caisson |
CN105386451A (en) * | 2015-10-16 | 2016-03-09 | 上海市基础工程集团有限公司 | Grouting device for preventing secondary sinking of open caisson |
CN105804052A (en) * | 2016-05-06 | 2016-07-27 | 同济大学 | Grouting pipeline structure, X-shaped special-shaped pile for prefabricating grouting pipeline and grouting method thereof |
CN105804083A (en) * | 2016-05-06 | 2016-07-27 | 同济大学 | Grouting pipeline device, conical special-shaped pile and application method thereof |
CN106088086A (en) * | 2016-08-08 | 2016-11-09 | 中国电建集团贵阳勘测设计研究院有限公司 | The pile body post-mud-jacking bored pile of karst area deep foundation pit fender post supporting |
CN110700266A (en) * | 2019-10-11 | 2020-01-17 | 重庆建工建筑产业技术研究院有限公司 | Underground continuous wall toe post-grouting construction method |
CN112900440A (en) * | 2021-01-21 | 2021-06-04 | 中国三峡新能源(集团)股份有限公司 | Grouting system for enhancing bearing capacity of offshore wind power pile foundation and construction method |
CN113737782B (en) * | 2021-09-14 | 2022-09-27 | 黄杰 | Synchronous forming method for anticorrosive protection layer of cast-in-situ bored pile |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1540104A (en) * | 2003-10-30 | 2004-10-27 | 北京城建集团有限责任公司 | Post mudjack construction technics for sidewal and bottom of bore of filling pile |
CN2663516Y (en) * | 2003-10-30 | 2004-12-15 | 北京城建集团有限责任公司 | Back pressing slurry injecting device to side and bottom of pile in drilling caisson pile procession |
CN101139836A (en) * | 2007-08-10 | 2008-03-12 | 上海市基础工程公司 | Drilling grout pile end follow-up grouting construction method |
-
2008
- 2008-08-04 CN CN 200810041358 patent/CN101333812B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1540104A (en) * | 2003-10-30 | 2004-10-27 | 北京城建集团有限责任公司 | Post mudjack construction technics for sidewal and bottom of bore of filling pile |
CN2663516Y (en) * | 2003-10-30 | 2004-12-15 | 北京城建集团有限责任公司 | Back pressing slurry injecting device to side and bottom of pile in drilling caisson pile procession |
CN101139836A (en) * | 2007-08-10 | 2008-03-12 | 上海市基础工程公司 | Drilling grout pile end follow-up grouting construction method |
Also Published As
Publication number | Publication date |
---|---|
CN101333812A (en) | 2008-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101333812B (en) | Grouter for back side grouting and its construction method | |
CN104594348B (en) | Enlarged footing bellows anchor pole and construction method thereof | |
CN105804770B (en) | The earth-filling method and its equipment in TBM method tunnel or tunnel construction | |
CN101603427B (en) | Shield synchronization slip casting construction technology | |
CN101806059B (en) | Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway | |
CN103953365A (en) | Single/double slurry alternated grouting reinforcement technology of tunnel and device of single/double slurry alternated grouting reinforcement technology | |
CN102561372B (en) | Plugging method for downcomer for well-point dewatering of deep foundation pit | |
CN102051879B (en) | Process for constructing soil anchor | |
CN100363560C (en) | Method for treating collapsed road surface around inspection-pit for underground lines | |
CN105986570B (en) | The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement | |
CN107989032A (en) | A kind of construction method of punching interlocking pile | |
CN110700266A (en) | Underground continuous wall toe post-grouting construction method | |
CN106948828A (en) | A kind of device that secondary grouting is carried out using shield synchronization slip casting equipment | |
CN112412496A (en) | Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel | |
CN110185453A (en) | A kind of construction method of shield section end horizontal reinforcing | |
CN103174135B (en) | Repair method of unqualified post-grouting bored concrete pile | |
CN111364469A (en) | Underwater concrete pouring device, construction method and application of underwater concrete pouring device in ultra-large deepwater open caisson foundation | |
CN208563315U (en) | A kind of pile foundation grouting behind shaft or drift lining constructing device | |
CN111170711A (en) | Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device | |
CN103174428B (en) | A kind of applied chemistry slurries implement the method for grouting for water blocking to vertical shaft | |
CN104452746A (en) | Construction method for bored pile | |
CN108587583A (en) | A kind of high proportion rectangular top pipe mud and preparation method thereof and construction method | |
CN204282147U (en) | A kind of reinforcement Bag Grouting Pile constructing structure | |
CN103114601B (en) | The rapid hardening high pressure jet grouting of strong absorbent formation cuts infiltration method and device thereof | |
CN109881696A (en) | A kind of HPPG back cover construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 200433 Yangpu District, Shanghai Star Road, No. 231 Applicant after: Shanghai Foundation Engineering Co., Ltd. Address before: 200433 Yangpu District, Shanghai Star Road, No. 231 Applicant before: Foundation Engineering Co. of Shanghai City |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: FOUNDATION ENGINEERING CO. OF SHANGHAI CITY TO: SHANGHAI FOUNDATION ENGINEERING CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD. Free format text: FORMER NAME: SHANGHAI FOUNDATION ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 200433 Yangpu District, Shanghai Star Road, No. 231 Patentee after: Shanghai Foundation Engineering Group Co., Ltd. Address before: 200433 Yangpu District, Shanghai Star Road, No. 231 Patentee before: Shanghai Foundation Engineering Co., Ltd. |