CN101329746A - System and method for automatically arranging production plan - Google Patents

System and method for automatically arranging production plan Download PDF

Info

Publication number
CN101329746A
CN101329746A CNA2007102008614A CN200710200861A CN101329746A CN 101329746 A CN101329746 A CN 101329746A CN A2007102008614 A CNA2007102008614 A CN A2007102008614A CN 200710200861 A CN200710200861 A CN 200710200861A CN 101329746 A CN101329746 A CN 101329746A
Authority
CN
China
Prior art keywords
scheduling
order
production
production schedule
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007102008614A
Other languages
Chinese (zh)
Inventor
叶步洋
梁志荣
王振波
王碧娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CNA2007102008614A priority Critical patent/CN101329746A/en
Publication of CN101329746A publication Critical patent/CN101329746A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention provides an automatic production plan scheduling system which comprises a host computer and a database. The database is stored with order information, production capacity scheduling and distributing information for various working stations on a production line, monthly delivery demand plan information and material incoming plan information in an enterprise. The host computer is used for reading information from the database, setting up working schedule and scheduling parameters, and automatically carrying out the scheduling of production plans according to multiple limit conditions such as the monthly delivery demand information, the material incoming plan information and the set priority sequence of the order arrangement, and distributing commissions involved with different orders to different working stations according to the production capacity conditions of each working station. The invention also provides an automatic production plan scheduling method.

Description

Production schedule automatic arrangement program system and method
Technical field
The present invention relates to a kind of production schedule program system and method.
Background technology
At present, the work flow of the production schedule scheduling in the factory is generally as follows: business department sends three kinds of orders (customer order, client ForeCast, production ForeCast) and gives traffic control; Traffic control is according to the production capacity at present order situation, worker station, and thing control personnel advance factory's plan according to what order form delivery time provided material, calculates the delivery schedule of order, if do not satisfy the friendship phase then reply the business personnel and consult the friendship phase; When the traffic control planner determined kinds of goods around after the plan of dispatching from the factory, give birth to the pipe planner then according to kinds of goods the dispatch from the factory production schedule and the ForeCast production schedule of latter two month around the plan, calculate the production schedule of every day simultaneously.
There are the following problems for the work flow of above-mentioned production scheduling: give birth to the pipe planner in production capacity situation, the material situation of order being carried out can not effectively stand in conjunction with the worker in the scheduling process, carry out production schedule scheduling effectively in the priority level of product inventory amount and different orders, produce with the production schedule of institute deploying and conflict thereby in the subsequent production process, occur actual production situation easily, influence order form delivery time.
Summary of the invention
In view of above content, be necessary to provide a kind of production schedule automatic arrangement program system, can be for the scheduler in conjunction with production capacity situation, the material situation at worker station, carry out production schedule scheduling effectively in the priority level of product inventory amount and different orders.
In addition, also be necessary to provide a kind of production schedule automatic arrangement program method, can be for the scheduler in conjunction with production capacity situation, the material situation at worker station, carry out production schedule scheduling effectively in the priority level of product inventory amount and different orders.
A kind of production schedule automatic arrangement program system, this system comprises main frame and database.Store production capacity deploying data, month shipment plan of needs data and the material that each worker stands on the production line in order data, the enterprise in the described database and advance factory's planning data.Described main frame comprises: the data read module, be used to visit described database, and read order data, each Work station capacity deploying data, month shipment plan of needs data and the material that need carry out production schedule scheduling from described database and advance factory's planning data; Parameter is provided with module, is used for the priority orders that supplies the user that calendar is set and the order scheduling is set; And production schedule arranging module, be used for advancing factory's plan information and the priority orders of the order scheduling that sets is carried out production schedule scheduling automatically according to described month shipment demand information, material, the task that each order is related is assigned to each worker station according to the production capacity situation at each worker station.
A kind of production schedule automatic arrangement program method, this method may further comprise the steps: (A) read the order data that need carry out scheduling; (B) read a moon shipment plan of needs table, obtain the shipment demand information of each finished product every day in this month; (C) read material and advance factory's planning chart, obtain material and advance factory's information; (D) the scheduling calendar is set; (E) priority orders of order scheduling is set; The priority orders that reaches the order scheduling of (F) advancing factory's plan information according to described moon shipment demand information, material and setting is carried out production schedule scheduling automatically, and the task that each order is related is assigned to each worker station according to the production capacity situation at each worker station.
Compared to prior art, production schedule automatic arrangement program system and method provided by the invention can be in conjunction with the production capacity situation at worker station, material situation, carry out production schedule scheduling automatically at the multiple restrictive conditions such as priority level of product inventory amount and different orders, improves the validity of production schedule scheduling.
Description of drawings
Fig. 1 is the hardware structure figure of production schedule automatic arrangement program of the present invention system preferred embodiment.
Fig. 2 is the process flow diagram of production schedule automatic arrangement program method of the present invention preferred embodiment.
Fig. 3 utilizes production schedule automatic arrangement program of the present invention system to carry out a surface chart in the scheduling process.
Embodiment
Fig. 1 is the hardware structure figure of production schedule automatic arrangement program of the present invention system preferred embodiment.This system mainly comprises main frame 10 and the database 30 that is connected with main frame 10.
The description of the goods that database 30 stores the order data, begun to put into production (work in process, WIP), production capacity deploying situation, month shipment plan of needs table and the material at each worker station advances data such as factory's planning chart on the production line.Wherein, the order data comprises friendship phase, the client of each order, the kind of order goods, the quantity of order demand, finish the related task of order (feed intake, cut, gum is fitted ... assembling, warehouse-in), the worker station that need pass through of each task, task be through the sequential scheduling information at worker station.Production capacity is meant production equipment fertile product quantity in the regular hour.The production capacity deploying situation at each worker station comprises average production capacity, the maximum production capacity at each worker station, and the board quantity that each worker station comprises, reaches production capacity deploying information that each worker stands every day etc. at the fixedly production capacity of each board, working time.Month shipment plan of needs table comprises the plan information that dispatches from the factory of all goods in certain in January, as shipment date, shipping Qty. etc.What material advanced material that factory's planning chart comprises that various goods are related advances factory's plan information, as advances factory's date, quantity etc.
Described main frame 10 also is connected with display 20, keyboard 40 and mouse 50.Keyboard 40 and mouse 50 are being provided with calendar data and scheduling parameter input data for the user.Display 20 provides a display interface to browse above-mentioned various data and data that scheduling produced for the user.
Described main frame 10 comprises that data read module 110, parameter are provided with module 120 and production schedule arranging module 130.
Data read module 110 is used for accessing database 30, reads order data, each Work station capacity deploying data, month shipment plan of needs table and the material that need carry out production schedule scheduling from database 30 and advances data such as factory's planning chart.
Parameter is provided with module 120 and is used for calendar being set and the scheduling parameter being set for the user.Calendar wherein being set being meant normal workday and the overtime that each worker station is set, can be that unit is provided with calendar for unit or with the month in week.The scheduling parameter is set comprises the priority level of setting the order scheduling.The scheduling parameter is set comprises being arranged on whether consider current WIP inventories in the follow-up scheduling process.The WIP stock is meant the quantity that the goods of order has put into production, if consider current WIP stock, then in follow-up scheduling process, the quantity required of respective orders should be reduced current WIP stockpile number.
Production schedule arranging module 130 is used for carrying out production schedule scheduling automatically according to the multiple restrictive conditions such as priority orders that described month shipment demand information, material advance factory's plan information and set the order scheduling, and the task that each order is related is assigned to each worker station according to the production capacity situation at each worker station.
As shown in Figure 2, be the process flow diagram of production schedule automatic arrangement program method of the present invention preferred embodiment.At first, in step S10, data read module 110 accessing databases 30 read the production capacity data at each worker station of the order data that need carry out production scheduling and enterprises from database 30.Wherein, the order data comprises friendship phase, the client of order, the kind of order goods, the quantity of order demand, finish the related task of order (feed intake, cut, gum is fitted ... assembling, warehouse-in), the worker station that need pass through of each task, task be through the sequential scheduling information at worker station; The production capacity data at each worker station comprises average production capacity, the maximum production capacity at each worker station, and the board quantity that each worker station comprises, reaches the information such as production capacity deploying that each worker stands every day at the fixedly production capacity of each board, working time.
Next, in step S12, data read module 110 accessing databases 30 read a moon shipment plan of needs table from database 30, obtain the shipment plan information of of that month all goods.In general, " first shipment is produced earlier " is one of main principle of production schedule deploying.
Further, in step S14, data read module 110 accessing databases 30 read material and advance factory's planning chart from database 30, and that obtains the related material of each order advances the factory situation condition." material first in first out " also is the main principle of production schedule deploying, if two order A are identical with the plan shipment date of B, but the advanced factory of the processing starting material of order B then earlier carries out production schedule scheduling to order B.
In step S16, the user is provided with the layout setting calendar that module 120 provides by parameter, and promptly be set the normal workday and the overtime at each worker station.Calendar setting can be a unit for unit or month in week, if be that unit then is provided with normal workday and the overtime in the week with the week; If with the month is that unit then is provided with normal workday and the overtime in certain January.
Calendar after setting completed, in step S18, the user is provided with the layout setting scheduling parameter (as shown in Figure 3) that module 120 provides by parameter, described scheduling parameter comprises the priority level of setting the order scheduling, as sets the fate in advance (as shipment time in advance be 1 day) of certain work station of a certain order.Advance under the identical situation of factory's time at each order shipment date and material in the original plan, according to the production schedule of each order of priority level deploying of the order that sets.Further, in step S20, the user judges whether the parameter setting considers the WIP Inventory Performance.The WIP stock is meant the quantity that the goods of order has put into production.If do not consider the WIP Inventory Performance, then directly enter step S24, the multiple restrictive conditions such as priority orders that production schedule arranging module 130 is advanced factory's plan information according to described month shipment demand information, material and set the order scheduling carry out production schedule scheduling automatically, and the task that each order is related is assigned to each worker station according to the production capacity situation at each worker station.
If be the current WIP stock of consideration in step S20 user judged result, then enter step S22, data read module 110 accessing databases 30, the WIP inventory information of current each goods of inquiry, production schedule arranging module 130 should be reduced current WIP stockpile number with the quantity required of respective orders; Afterwards, flow process enters step S24.

Claims (4)

1. production schedule automatic arrangement program system, this system comprises main frame and database, store production capacity deploying data, month shipment plan of needs data and the material that each worker stands on the production line in order data, the enterprise in the described database and advance factory's planning data, it is characterized in that described main frame comprises:
The data read module is used to visit described database, reads order data, each Work station capacity deploying data, month shipment plan of needs data and the material that need carry out production schedule scheduling from described database and advances factory's planning data;
Parameter is provided with module, is used for the priority orders that supplies the user that calendar is set and the order scheduling is set; And
Production schedule arranging module is used for advancing factory's plan information and the priority orders of the order scheduling that sets is carried out the production schedule scheduling task that each order is related automatically and is assigned to each worker station according to the production capacity situation at each worker station according to described month shipment demand information, material.
2. production schedule automatic arrangement program as claimed in claim 1 system is characterized in that described production schedule arranging module also is used for the quantity required of the product of respective orders being reduced current in product inventory quantity in the scheduling process.
3. a production schedule automatic arrangement program method is characterized in that this method may further comprise the steps
Read the order data that to carry out scheduling;
Read a moon shipment plan of needs table, obtain the shipment demand information of each finished product every day in this month;
Read material and advance factory's planning chart, obtain material and advance factory's information;
The scheduling calendar is set;
The priority orders of order scheduling is set; And
Advance factory's information and the priority orders of the order scheduling that sets is carried out the production schedule scheduling task that each order is related automatically and is assigned to each worker station according to the production capacity situation at each worker station according to above-mentioned shipment demand information, material.
4. production schedule automatic arrangement program method as claimed in claim 3 is characterized in that this method is further comprising the steps of:
Judge whether to consider at the product inventory state;
If consider, then the quantity required of the product of respective orders is reduced the current step of carrying out production schedule scheduling automatically that changes over to after product inventory quantity at the product inventory state.
CNA2007102008614A 2007-06-22 2007-06-22 System and method for automatically arranging production plan Pending CN101329746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007102008614A CN101329746A (en) 2007-06-22 2007-06-22 System and method for automatically arranging production plan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007102008614A CN101329746A (en) 2007-06-22 2007-06-22 System and method for automatically arranging production plan

Publications (1)

Publication Number Publication Date
CN101329746A true CN101329746A (en) 2008-12-24

Family

ID=40205546

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007102008614A Pending CN101329746A (en) 2007-06-22 2007-06-22 System and method for automatically arranging production plan

Country Status (1)

Country Link
CN (1) CN101329746A (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102622667A (en) * 2012-02-13 2012-08-01 浪潮集团山东通用软件有限公司 Balance production scheduling method based on multi-product and multi-production-line production mode
CN102867219A (en) * 2012-09-27 2013-01-09 乐华建科技(北京)有限公司 System and method for automatically scheduling business
CN103020765A (en) * 2012-12-10 2013-04-03 红塔烟草(集团)有限责任公司 Tobacco leaf raw material dynamic balancing method
CN103679411A (en) * 2012-09-20 2014-03-26 金蝶软件(中国)有限公司 Material net demand balance method based on priority and device
CN104008435A (en) * 2013-02-25 2014-08-27 广州宝钢南方贸易有限公司 Automatic distributor of steel production material and method thereof
CN104252667A (en) * 2014-09-26 2014-12-31 武汉钢铁(集团)公司 Material production scheduling simulation device
CN104361482A (en) * 2014-12-09 2015-02-18 北京京东尚科信息技术有限公司 Method and system for distributing orders to storehouse
CN104392311A (en) * 2014-11-14 2015-03-04 浙江力太科技有限公司 Intelligent production scheduling method based on state driving
CN104614634A (en) * 2015-02-28 2015-05-13 苏州路之遥科技股份有限公司 Coordinating networking method for production plan and delivery plan of intelligent wire harness tester
CN105160439A (en) * 2015-10-08 2015-12-16 桥弘软件开发(上海)有限公司 Production scheduling method and automatic scheduling system
CN106251084A (en) * 2016-08-09 2016-12-21 武汉益模科技股份有限公司 A kind of production schedule used based on computer software performs management system and method
CN106327105A (en) * 2016-09-07 2017-01-11 东信和平科技股份有限公司 Order priority level data processing method and order priority level data processing system
CN106408112A (en) * 2016-08-31 2017-02-15 广州亿澳斯软件股份有限公司 Production order production scheduling management method and production scheduling optimizer system
CN106408188A (en) * 2016-09-18 2017-02-15 江苏绪普信息科技有限公司 Production scheduling system
CN106897832A (en) * 2017-02-24 2017-06-27 西门子传感器与通讯有限公司 The production scheduling method of production line, the production scheduling system of production line
CN106920023A (en) * 2015-12-28 2017-07-04 北京智芯微电子科技有限公司 A kind of chip production issues management method and system
CN107784377A (en) * 2016-08-26 2018-03-09 阿里巴巴集团控股有限公司 Item data processing method, device and server
CN108665352A (en) * 2018-05-10 2018-10-16 延锋彼欧(沈阳)汽车外饰***有限公司 Customer order information emergency processing method and device
CN110189040A (en) * 2019-06-04 2019-08-30 合肥博耀信息技术有限公司 A kind of wisdom production scheduled production algorithm
CN110889711A (en) * 2019-12-05 2020-03-17 广州百花香料股份有限公司 Client information management method and device, computer equipment and storage medium
CN111126806A (en) * 2019-12-12 2020-05-08 四川爱联科技有限公司 Marketing, production and supply informatization system based on 2B service
CN111178765A (en) * 2019-12-31 2020-05-19 南京同赢信息科技有限公司 Production line process scheduling method based on production tasks and production line configuration
CN111523756A (en) * 2020-03-18 2020-08-11 唐山钢铁集团有限责任公司 APS-based method for calculating speed of iron and steel enterprise unit
CN111932042A (en) * 2020-10-09 2020-11-13 深圳坤湛科技有限公司 Adaptive scheduling method, apparatus, and computer storage medium
CN112329966A (en) * 2019-08-05 2021-02-05 珠海格力电器股份有限公司 Finished product matching reasonable production scheduling planning method, computer readable storage medium and management system
CN112396322A (en) * 2020-11-18 2021-02-23 广东赛意信息科技有限公司 Production plan-based process technology unit productivity assessment method and system
CN112734222A (en) * 2021-01-06 2021-04-30 成都星云智联科技有限公司 Factory order production scheduling self-adaptive method, equipment and storage medium
WO2021102902A1 (en) * 2019-11-29 2021-06-03 京东方科技集团股份有限公司 System for recommending maximum quantity of products in process, method, and computer readable medium
CN113344396A (en) * 2021-06-11 2021-09-03 深圳市时代速信科技有限公司 Semiconductor packaging automatic production scheduling method and system

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102622667A (en) * 2012-02-13 2012-08-01 浪潮集团山东通用软件有限公司 Balance production scheduling method based on multi-product and multi-production-line production mode
CN102622667B (en) * 2012-02-13 2016-08-03 浪潮通用软件有限公司 A kind of based on the equilibrium scheduling method under multi-product multiple production line production model
CN103679411A (en) * 2012-09-20 2014-03-26 金蝶软件(中国)有限公司 Material net demand balance method based on priority and device
CN102867219B (en) * 2012-09-27 2016-04-06 乐华建科技(北京)有限公司 A kind of business automatic arrangement program system and method
CN102867219A (en) * 2012-09-27 2013-01-09 乐华建科技(北京)有限公司 System and method for automatically scheduling business
CN103020765A (en) * 2012-12-10 2013-04-03 红塔烟草(集团)有限责任公司 Tobacco leaf raw material dynamic balancing method
CN104008435A (en) * 2013-02-25 2014-08-27 广州宝钢南方贸易有限公司 Automatic distributor of steel production material and method thereof
CN104252667A (en) * 2014-09-26 2014-12-31 武汉钢铁(集团)公司 Material production scheduling simulation device
CN104392311A (en) * 2014-11-14 2015-03-04 浙江力太科技有限公司 Intelligent production scheduling method based on state driving
CN104361482A (en) * 2014-12-09 2015-02-18 北京京东尚科信息技术有限公司 Method and system for distributing orders to storehouse
CN104614634A (en) * 2015-02-28 2015-05-13 苏州路之遥科技股份有限公司 Coordinating networking method for production plan and delivery plan of intelligent wire harness tester
CN105160439A (en) * 2015-10-08 2015-12-16 桥弘软件开发(上海)有限公司 Production scheduling method and automatic scheduling system
CN105160439B (en) * 2015-10-08 2019-03-01 桥弘软件开发(上海)有限公司 A kind of production scheduling method and automatic arrangement program system
CN106920023A (en) * 2015-12-28 2017-07-04 北京智芯微电子科技有限公司 A kind of chip production issues management method and system
CN106251084A (en) * 2016-08-09 2016-12-21 武汉益模科技股份有限公司 A kind of production schedule used based on computer software performs management system and method
CN107784377A (en) * 2016-08-26 2018-03-09 阿里巴巴集团控股有限公司 Item data processing method, device and server
CN106408112A (en) * 2016-08-31 2017-02-15 广州亿澳斯软件股份有限公司 Production order production scheduling management method and production scheduling optimizer system
CN106327105A (en) * 2016-09-07 2017-01-11 东信和平科技股份有限公司 Order priority level data processing method and order priority level data processing system
CN106408188A (en) * 2016-09-18 2017-02-15 江苏绪普信息科技有限公司 Production scheduling system
CN106897832A (en) * 2017-02-24 2017-06-27 西门子传感器与通讯有限公司 The production scheduling method of production line, the production scheduling system of production line
CN108665352A (en) * 2018-05-10 2018-10-16 延锋彼欧(沈阳)汽车外饰***有限公司 Customer order information emergency processing method and device
CN108665352B (en) * 2018-05-10 2022-04-05 延锋彼欧(沈阳)汽车外饰***有限公司 Customer order information emergency processing method and device
CN110189040A (en) * 2019-06-04 2019-08-30 合肥博耀信息技术有限公司 A kind of wisdom production scheduled production algorithm
CN112329966A (en) * 2019-08-05 2021-02-05 珠海格力电器股份有限公司 Finished product matching reasonable production scheduling planning method, computer readable storage medium and management system
WO2021102902A1 (en) * 2019-11-29 2021-06-03 京东方科技集团股份有限公司 System for recommending maximum quantity of products in process, method, and computer readable medium
CN110889711A (en) * 2019-12-05 2020-03-17 广州百花香料股份有限公司 Client information management method and device, computer equipment and storage medium
CN111126806A (en) * 2019-12-12 2020-05-08 四川爱联科技有限公司 Marketing, production and supply informatization system based on 2B service
CN111178765A (en) * 2019-12-31 2020-05-19 南京同赢信息科技有限公司 Production line process scheduling method based on production tasks and production line configuration
CN111523756A (en) * 2020-03-18 2020-08-11 唐山钢铁集团有限责任公司 APS-based method for calculating speed of iron and steel enterprise unit
CN111523756B (en) * 2020-03-18 2023-08-25 唐山钢铁集团有限责任公司 APS-based method for calculating unit speed of iron and steel enterprise
CN111932042A (en) * 2020-10-09 2020-11-13 深圳坤湛科技有限公司 Adaptive scheduling method, apparatus, and computer storage medium
CN112396322A (en) * 2020-11-18 2021-02-23 广东赛意信息科技有限公司 Production plan-based process technology unit productivity assessment method and system
CN112734222A (en) * 2021-01-06 2021-04-30 成都星云智联科技有限公司 Factory order production scheduling self-adaptive method, equipment and storage medium
CN113344396A (en) * 2021-06-11 2021-09-03 深圳市时代速信科技有限公司 Semiconductor packaging automatic production scheduling method and system

Similar Documents

Publication Publication Date Title
CN101329746A (en) System and method for automatically arranging production plan
CA2747928C (en) System, method, and computer program for manufacturing estimation production assembly and inventory management
Öker et al. Time‐driven activity‐based costing: An implementation in a manufacturing company
Pibernik Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
JP5738779B2 (en) Supply capability estimation system, method, and program
Yang et al. Postponement: an inter-organizational perspective
JP2003228410A (en) Work commencement management system
KR101550740B1 (en) Optimized production capacity management system in digital factory using real-time factory situation
Ashayeri et al. An application of a unified capacity planning system
CN114596020A (en) Project MRP design method and system for large-scale customized production
EP2610696A1 (en) Process design/production planning device
US20160300169A1 (en) Supply chain network sensitivity analysis using adjusted network parameters
Albrecht et al. Continuous-time scheduling of production, distribution and sales in photovoltaic supply chains with declining prices
US20040049415A1 (en) System and method for rescheduling procurement according to altered demand
JP5089352B2 (en) Sales production planning system, operation method of sales production planning system, and computer program
US7580766B1 (en) Manufacturing resource planning by entity
WO2015019315A1 (en) Smart enterprise resource planning
Sawik Multi-objective master production scheduling in make-to-order manufacturing
US7890201B2 (en) Production planning system
US20150066565A1 (en) Systems and methods for managing an inventory of component parts
TW573270B (en) Multiple constrains planning and scheduling system
Bertolini et al. A scrumban board-based approach to improve material flow in engineering to order (ETO) companies: an industrial application based on action research
Sawik Multi-objective due-date setting in a make-to-order environment
US20040122724A1 (en) System and method for generating priorities of manufacturing orders
JP4318162B2 (en) Production schedule planning management method and production schedule planning management program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20081224