CN101256647A - Item management system being suitable for garden engineering - Google Patents

Item management system being suitable for garden engineering Download PDF

Info

Publication number
CN101256647A
CN101256647A CNA2008100354034A CN200810035403A CN101256647A CN 101256647 A CN101256647 A CN 101256647A CN A2008100354034 A CNA2008100354034 A CN A2008100354034A CN 200810035403 A CN200810035403 A CN 200810035403A CN 101256647 A CN101256647 A CN 101256647A
Authority
CN
China
Prior art keywords
project
management
information
gardens
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100354034A
Other languages
Chinese (zh)
Inventor
王艳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Thinklou Information Tech Inc
Original Assignee
Shanghai Thinklou Information Tech Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Thinklou Information Tech Inc filed Critical Shanghai Thinklou Information Tech Inc
Priority to CNA2008100354034A priority Critical patent/CN101256647A/en
Publication of CN101256647A publication Critical patent/CN101256647A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a management system for garden project information which is suitable for garden enterprises, comprising a plurality of client computer apparatus, a plurality of server computer apparatus, and a network connected with the computer apparatus; the system configures management structures of two layers of company layer and project layer which set different management authorities, different information levels and different project information according to the different roles (users); the company layer is divided into two levels of group headquarter and subsidiary company, in the level of group headquarter, a management layer gathering information column is established to totally exhibit the information that the company headquarter needs to know and the associated information of each subsidiary companies; in the level of subsidiary company, the project progress information and cost information of which the subsidiary company in charge is shown. The invention settles the problem about the cost management, remote management and multi-project management which are given the top priority in the garden project management, thus dramatically improving the management efficiency and saving the cost.

Description

A kind of project management system that is applicable to Garden Engineering
Technical field:
The invention belongs to a kind of project information management system, refer to a kind of gardens project information management systems (LPMM) that are applicable to Garden Engineering especially.
Background technology:
At present, the business of many gardens enterprise has related to all parts of the country, the business development of grouping of the world economy has become the target of the current and future development of enterprise, and brought into schedule for the telemanagement demand of multinomial order management of enterprise and strange land project, how to improve core competence of enterprises, how to strengthen enterprise internal management, how effectively to control project process and cost, become the problem that enterprise presses for solution gradually.The Garden Engineering construction often relates to comparatively complicated capital construction, the project duration is longer, the expenditure of human, financial, and material resources aspect is comparatively frequent, this has brought suitable difficulty to project management, if there are the small part managerial personnel can overcome these difficult problems at present, the outstanding management of the realization project of skill becomes the refinement and the in-depth of the project management of gardens enterprise engineering experience but how these managerial experience are precipitated, and apply in the software, then do not occurring as yet at present.Some garden management softwares of Chu Xianing mainly are input and the preservations that realizes some common human, financial, and material resources in the market, can realize whole interactive management and the function of in time, effectively controlling cost with profit is to be beyond one's reach far away.
Summary of the invention:
The objective of the invention is to fill up the blank of present gardens enterprise information management, resource management and project management system aspect, the integration management system of a kind of information that is applicable to gardens enterprise, resource, project management is provided.Not only skill combines the software engineering of advanced management experience with exquisiteness, and solved of paramount importance cost management in the enterprise engineering project management of gardens, profit control, telemanagement problem, thereby optimized the resources effective allotment greatly, improved the efficiency of management, saved project cost.
In order to achieve the above object, technology contents of the present invention is as follows:
A kind of gardens project information management system that is applicable to gardens enterprise, comprise plurality of client end computer equipment, the server end computer equipment, and the network that connects the aforementioned calculation machine equipment, described system is provided with company's layer, the two-layer management framework of item layer, described company layer carries out following setting: according to different roles, set different administration authorities, the visit claim of different information aspects and different project information, described company layer is divided into two aspects of general headquarters of group and branch office, in general headquarters of group aspect, set up administration and supervision authorities summary information hurdle, administration summary information hurdle, financial management summary information hurdle, project support summary information hurdle, the information that general headquarters of described column centralized displaying group need understand and the relevant information of each branch office; In branch office's aspect, show the command information of project process information, cost information, profit information and general headquarters of group that branch office is responsible for self; Described item layer carries out following setting: set up project information hurdle, cost control hurdle, progress control hurdle, quality control hurdle, maintenance and manage hurdle, project contract management hurdle after sale, the multinomial purpose progress msg of described column centralized displaying, cost information, anomalous event information.
Further, the information management function of described management system adopts the B/S structure according to the requirement of the information issue of gardens industry, realizes the issue of system desktop information, the Email Information issue, and the short message issue, self-defined letter form overlaps in batches to be beaten.
Further, the flow management function of described management system provides the workflow management platform according to gardens industry workflow management requirement, by pending workflow management, doing workflow management, flow process tracing management, realizes multiple information issue and circulation.
Further, the resource management function of described management system is according to the demand of the main body service management of gardens industry, the management of realization project chance and project resource in early stage, the bidding management of system, the technical data management that is associated, material depot, cost storehouse, project equipment goods and materials series module, comprehensively, provide systematized information support and resource guarantee for consulting the early stage of project with collection, association, the utilization of project resource system in earlier stage.
Further, the requirement that the investment decision management function of described management system is assessed in earlier stage according to the project of gardens industry realizes that the profit of the project budget, measuring and calculating, project resource management and distribution, project is estimated, being ranked of project implementation plan.
Further, the planning management function of described management system is according to the demand of gardens industry cost management, realized the management of personal daily work program, in project management, realized project material purchases planning management, in time, react the generating process of project material cost accurately, project construction overall planning management, the management of project construction detailed planninng in project management, have also been realized simultaneously, record, track project construction overall process.
Further, the cost management function of described management system is according to the demand of the cost management of gardens industry, by compiling and edit of the project budget, the management of the generating process of project cost, comprise the process control of purchasing management, contract management, other payment managements, realized the Dynamic Cost Management of project.
Further, the profit control function of described management system is according to the profit control demand of gardens industry, and profit measurement, the project by project early stage be actual collects money, the management of the generating processes such as visa management of project, has realized the tracking of the dynamic profit of project.
Further, the work management function of described management system is according to the construction of gardens industry, the requirement of work management, modules such as the construction management that provides by system, quality safety management, project completion maintenance management have realized monitoring, safety management, quality management, completion management, the maintenance service management of project construction progress.
Further, the multinomial order management function of described management system is according to the secondary management mode of most enterprises of gardens industry, multinomial purpose stratification management mode is provided, gather layer in group company and realized the tabulate statistics of multinomial order information by system, the essential information that comprises project gathers, project ledger, project process gathers, the project work amount gathers, project cost gathers, the project profit gathers, the project funds flow gathers, the project relevant documentation gathers, all kinds of contracts of project gather, the project visa gathers, realized that gardens enterprise carries out the statistics of various information data in the process, the distribution of all kinds of resources and utilization simultaneously at multinomial order.
Further, the administration function of described management system is according to the enterprise's routine work characteristics and the requirement of gardens industry, realized the relevant content of enterprise's administration by system, the standardization document management, office equipment management, easily-consumed products management, employee's personnel file management, talents information library management, the corporate client that comprise routine work are managed the information-based module of the essential administration of a series of enterprises routine work, and in conjunction with day to day operation information of managing data, a line data basis that provides enterprise to realize performance appraisal, KPI.
Further, the process management function of described management system is according to the work characteristics and the requirement of the field management of gardens industry, effectively realized telemanagement by system, adopt the production method of working-yard planimetric map, the outdoor scene photo of integration project, screen image, the situation at project scene is presented in face of the user, and the real-time imaging transmission technology is provided, realize the real-time Transmission of project field image, sound.
Technological achievement of the present invention is: this project management system is according to the multistage architecture pattern of nsg layer, company's layer, item layer, clarification in certain roles, refinement Control Node, each key element of project management is fused in the system, realizes the multinomial order of enterprise, polytopic management expectancy.System serves as theme around project prophase management, project cost control management, project site construction management, project profit control four big cores, has included bidding management, project information, project contract, project cost control, project profit control, store keeping, construction management, project and has asked money management, the management of project returned money, quality and safety control, maintenance each link such as to manage after sale.Proven technique framework, friendly user interface, mode of operation is the information-based project management system platform that a telemanagement, real-time response, science decision are built by gardens enterprise easily.
Description of drawings:
Desktop synoptic diagram when Fig. 1 is in nsg layer for the information promulgating platform of gardens project information management system.
Desktop synoptic diagram when Fig. 2 is in company's layer for the information promulgating platform of gardens project information management system.
Desktop synoptic diagram when Fig. 3 is in item layer for the information promulgating platform of gardens project information management system.
Embodiment:
Below in conjunction with embodiment the embodiment of the invention is described in further details:
As shown in Figure 1, 2, 3, the user lands this project information management system at the client computer, enters system desktop, and it is available that the desktop left side is provided with a plurality of command menus.
The command menu shared module has: " individual workbench ", " system management ".
Command menu nsg layer, company's layer have: " administration ", " financial management ", " group/corporate resource storehouse ", " project technical support ", " group/company's case base ", " project gathers ".
The command menu item layer has: " individual workbench ", " bidding management ", " project information ", " project contract ", " project cost control ", " project profit control ", " store keeping ", " construction management ", " project is asked the money management ", " management of project returned money ", " quality and safety control ", " project is completed and is managed ", " maintenance is managed after sale ".
The system desktop center section is provided with " information " and checks that module, " todo list " check that module, " event notification " check module, " star reveal assistant " module.
The uppermost gauge outfit center section of desktop is provided with: user profile (showing active user, current date and time); The selection switching push button of group, company, project; System information (desktop, revise password, withdraw from and land).
Below manipulating of each function menu done an explanation:
" individual workbench ", " system management " two big modules in the menu bar in system left side are shared modules, also are the menu bar that the user of any authority can manipulate.Wherein " individual workbench " comprised work program, todo list, at suitable, the matters of submitting to a higher level for approval or revision of handling affairs, careful matters, information, my news in brief, these submenus of employee's address list.Can well put the various work of oneself handling in order at hand by these submenus user, thereby improve office efficiency." system management " comprised user management, Role Management, division management, module management, dictionary parameter, these submenus of project maintenance.Mainly be that claim, role to the user sets, the dictionary item of system is carried out self-defined interpolation, new project information is added management.
The module that the user of nsg layer, company's layer authority uses in the menu bar in system left side has: " administration " comprised that standard document, contract management, Employee Profile, talents information storehouse, engineering material management, office appliance are managed, customer information is fed back these submenus.The user can be according to the authority responsibility of self, in the shared administration of the relevant company of this column issue, the management information aspect the occurrences in human life." financial management " comprised project please money management, project examination single tube reason, project payment management, project revenue control, company ask money management, company's examination and approval document management, company's payment management, these submenus of company's revenue control.The user manipulates these submenus according to the authority responsibility of self, thereby the expenditure and the income of project managed, and allows corporate decision's layer understand the balance between revenue and expenditure situation and the use of funds situation of enterprise in time, accurately." corporate resource storehouse " comprised store keeping, nursery bed management, supplier management, these submenus of subcontractor management.Mainly preserve material information, nursery stock information, supplier information, subcontractor's information in these submenus, and the supply price and the material of relevant supplier carried out reference relatively, thereby saved purchase cost, saving cost of labor." technical support " comprised quota storehouse, engineering specification document, safety standard document, technical specification document, these submenus of construction quality standard document.These submenus mainly are that the material stock of enterprise is added up and upgrade, and the various project documents that relate in the project construction process, engineering safety standard, technical manual etc. are preserved and the tracking data record, so that in time call and consult." case library " comprised municipal works case, gardens project text, quality management case, safety management case, these submenus of technical management case.These cases are that knowledge, the resource of gardens enterprise, the perfection of wisdom are preserved." project gathers " comprised that the bid project gathers, the construction period project gathers, safeguards that the phase project gathers, end project gathers, project cost gathers, the project profit gathers these submenus.These submenus with the bid project of gardens enterprise, construction period project, safeguard the statistics of tabulating such as phase project, thereby clearly show progress situation, the cost of project of various different conditions a situation arises, contribution to profit situation etc.
The module that the user of item layer authority uses in the menu bar in system left side has: " bidding management " comprised bid data, prequalification, technical bid, commercial bid, these submenus of bid contract.System's real simulation the overall process of project bid, record all linked with one another, examine, supervise the whole data that relate in the project bidding and tendering process." project information " comprised project essential information, project personnel's examination, project document management, these submenus of client's suggestion feedback.These submenus have realized that mainly project carries out the standardized management of fundamentals such as the basic document, personnel checking-up in the process." project contract " comprised that Party A's contract, subcontract, material contract, change management, visa manage these submenus.All contracts unifications that relate in the project process are sorted out, gathered, and follow up in real time, the important contract text with legal effect is provided when settling accounts for project." project cost control " comprised cost budgeting table, dynamic cost table, these submenus of project funds flowmeter.Project cost is carried out tracking, the prediction of overall process to settling accounts from the budget to the process, and count the data sheet in the various dynamic processes, the data support of science is provided when making a strategic decision for decision-making level." project profit control " comprised dynamic profit statement, historical profit table two submenu.Dynamic profit, historical profit to project in the project process are carried out dynamic tracking, record, grasp the balance between revenue and expenditure situation of project in real time." store keeping " comprised material planning, material purchases, these submenus of material machine account.Realized the unified standardized administration that material is planned, buying has foundation, machine account to inquire about." construction management " comprised construction overall planning, construction detailed planninng, construction speed, all schedules, construction journal, construction speed weekly, Party A's workload monthly magazine, subpackage plan, subcontractor's Workload Account, other plan these submenus.Realized the standardized management in the project site operation process." project please money management " comprised engineering please the money management, the management of engineering examination and approval document, engineering received payment management, engineering payables manage these submenus.All funds that take place in the project process with please money unify standardized management, cost that project has been taken place and the cost that will take place carry out real-time statistics, gather." management of project returned money " comprised that returned money plan, Party A ask money to be managed, reality is received, actual due-in these submenus.Agreement according to gardens enterprise and Party A's contract is drafted out the returned money plan, asks money thereby carry out the Party A according to plan, and actual required material, the data of returned money of carrying out in the process of project are followed the tracks of timely, add up, preserved." quality and safety control " comprised quality check, safety inspection, check-up, these submenus of outdoor scene photo management.Quality in the project construction process, safety, technology are carried out real-time oversight, inspection, and file with the form of real picture." project is completed and is managed " comprised budget needed for the completion of projects table, intermediary's audit information, these submenus of the project evaluation.Track record is carried out in budget needed for the completion of projects to project." maintenance is managed after sale " comprised that maintenance information, maintenance work daily paper, maintenance monthly test form, maintenance personnel check and rate these submenus.Mainly the project that enters the maintenance stage is carried out the tracking of overall process record and the standardized management of maintenance work.
" information " column of system desktop center section, the user can check, issue corporate news, trade trend and other relevant information; At " todo list " column, the matters that the user can check, issue its matters that need handle as early as possible and need other people to cooperate; In " event notification " hurdle, the user can be to important work delivery system information, carry out work early warning and prompting, can also remind the working node and the great link matters of the key of engineering project, and these reminded contents can send to user mobile phone by the SMS module of the system integration and other user mobile phone when setting on; At " star reveal assistant " column, the system integration comparatively practical some related tools in the daily life, such as weather forecast, map inquiry, traffic inquiry etc.
The uppermost gauge outfit center section of system desktop: " user profile " mainly shows user's name, current date and the time of current using system.Group, company, these choice menus of project mainly are to allow user's selective system show the information of which aspect.The option system will show current being in " so-and-so certain project " desktop; System of selection company will show current being in " certain so-and-so branch office " desktop; Select the system of group then to show current being in " group " summary information desktop." system information " comprised desktop, revised password, withdrawed from and land, and Desktop Button is to allow the shortcut of user's fast return desktop; Revising password is the password that lands of user's modification oneself; Withdraw from the operating key that lands when maybe needing to log off when being the switching user.
Now each the big featured function to these gardens project information management systems (LPMM) makes introductions all round:
1, information management
System adopts the exploitation of B/S structural design according to the requirement of the information issue of gardens industry.In conjunction with ripe information publishing technology, realize the issue of system desktop information, the Email Information issue, the short message issue, self-defined letter form overlaps in batches to be beaten.
2, workflow management
System is according to gardens industry workflow management requirement, the workflow management platform is provided, by inbox, in the management mode of doing case, flow process tracking, realize the workflow management of traditional OA system, and further combining information distribution technology, realize the means of multiple information issue and circulation, improved the efficient of flow process greatly.
3, resource management
Described management system is according to the demand of the main body service management of gardens industry, system has realized the management of project chance and project resource in early stage, a series of modules such as the bidding management of system, the technical data management that is associated, material depot, cost storehouse, project equipment goods and materials, comprehensive collection, association, utilization with project resource system in earlier stage, provide systematized information support and resource guarantee for consulting the early stage of project, effectively improved the success ratio that project is expanded.
4, investment decision management
The requirement that described management system is assessed in earlier stage according to the project of gardens industry, by system realized that the profit of the project budget, measuring and calculating, project resource management and distribution, project is estimated, the mode such as be ranked of project implementation plan, effectively realized the investment decision analysis of project, the decision-making foundation of distinctization is provided for senior enterprise leader.
5, planning management
System is according to the demand of gardens industry cost management, realized the management of personal daily work program, the working environment of providing convenience for department and individual schedule job placement; In project management, realized project material purchases planning management, reacted the generating process of project material cost in time, accurately, for the control of enterprise's project cost provides systematized guarantee.Project construction overall planning management, the management of project construction detailed planninng in project management, have also been realized simultaneously, record, track project construction overall process.
6, cost management
System is according to the demand of the cost management of gardens industry, compile and edit (target cost) by the project budget, the management of the generating process of project cost (dynamically cost), comprise the process control of purchasing management, contract management, other payment managements, effectively realized the Dynamic Cost Management of project, provide systematized guarantee for enterprise effectively controls project cost.
7, profit control
System is according to the profit control demand of gardens industry, profit measurement, project by project early stage be actual collects money, the management of the generating processes such as visa management of project, the Party A of enterprise effectively realized the tracking of the dynamic profit of project, for please urge money, Party B's payment clearing, the dynamic accounting of project profit that systematized data support is provided by money.
8, work management
System is according to the construction of gardens industry, the requirement of work management, modules such as the construction management that provides by system, quality safety management, project completion maintenance management, the effectively monitoring of the project construction progress that realizes, safety management, quality management, completion management, maintenance service management.
9, multinomial order management
System is according to the secondary management mode of most enterprises of gardens industry, multinomial purpose stratification management mode is provided, gather layer in company and realized the tabulate statistics of multinomial order information by system, the essential information that comprises project gathers, project ledger, project process gathers, the project work amount gathers, project cost gathers, the project profit gathers, the project funds flow gathers, the project relevant documentation gathers, all kinds of contracts of project gather, the project visa gathers etc., realized that effectively gardens enterprise carries out the statistics of various information data in the process simultaneously at multinomial order, the distribution of all kinds of resources and utilization provide the guarantee of effective system management for the scope of the enterprise development.
10, administration
System is according to the enterprise's routine work characteristics and the requirement of gardens industry, realized the relevant content of enterprise's administration by system, the information-based module of the essential administration of a series of enterprises routine works such as standardization document management, office equipment management, easily-consumed products management, employee's personnel file management, talents information library management, corporate client management that comprises routine work, and in conjunction with day to day operation information of managing data, a line data basis that provides enterprise to realize performance appraisal, KPI efficiently solves the trouble and worry of enterprise's daily operation.
11, long-range (scene) management
System has effectively realized long-range (scene) management according to the work characteristics and the requirement of the field management of gardens industry by system.System adopts the production method of working-yard planimetric map, and the outdoor scene photo of integration project, screen image are presented in the situation at project scene in face of the user.System provides the real-time imaging transmission technology, effective combination by wireless network and network shooting machine technology, the real-time Transmission of realization project field image, sound, satisfy a series of field management requirements such as gardens enterprise project is reconnoitred, project monitoring, project on-the-spot meeting, improve on-the-spot affairs punishment efficient greatly, reduced managerial personnel's business travel cost.
Thus, the user is after landing this project information management (LPMM) system, by each command menu on the operation information platform desktop, can set in advance each user's claim, role, limit the quantity of information that each user can see, can operate editor's information, thereby the claim of general headquarters of group and each branch office is distinguished, thereby make things convenient for the corporate HQ that each branch office is carried out telemanagement.Simultaneously the user operates each command menu, can handle the basic all problems that is run in the Garden Engineering project construction, can be undertaken perfect by system to the cost of project, material, progress, quality etc.The project process management that system provides, cost management, profit control etc. can be paid and balance between revenue and expenditure by the every cost of strict control item purpose, strictly observe budget and operate.Construction is extremely helpful for Garden Engineering can to predict it.

Claims (10)

1, a kind of gardens project information management system that is applicable to gardens enterprise comprises plurality of client end computer equipment, server end computer equipment, and the network that connects the aforementioned calculation machine equipment, it is characterized in that:
Described system is provided with company's layer, the two-layer management framework of item layer,
Described company layer carries out following setting: according to different roles, set the visit claim of different administration authorities, different information aspect and different project information, described company layer is divided into two aspects of general headquarters of group and branch office, in general headquarters of group aspect, set up administration and supervision authorities summary information hurdle, administration summary information hurdle, financial management summary information hurdle, project support summary information hurdle, the information that general headquarters of described column centralized displaying group need understand and the relevant information of each branch office; In branch office's aspect, show the command information of project process information, cost information, profit information and general headquarters of group that branch office is responsible for self;
Described item layer carries out following setting: set up project information hurdle, cost control hurdle, progress control hurdle, quality control hurdle, maintenance and manage hurdle, project contract management hurdle after sale, the multinomial purpose progress msg of described column centralized displaying, cost information, anomalous event information.
2, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The resource management function of described management system is according to the demand of the main body service management of gardens industry, the management of realization project chance and project resource in early stage, the bidding management of system, the technical data management that is associated, material depot, cost storehouse, project equipment goods and materials series module, comprehensively, provide systematized information support and resource guarantee for consulting the early stage of project with collection, association, the utilization of project resource system in earlier stage.
3, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The requirement that the investment decision management function of described management system is assessed in earlier stage according to the project of gardens industry realizes that the profit of the project budget, measuring and calculating, project resource management and distribution, project is estimated, being ranked of project implementation plan.
4, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The planning management function of described management system is according to the demand of gardens industry cost management, realized the management of personal daily work program, in project management, realized project material purchases planning management, the generating process of reaction project material cost, project construction overall planning management, the management of project construction detailed planninng in project management, have also been realized simultaneously, record, track project construction overall process.
5, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The cost management function of described management system is according to the demand of the cost management of gardens industry, by compiling and edit of the project budget, the management of the generating process of project cost comprises the process control of purchasing management, contract management, other payment managements, has realized the Dynamic Cost Management of project.
6, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The profit control function of described management system is according to the profit control demand of gardens industry, and profit measurement, the project by project early stage be actual collects money, the management of the generating processes such as visa management of project, has realized the tracking of the dynamic profit of project.
7, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The work management function of described management system is according to the construction of gardens industry, the requirement of work management, modules such as the construction management that provides by system, quality safety management, project completion maintenance management have realized monitoring, safety management, quality management, completion management, the maintenance service management of project construction progress.
8, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The multinomial order management function of described management system is according to the secondary management mode of most enterprises of gardens industry, multinomial purpose stratification management mode is provided, gather layer in group company and realized the tabulate statistics of multinomial order information by system, the essential information that comprises project gathers, project ledger, project process gathers, the project work amount gathers, project cost gathers, the project profit gathers, the project funds flow gathers, the project relevant documentation gathers, all kinds of contracts of project gather, the project visa gathers, realized that gardens enterprise carries out the statistics of various information data in the process, the distribution of all kinds of resources and utilization simultaneously at multinomial order.
9, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The administration function of described management system is according to the enterprise's routine work characteristics and the requirement of gardens industry, realized the relevant content of enterprise's administration by system, the standardization document management, office equipment management, easily-consumed products management, employee's personnel file management, talents information library management, the corporate client that comprise routine work are managed the information-based module of the essential administration of a series of enterprises routine work, and in conjunction with day to day operation information of managing data, a line data basis that provides enterprise to realize performance appraisal, KPI.
10, the gardens project information management system that is applicable to gardens enterprise according to claim 1 is characterized in that:
The process management function of described management system is according to the work characteristics and the requirement of the field management of gardens industry, effectively realized telemanagement by system, adopt the production method of working-yard planimetric map, the outdoor scene photo of integration project, screen image, the situation at project scene is presented in face of the user, and the real-time imaging transmission technology is provided, realize the real-time Transmission of project field image, sound.
CNA2008100354034A 2008-03-31 2008-03-31 Item management system being suitable for garden engineering Pending CN101256647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100354034A CN101256647A (en) 2008-03-31 2008-03-31 Item management system being suitable for garden engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100354034A CN101256647A (en) 2008-03-31 2008-03-31 Item management system being suitable for garden engineering

Publications (1)

Publication Number Publication Date
CN101256647A true CN101256647A (en) 2008-09-03

Family

ID=39891451

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100354034A Pending CN101256647A (en) 2008-03-31 2008-03-31 Item management system being suitable for garden engineering

Country Status (1)

Country Link
CN (1) CN101256647A (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102542370A (en) * 2010-12-14 2012-07-04 上海莫言信息科技有限公司 Role management and implementation method for electronic commerce platform of cross-region tourist distribution center
CN102622678A (en) * 2012-03-29 2012-08-01 贵州省烟草公司遵义市公司 System for managing tobacco production infrastructures
CN103617518A (en) * 2013-10-31 2014-03-05 淘金信息科技(苏州)有限公司 An office automation system
CN103679373A (en) * 2013-04-12 2014-03-26 国家电网公司 Full chain budget data processing system and method for production infrastructure standard cost system
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104331779A (en) * 2014-11-21 2015-02-04 苏州天地微易智能科技有限公司 Development area construction project management system and method
CN104376431A (en) * 2014-12-02 2015-02-25 国网浙江余姚市供电公司 Engineering project management method and system
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN105022685A (en) * 2015-08-14 2015-11-04 国网北京市电力公司 Data processing method and device
CN105160463A (en) * 2015-08-19 2015-12-16 武汉海王新能源工程技术有限公司 Enterprise management system on basis of project management
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106301948A (en) * 2016-08-31 2017-01-04 北京奇艺世纪科技有限公司 A kind of message circulation visualization and monitoring method and system
CN107730219A (en) * 2017-11-21 2018-02-23 成都金川田农机制造有限公司 Science and technology item systematic management system
CN107918824A (en) * 2017-11-02 2018-04-17 中交第二公路工程局有限公司 A kind of highway engineering construction Norm Measure method
CN107944665A (en) * 2017-11-01 2018-04-20 北京新机场建设指挥部 A kind of Engineering Project Information Management System and method
CN108510206A (en) * 2018-04-10 2018-09-07 北京曜世科技有限公司 A kind of free house decoration management system and method
CN108629514A (en) * 2018-05-07 2018-10-09 襄阳市尚贤信息科技有限公司 A kind of engineering information technical management system
CN109242414A (en) * 2018-08-16 2019-01-18 深圳前海启航供应链管理有限公司 A kind of contract management system
CN109840664A (en) * 2017-11-29 2019-06-04 镇江市新创计算机***集成有限公司 A kind of management method based on decision management system
CN111291994A (en) * 2020-02-12 2020-06-16 普元信息技术股份有限公司 Multi-project management system and method suitable for agile development mode in big data environment
CN111563703A (en) * 2020-07-16 2020-08-21 普源精电科技股份有限公司 Project management system, project management method, computer device, and computer-readable storage medium
CN112819302A (en) * 2021-01-21 2021-05-18 中石化第十建设有限公司 Full-process equipment Internet of things management system and method
CN113592611A (en) * 2021-06-28 2021-11-02 龙净能源发展有限公司 Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
CN116611795A (en) * 2023-07-19 2023-08-18 深圳广信建设(集团)有限公司 Construction progress intelligent management and control system suitable for garden construction

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102542370A (en) * 2010-12-14 2012-07-04 上海莫言信息科技有限公司 Role management and implementation method for electronic commerce platform of cross-region tourist distribution center
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102521709B (en) * 2011-12-22 2016-06-29 上海建科工程咨询有限公司 A kind of online risk management system of Construction Quality safety
CN102622678A (en) * 2012-03-29 2012-08-01 贵州省烟草公司遵义市公司 System for managing tobacco production infrastructures
CN103679373A (en) * 2013-04-12 2014-03-26 国家电网公司 Full chain budget data processing system and method for production infrastructure standard cost system
CN103617518A (en) * 2013-10-31 2014-03-05 淘金信息科技(苏州)有限公司 An office automation system
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN104331779A (en) * 2014-11-21 2015-02-04 苏州天地微易智能科技有限公司 Development area construction project management system and method
CN104376431A (en) * 2014-12-02 2015-02-25 国网浙江余姚市供电公司 Engineering project management method and system
CN105022685A (en) * 2015-08-14 2015-11-04 国网北京市电力公司 Data processing method and device
CN105160463A (en) * 2015-08-19 2015-12-16 武汉海王新能源工程技术有限公司 Enterprise management system on basis of project management
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106301948B (en) * 2016-08-31 2020-01-03 北京奇艺世纪科技有限公司 Message flow visualization and monitoring method and system
CN106301948A (en) * 2016-08-31 2017-01-04 北京奇艺世纪科技有限公司 A kind of message circulation visualization and monitoring method and system
CN107944665A (en) * 2017-11-01 2018-04-20 北京新机场建设指挥部 A kind of Engineering Project Information Management System and method
CN107918824A (en) * 2017-11-02 2018-04-17 中交第二公路工程局有限公司 A kind of highway engineering construction Norm Measure method
CN107918824B (en) * 2017-11-02 2022-03-08 中交第二公路工程局有限公司 Method for determining construction quota of highway engineering
CN107730219A (en) * 2017-11-21 2018-02-23 成都金川田农机制造有限公司 Science and technology item systematic management system
CN109840664A (en) * 2017-11-29 2019-06-04 镇江市新创计算机***集成有限公司 A kind of management method based on decision management system
CN108510206A (en) * 2018-04-10 2018-09-07 北京曜世科技有限公司 A kind of free house decoration management system and method
CN108629514A (en) * 2018-05-07 2018-10-09 襄阳市尚贤信息科技有限公司 A kind of engineering information technical management system
CN109242414A (en) * 2018-08-16 2019-01-18 深圳前海启航供应链管理有限公司 A kind of contract management system
CN111291994A (en) * 2020-02-12 2020-06-16 普元信息技术股份有限公司 Multi-project management system and method suitable for agile development mode in big data environment
CN111563703A (en) * 2020-07-16 2020-08-21 普源精电科技股份有限公司 Project management system, project management method, computer device, and computer-readable storage medium
CN112819302A (en) * 2021-01-21 2021-05-18 中石化第十建设有限公司 Full-process equipment Internet of things management system and method
CN113592611A (en) * 2021-06-28 2021-11-02 龙净能源发展有限公司 Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
CN116611795A (en) * 2023-07-19 2023-08-18 深圳广信建设(集团)有限公司 Construction progress intelligent management and control system suitable for garden construction

Similar Documents

Publication Publication Date Title
CN101256647A (en) Item management system being suitable for garden engineering
US20210110347A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US8341089B2 (en) Real estate management system and method
CN110334950B (en) Iron tower intelligent production and group management and control system
CN203165006U (en) Engineering project management system
CN105303306B (en) Electric power material dispatching platform system
US20030018490A1 (en) Object oriented system and method for planning and implementing supply-chains
US20150109287A1 (en) Method and system for supply chain network sensitivity analysis and presentation
CN107203610A (en) A kind of resource-sharing data processing equipment and method
CN107292589B (en) Full industry chain informatization cloud service platform
CN110070334A (en) The information processing method of project management and application
CN104881758A (en) ERP system capable of realizing integrated supply chain cooperative production and operation method thereof
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
Ali et al. ERP System Implementation in a Leading LED Manufacturing in Malaysia: A Supply Chain Perspective
CN115034740A (en) Full life cycle project management cloud platform system
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
CN109816317A (en) Project Abroad logistic information management system
Wynn et al. Demand-supply chain management: systems implications in an SME packaging business in the UK
US20120053964A1 (en) Systems and methods for online insurance financial planning
CN102663539A (en) Operation cost management system based on platform of internet of things
CN107688896A (en) Science Research Information Management System, method, storage medium and its computer equipment
JP2003288476A (en) Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line
CN114066382B (en) Settlement management system based on mobile internet technology
Altekar Enterprisewide resource planning: theory and practice
US20170140399A1 (en) Commitments and forecasting management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Shanghai Thinklou Information Tech., Inc.

Document name: Notification of before Expiration of Request of Examination as to Substance

DD01 Delivery of document by public notice

Addressee: Wang Yanhua

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080903