CN101220554A CNA2008100026665A CN200810002666A CN101220554A CN 101220554 A CN101220554 A CN 101220554A CN A2008100026665 A CNA2008100026665 A CN A2008100026665A CN 200810002666 A CN200810002666 A CN 200810002666A CN 101220554 A CN101220554 A CN 101220554A
Authority
CN
China
Prior art keywords
steam
cylinder
control method
steam generator
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100026665A
Other languages
Chinese (zh)
Other versions
CN101220554B (en
Inventor
孙彰佑
裴祥训
崔喆珍
金东炫
孙永福
金兴在
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LG Electronics Inc
Original Assignee
LG Electronics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020070003716A external-priority patent/KR100830514B1/en
Application filed by LG Electronics Inc filed Critical LG Electronics Inc
Publication of CN101220554A publication Critical patent/CN101220554A/en
Application granted granted Critical
Publication of CN101220554B publication Critical patent/CN101220554B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F58/00Domestic laundry dryers
    • D06F58/30Drying processes 
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F58/00Domestic laundry dryers
    • D06F58/20General details of domestic laundry dryers 
    • D06F58/203Laundry conditioning arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Detail Structures Of Washing Machines And Dryers (AREA)

Abstract

The present invention relates to a dryer and a method for controlling the same. The method for controlling a dryer includes a steam supply step for supplying steam generated in a steam generator to a dram, and a hot air supply step for supply hot air generated in a hot air heater to the drum. The method according to the present invention has an advantageous effect of removing wrinkles efficiently.

Description

Cloth apparatus and control method thereof
The cross reference of related application
The application requires to be incorporated by reference at this full content with this korean patent application, as this korean patent application having been carried out sufficient elaboration here in the rights and interests of the korean patent application No.10-2007-0003716 of submission on January 12nd, 2007.
Technical field
The present invention relates to a kind of cloth apparatus and control method thereof, more specifically, the present invention relates to a kind of dryer and the control method thereof that can eliminate or prevent fold on the clothes or fold.
Background technology
Cloth apparatus is to utilize high temperature air to dry the household electrical appliance of washed (for example washing clothes).Usually, cloth apparatus comprises: cylinder, this cylinder are used to hold object to be dried; The drive source that is used for head roll; Heating unit, this heating unit are used for the air that will be introduced in the cylinder is heated; And blower unit, this blower unit is used for sucking air in the cylinder or discharging outside the cylinder.
According to how air being heated (type that is heating unit), cloth apparatus can be divided into electric cloth apparatus or gas cloth apparatus.The electricity cloth apparatus utilizes resistance heat that air is heated, and the heat that the gas cloth apparatus utilizes gas combustion to produce heats air.In addition, cloth apparatus can be divided into condensing type cloth apparatus or emission type cloth apparatus.In the condensing type cloth apparatus, the air that has carried out heat exchange with object to be dried in the cylinder and become high wetting phase carries out circulation and does not discharge outside the cloth apparatus.Carry out heat exchange between additional condenser and outside air, to produce condensed water, this condensed water is discharged from outside the cloth apparatus.In the emission type cloth apparatus, the air that has carried out heat exchange with object to be dried in the cylinder and become high wetting phase is directly discharged outside the cloth apparatus.How to put in the cloth apparatus according to clothing, cloth apparatus can be divided into top-loaded formula cloth apparatus or anterior loaded type cloth apparatus.In top-loaded formula cloth apparatus, object to be dried is put into the cloth apparatus from the top.Forwardly in the loaded type cloth apparatus, object to be dried is put into the cloth apparatus from the front.
Yet the traditional cloth apparatus with above-mentioned structure has following problem.
Usually, washed and the clothing of rotary dehydration is placed in the cloth apparatus, this clothing is dried by cloth apparatus.Yet according to the principle of washing, the washing clothing can produce fold, and in the oven dry that cloth apparatus carries out is handled, can not eliminate the fold on the clothing fully.Therefore, need additional flatiron to handle the fold of eliminating on the oven dry object (i.e. the clothing of having been dried) by traditional cloth apparatus.
In addition, in normal storage with use clothes and when washed, may make clothes and washed generation fold, fold or fold (being referred to as " fold " hereinafter).Therefore, exist can and eliminating the tight demand of the device of the fold on the clothes between storage period easily and easily in the normal use of clothes.
Summary of the invention
Therefore, the present invention relates to a kind of the elimination basically because the restriction of correlation technique and the cloth apparatus and the control method thereof of one or more problems that shortcoming is caused.
The purpose of this invention is to provide and a kind ofly can prevent and/or eliminate the fold on the clothes or the cloth apparatus and the control method thereof of fold.
Other advantage of the present invention, purpose and feature will be set forth in part in the following description, and will be partly obvious to those of ordinary skills after the description below having checked, and maybe can obtain from enforcement of the present invention.Can realize and obtain purpose of the present invention and other advantage by the structure that particularly points out in specification, claim and the accompanying drawing.
According to purpose of the present invention, in order to realize these purposes and other advantage, also broadly described as institute's enforcements here, a kind of control method of cloth apparatus comprises: the steam of steam generator generation is fed in the cylinder; And hot-air is fed in the cylinder clothes of being got wet by steam with oven dry.
Preferably, this control method also comprises: carrying out before the steam that steam generator is produced is fed to step in the cylinder, the inside of cylinder is heated.Preferably, the step that the inside of cylinder is heated comprises: the hot-air that hot air heater is produced is fed in the cylinder.Preferably, the step that the inside of cylinder is heated comprises: at one section preset time of steam generator operation back operation hot air heater.More preferably, the step that the inside of cylinder is heated comprises: operation hot air heater when the water level in steam generator arrives high water level.In addition, preferably, the step that the inside of cylinder is heated comprises: with the capacity operation hot air heater less than the rated capacity of hot air heater.
Preferably, the step that the inside of cylinder is heated comprises: stop the operation of hot air heater when steam generator produces steam.More preferably, the step that the inside of cylinder is heated comprises: force to stop the operation of hot air heater after hot air heater has moved scheduled time slot.In addition, preferably, the step that the inside of cylinder is heated comprises makes the cylinder rotation.
Preferably, the steam that steam generator is produced is fed to step in the cylinder and comprises and make the cylinder rotation.More preferably, cylinder is rotated off and on.At this moment, the dwell time of cylinder can be greater than the rotational time of cylinder.
Preferably, when the water level in the steam generator was low water level, steam generator began water is heated, and when the water level in the steam generator is high water level, stopped steam generator being supplied water.In addition, preferably, when the water level in the steam generator arrives low water level between delivery period, steam generator is carried out the water supply of a period of time.
Preferably, this control method also comprises and makes cylinder cooling.In addition, preferably, this control method also comprises: be fed to after step in the cylinder finishes at the steam that steam generator is produced, the water that remains in the steam generator gathered together, so that remaining water is discharged to the outside.More preferably, the step that the water that remains in the steam generator is gathered together comprises remaining water pump in the steam generator is delivered to the outside.
Preferably, according to selected pattern, the steam that steam generator is produced be fed in the step in the cylinder the steam supply time with hot-air is fed in the cylinder different with the hot-air supply time in the step of drying the clothes of being got wet by steam.For example, it is long to be used for comparable steam supply time and the hot-air supply time that is used to eliminate fold of the steam supply time of sterilization and hot-air supply time.In addition, it is short to be used to comparable steam supply time and the hot-air supply time that is used to eliminate fold of the steam supply time of shaking up and hot-air supply time.
According to aforesaid the present invention, can prevent and/or eliminate the fold on the clothes effectively.
It should be understood that aforementioned general description of the present invention and following detailed all are exemplary with illustrative, and be intended to provide desired of the present invention further specifying.
Description of drawings
Here included accompanying drawing provides further understanding of the present invention, and is combined in the present patent application, constitutes the application's a part, and these accompanying drawings show embodiments of the invention, and is used from explanation principle of the present invention with specification one.In the accompanying drawings:
Fig. 1 shows the decomposition diagram according to the embodiment of cloth apparatus of the present invention;
Fig. 2 is the vertical sectional view of Fig. 1;
Fig. 3 shows the cutaway view of the steam generator of Fig. 1;
Fig. 4 shows the view according to another embodiment of cloth apparatus of the present invention, wherein mainly shows the steam generator of cloth apparatus;
Fig. 5 shows the decomposition diagram of example of the watering of Fig. 4;
Fig. 6 shows the decomposition diagram of the water softening member of Fig. 5;
Fig. 7 A to Fig. 7 C is the part cut-away, perspective view of Fig. 5;
Fig. 8 shows the watering of Fig. 4 and the side view of the syndeton between the pump;
Fig. 9 A and Fig. 9 B show the cutaway view of the installation and removal of watering;
Figure 10 shows the perspective view of modification of the pin of Fig. 9;
Figure 11 shows the cutaway view of another embodiment of the watering of Fig. 4 and the syndeton between the pump;
Figure 12 is the cutaway view of example that has schematically shown the pump of Fig. 4;
Figure 13 shows the cutaway view of example of the nozzle of Fig. 4;
Figure 14 and Figure 15 show the cutaway view and the perspective view of another example of the nozzle of Fig. 4 respectively;
Figure 16 and Figure 17 show the cutaway view and the perspective view of another example of the nozzle of Fig. 4 respectively;
Figure 18 shows the front view of installation example of the nozzle of Fig. 4;
Figure 19 A and Figure 19 B are the cutaway views of example that has schematically shown the safety valve of Fig. 4;
Figure 20 shows the perspective view of installation example of the parts of Fig. 4;
Figure 21 shows the perspective view of another example of the watering of Fig. 4;
Figure 22 shows the view according to the embodiment of cloth apparatus control method of the present invention;
Figure 23 shows the flow chart of control method of the pump of Figure 22;
Figure 24 shows the view according to another embodiment of cloth apparatus control method of the present invention;
Figure 25 shows the view according to the another embodiment of cloth apparatus control method of the present invention.
The specific embodiment
Now will be in detail with reference to the preferred embodiments of the present invention, the example of these embodiment shown in the drawings.As possible, will in institute's drawings attached, use identical Reference numeral to refer to same or analogous part.
Hereinafter, for cloth apparatus according to the present invention and control method thereof are described, top-loaded electricity condensed type clothing machine will be described as embodiments of the invention.Yet the present invention is not limited to above-mentioned specific cloth apparatus, therefore, the present invention can also be applied to the anterior condensation of gas formula cloth apparatus that loads.
With reference to Fig. 1 and Fig. 2 cloth apparatus and control method thereof according to the embodiment of the invention are described.
In the rack 10 that forms the cloth apparatus outward appearance, the belt 68 that swing roller 20, motor 70 is installed and is used for head roll 20.Pre-position in rack 10, heater 90 is installed (for convenience of description, be called " hot air heater " hereinafter) and hot-air supply pipe 44, heater 90 is used for air is heated, to produce high temperature air (being called hot-air hereinafter), hot-air supply pipe 44 is used for the hot-air that hot air heater 90 produces is fed in the cylinder 20.Blast pipe 80 and blower unit 60 also are installed in rack 10, and the highly humid air that blast pipe 80 is used for having carried out heat exchange with cylinder 20 object to be dried is discharged to outside the dryer, and blower unit 60 is used to suck this highly humid air.In addition, the pre-position in rack 10 is equipped with the steam generator 200 that is used to produce high-temperature steam.In this embodiment, for convenience of description, illustrated and described the indirect drive systems of utilizing motor 70 and belt 68 to make cylinder 20 rotations.Yet the present invention is not limited to this indirect drive systems.For example, the present invention may be used on motor and is directly connected to the rear portion of cylinder 20 so that the Direct Driving System that cylinder 20 is directly rotated by motor.
Each parts to cloth apparatus are described in detail now.
Rack 10 forms the outward appearance of cloth apparatus.Rack 10 comprises: substrate 12, and substrate 12 constitutes the bottom of rack 10; A pair of side cover 14, this vertically is installed in the substrate 12 side cover 14; Be installed in the protecgulum 16 and the bonnet 18 at the front and rear place of side cover 14 respectively; And the top cover 17 that is positioned at place, side cover 14 tops.Control panel 19 with various console switch is arranged on top cover 17 or protecgulum 16 places usually.Door 164 is installed on protecgulum 16.Bonnet 18 is provided with suction unit 182 and steam vent 184, and outside air is introduced into by suction unit 182, and steam vent 184 is the last passages that are used for outside the air discharge rack 10 of cylinder 20.
The inner space of cylinder 20 is as drying chamber, and oven dry is handled and carried out in this drying chamber.The lifter 22 that is used to make object to be dried to rise and fall preferably is installed in the cylinder 20, so that the object upset, thereby drying efficiency improved.
On the other hand, between cylinder 20 and rack 10, that is to say,, be separately installed with front supporting member 30 and back support member 40 between cylinder 20 and the protecgulum 16 and between cylinder 20 and bonnet 18.Cylinder 20 rotatably is installed between front supporting member 30 and the back support member 40.Between front supporting member 30 and the cylinder 20 and between back support member 40 and cylinder 20, be separately installed with the seal (not shown) that is used to prevent the air leakage.Specifically, front supporting member 30 and back support member 40 surround the front and rear of cylinder 20, to limit drying chamber.In addition, front supporting member 30 and back support member 40 are respectively applied for the front-end and back-end of back-up roller 20.
Be formed with opening in front supporting member 30, cylinder 20 is connected with the outside of cloth apparatus by this opening.This opening is is optionally opened and closed by door 164.In addition, fibre pipe 50 is connected to front supporting member 30, and this fibre pipe 50 is to be used for the air of cylinder 20 is discharged to the outer passage of cloth apparatus.Fabric filter 52 is installed in fibre pipe 50.One side of blower unit 60 is connected to fibre pipe 50, and the opposite side of blower unit 60 is connected to blast pipe 80.Blast pipe 80 is connected with steam vent 184 in being formed on bonnet 18.Therefore, when blower unit 60 operations, the air in the cylinder 20 is discharged from outside the cloth apparatus by fibre pipe 50, blast pipe 80 and steam vent 184.At this moment, the external substance such as fiber is filtered out by fabric filter 52.Usually, blower unit 60 comprises air blast 62 and blower drum 64.Air blast 62 is typically connected to the motor 70 of head roll 20.
Be formed with the opening 42 that includes a plurality of through holes in the back support member 40.Hot-air supply pipe 44 is connected to these openings 42.Hot-air supply pipe 44 usefulness that are connected with cylinder 20 act on hot-air are fed to passage in the cylinder 20.Therefore, hot air heater 90 is installed in the pre-position on the hot-air supply pipe 44.
On the other hand, the pre-position in rack 10 is equipped with and is used to produce the steam generator 200 of waiting to be fed to the steam in the cylinder 20.With reference to Fig. 3 the details of steam generator 200 is described below.
Steam generator 200 comprises: the water tank 210 that is used to store water; Be installed in the heater 240 in the water tank 210; Level sensor 260, level sensor 260 is used for the water level of sensing steam generator 200; And temperature sensor 270, temperature sensor 270 is used for the temperature of sensing steam generator 200.Level sensor 260 generally includes public electrode 262, low water level electrode 264 and high water level electrode 266.Level sensor 260 lead based on the electricity between public electrode 262 and the high water level electrode 264 or public electrode 262 and low water level electrode 266 between electricity lead high water level or low water level in the sensing steam generator 200.
Be connected to steam generator 200 a side be the water supply hose 220 that is used to supply water.Be connected to steam generator 200 opposite side be the steam hose 230 that is used for exhaust steam.The nozzle 250 that preferably will form reservation shape is installed to the tip of steam hose 230.Usually, an end of water supply hose 220 is connected to the outside watering such as hose.The tip of steam hose 230 or nozzle 250 (being steam outlet) are arranged in the pre-position of cylinder 20, are used for steam is sprayed onto in the cylinder 20.
On the other hand, in this embodiment, steam generator 200 is configured to following structure, in this structure, the water that 240 pairs of heaters are stored in the scheduled volume in the water tank 210 with preliminary dimension heats, to produce steam (being called for convenience of description, " bucket hot type steam generator " hereinafter).Yet the present invention is not limited to above-mentioned specific steam generator.Therefore, the present invention can use any steam generator, as long as this steam generator can produce steam.For example, also steam generator 200 can be configured to following structure, in this structure, heater is directly installed on around the mobile water supply hose that passes through of water, so that water is heated, (be not called for convenience of description, " pipe hot type steam generator " hereinafter) and water is not stored in the predetermined space.
Now with reference to Fig. 4 another embodiment according to cloth apparatus of the present invention is described.
In this embodiment, be used for being installed to cloth apparatus removably to the watering that steam generator 200 supplies water.As previous embodiment, watering can be a hose.Yet in this case, the installation of watering is very complicated.This is because do not make water usually in dryer, therefore when using hose as watering, the various device that appends on the hose must be installed.Therefore, in this embodiment, use dismountable watering 300.Specifically, watering 300 separates with steam generator 200, so that watering 300 is full of water.After watering 300 was full of water, watering 300 was connected to the water channel of steam generator 200, promptly was connected to water supply hose 220, and this is very easily.
Pump 400 preferably is installed between watering 300 and steam generator 200.This pump preferably can rotate along clockwise direction with counterclockwise.Therefore, can supply water, and can assemble remaining water from steam generator 200 in case of necessity to steam generator 200.Yet, can also utilize the water-head between watering 300 and the steam generator 200 to supply water, and need not to use pump 400 to steam generator 200.Yet, the normally standardized product of the various parts of cloth apparatus, and be designed to compact structure, the result causes the structural free space of cloth apparatus not enough fully.For this reason, if do not change the size of the various parts of traditional cloth apparatus, utilize water-head to supply water so and be practically impossible.Therefore, when using the little pump 400 of size, steam generator 200 can be installed and need not to change the size of the various parts of traditional cloth apparatus, therefore, the use of pump 400 is very useful.In addition, the reason of assembling remaining water from steam generator 200 is that heater may damage because of remaining water in the steam generator 200, if perhaps do not use steam generator 200 for a long time, what use so later on may be corruption water.
In the aforementioned embodiment, water is supplied in the top of steam generator 200, and steam is discharged from the top of steam generator 200.On the other hand, in the present embodiment, water is supplied in the bottom of steam generator 200, and steam is discharged from the top of steam generator 200.This structure is favourable for assembling remaining water from steam generator 200.
In addition, safety valve 500 is preferably mounted at and is used for steam channel that steam is discharged from steam generator 200, promptly is installed on the steam hose 230.
Hereinafter, will each parts of cloth apparatus be described in detail.
At first the details of dismountable watering 300 (being called for convenience of description, " tube box " hereinafter) is described with reference to Fig. 5.
Tube box 300 comprises the upper casing 320 that is used to store the lower casing 310 of water and is installed to lower casing 310 removably.When tube box 300 was configured to comprise the structure of lower casing 310 and upper casing 320, the incrustation scale that accumulates in the box 300 was removed easily.In addition, easily with filter 330 with 340 and water softening member 350 separate and cleaning or the filter 330 that upgrade to separate and 340 and the water softening member 350 that separates easily with upper casing, lower casing.
First filter 330 preferably is installed to upper casing 320.Specifically, first filter 330 is installed in the water of upper casing 320 and introduces in the part, is used for when tube box 300 supplies water water being carried out primary filter.
Preferably open and close member 360 is installed to lower casing 310, open and close member 360 is used for optionally the water of tube box 300 is discharged to the outside.Therefore, when tube box 300 separates with cloth apparatus, do not allow the water in the box 300 to be discharged to the outside, and when a tube box 300 is installed in the cloth apparatus, allow the water in the tube box 300 to be discharged to the outside.Be used for second filter 340 that water filters preferably is installed to open and close member 360.More preferably, second filter 340 is installed to open and close member 360 removably.By first filter 330 and second filter 340 are provided, can from water, filter out impurity with interest such as micronic dust.Preferably, first filter 330 is made by about 50 mesh nets, and second filter 340 is made by about 60 mesh nets.Here, 50 mesh nets are that the mesh number that is configured to unit are is the mesh net of 50 structure.Therefore, constitute the size in hole of mesh of first filter 330 greater than the size in the hole of the mesh that constitutes second filter 340.As a result, first filter 330 tentatively filters out the big external substance article of size, and 340 grades of ground of second filter filter out the little external substance article of size.
In the tube box 300 the water softening member 350 that is used for demineralized water is installed preferably.More preferably, water softening member 350 is installed in the box 300 removably.As shown in Figure 6, water softening member 350 comprises lower casing 352 with a plurality of through holes and the upper casing 353 that is installed to lower casing 352 removably.Upper casing 353 has a plurality of through holes.Preferably, the space that is limited between upper casing 353 and the lower casing 352 has been full of the ion exchange resin (not shown).
Use the reasons are as follows of water softening member 350.When the hardness of water of waiting to be supplied to steam generator 200 is high, such as calcium carbonate (CaCO 3) lime may decompose, this is because be dissolved in calcium bicarbonate (Ca (HCO in the water 3) 2) be heated, and lime may corrode heater.Especially in the Europe and the U.S., water is the hard water with high rigidity.For this reason, above-mentioned phenomenon may be very serious.Therefore, preferably, utilize ion exchange resin to remove calcium ion and magnesium ion earlier, thereby prevent that lime from decomposing.When carrying out the water softening processing, the efficient of ion exchange resin reduces.Therefore, can utilize salting liquid (NaCl) ion exchange resin of regenerating, make it possible to reuse ion exchange resin.For the purpose of reference, with 2 (R-SONa)+Ca2<-(R-SO) Ca+2Na represents to make the water softening of spent ion exchange resin to handle, and represents the regeneration of ion-exchange resin processing with (R-SO) Ca+2NaCl<-2 (R-SONa)+CaCl.
Hereinafter, with reference to Fig. 7 A to Fig. 7 C the installation and removal structure between second filter 340 and the open and close member 360 is described in detail.
Open and close member 360 is installed to the lower casing 310 of a box 300.Open and close member 360 comprises flow channel 362 and pin 365, and flow channel 362 is connected with tube box 300, and pin 365 is used for optionally opening and closing flow channel 362.Flow channel 362 comprises inner flow passage 362a and outer flow channels 362b.Catch ridge 361 and be formed into the outer surface of inner flow passage 362a.Second filter 340 comprises housing 341 and is installed to the filtering ring of a side of housing 341 that housing 341 forms the corresponding shape with inner flow passage 362a.The opposite side that ridge 361 corresponding grooves 342 are formed into housing 341 of catching with inner flow passage 362a.This groove 342 has horizontal groove part and perpendicular grooves part, and thus, groove 342 forms " L " shape.Therefore, shown in Fig. 7 B, the groove 342 of second filter 340 (being specially the horizontal groove part) is engaged in catching on the ridge 361 of inner flow passage 362a, and shown in Fig. 7 C, second filter 340 rotation, the result has realized connecting between second filter 340 and the open and close member 360.Second filter 340 and open and close member 360 separate according to opposite order.Therefore, do not provide here the description that separates between second filter 340 and the open and close member 360.
Hereinafter, with reference to Fig. 8 being connected between tube box 300 and the pump 400 is described in detail.
As shown in Figure 8, tube box 300 is connected with each other by intermediate hose 490 with pump 400.One side of intermediate hose 490 is directly connected to the inlet 430 of pump, and the opposite side of intermediate hose 490 is connected to a box 300 by connector 480.Preferably, the inlet 430 of pump 400 and intermediate hose 490 are by 492 secured to one another connections of holder, and connector 480 and intermediate hose 490 be also by another 492 secured to one another connections of holder, prevented thus from the seepage in the inlet 430 that is limited to pump 400 and the gap between the intermediate hose 490 and from being limited to the seepage in the gap between connector 480 and the intermediate hose 490.
Hereinafter, will be described in detail being connected between tube box 300 and the connector 480 with reference to figure 9A to Figure 10.
As previously mentioned, the open and close member 360 that is connected with tube box 300 is installed to a box 300.This open and close member 360 comprises flow channel 362 and is used for optionally opening and closing the pin 365 of flow channel 362.This flow channel 362 comprises inner flow passage 362a and outer flow channels 362b.In addition, O ring 369 is installed to the outer surface of outer flow channels 362b, is used to keep airtight.
Simultaneously, be formed with recess 366, and be formed with the part 365a (referring to Figure 10) that flows at the opposite side place of the shank 365b of pin 365 at the side place of the shank 365b of pin 365.In recess 366, be equipped with and open and close part 367.The part 365a that flows roughly forms cross-like shape, so that water flows through between cross leaf.Preferably, opening and closing part 367 is made by rubber.
Support section 363 with a plurality of through hole 363a is installed in flow channel 362, and support section 363 is used for the shank 365b of supporting pin 365.Between the mobile part 365a of support section 363 and pin 365, spring 364 is installed.Connector 480 comprises outside connector 482 and inner connector 484, outside connector 482 has the big internal diameter of external diameter than the outer flow channels 362b of open and close member 360, and inner connector 484 has the little external diameter of internal diameter than the outer flow channels 362b of open and close member 360.
Shown in Fig. 9 A, under tube box 300 and state that connector 480 separates, the tip of inner flow passage 362a is positioned at switching part 367 sealings at a side place of pin 365, and this side of pin 365 is subjected to the fexible bias pressure of spring 364.Therefore, the obstructed via flow passage of water in the tube box 300 is discharged to the outside.When tube box 300 was inserted in the connector 480, shown in Fig. 9 B, pin 365 was under the effect of the inside of connector 480 connector 484, and the elastic force that abuts against spring 364 is advanced towards inner flow channel 362a.Therefore, the switching part 367 that is positioned at a side place of pin 365 is separated with the tip of inner flow passage 362a, and water flows between them as a result, and therefore, the water in the tube box is discharged to the outside by flow channel, promptly is discharged to pump 400.According to the present invention,, prevented the leakage of water effectively by using the double sealing structure of spring 364 and O ring 369.
As shown in figure 10, an end of pin 365 (inside 366 of the part 365a that promptly flows) is preferably taper.Compare with simple column construction, in this pyramidal structure, the zone of the flow channel that water flow through has increased, and has realized that thus water is more effective mobile.
On the other hand, as shown in figure 11, tube box 300 can be directly connected to pump and need not to use intermediate hose 490.In this case, must suitably change the shape of the inlet 430a of pump 400, make inlet 430a comprise outside inlet 432 and inner inlet 434.Specifically, the inlet 430a of pump 400 is configured such that the inlet 430a of pump 400 has the structure with the structural similarity of the connector 480 of Fig. 9.Therefore the holder 492 that the advantage of this structure has been to save intermediate hose 490 and has been used to seal, is compared with syndeton shown in Figure 9 with Fig. 8, has reduced the cost of material when having simplified manufacture process.
On the other hand, in the above-described embodiments, first filter 330, second filter 340 and water softening member 350 are installed to dismountable box 300.Yet the present invention is not limited to above-mentioned ad hoc structure.For example, the present invention also may be used on using the situation of outside hose as watering 300.In this case, preferably in first filter 330, second filter 340 and the water softening member 350 at least one is installed on the water channel that is connected to steam generator 200.Even more preferably first filter 330, second filter 340 and water softening member 350 are installed on the water channel removably in this case.In addition, preferably, first filter 330, second filter 340 and water softening member 35 are included in the single container, and this container is installed on the water channel removably.
Hereinafter, with reference to Figure 12 pump 400 is described.
Pump 400 is used for optionally supplying water to steam generator 200.Specifically, pump 400 rotates along clockwise direction with counterclockwise, optionally to assemble remaining water to steam generator 200 water supply or from steam generator 200.
Can use gear type pump, pulsating pump and diaphragm pump as pump 400.Even in pulsating pump and diaphragm pump, also can control fluid and flow with anticlockwise along clockwise direction by the polarity that changes circuit instantaneously.Figure 12 shows the gear type pump 400 as the example of pump 400.Gear type pump 400 comprises a pair of gear 420 that is arranged in the housing 410.This housing 410 is provided with inlet 430a and outlet 414.Specifically, according to the direction of rotation of gear 420, water is discharged to outlet 414 from inlet 430a, perhaps is discharged to inlet 430a from exporting 414.
Hereinafter, will be described in detail nozzle 250 with reference to figures 13 to Figure 17.
As shown in figure 13, nozzle 250 can be configured to common shape.Specifically, nozzle 250 can be constructed with relatively large diameter and relative tubular than minor diameter, make the spray hole 251a at tip 251 places of steam by being formed on nozzle 250 be sprayed onto in the cylinder.In addition, nozzle 250 preferably is provided with the support section 259 of the installation that is used for nozzle 250.When the spray hole 251a that only locates by the tip that is formed on nozzle 250 sprayed steam, as shown in figure 13, steam was sprayed onto in the cylinder partly by the kinetic energy of steam, may reduce smoothing wrinkle efficient like this.Therefore, preferably suitably change the shape of nozzle 250.
Hereinafter, with reference to Figure 14 and Figure 15 another embodiment of nozzle 250 is described.
As shown in the figure, pilot jet 253 is installed in and is connected to steam generator 200, is used for steam is sprayed onto nozzle 250 in the cylinder.In this case, nozzle 250 can be constructed with the shape of unified diameter, perhaps is constructed with relatively large diameter and relative shape than minor diameter.When nozzle 250 was constructed with relatively large diameter with relative shape than minor diameter, preferably, the tip 251 of nozzle 250 had the diameter that increases a little.Pilot jet 253 is constructed with relatively large diameter and relative shape than minor diameter, and preferable configuration is tapered.Preferably, the outward-dipping angle of pilot jet 253 is less than the outward-dipping angle of nozzle 250.For example, nozzle 250 outward-dipping 30 degree, and pilot jet 253 outward-dipping 15 degree.
Utilize above-mentioned structure, can increase the angle of flare of steam, make it possible to, thereby improve smoothing wrinkle efficient by the steam clothes of getting wet equably.
In Figure 15, unaccounted Reference numeral 259a represents to be formed on the connection holes in the support section.
Hereinafter, with reference to Figure 16 and Figure 17 the another example of nozzle 250 is described.
Preferably, the eddy current generation member that is used to produce eddy current is installed in nozzle 250.In this case, nozzle 250 can be constructed with the shape of unified diameter or have relatively large diameter and relative shape than minor diameter.When nozzle 250 was constructed with the shape of relatively large diameter and relative minor diameter, preferably, the tip 251 of nozzle 250 had the diameter that increases a little.
Preferably, eddy current generation member comprises blade 257.Each blade 257 extends internally from the inwall of nozzle 250.Preferably, each blade 257 forms curve form.Blade 257 can directly link to each other mutually in the center of nozzle 250.Yet, preferably, in nozzle 250, be provided with intermediate member 25, make each blade be connected between the inwall and intermediate member 258 of nozzle 250.More preferably, in intermediate member 258, be formed with flow channel 258a.Utilize this structure, can improve mouldability and production in enormous quantities ability.
Utilize above-mentioned structure, during flow of steam, produce eddy current,, make and improved smoothing wrinkle efficient thus by the steam clothes of can getting wet equably to improve kinetic energy and angle of flare.
Simultaneously, as shown in figure 18, nozzle 250 preferred adjacent openings 42 are installed, and hot-air is fed in the cylinder by opening 42, makes steam can be sprayed onto the front portion of cylinder from the rear portion of cylinder.This is because air is to introduce from the opening 42 that is formed on back support member 40, is discharged to the fibre pipe (not shown, referring to Fig. 1) of door 104 belows then.Consequently, gas channel is used as fibre pipe at about opening 42 places.Therefore, when nozzle 250 adjacent openings 42 were installed, the steam that is sprayed flowed along gas channel, the steam clothes of getting wet equably thus.
Simultaneously, the nozzle of describing in this embodiment 250 also can be applicable to have the cloth apparatus of the watering that is different from dismountable watering 300.For example, nozzle 250 may be used on using the situation of outside hose as watering 300.
Hereinafter, will be described in detail safety valve 500 with reference to Figure 13 and Figure 19.
At the normal operation period of steam generator 200, steam is sprayed onto in the cylinder by steam hose 230 and nozzle 250.Yet, when the microfiber article of fiber that produces during clothes oven dry is handled or external substance are attached to the spray-hole 251a of nozzle 250 and accumulate among the spray-hole 251a, therefore and when having sealed spray-hole 251a, steam can not be fed in the cylinder swimmingly, but the pressure of steam is applied to steam generator 200 in opposite direction.As a result, the pressure in the steam generator 200 increases, and therefore steam generator 200 may break.Especially, using the water tank in bucket hot type steam generator usually is not to make according to the interior pressure design of high-pressure bottle, and the result further increases the possibility of breaking.Therefore, preferably provide suitable safety device.
When the steam flow channel that steam flow through of steam generator generation was blocked, safety valve 500 played steam is discharged to outside effect.Therefore, safety valve 500 preferably is installed in steam flow channel (for example steam hose 230).More preferably, safety valve 500 is installed near the tip of steam hose 230, for example adjacent nozzles 250 is installed.
Safety valve 500 comprises housing 510 and switching part 530, and an end of housing 510 is connected with steam hose 230, and the other end is connected with the external world, opens and closes part 530 to be installed in the housing 510, is used for optionally opening and sealing casing 510 and steam hose 230.Specifically, opening and closing part 530 is installed in the steam flow channel connected component 513 of casing 510.Opening and closing part 530 is supported by spring 520.Certainly, an end of spring 520 is connected to and opens and closes part 530, and the other end of spring 520 is connected to the standing part 540 that is fixed to casing 510 in a predefined manner.
Shown in Figure 19 A, when steam hose 230 does not have to block and when therefore the pressure in the steam hose 230 was less than the predetermined pressure level, steam can not overcome the elastic force of spring 520.Therefore, open and close part 530 closed steam flow channel connected components 513, consequently steam can not be discharged to the outside.Yet, shown in Figure 19 B, when steam hose 230 block and therefore the pressure in the steam hose 230 surpass predetermined pressure level (1kgf/cm for example 2) time, steam overcomes the elastic force of spring 520.Therefore, the switching part 530 of closed steam flow channel connected component 513 is moved, and consequently steam is discharged to the outside by steam flow channel connected component 513 and external communications part 511.
Hereinafter, be described mainly comprising installation example with reference to Figure 20 according to the parts of the steam pipework of steam generator of the present invention.
The drawer type container that can insert and take out (being called " drawer " hereinafter) is installed in the pre-position in the cloth apparatus.Preferably, tube box 300 is installed in the drawer 700.Specifically, a tube box 300 is not to be directly connected to connector 480, and be mounted in the drawer 700, and drawer 700 is inserted into and takes out, and makes a tube box 300 be connected to connector 480 indirectly and separate with connector 480.
Preferably, drawer 700 is positioned at the place, front portion of cloth apparatus, for example is positioned at control panel 19 places.More particularly, at the place, rear portion of control panel 19 support member 820 is installed.Support member 820 is arranged to approximately parallel with top frame 830.Preferably will be used for the drawer guide spare 710 of drawer 700 channeling conducts and support is installed to support member 820 and top frame 830.More preferably, at the part place at the top of drawer guide spare 710 top guiding piece 810 is installed.
The top of drawer guide spare 710 and a side (front portion of cloth apparatus) are opened wide.Drawer 700 is inserted into and takes out by the side mouth of drawer guide spare 710.Connector 480 is installed to the top of drawer guide spare 710 at the opposite side of drawer guide spare 710.
As mentioned above, consider the convenience in the use, preferably drawer 700 is installed in the place, front portion of cloth apparatus.Figure 20 shows the control panel 19 that is installed in cloth apparatus protecgulum place.Therefore, drawer 700 is inserted in the control panel 19, and takes out from control panel 19.Yet the present invention is not limited to above-mentioned ad hoc structure.For example, as shown in Figure 1, when control panel is installed in the top cover place of cloth apparatus, drawer 700 can be directly installed on the protecgulum place of cloth apparatus.
On the other hand, when tube box 300 was installed in the drawer 700, preferably, the shape of the opposite side of tube box 300 was corresponding with the shape of the opposite side of drawer 700 at least, and therefore, tube box 300 securely is connected to drawer 700.Preferably form recess 301, separate with drawer 700 to allow the user that tube box 300 is installed in the drawer 700 and with tube box 300 at the opposite side place of tube box 300.
Hereinafter, the method that supplies water with reference to Figure 20 subtend tube box 300 is described in detail.
When the user took out drawer 700, tube box 300 also was removed.Under this state, the user separates tube box 300 from drawer 700.Subsequently, the user is fed to water in the tube box 300 of separation by feed water inlet (for example first filter 330), makes tube box 300 be full of water.After this, the user is put into water-filled tube box 300 in the drawer 700, inwardly pushes drawer 700 then.As a result, tube box 300 is connected to connector 480 automatically, and therefore, the water in the tube box flows towards pump 400.
After the use of having finished cloth apparatus, the user can separate tube box 300 according to reverse order from drawer 700.According to the present invention, tube box 300 comprises upper casing 320 and lower casing 310.Therefore, easily and be convenient to clean the tube box 300 of separation.
On the other hand, as shown in figure 21, drawer 700 can be used as the watering that can directly dismantle.Yet when drawer 700 was used as the watering that can directly dismantle, owing to the carelessness to drawer user between 700 delivery periods, water may overflow.By using tube box 300 can address this problem to a certain extent as dismountable watering.When drawer 700 is used as the watering that can directly dismantle, can simplify the structure of drawer 700.For convenience of description, Figure 21 only shows the water softening member 350 that is installed in the drawer 700.Yet the present invention is not limited to this structure.For example, also first filter 330 and second filter 340 can be installed in the drawer 700.
Hereinafter, with reference to Figure 22 and Figure 23 the control method according to cloth apparatus of the present invention is described.
Cloth apparatus can move under two mode of operations usually.A mode of operation is to carry out the original function of cloth apparatus, promptly carries out the clothes drying operation.Another mode of operation is to carry out the operation (being called for convenience's sake, " renovation operation " hereinafter) that is used to eliminate the fold on the clothes.Renovating operating period, the fold on eliminating clothes, also can carry out sterilization, deodorizing, preventing to produce static in the clothes clothes, and the clothes of shaking up.The control method that is used for drying operation generally includes hot-air supply step and cooling step.These steps are used equally in traditional cloth apparatus, therefore are not described in detail.The control method that is used to renovate operation will be described in detail steam supplied below particularly including steam supplied.
The cloth apparatus control method that is used to renovate operation comprises to the steam supplied (SS5) of cylinder supply steam with to the hot-air supply step (SS7) of cylinder supply hot-air.Preferably, carry out cylinder heating steps (SS3) before in steam supplied (SS5).In addition, the control method that is used for renovating operation also comprises to steam generator and supplying water to produce the water supply step (SS1) of the necessary steam of steam supplied (SS5).
Preferably, carry out water supply step (SS1) before at cylinder heating steps (SS3).In addition, preferably, also be included in the cooling step (SS9) of the chilling roll that hot-air supply step (SS7) carries out afterwards according to control method of the present invention.Preferably, also be included in the water (being the surplus water in the steam generator) that will remain in the steam generator that steam supplied (SS5) carries out afterwards according to control method of the present invention and be discharged to outside water agglomeration step.(will be described in detail this water agglomeration step hereinafter.) can utilize the additional heater that is installed in the cylinder that cylinder is heated; Yet, preferably only use hot air heater.
To control step to each now is described in detail.
Cylinder heating steps (SS3) is that cylinder is heated to predetermined temperature makes it possible to more effectively carry out the smoothing wrinkle of clothes in next step (being steam supplied (SS5)) step.Cylinder heating steps (SS3) is performed predetermined periods (T_pre-T_pump).At this moment, cylinder is rotated, and preferably is reversed.More preferably, cylinder is overturn off and on.Upset is to make cylinder with about 50rpm or lower speed rotation, so that clothes can not be attached to the inwall of cylinder.In the technical field of upset under the present invention is known, therefore is not described in detail.
Preferably, after the water supply of having carried out scheduled time slot (T_pump) to steam generator, the moment that the water level in steam generator arrives high water level begins cylinder heating steps (SS3).In addition, preferably, at the moment of beginning cylinder heating steps (SS3) operation steam heater.This is just to produce because steam moves back one period scheduled time at steam heater.
In addition, preferably, the termination of cylinder heating steps (SS3) is approximately consistent with the moment that steam produces.In fact, stopped cylinder heating steps (SS3) before preferably in steam is fed to cylinder.This be because, when continuously cylinder being heated, the internal temperature of cylinder excessively raises when the moment (promptly in steam supplied (SS5)) that produces at steam, the steam potential evaporation that the result is fed in the cylinder becomes gas.
Steam supplied (SS5) is to make the step that the smoothing wrinkle of clothes is mainly carried out to cylinder supply steam.Steam supplied (SS5) is performed scheduled time slot (T_steam).At this moment, cylinder is rotated, and preferably is reversed.More preferably, cylinder is overturn off and on.By pre-determining and set up the period (T_steam) that steam supplied (SS5) is performed based on test such as the factor of the amount of waiting to dry object.In steam supplied (SS5), the water level in the steam generator has reduced.Therefore, preferably when detecting low water level, supply water to steam generator.In this case, supply water to steam generator serially, up to detecting high water level.Yet preferably, the water level in steam generator carries out the scheduled time slot water supply in (for example about 3 seconds) to steam generator before arriving high water level, to improve the efficiency of heating surface.If the water level that supplies water in steam generator to steam generator arrives high water level, must a large amount of water be heated so.Therefore, the supply of steam is interrupted predetermined periods, and the supply that recovers steam after the water boiling.Yet when steam generator having been carried out the water supply in scheduled time slot (for example 3 seconds), steam produced in about 1 second.Therefore, can almost supply steam in the cylinder continuously.
In addition, preferably, for example repeat upset in the steam supplied (SS5) off and on and periodically in 3 seconds mode of about per minute.In steam supplied (SS5), cylinder can be overturn continuously.Yet, in this case, be fed to steam in the cylinder and can be discharged to the outside at once and do not stay in the cylinder.This is to be driven simultaneously by single-motor because of blower unit and cylinder, and therefore, when cylinder rotated, blower unit also moved, thereby steam is discharged outside the cylinder.Therefore, preferably in steam supplied (SS5), cylinder is rotated off and on, make the rotational time of cylinder less than the dwell time of cylinder.
In addition, what the present inventor carried out studies show that, the position of clothes changes during the cylinder rotation continuously in the cylinder, and when cylinder stopped, clothes was positioned at the anterior place approximately down of cylinder, promptly near the door.Yet the sprinkling direction of nozzle is difficult to change, and therefore, nozzle is fixed to the following front portion of pointing to cylinder.For this reason, preferably clothes is placed on the sprinkling direction of nozzle, promptly is placed on the following anterior place of cylinder.Therefore, preferably one short period of index drum rotation, make clothes can be placed on the sprinkling direction of nozzle, therefore, can be in clothes in steam supplied (SS5) with a large amount of vapor absorption.
Hot-air supply step (SS7) is to dry the step of the clothes of being got wet a little by steam once more to the cylinder supply hot-air that hot air heater produced.Hot-air supply step (SS7) is performed one section preset time (T_dry).At this moment, cylinder does not overturn.Equally by pre-determining and set up the period (T_dry) that hot-air supply step (SS7) is performed based on experiment such as the factor of the amount of object to be dried.Preferably, the water that will remain in the steam generator after hot-air supply step (SS7) finishes is discharged to a box.At this moment, the temperature height of the surplus water in the steam generator.Therefore, not at once the surplus water in the steam generator to be discharged to a box, but the discharge of surplus water in the steam generator is postponed scheduled time slot (T_delay).When the temperature in the steam generator was lower than predetermined temperature (Temp_crit), the surplus water in the steam generator was discharged to a box.(following these details are described.)
Cooling step (SS9) is the step that makes object cooling to be dried, and the temperature of object to be dried is supplied in the step (SS7) at hot-air and raise.Cooling step (SS9) is performed one section preset time (T_cooling).At this moment, cylinder does not overturn.Equally by pre-determining and set up the period (T_cooling) that cooling step (SS9) is performed based on experiment such as the factor of the amount of object to be dried.Though can be to cylinder supply cold air in cooling step (SS9), the temperature of object is not high relatively.Therefore, object is kept one section preset time of current former state, this is simple but preferred.
With reference to Figure 22 and Figure 23 the method for control pump is described hereinafter.
The pump in accordance with the present invention control method comprises: wait to be fed to the water supply step (S100 and S200) that the steam generator of the steam of cylinder supplies water to generation, and will remain in the water agglomeration step (S300) that the water in the steam generator gathers together.Certainly, water supply step (S100 and S200) preferably includes initial water supply step (S100) and keeps the water level of the water level in the steam generator to keep step (S200).On the other hand, preferably carry out water agglomeration step (S300) by pump.More preferably, water is gathered the detachable watering that is connected to steam generator.
Now each step is described in detail.
As mentioned above, water supply step (S100 and S200) preferably includes initial water supply step (S100) and keeps the water level of the water level in the steam generator to keep step (S200).Pump is along side's rotation clockwise, with supply water to steam generator (S1).When the water level in the steam generator arrived high water level (S3), pump stopped, and steam heater bring into operation (S5).
Along with the operation of steam heater, water is heated, to produce steam.Water in the steam generator reduces along with the discharge of the steam that is produced.Therefore, the water level in the steam generator is detected, and when the water level in the steam generator arrived low water level, pump was rotated in a clockwise direction, with supply water to steam generator (S9 and S11).At this moment, as previously mentioned, supply water to steam generator serially, until detecting high water level.Yet, preferably, steam generator carried out one period scheduled time (for example, about 3 seconds) water supply is to improve the efficiency of heating surface.
On the other hand, when the steam supply time (T_steam) of scheduled time slot when passing (S7), steam heater stops (S13), and postpones scheduled time slot (T_delay) (S15).The reason that postpones scheduled time slot (T_delay) is to make the temperature of the surplus water in the steam generator farthest to reduce.Subsequently, when the temperature in the steam generator is lower than safe temperature (Temp_crit) (S17), pump rotates scheduled time slot (for example, about 30 seconds) in the counterclockwise direction, to assemble remaining water (S25) from steam generator.Yet, when the temperature in the steam generator is higher than safe temperature (Temp_crit), does not directly assemble surplus water, but take safety measures from steam generator.For example, whether the water level in the steam generator is lower than high water level and is carried out definite (S19).When the water level in determining steam generator was lower than high water level, pump was rotated in a clockwise direction scheduled time slot (for example, about 5 seconds), with supply water again to steam generator (S21).On the other hand, when the water level in determining steam generator was not less than high water level, the temperature in the steam generator was compared (S23) with safe temperature (Temp_crit).When the temperature in the steam generator is lower than safe temperature (Temp_crit) (S23), pump rotates scheduled time slot (for example, about 30 seconds) in the counterclockwise direction, to assemble surplus water (S25) from steam generator.On the other hand, when the temperature in the steam generator was higher than safe temperature (Temp_crit), this process finished, and pump does not rotate from steam generator in the counterclockwise direction assembles surplus water (S27).Certainly, after having postponed scheduled time slot, the temperature in the steam generator can compare with safe temperature, and when having satisfied above-mentioned requirements, can assemble surplus water from steam generator.Here, safe temperature (Temp_crit) is meant the maintained maximum temperature of reliability of pump.For example, safe temperature is about 60 degree.
It all is illustrative examples that Figure 22 and water supply time (T_pump) shown in Figure 23, steam produce time (T_pre), steam supply time (T_steam), drying time (T_dry), cool time (T_cooling), time delay (T_delay), flip-flop transition and pump operation time, and above-mentioned special time can suitably change according to the amount of the capacity of cloth apparatus or object to be dried.
Hereinafter, will be described another embodiment of cloth apparatus control method according to the present invention with reference to Figure 24.
This embodiment is identical with previous embodiment on basic principle; Yet, provide this embodiment more effectively to carry out the generation of steam.
Steam is fed to (SS5) in the cylinder in steam supplied.Yet,, also need to make the required time of water boiling even when steam generator moves.For this reason, steam does not produce at once.Move steam generator before it is therefore preferable that in steam is fed to cylinder.Yet for the sake of security, preferably, the heater of operation steam generator when the water level in steam generator arrives low water level.
On the other hand, the moment (promptly beginning the moment of the operation of hot air heater) of beginning cylinder heating steps (SS3) can be after the operation of steam generator.Yet consider the thermal capacity of the water in the steam generator, preferably, move hot air heater when the water level in steam generator arrives high water level or when the heater of steam generator is opened.
At this moment, hot air heater can the rated capacity operation.Yet preferably, hot air heater is with the capacity operation less than rated capacity.For example, when the rated capacity of hot air heater was 5400W, preferably, hot air heater was with only about half of (being 2700W) operation of rated capacity.This is because therefore the also operation in cylinder heating steps (SS3) of the heater of steam generator, when hot air heater moves with rated capacity, needs to increase the general power that offers cloth apparatus.
Simultaneously, water supply step (SS1), i.e. water supply to steam generator stops when the water level in steam generator arrives high water level usually.Yet, preferably after the beginning of supplying water, promptly after the operation of pump begins,, execute one section preset time of next step (for example, 90 seconds) no matter whether the water level in the steam generator arrives high water level.This be because, when since steam generator detect high water level unusually and not the time, the water in the steam generator overflows in cylinder.It is therefore preferable that and after scheduled time slot passes, carry out next step.
In addition, cylinder heating steps (SS3) stops when steam generator produces steam usually.Yet (for example, 5 minutes) execute next step afterwards preferably, at the fixed time.This is because though the unusual possibility of hot air heater is very low usually, for the sake of security, preferably carry out afterwards next step at the fixed time.Simultaneously, be difficult to determine whether steam generator has produced steam.It is therefore preferable that before cylinder heating steps (SS3) is in steam is fed to cylinder and stopped.
The experimental result that the present inventor carried out shows that renovation operation according to the present invention has the effect of eliminating and preventing the fold on the clothes, though this effect there are differences according to the garment type (for example type of clothing materials) and the wettability of clothes.The example of object to be dried can be the clothing of being crossed by the washing machine rotary dehydration.Yet this object is not limited to clothing.For example, when eliminating the fold of having worn on about one day clothes, promptly eliminate and dried and a little during the fold on the clothes of fold, the present invention is particularly useful by cloth apparatus according to the present invention.In other words, cloth apparatus according to the present invention can be used as a kind of fold cancellation element.
Hereinafter, with reference to Figure 25 the another embodiment of cloth apparatus control method according to the present invention is described.
As previously mentioned, renovation operation according to the present invention has the effect of eliminating fold from clothes.In addition, what the present inventor carried out studies show that, the renovation operation has the effect of to a certain extent clothes being carried out sterilization and shaking up.The operation that is used to carry out the cloth apparatus of this function consists essentially of steam supplied and hot-air supply step (baking step).Yet, preferably suitably change steam supply time and hot-air supply time according to purpose.
Steam supply time when for example, clothes being carried out sterilization and hot-air supply time are preferably long than steam supply time and hot-air supply time when eliminating fold from clothes.Steam supply time when on the other hand, shaking up clothes and hot-air supply time preferably steam supply time and the hot-air supply time when eliminating fold from clothes are short.Consider the amount of clothes, can come suitably to determine Best Times based on test.
Cloth apparatus and control method thereof with above-mentioned structure have following effect.
At first, the present invention has and effectively prevents or eliminate pleat on the object to be dried that has dewatered The effect of wrinkle or fold. In addition, the present invention has the effect of object being carried out sterilization and deodorizing.
Secondly, the present invention has the fold effectively eliminated on the drying clothes or fold and need not The effect of flatiron.
Be apparent that for those of ordinary skills, do not deviating from spirit of the present invention or model In the situation of enclosing, can make in the present invention various modifications and variations. Therefore, the present invention covers Modifications and variations of the present invention, as long as these modifications and variations drop on claim and are equal to In the scope of thing.

Claims (22)

1. the control method of a cloth apparatus, this control method comprises:
Supply steam in the cylinder; And
Hot-air is fed in the described cylinder, to dry the clothes of being got wet by described steam.
2. according to the control method of claim 1, also comprise:
Before the step in execution supplies steam to cylinder, the inside of described cylinder is heated.
3. according to the control method of claim 2, wherein the step that the inside of described cylinder is heated comprises:
The hot-air that hot air heater is produced is fed in the described cylinder.
4. according to the control method of claim 3, wherein the step that the inside of described cylinder is heated comprises:
After having finished or when opening the heater of steam generator, move one section preset time of described hot air heater to the water supply of steam generator.
5. according to the control method of claim 4, wherein the step that the inside of described cylinder is heated comprises:
Water level in described steam generator moves described hot air heater when arriving high water level.
6. according to the control method of claim 5, wherein the step that the inside of described cylinder is heated comprises:
Stopped the operation of described hot air heater before in steam is fed to cylinder.
7. according to the control method of claim 5, wherein the step that the inside of described cylinder is heated comprises:
After having moved scheduled time slot, described hot air heater stops the operation of described hot air heater.
8. according to the control method of claim 5, wherein the step that the inside of described cylinder is heated comprises:
Make described cylinder rotation.
9. according to the control method of claim 3, wherein the step that the inside of described cylinder is heated comprises:
Move described hot air heater, with supply than the heat that lacks at the heat of the described hot air heater of operation when drying the clothes of being got wet by steam.
10. according to the control method of claim 9, wherein said operation comprises the described hot air heater of operation, with the more low intensive heat of generation, thus the more a spot of heat of supply.
11. according to the control method of claim 10, wherein the step that the inside of described cylinder is heated comprises:
Before beginning to be fed in the cylinder, steam stops the operation of described hot air heater.
12. according to the control method of claim 10, wherein the step that the inside of described cylinder is heated comprises:
After described hot air heater operation scheduled time slot, stop the operation of described hot air heater.
13. according to the control method of claim 3, wherein the step that is fed in the cylinder of the steam that steam generator is produced comprises:
Make described cylinder rotation.
14. according to the control method of claim 13, wherein said cylinder is rotated off and on.
15. according to the control method of claim 14, the dwell time of wherein said cylinder is longer than the rotational time of described cylinder.
16. the control method according to claim 3 also comprises:
Make described cylinder cooling.
17. according to the control method of claim 16, the supply of wherein said steam comprises by steam generator generation steam, and this control method also comprises:
After the supply of steam finishes, the water that remains in the described steam generator is gathered together, so that surplus water is discharged to the outside.
18., wherein will remain in the step that the water in the described steam generator gathers together and comprise according to the control method of claim 17:
Surplus water in the described steam generator is pumped into the outside.
19., wherein supply steam to the steam supply time in the step in the cylinder and the hot-air supply time that hot-air is fed in the cylinder in the step of the clothes of being got wet by steam with oven dry changes with selected pattern according to the control method of claim 3.
20. according to the control method of claim 19, it is longer than the steam supply time and the hot-air supply time that are used to eliminate fold wherein to be used for the steam supply time of sterilization and hot-air supply time.
21. according to the control method of claim 19, it is shorter than the steam supply time and the hot-air supply time that are used to eliminate fold wherein to be used to the steam supply time of shaking up and hot-air supply time.
22., wherein control the operation of described pump according to the temperature of the surplus water in the described steam generator according to the control method of claim 18.
CN2008100026665A 2007-01-12 2008-01-14 Laundry machine and method for controlling the same Active CN101220554B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR1020070003716 2007-01-12
KR1020070003716A KR100830514B1 (en) 2006-06-12 2007-01-12 laundry dryer and method for controlling the same
KR10-2007-0003716 2007-01-12

Publications (2)

Publication Number Publication Date
CN101220554A true CN101220554A (en) 2008-07-16
CN101220554B CN101220554B (en) 2011-01-19

Family

ID=39510076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100026665A Active CN101220554B (en) 2007-01-12 2008-01-14 Laundry machine and method for controlling the same

Country Status (3)

Country Link
CN (1) CN101220554B (en)
AU (1) AU2008200122B2 (en)
DE (1) DE102008003247B4 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103608508A (en) * 2010-10-19 2014-02-26 Lg电子株式会社 Washing machine having drying function
CN109468816A (en) * 2017-09-08 2019-03-15 青岛海尔滚筒洗衣机有限公司 A kind of heat pump module and washer/dryer

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100999266B1 (en) 2008-05-15 2010-12-07 엘지전자 주식회사 Dryer and controlling method thereof
DE102013212350B4 (en) * 2013-06-26 2023-07-06 BSH Hausgeräte GmbH Plug-in part for a household appliance
EP2826909B1 (en) * 2013-07-19 2021-10-13 Electrolux Appliances Aktiebolag Method for operating a steam generation unit in a laundry dryer and method of operating a laundry dryer
DE102022106668A1 (en) 2022-03-22 2023-09-28 Verein der Freunde und Förderer des Jugendforschungszentrums Schwarzwald - Schönbuch e.V Laundry treatment device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100531379B1 (en) * 2003-08-13 2005-11-28 엘지전자 주식회사 Method for smoothing wrinkles of laundry in Drum-type washing machine
KR101003358B1 (en) * 2003-12-16 2010-12-23 삼성전자주식회사 Washing machine
JP4030523B2 (en) * 2004-05-12 2008-01-09 三洋電機株式会社 Washing machine
KR20060061974A (en) * 2004-12-02 2006-06-09 삼성전자주식회사 Apparatus for remove wrinkles of clothes and method thereof
DE102007007354B4 (en) * 2006-02-20 2013-10-10 Lg Electronics Inc. Clothes dryer and method of control
KR100780108B1 (en) 2006-07-03 2007-11-30 박철우 the port for closing up pipes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103608508A (en) * 2010-10-19 2014-02-26 Lg电子株式会社 Washing machine having drying function
CN109468816A (en) * 2017-09-08 2019-03-15 青岛海尔滚筒洗衣机有限公司 A kind of heat pump module and washer/dryer

Also Published As

Publication number Publication date
DE102008003247B4 (en) 2016-07-28
AU2008200122B2 (en) 2009-09-03
CN101220554B (en) 2011-01-19
DE102008003247A1 (en) 2008-07-17
AU2008200122A1 (en) 2008-07-31

Similar Documents

Publication Publication Date Title
KR100830514B1 (en) laundry dryer and method for controlling the same
US8931186B2 (en) Drying machine and method for controlling the same
KR100698132B1 (en) Laundry dryer
US7997006B2 (en) Laundry machine and control method thereof
CN101205681B (en) Washing machine
US8365438B2 (en) Laundry dryer and method for controlling the same
KR101253180B1 (en) Steam laundry dryer
CN101024916B (en) Dryer and method for controlling same
US20090307921A1 (en) Laundry dryer and method for controlling the same
CN101220554B (en) Laundry machine and method for controlling the same
KR100774217B1 (en) Laundry dryer
KR20100031929A (en) Ductless dryer
KR100698133B1 (en) Method for controlling the laundry dryer
KR101265615B1 (en) Laundry treating apparatus
KR101341463B1 (en) Steam laundry dryer
KR100662472B1 (en) Laundry dryer with steam generator
CN101466886B (en) Laundry dryer and method for controlling the same
CN101473086B (en) Laundry dryer and method for controlling the same
KR100774219B1 (en) Laundry dryer
KR100698224B1 (en) Laundry dryer
KR100698222B1 (en) Laundry dryer and method for controlling the same
KR100698223B1 (en) Laundry dryer and method for controlling the same
KR101208533B1 (en) laundry dryer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant