CN101152872A - Ultra-high intelligent system for curved outer rail of railway - Google Patents

Ultra-high intelligent system for curved outer rail of railway Download PDF

Info

Publication number
CN101152872A
CN101152872A CNA200610141707XA CN200610141707A CN101152872A CN 101152872 A CN101152872 A CN 101152872A CN A200610141707X A CNA200610141707X A CN A200610141707XA CN 200610141707 A CN200610141707 A CN 200610141707A CN 101152872 A CN101152872 A CN 101152872A
Authority
CN
China
Prior art keywords
superelevation
outer rail
train
central processing
processing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200610141707XA
Other languages
Chinese (zh)
Inventor
刘凤奎
蔺鹏臻
王亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
Original Assignee
Lanzhou Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University filed Critical Lanzhou Jiaotong University
Priority to CNA200610141707XA priority Critical patent/CN101152872A/en
Publication of CN101152872A publication Critical patent/CN101152872A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention belongs to the field of railway system and railway track structure and relates to a railway curve segment superelevation of outer rail intelligent system. The intelligent system real-timely adjusts the superelevation of outer rail to fit the need of superelevation of outer rail of trains at different speeds. The intelligent system comprises a speed detecting device, a central processing system, a superelevation of outer rail adjusting device and a monitoring device. The principle is as follows: the speed detecting device is arranged in a straight line segment before the railway enters the curve segment, which detects the speed of the train which is about to travel into the curve segment and sends the speed to the central processing system. The central processing system works out a needed value of the superelevation of outer rail according to the speed and sends an order to the superelevation of outer rail adjusting device which is arranged on the curve segment. The superelevation of outer rail adjusting device completes the adjustment of superelevation of outer rail according to the order and before the train travels into the curve segment. When the train travels through, the monitoring device real timely monitors traveling state of the train and sends information to the central processing system. The central processing system judges whether the value of the superelevation satisfies the need of train traveling according to the information and when necessary the central processing system sends the order to adjust the superelevation.

Description

Ultra-high intelligent system for curved outer rail of railway
Technical field
The invention belongs to the railway system (B61B1/00), railway track structure (E01B2/00) field, particularly the railway curve section is regulated the intelligence system of superelevation of outer rail.
Background technology
On railway curve, outer side track need be provided with the effect of superelevation with equilibrium centrifugation power.The size and the road speed of centnifugal force are proportional, and with the radius of curve relation of being inversely proportional to.In theory, should corresponding superelevation be set according to different lines vehicle speed and radius of curve.In the present railway system, in fact usually the average velociity with the various trains that move on the circuit serves as according to the superelevation value is set.Therefore, high speed train the superelevation phenomenon occurs owing during by curve, and there was superelevation in the low speed train during by curve, the railway of passenger-cargo conllinear, and this problem is particularly outstanding.Cross superelevation, owe superelevation and all influence the stationarity of train operation, passenger's comfort level, even influence traffic safety.
Summary of the invention
By being installed in the intelligence system of railway curve section, adjust the superelevation of outer rail value in real time, with the train that adapts to friction speed needs, guarantee train safe, smooth running to superelevation of outer rail.
This intelligence system comprises: speed detector (A), central processing system (B), superelevation of outer rail control apparatus (C), control monitor unit (D).
Principle of work: installation rate detecting device on the linear portion before circuit enters curve, detect the train speed that is about to the entrance curve section, and velocity information be transferred to central processing system.Central processing system calculates the size of required superelevation of outer rail value according to train running speed, and sends regulating command to the superelevation of outer rail control apparatus that is positioned on the segment of curve.The superelevation of outer rail control apparatus was finished superelevation and is regulated according to instruction before train entrance curve section.When train moved on curve, control monitor unit was monitored in real time to its running state, and will send out central processing system for information about same.Central processing system is passed judgment on the superelevation adjustment in view of the above and whether is satisfied the train operation requirement, in case of necessity, sends and revises the superelevation instruction.
Description of drawings
Fig. 1 is a scheme drawing of the present invention.
The specific embodiment
Superelevation of outer rail intelligence system each several part position and requirement be set:
1. speed detector A
At distance point of tangent to spiral (ZH) L place (straight sides), installation rate detecting device.Require this device can accurately detect the train speed of entrance curve section soon.Here L is an early warning distance, is after the adjustment of track superelevation value is finished, the assurance of train safe entrance curve section.Early warning distance L can estimate by following formula:
L=V max·Δt
V Max---the maximum speed per hour of train driving, generally can be by existing train maximum speed of this circuit or planning maximum speed value.
Δ t---control apparatus is adjusted V MaxThe time length of required superelevation of outer rail.
2. central processing system B
In the segment of curve appropriate positions near central processing system is installed.Central processing system is the embedded integrated chip with program curing in fact just.
Central processing system should be according to train speed size calculated curve superelevation of outer rail value; And send the superelevation regulating command for the superelevation of outer rail control apparatus; Train is analyzed by the speed of curve, judged the running state of train.
The computing formula of superelevation value:
h = 118 . V 2 R ( mm )
Speed (Km/h) when V---train passes through curve.
R---radius of curve (m).
3. superelevation of outer rail control apparatus C
To the scope between point of spiral to tangent (HZ), outer rail is arranged to the adjustable rail structure of tread absolute altitude at point of tangent to spiral (ZH), can in time adjusts its tread absolute altitude according to the instruction of central processing system.
4. control monitor unit D
To the appropriate location between point of spiral to tangent (HZ), some control monitor units are installed at point of tangent to spiral (ZH).The actual speed of train by curve, train operation stationarity etc. are monitored in real time, and give central processing system this message feedback.

Claims (3)

1. the intelligence system of railway curve adjusted superelevation of outer rail.It is characterized in that: the real-time regulated superelevation of outer rail, with the requirement of the train that adapts to friction speed, avoided superelevation or owed superelevation superelevation.
2. the intelligence system of rail line curve adjusted superelevation of outer rail.It is characterized in that: the real-time regulated superelevation of outer rail, with the requirement of the train that adapts to friction speed, avoided superelevation or owed superelevation superelevation.
3. in the flow production line, the intelligence system of track transmission route curve adjusted outside superelevation.It is characterized in that: real-time regulated outside superelevation, with the requirement of the means of delivery that adapts to friction speed, avoided superelevation or owed superelevation superelevation.
CNA200610141707XA 2006-09-27 2006-09-27 Ultra-high intelligent system for curved outer rail of railway Pending CN101152872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200610141707XA CN101152872A (en) 2006-09-27 2006-09-27 Ultra-high intelligent system for curved outer rail of railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200610141707XA CN101152872A (en) 2006-09-27 2006-09-27 Ultra-high intelligent system for curved outer rail of railway

Publications (1)

Publication Number Publication Date
CN101152872A true CN101152872A (en) 2008-04-02

Family

ID=39254817

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200610141707XA Pending CN101152872A (en) 2006-09-27 2006-09-27 Ultra-high intelligent system for curved outer rail of railway

Country Status (1)

Country Link
CN (1) CN101152872A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866657A (en) * 2014-01-20 2014-06-18 青岛安福尔车业有限公司 Height automatic adjusting device for railway curve, and railway
CN105631145A (en) * 2015-12-31 2016-06-01 中国神华能源股份有限公司 Ultrahigh optimization method and equipment of railway curve
CN109109878A (en) * 2018-07-24 2019-01-01 重庆宣昶工贸有限公司 A kind of rail tooling container
CN115432031A (en) * 2022-10-11 2022-12-06 中车南京浦镇车辆有限公司 Dynamic curve track gauge and superelevation control method based on wheel track vibration

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866657A (en) * 2014-01-20 2014-06-18 青岛安福尔车业有限公司 Height automatic adjusting device for railway curve, and railway
CN105631145A (en) * 2015-12-31 2016-06-01 中国神华能源股份有限公司 Ultrahigh optimization method and equipment of railway curve
CN105631145B (en) * 2015-12-31 2019-01-22 中国神华能源股份有限公司 Railway curve superelevation optimization method and equipment
CN109109878A (en) * 2018-07-24 2019-01-01 重庆宣昶工贸有限公司 A kind of rail tooling container
CN115432031A (en) * 2022-10-11 2022-12-06 中车南京浦镇车辆有限公司 Dynamic curve track gauge and superelevation control method based on wheel track vibration
CN115432031B (en) * 2022-10-11 2023-12-01 中车南京浦镇车辆有限公司 Dynamic curve track gauge and ultrahigh control method based on wheel track vibration

Similar Documents

Publication Publication Date Title
US10363949B2 (en) System and method for controlling a vehicle system
RU2384446C2 (en) Method for determining and considering side wind loads for moving rail vehicle, and suitably made last carriage of rail vehicle
CN104340236B (en) The train automatic Pilot control system of straddle-type monorail train
WO2011086629A1 (en) Operation support device and automatic operation device
US6976713B2 (en) Apparatus for use in applying granular material to a rail
CA3039218C (en) Railway road crossing warning system with sensing system electrically-decoupled from railroad track
TWI579176B (en) Train control system
CN112644561B (en) Train tracking capacity determination method based on relative speed tracking model
KR101449742B1 (en) Device For Controlling Distance Between Trains
CN101152872A (en) Ultra-high intelligent system for curved outer rail of railway
US20210213920A1 (en) Method for managing braking in a degraded adhesion condition for a vehicle system
CN101920710A (en) Analyzing method of main track trafficability of urban rail transit in moving block
US6572056B2 (en) Method and apparatus for uniform time warning of railroad trains
KR20070005972A (en) A apparatus for speed control in section of curve/gradient and the method thereof
CN101821142B (en) Method for adapting at least one parameter in controlled system of vehicle
AU2017202262A1 (en) Rail transport system
CN110435702A (en) A kind of unmanned electric locomotive Derail detector in underground and method
US11472450B2 (en) Method and control unit for detection of derailment on the basis of wheel speed signals
US9592842B1 (en) Railroad locomotive control system having switch position indication and method of use
JPH02109773A (en) Railroad crossing control method by wireless command
EP3428034B1 (en) Railway vehicle derailment detection method and device
CN108854177A (en) Mud scraper operation control system and its control method
KR102679135B1 (en) System for Measuring Rail Displacement
CN109910943B (en) Safe control system and method for wheel rim abrasion
JP2013212760A (en) Operation support device and operation support method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080402