CN101148871A - Method for increasing thin-sand-layer-filling soft clay foundation vacuum degree - Google Patents
Method for increasing thin-sand-layer-filling soft clay foundation vacuum degree Download PDFInfo
- Publication number
- CN101148871A CN101148871A CNA2007100471419A CN200710047141A CN101148871A CN 101148871 A CN101148871 A CN 101148871A CN A2007100471419 A CNA2007100471419 A CN A2007100471419A CN 200710047141 A CN200710047141 A CN 200710047141A CN 101148871 A CN101148871 A CN 101148871A
- Authority
- CN
- China
- Prior art keywords
- sand
- layer
- water pressure
- pore water
- draining board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007100471419A CN100549305C (en) | 2007-10-18 | 2007-10-18 | Improve the method for thin-sand-layer-filling soft clay foundation vacuum degree |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007100471419A CN100549305C (en) | 2007-10-18 | 2007-10-18 | Improve the method for thin-sand-layer-filling soft clay foundation vacuum degree |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101148871A true CN101148871A (en) | 2008-03-26 |
CN100549305C CN100549305C (en) | 2009-10-14 |
Family
ID=39249561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007100471419A Expired - Fee Related CN100549305C (en) | 2007-10-18 | 2007-10-18 | Improve the method for thin-sand-layer-filling soft clay foundation vacuum degree |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100549305C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116019A (en) * | 2009-12-31 | 2011-07-06 | 上海港湾软地基处理工程(集团)有限公司 | Method for rapidly treating soft foundation through high vacuum densification |
CN102535431A (en) * | 2012-03-14 | 2012-07-04 | 天津港(集团)有限公司 | Method for quickly forming blown and filled ultra-soft soil foundation surface layer duricrust and device for realizing method |
CN102733371A (en) * | 2012-07-18 | 2012-10-17 | 王军 | Closed direct-sucking sectional vacuum preloading foundation treatment method |
CN103966998A (en) * | 2014-04-30 | 2014-08-06 | 中交天津港湾工程研究院有限公司 | Reinforcement technology and device for deep soft soil foundation comprising sandy soil interbed |
CN105158138A (en) * | 2015-08-05 | 2015-12-16 | 宁波大学 | Detection apparatus of soil permeability |
CN105649002A (en) * | 2015-12-29 | 2016-06-08 | 上海强劲地基工程股份有限公司 | Rapid treatment system and rapid treatment method for soft soil foundation |
CN106894406A (en) * | 2017-02-24 | 2017-06-27 | 南京工业大学 | Vacuum preloading foundation treatment method adopting positioning permeable pipe |
CN107190728A (en) * | 2017-06-26 | 2017-09-22 | 中交航局第三工程有限公司 | A kind of drainage plate striking device and method |
-
2007
- 2007-10-18 CN CNB2007100471419A patent/CN100549305C/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116019A (en) * | 2009-12-31 | 2011-07-06 | 上海港湾软地基处理工程(集团)有限公司 | Method for rapidly treating soft foundation through high vacuum densification |
CN102535431A (en) * | 2012-03-14 | 2012-07-04 | 天津港(集团)有限公司 | Method for quickly forming blown and filled ultra-soft soil foundation surface layer duricrust and device for realizing method |
CN102535431B (en) * | 2012-03-14 | 2014-09-17 | 天津港(集团)有限公司 | Method for quickly forming blown and filled ultra-soft soil foundation surface layer duricrust and device for realizing method |
CN102733371A (en) * | 2012-07-18 | 2012-10-17 | 王军 | Closed direct-sucking sectional vacuum preloading foundation treatment method |
CN102733371B (en) * | 2012-07-18 | 2015-06-24 | 温州大学 | Closed direct-sucking sectional vacuum preloading foundation treatment method |
CN103966998A (en) * | 2014-04-30 | 2014-08-06 | 中交天津港湾工程研究院有限公司 | Reinforcement technology and device for deep soft soil foundation comprising sandy soil interbed |
CN105158138A (en) * | 2015-08-05 | 2015-12-16 | 宁波大学 | Detection apparatus of soil permeability |
CN105649002A (en) * | 2015-12-29 | 2016-06-08 | 上海强劲地基工程股份有限公司 | Rapid treatment system and rapid treatment method for soft soil foundation |
CN106894406A (en) * | 2017-02-24 | 2017-06-27 | 南京工业大学 | Vacuum preloading foundation treatment method adopting positioning permeable pipe |
CN107190728A (en) * | 2017-06-26 | 2017-09-22 | 中交航局第三工程有限公司 | A kind of drainage plate striking device and method |
CN107190728B (en) * | 2017-06-26 | 2022-10-18 | 中交一航局第三工程有限公司 | Drainage plate setting device and method |
Also Published As
Publication number | Publication date |
---|---|
CN100549305C (en) | 2009-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100549305C (en) | Improve the method for thin-sand-layer-filling soft clay foundation vacuum degree | |
CN101144274B (en) | Method for carrying vacuum prepressing consolidation by using plastic draining plate with box | |
CN100549304C (en) | A kind of nothing sealing fast vacuum prepressing method | |
CN104120710B (en) | A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill | |
CN101413261B (en) | Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method | |
CN101225656B (en) | Method for rapidly reinforcing ultra-soft soil superficial layer | |
CN102220757B (en) | Immediate processing method for drainage solidifying of super soft soil shallow surface space | |
Zhang et al. | Temperature and gas pressure monitoring and leachate pumping tests in a newly filled MSW layer of a landfill | |
CN104120711A (en) | Structure and method for conducting reinforcing processing on soft foundation by combining surcharge preloading and vacuum preloading | |
CN105239554A (en) | Vacuum and preloading drainage structure with low-permeability sand layers and construction method | |
Indraratna | Recent advances in vertical drains and vacuum preloading for soft ground stabilisation | |
Zhuang et al. | Evaluation of vacuum preloading with vertical drains as a soft soil improvement measure | |
O’Kelly | Case studies of vacuum consolidation ground improvement in peat deposits | |
CN101144273B (en) | Geotechnics plastic draining plate with top box used for vacuum prepressing | |
Chu et al. | Soft soil improvement through consolidation: an overview | |
CN113605359B (en) | Multilayer complex soft soil foundation rapid dewatering consolidation construction structure and construction method | |
CN207919608U (en) | A kind of high-low-position double-face vacuum preconsolidation weak soil experimental rig | |
CN203939019U (en) | A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure | |
CN108166542A (en) | A kind of high-low-position double-face vacuum preconsolidation weak soil experimental rig | |
CN109944263B (en) | Double-vacuum dewatering system and method | |
CN110984122A (en) | Vacuum preloading device and method for enhancing drainage function | |
Woo et al. | Preconsolidation of soft Bangkok clay by vacuum loading combined with non-displacement sand drains | |
CN204959728U (en) | It carries pre -compaction drainage structures jointly to pile with vacuum of low permeability sand bed | |
Jiang et al. | Investigation on in situ test and measurement technique of groundwater level in vacuum preloading | |
Indraratna et al. | Performance monitoring of vacuum preloading for stabilizing soft foundations for transportation and port infrastructure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI XINGYU CONSTRUCTION GROUP CO., LTD. Free format text: FORMER OWNER: SHANGHAI JIAO TONG UNIVERSITY Effective date: 20110214 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200240 NO.800, DONGCHUAN ROAD, MINHANG DISTRICT, SHANGHAI TO: 200433 BUILDING 8, NO.1675, HUANGXING ROAD, YANGPU DISTRICT, SHANGHAI |
|
TR01 | Transfer of patent right |
Effective date of registration: 20110214 Address after: 8, 1675, Huang Xing Road, 200433, Shanghai, Yangpu District Patentee after: Shanghai Xingyu Construction Group Co., Ltd. Address before: 200240 Dongchuan Road, Shanghai, No. 800, No. Patentee before: Shanghai Jiao Tong University |
|