CN203939019U - A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure - Google Patents

A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure Download PDF

Info

Publication number
CN203939019U
CN203939019U CN201420313664.9U CN201420313664U CN203939019U CN 203939019 U CN203939019 U CN 203939019U CN 201420313664 U CN201420313664 U CN 201420313664U CN 203939019 U CN203939019 U CN 203939019U
Authority
CN
China
Prior art keywords
vertical drainage
drainage plate
permeable formation
soft foundation
preloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420313664.9U
Other languages
Chinese (zh)
Inventor
干焕军
余朝伟
冯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO HIGH-TECH ZONE SEA-CLOSURE ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
NINGBO HIGH-TECH ZONE SEA-CLOSURE ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HIGH-TECH ZONE SEA-CLOSURE ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical NINGBO HIGH-TECH ZONE SEA-CLOSURE ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201420313664.9U priority Critical patent/CN203939019U/en
Application granted granted Critical
Publication of CN203939019U publication Critical patent/CN203939019U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure, it is included in the first woven cloth setting gradually on the upper soll layer in treatment of soft foundation region, the first permeable formation, the second permeable formation, preloading mud layer, the second woven cloth and diaphragm seal, also comprise the first long vertical drainage plate, the first short vertical drainage plate, Horizontal filter pipe arm, Horizontal filter pipe house steward, vacuum pump, the second vertical drainage plate, the first long vertical drainage plate and the first short vertical drainage plate insert in treatment of soft foundation region, Horizontal filter pipe arm is positioned in the first permeable formation, Horizontal filter pipe arm is connected with vacuum pump by Horizontal filter pipe house steward, the second vertical drainage plate inserts in preloading mud layer, advantage is by plugging two kinds of different vertical drainage plates of length in treatment of soft foundation region, plug vertical drainage plate in preloading mud layer, under vacuum condition, carry out again draining, can not only shorten the fixed cycle, and the supporting capacity of ground after consolidation process is large.

Description

A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure
Technical field
The utility model relates to a kind of reinforcing soft foundation treatment system, especially relates to a kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure.
Background technology
At present, the soft base of consolidation process has much to raise the process of site elevation, and activities is generally: first barged-in fill is carried out in place and be backfilled to design elevation; Then adopt the method such as vacuum method or Vacuum-loading Pre-pressing Method to carry out reinforcing soft foundation processing.At present, generally in reinforcing soft foundation processing procedure, the hydraulic reclamation soil body is carried out to consolidation process simultaneously, Vacuum-loading Pre-pressing Method is conventional method, but that the method exists is significantly not enough: 1) the fixed cycle long, the supporting capacity after former treatment of soft foundation region is fixed is little; 2) if utilize water as preloading pressure, the supporting capacity of the hydraulic reclamation solum after consolidation process limited (being less than or equal to 80kPa), and it is limited to process the degree of depth, so that restricted to a certain extent the promotion and application of the method; 3) if use mud bag as preloading pressure, after consolidation process, need to move away from mud bag, use inconvenient.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure, and its fixed cycle is short, and the supporting capacity of ground after treatment is large, the processing degree of depth is high.
The utility model solves the problems of the technologies described above adopted technical scheme: a kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure, it is characterized in that comprising the first woven cloth, the first permeable formation, the first long vertical drainage plate, the first short vertical drainage plate, Horizontal filter pipe arm, Horizontal filter pipe house steward, vacuum pump, the second permeable formation, preloading mud layer, the second vertical drainage plate, the second woven cloth and diaphragm seal, the first described woven cloth is laid on the upper soll layer in treatment of soft foundation region, the first described permeable formation is layed in the first described woven cloth, the first described long vertical drainage plate and the first described short vertical drainage plate insert in treatment of soft foundation region through the first described permeable formation and the first described woven cloth, and first permeable formation of the top that makes the first described long vertical drainage plate and described the first short vertical drainage plate described in being arranged in, the first short vertical drainage plate described in one is positioned at the middle that forms the first long vertical drainage plate described in four of rectangle, described Horizontal filter pipe arm is positioned in the first described permeable formation, the top of the top of the first described long vertical drainage plate and the first described short vertical drainage plate is connected with described Horizontal filter pipe arm respectively, described Horizontal filter pipe arm is connected with described vacuum pump by described Horizontal filter pipe house steward, the second described permeable formation is layed on the first described permeable formation, described preloading mud layer is arranged on the second described permeable formation, the second described vertical drainage plate inserts in described preloading mud layer, and the bottom of the second described vertical drainage plate just extends in the second described permeable formation, the second described woven cloth is layed on described preloading mud layer, described diaphragm seal is layed in the second described woven cloth, and the sealing of described diaphragm seal covers the vacuum preloading processing region being made up for the treatment of of soft foundation region and described preloading mud layer.
The first described permeable formation is made up of the first non-woven geotextile that is layed in the first sand cushion in the first described woven cloth and be covered on the first described sand cushion, the top of the first described long vertical drainage plate and the first described short vertical drainage plate is arranged in the first described sand cushion, and described Horizontal filter pipe arm is embedded in the first described sand cushion.
The second described permeable formation is made up of the second non-woven geotextile that is arranged at the second sand cushion on the first described permeable formation and be covered on the second described sand cushion.
Build the earth rock cofferdam having with the design elevation equal altitudes in treatment of soft foundation region in the upper soll layer edge in treatment of soft foundation region, the first described woven cloth, the first described permeable formation, described the second permeable formation and described preloading mud layer are positioned at described earth rock cofferdam, described Horizontal filter pipe house steward is through described earth rock cofferdam, and the one end that is positioned at described earth rock cofferdam is connected with described Horizontal filter pipe arm, the one end being positioned at outside described earth rock cofferdam is connected with described vacuum pump.
On treatment of soft foundation region, dig the degree of depth along the edge of vacuum preloading processing region and be at least the sealing ditch of 2~3m, the edge of described diaphragm seal is pressed in described sealing ditch by clay, and vacuum preloading processing region is sealed completely.
The insertion depth of the first described long vertical drainage plate is 12~20m, and the insertion depth of the first described short vertical drainage plate is 8~12m.
Compared with prior art, the utility model has the advantage of:
1) the utility model by plugging two kinds of different vertical drainage plates of length in treatment of soft foundation region, on treatment of soft foundation region, serous fluid of dredger fill layer forms preloading mud layer and carries out piling prepressing, in preloading mud layer, plug vertical drainage plate, under vacuum condition, carry out again draining, this mode can not only be accelerated concretion of soft foundation speed, shorten the fixed cycle, and the supporting capacity of ground after consolidation process is large, after former treatment of soft foundation region is fixed, can reach 130~170kPa, after preloading mud layer is fixed, just can reach 60~80kPa without covering again in the above water or covering the loads such as sandbag, this external cause is reinforced under vacuum condition, can effectively improve the processing degree of depth of ground after treatment.
2) the utility model method, in raising site elevation, just can reach preloading combined vacuum pre-compressed effect without piling prepressing, has reduced cost, and can guarantee the resistance to overturning in place.
Brief description of the drawings
Fig. 1 is the layout schematic diagram of the utility model structure.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment is described in further detail the utility model.
The piling prepressing united vacuum precompressed soft foundation consolidation process of the one structure that the present embodiment proposes, as shown in Figure 1, it comprises the first woven cloth 8, the first permeable formation, the first long vertical drainage plate 1, the first short vertical drainage plate 2, Horizontal filter pipe arm 3, Horizontal filter pipe house steward 4, vacuum pump 5, the second permeable formation, preloading mud layer 6, the second vertical drainage plate 7, the second woven cloth 15 and diaphragm seal 16, the first woven cloth 8 is laid on the upper soll layer in treatment of soft foundation region, the first permeable formation is layed in the first woven cloth 8, the first long vertical drainage plate 1 and the first short vertical drainage plate 2 insert in treatment of soft foundation region through the first permeable formation and the first woven cloth 8, and make the top of the first long vertical drainage plate 1 and the first short vertical drainage plate 2 be arranged in the first permeable formation, a first short vertical drainage plate 2 is positioned at the middle of four the first long vertical drainage plates 1 that form rectangle, Horizontal filter pipe arm 3 is positioned in the first permeable formation, the top of the top of the first long vertical drainage plate 1 and the first short vertical drainage plate 2 is connected with Horizontal filter pipe arm 3 respectively, Horizontal filter pipe arm 3 is connected with vacuum pump 5 by Horizontal filter pipe house steward 4, the second permeable formation is layed on the first permeable formation, preloading mud layer 6 is arranged on the second permeable formation, the second vertical drainage plate 7 inserts in preloading mud layer 6, and the bottom of the second vertical drainage plate 7 just extends in the second permeable formation, the second woven cloth 15 is layed on preloading mud layer 6, diaphragm seal 16 is layed in the second woven cloth 15 and diaphragm seal 16 sealings cover the vacuum preloading processing region being made up for the treatment of of soft foundation region and preloading mud layer 6.
In this specific embodiment, the first permeable formation forms by being layed in the first sand cushion 9 in the first woven cloth 8 and the first non-woven geotextile 12 being covered on the first sand cushion 9, the top of the first long vertical drainage plate 1 and the first short vertical drainage plate 2 is arranged in the first sand cushion 9, and Horizontal filter pipe arm 3 is embedded in the first sand cushion 9.
In this specific embodiment, the second permeable formation forms by being arranged at the second sand cushion 10 on the first permeable formation and the second non-woven geotextile 11 being covered on the second sand cushion 10.
In this specific embodiment, enclose the earth rock cofferdam 13 of building with the design elevation equal altitudes in treatment of soft foundation region in the upper soll layer edge in treatment of soft foundation region, the first woven cloth 8, the first permeable formation, the second permeable formation and preloading mud layer 6 are positioned at earth rock cofferdam 13, Horizontal filter pipe house steward 4 is through earth rock cofferdam 13, and the one end (water inlet end) that is positioned at earth rock cofferdam 13 is connected with Horizontal filter pipe arm 3, the one end (water side) being positioned at outside earth rock cofferdam 13 is connected with vacuum pump 5; Along the edge of vacuum preloading processing region and be positioned to dig outside earth rock cofferdam 13 to be useful on and by clay, the edge of diaphragm seal 16 sealed and the degree of depth is at least the sealing ditch 14 of 2~3m, vacuum preloading processing region is sealed completely.
In this specific embodiment, the insertion depth of the first long vertical drainage plate 1 can be designed to 12~20m, and as being designed to 15m, the insertion depth of the first short vertical drainage plate 2 can be designed to 8~12m, as being designed to 10m; Horizontal filter pipe arm 3 and Horizontal filter pipe house steward 4 all adopt existing bellows; It is the jet vacuum pump of 7.5kW that vacuum pump 5 is selected power.
The detailed process that the structure that adopts the present embodiment to provide realizes reinforcing soft foundation processing is:
1. flatten treatment of soft foundation region, then first on the upper soll layer in treatment of soft foundation region, lay one deck the first woven cloth, in the first woven cloth, lay again one deck sand and form the first sand cushion, finally on the first sand cushion, lay one deck the first non-woven geotextile, form the first permeable formation by the first sand cushion and the first non-woven geotextile.
At this, the object in leveling treatment of soft foundation region is the upper soll layer surface in order to ensure the vertical treatment of soft foundation of the selfweight stress region of follow-up serous fluid of dredger fill.
In the time of Specific construction, the first woven cloth should be laid smooth, and elasticity will be evenly, and end wants anchor firmly, act as isolated silt particle and mixes, and ensures the drainability of the first permeable formation; The first sand cushion is laid and is formed by fine sand, and the thickness of the first sand cushion can be designed to 20~25cm; Owing to can pass the second permeable formation in the time plugging the second vertical drainage plate, mud in preloading mud layer may drain in the first permeable formation along the gap of jack like this, can cause the mud content of the first permeable formation to increase, therefore lay the first non-woven geotextile, can effectively prevent that like this mud in preloading mud layer from draining in the first permeable formation.
2. after position of p ile machine and draining sheet pile position registration, in treatment of soft foundation region, plug the first long vertical drainage plate and the first short vertical drainage plate through the first permeable formation and the first woven cloth, and make the top of the first long vertical drainage plate and the first short vertical drainage plate be arranged in the first permeable formation, make a first short vertical drainage plate be positioned at the middle of four the first long vertical drainage plates that form rectangle simultaneously.
In the time of Specific construction, the first long vertical drainage plate and the first short vertical drainage plate are inserted automatically by Gravitative Loads, can be aided with vibrating hammer and coordinate while running into inserted to play difficulty location; The width of the first long vertical drainage plate and the first short vertical drainage plate all can be designed to 8~12cm, the insertion depth of the first long vertical drainage plate can be made as 12~20m, the insertion depth of the first short vertical drainage plate can be made as 8~12m, air line distance between the first long vertical drainage plate and the first short vertical drainage plate is 0.7m~1.5m, and the first long vertical drainage plate and the first short vertical drainage plate all expose first permeable formation 15~20cm.
3. in the first permeable formation, arrange Horizontal filter pipe arm, then complete being connected of the first long vertical drainage plate and Horizontal filter pipe arm and being connected of the first short vertical drainage plate and Horizontal filter pipe arm, complete being again connected of Horizontal filter pipe arm and Horizontal filter pipe house steward, finally connect a vacuum pump in Horizontal filter pipe house steward's water side.
At this, it is the bellows of 4~6cm that Horizontal filter pipe arm can adopt diameter, it is the bellows of 6~8cm that Horizontal filter pipe house steward can adopt diameter, need on bellows, punch by rounded projections arranged along pipe shaft in use, make floral tube, wrap up one deck again and cover porose filter membrane as drainage layer, filter membrane requires to be adjacent to chimney filter, reaches only permeable not saturating sand; In the time that Specific construction is arranged Horizontal filter pipe arm, requiring horizontal spacing is 6~7m, and longitudinal pitch is 30~40m, can adopt the forms such as strip, pectination or featheriness, and form loop, and flap valve and pipe valve etc. can be set on Horizontal filter pipe arm; Vacuum pump is selected the jet vacuum pump of 7.5kW, in the time of Specific construction, and can every 900~1100m 2be equipped with a vacuum pump.
4. first on the first permeable formation, lay one deck sand and form the second sand cushion, then on the second sand cushion, cover one deck the second non-woven geotextile, form the second permeable formation by the second sand cushion and the second non-woven geotextile.
In the time of Specific construction, the thickness of the second sand cushion can be made as 20~25cm, and laying the second sand cushion utilizes the preloading mud layer discharging consolidation of top hydraulic reclamation, covers one deck 250g/m on the second sand cushion 2the second non-woven geotextile object be in order to isolate the second sand cushion and preloading mud layer.
5. first according to the design elevation in treatment of soft foundation region, build in the upper soll layer edge in treatment of soft foundation region and the earth rock cofferdam of design elevation equal altitudes, then form preloading mud layer to serous fluid of dredger fill to design elevation on the second permeable formation in earth rock cofferdam.
6. in preloading mud layer, plug the second vertical drainage plate, and the bottom of the second vertical drainage plate is just extended in the second permeable formation, in the time of Specific construction, can make the second vertical drainage plate insert the second sand cushion 20cm.
7. on preloading mud layer, lay successively the second woven cloth and diaphragm seal, and make the disposable vacuum preloading processing region being formed by treatment of soft foundation region and preloading mud layer that covers completely of diaphragm seal, then on treatment of soft foundation region, dig the degree of depth along the edge of vacuum preloading processing region and be at least 2~3m as sealing ditch that at least 2.5m is dark, recycling clay is by the edge indentation sealing ditch of diaphragm seal, so that vacuum preloading processing region seals completely.
At this, the effect of the second woven cloth is to prevent that diaphragm seal from contacting and being damaged with preloading mud layer; Diaphragm seal adopts existing 16 vacuum diaphragm, can on preloading mud layer, lay 1~3 layer; In the time of Specific construction, be the clay dry and cracked gas leakage under natural drying that prevents from sealing in ditch, in sealing ditch, cover water, good to guarantee sealing.
8. utilize vacuum pump, vacuum preloading processing region is carried out to vacuum preloading processing, realize the reinforcing in treatment of soft foundation region.
In the time of Specific construction, open vacuum pump, first try to take out, check the sealing situation of mechanical running status, vacuum preloading processing region; In vacuum draw running, vacuum under necessary continual observation diaphragm seal, require the vacuum under diaphragm seal to be more than or equal to 80kPa, turn on pump rate is more than or equal to 80%, vacuumize 90~120 days duration, if the vacuum under diaphragm seal is inadequate, the break operating condition of gas leakage situation and vacuum pump of sealing situation, the diaphragm seal that should check diaphragm seal and pipe-line system, find reason, adopt remedial measures, according to measured settlement hyperbola of fit, prediction final settlement, reaches 80% in conjunction with the degree of consolidation and judges when stop vacuumizing.

Claims (6)

1. a piling prepressing united vacuum precompressed soft foundation consolidation process structure, it is characterized in that comprising the first woven cloth, the first permeable formation, the first long vertical drainage plate, the first short vertical drainage plate, Horizontal filter pipe arm, Horizontal filter pipe house steward, vacuum pump, the second permeable formation, preloading mud layer, the second vertical drainage plate, the second woven cloth and diaphragm seal, the first described woven cloth is laid on the upper soll layer in treatment of soft foundation region, the first described permeable formation is layed in the first described woven cloth, the first described long vertical drainage plate and the first described short vertical drainage plate insert in treatment of soft foundation region through the first described permeable formation and the first described woven cloth, and first permeable formation of the top that makes the first described long vertical drainage plate and described the first short vertical drainage plate described in being arranged in, the first short vertical drainage plate described in one is positioned at the middle that forms the first long vertical drainage plate described in four of rectangle, described Horizontal filter pipe arm is positioned in the first described permeable formation, the top of the top of the first described long vertical drainage plate and the first described short vertical drainage plate is connected with described Horizontal filter pipe arm respectively, described Horizontal filter pipe arm is connected with described vacuum pump by described Horizontal filter pipe house steward, the second described permeable formation is layed on the first described permeable formation, described preloading mud layer is arranged on the second described permeable formation, the second described vertical drainage plate inserts in described preloading mud layer, and the bottom of the second described vertical drainage plate just extends in the second described permeable formation, the second described woven cloth is layed on described preloading mud layer, described diaphragm seal is layed in the second described woven cloth, and the sealing of described diaphragm seal covers the vacuum preloading processing region being made up for the treatment of of soft foundation region and described preloading mud layer.
2. the piling prepressing united vacuum precompressed soft foundation consolidation process of one according to claim 1 structure, it is characterized in that the first described permeable formation is made up of the first non-woven geotextile that is layed in the first sand cushion in the first described woven cloth and be covered on the first described sand cushion, the top of the first described long vertical drainage plate and the first described short vertical drainage plate is arranged in the first described sand cushion, and described Horizontal filter pipe arm is embedded in the first described sand cushion.
3. the piling prepressing united vacuum precompressed soft foundation consolidation process of one according to claim 1 and 2 structure, is characterized in that the second described permeable formation is made up of the second non-woven geotextile that is arranged at the second sand cushion on the first described permeable formation and be covered on the second described sand cushion.
4. the piling prepressing united vacuum precompressed soft foundation consolidation process of one according to claim 3 structure, it is characterized in that building in the upper soll layer edge in treatment of soft foundation region the earth rock cofferdam having with the design elevation equal altitudes in treatment of soft foundation region, the first described woven cloth, the first described permeable formation, the second described permeable formation and described preloading mud layer are positioned at described earth rock cofferdam, described Horizontal filter pipe house steward is through described earth rock cofferdam, and the one end that is positioned at described earth rock cofferdam is connected with described Horizontal filter pipe arm, the one end being positioned at outside described earth rock cofferdam is connected with described vacuum pump.
5. the piling prepressing united vacuum precompressed soft foundation consolidation process of one according to claim 4 structure, it is characterized in that on treatment of soft foundation region, digging the degree of depth along the edge of vacuum preloading processing region and be at least the sealing ditch of 2~3m, the edge of described diaphragm seal is pressed in described sealing ditch by clay, and vacuum preloading processing region is sealed completely.
6. the piling prepressing united vacuum precompressed soft foundation consolidation process of one according to claim 5 structure, is characterized in that the insertion depth of the first described long vertical drainage plate is 12~20m, and the insertion depth of the first described short vertical drainage plate is 8~12m.
CN201420313664.9U 2014-06-13 2014-06-13 A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure Expired - Lifetime CN203939019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420313664.9U CN203939019U (en) 2014-06-13 2014-06-13 A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420313664.9U CN203939019U (en) 2014-06-13 2014-06-13 A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure

Publications (1)

Publication Number Publication Date
CN203939019U true CN203939019U (en) 2014-11-12

Family

ID=51858346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420313664.9U Expired - Lifetime CN203939019U (en) 2014-06-13 2014-06-13 A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure

Country Status (1)

Country Link
CN (1) CN203939019U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120711A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Structure and method for conducting reinforcing processing on soft foundation by combining surcharge preloading and vacuum preloading
CN113684815A (en) * 2021-08-20 2021-11-23 连云港巨基岩土工程有限公司 Solid-liquid separation method for high-water-content soft material

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120711A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Structure and method for conducting reinforcing processing on soft foundation by combining surcharge preloading and vacuum preloading
CN104120711B (en) * 2014-06-13 2016-06-29 宁波高新区围海工程技术开发有限公司 A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure and method
CN113684815A (en) * 2021-08-20 2021-11-23 连云港巨基岩土工程有限公司 Solid-liquid separation method for high-water-content soft material

Similar Documents

Publication Publication Date Title
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN104120711B (en) A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure and method
CN102587352B (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN103628468B (en) A kind of water penetration pile combined vacuum prepressing ground foundation treatment method
CN110195430A (en) A kind of anti-stacking pressure construction of soft soil treatment method of multidimensional sealing space vacuum water diversion
CN106840086A (en) The rapidly solidified weak soil experimental rig of low Low Level vacuum method
CN101130952A (en) Packingless fast vacuum prepressing dynamic consolidation method
CN105239555A (en) Method for treating soft soil foundation through combination of bagged grouting gravel pile and vacuum preloading
CN205636721U (en) Strain equipment that well vacuum preloading consolidated deep soft soil foundation
CN105780754A (en) Sand-bed-free vacuum preloading and water bag heaped loading combined reinforcing device and method for soft soil foundation
CN1807773A (en) Treatment method for thick collapsed loess foundation
CN111501730A (en) Vacuum preloading drainage consolidation method for uranium tailing mud
CN203939019U (en) A kind of piling prepressing united vacuum precompressed soft foundation consolidation process structure
CN102787608B (en) Gravity type foundation pit supporting system under vacuum effect and construction method
CN107806079A (en) A kind of reinforced soft soil ground device
CN104563091A (en) Structure and method for processing consolidation of water pumping and air exhausting soft foundation
CN204475309U (en) One is drawn water and is vented concretion of soft foundation process structure
CN102704458A (en) Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN110485405B (en) Reinforcing system and reinforcing method for soft soil foundation
CN107604897A (en) The reinforcement means that the vacuum preloading of soft soil foundation, air pressure splitting and grouting are combined
CN104746506A (en) Soft soil combined preloading structure and construction method
CN103352458B (en) Controllable type negative pressure of vacuum well high-efficiency water-absorbing concretion method under film
CN208803456U (en) A kind of structure for reinforcing peat soil using sand pile and drain bar
CN206540536U (en) The rapidly solidified weak soil experimental rig of low Low Level vacuum method
CN205917709U (en) Integral type well dotted arranges house steward vacuum system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Reclaim Construction Technology Co.,Ltd.

Assignor: NINGBO HIGH-TECH ZONE RECLAIM ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

Contract record no.: 2015320000399

Denomination of utility model: Structure and method for conducting reinforcing processing on soft foundation by combining surcharge preloading and vacuum preloading

Granted publication date: 20141112

License type: Exclusive License

Record date: 20150601

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141112