CN101058979A - Construction method for pulling-resistant and pressure-resistant slip casting pipe pile - Google Patents

Construction method for pulling-resistant and pressure-resistant slip casting pipe pile Download PDF

Info

Publication number
CN101058979A
CN101058979A CN 200710072255 CN200710072255A CN101058979A CN 101058979 A CN101058979 A CN 101058979A CN 200710072255 CN200710072255 CN 200710072255 CN 200710072255 A CN200710072255 A CN 200710072255A CN 101058979 A CN101058979 A CN 101058979A
Authority
CN
China
Prior art keywords
pipe
resistant
hole
slip casting
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200710072255
Other languages
Chinese (zh)
Other versions
CN100462507C (en
Inventor
何新东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2007100722559A priority Critical patent/CN100462507C/en
Publication of CN101058979A publication Critical patent/CN101058979A/en
Application granted granted Critical
Publication of CN100462507C publication Critical patent/CN100462507C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A construction method of casting pipe pile plucking with resistance to plucking and pressing, The invention relates to a construction method of pipe pile. The purpose of the invention is: solving the insufficient problems of resistance to plucking and pressing happened in the buildings which are built under complex geological conditions or under higher groundwater level geological strata and the problems are generated by bottom board percolating water due to buildings bottom board plucking resistance is insufficient, declination due to excessive eccentricity when design buildings and when design the resistance to plucking of new buildings. The invention drills hole downward on the buildings basic layer according the design height mark and bore diameter of pipe pile, lifts downward steel pipes or plastic pipes with slip casting hole after the drilled hole is completed, lifts downward reinforcement bar or reinforcement cage in the hole out the steel pipes or plastic pipes, lifts downward sands and broken stone between the outer wall of the steel pipes or plastic pipes and the hole wall. The invention has extremely distinctive action in buildings plucking-resistance and reinforcement, buildings declination correction and the foundation reinforcement project of house floors addition and reconstruction. The pile type in the invention is suitable for various geological strata, it can be used for the plucking-resistance, reinforcement and foundation reinforcement of prior buildings and the resistance-plucking pile construction of new buildings.

Description

A kind of job practices of pulling-resistant and pressure-resistant slip casting pipe pile
Technical field
The present invention relates to a kind of job practices of pile tube.
Background technology
The building of building on geological conditions complexity or the higher stratum of groundwater table tends to produce following point: the one, and the design of building base plate anti-floating is not enough, makes base plate produce the crack infiltration; The 2nd, whole building designs eccentric excessive generation and tilts; The 3rd, uplift pile uplift resistance deficiency when the new building thing carries out the anti-floating design.The method that prevents at present or administer all can not thoroughly address the above problem.
Summary of the invention
The objective of the invention is the building built on geological conditions complexity or the higher stratum of groundwater table for solving, the foot plate infiltration of building base plate anti-floating power, building design eccentric excessive generation inclination, the not enough problem of uplift pile uplift resistance when the new building thing carries out the anti-floating design, and a kind of job practices of pulling-resistant and pressure-resistant slip casting pipe pile is provided.Method of the present invention realizes by following steps: one, hole downwards on the basal layer of building according to the design elevation and the aperture of stake; Two, be lowered to the steel pipe or the plastic pipe of band injected hole behind the pore-forming in the hole, the position of steel pipe or plastic pipe is placed in the middle in the hole; Three, in the hole in the steel pipe or the plastic pipe outside, be lowered to reinforcing bar or reinforcing cage; Four, in the outer wall of steel pipe or plastic pipe and the space between the hole wall, be lowered to sand or rubble; Five, in steel pipe or plastic pipe, be lowered to the Grouting Pipe of band grouting stop-valve; Six, start grouting pump and begin slip casting in the stake hole; Seven, steel pipe or plastic pipe carry out effectively (welding) and are connected and seal a waterproofing work respectively with between the basal layer of reinforcing bar or reinforcing cage and building behind the pile.The present invention has effect extremely significantly in the ground base enforcement engineering of the anti-floating reinforcing of building, building inclination rectification, adding building layer transformation.Stake type of the present invention is applicable to various stratum, according to the groundwater table height, can adopt different pore-forming technique pore-formings, pile.Can carry out stake footpath according to different uplift resistances, stake is long and the adjustment of reinforcing cage ,-also can carry out slip casing by pressure repeatedly simultaneously at the different position of pile body, the stake footpath is enlarged, form special-shaped enlarged footing, be used to improve resistance to plucking, compressive resistance.The present invention can be used for anti-floating reinforcing, ground base enforcement and the new building thing uplift pile construction of existing building.
Description of drawings
Fig. 1 is a pile schematic diagram of the present invention, Fig. 2 is the construction schematic diagram of holing downwards on the basal layer of building in the specific embodiment one, Fig. 3 is the construction schematic diagram that is lowered to reinforcing bar or reinforcing cage in the specific embodiment one in the hole in the steel pipe or the plastic pipe outside, Fig. 4 is the construction schematic diagram that is lowered to sand or rubble in the specific embodiment one in the outer wall of steel pipe or plastic pipe and the space between the hole wall, Fig. 5 is the construction schematic diagram that is lowered to the Grouting Pipe of band grouting stop-valve in the specific embodiment one in steel pipe or plastic pipe, Fig. 6 is the construction schematic diagram of envelope stake in the specific embodiment one, and Fig. 7~Figure 12 is the construction schematic diagram that the stake of underground water anti-floating is arranged.
The specific embodiment
The specific embodiment one: (referring to Fig. 1~Fig. 6) method of present embodiment realizes by following steps: one, on the basal layer of building, hole downwards according to the design elevation and the aperture of stake; Two, be lowered to the steel pipe or the plastic pipe of band injected hole behind the pore-forming in the hole, the position of steel pipe or plastic pipe is placed in the middle in the hole; Three, in the hole in the steel pipe or the plastic pipe outside, be lowered to reinforcing bar or reinforcing cage; Four, in the outer wall of steel pipe or plastic pipe and the space between the hole wall, be lowered to sand or rubble; Five, in steel pipe or plastic pipe, be lowered to the Grouting Pipe of band grouting stop-valve; Six, start grouting pump and begin slip casting in the stake hole; Seven, steel pipe or plastic pipe carry out effectively (welding) and are connected and seal a waterproofing work respectively with between the basal layer of reinforcing bar or reinforcing cage and building behind the pile.
The specific embodiment two: the diameter of phi of steel pipe or plastic pipe is 50~150mm in the present embodiment.Other is identical with the specific embodiment one.
The specific embodiment three: be fixed with cranse in the present embodiment on the outer wall of steel pipe or plastic pipe, the spacing of cranse is 50cm.Being fixed with cranse on the outer wall of steel pipe or plastic pipe is used for improving and the concrete frictional force of pile body.Other is identical with the specific embodiment one.
The specific embodiment four: in groundwater table during with the overlying strata pile, sand between steel pipe or plastic pipe and the hole wall or rubble are provided with the plurality of sections concrete and end the slurry layer in the present embodiment, and only starching layer thickness is 80~150cm.Its top is only starched layer thickness and is not less than 150cm.Other is identical with the specific embodiment one.
The specific embodiment five: in steel pipe or plastic pipe, be lowered in the present embodiment band grouting stop-valve Grouting Pipe after repeatedly in any one section slip casting.The Grouting Pipe diameter of phi is 25~50mm, and grouting pressure is 0.2~20Mpa.Other is identical with the specific embodiment one.
The specific embodiment six: in (referring to Fig. 7~12) present embodiment in groundwater table during with the sub-surface pile, adopt churning mode or rotation to creep into the form pore-forming, promptly inscribe steel pipe or plastic pipe behind the pore-forming, insert reinforcing bar, fill out building stones in small, broken bits, fill up the back earlier in steel pipe or the clear hole of the first perforate section slip casting, plastic pipe top, treat to stop after steel pipe or plastics pore and slotting reinforced hole return the cement paste that makes new advances.Afterwards, again by stake bottom upwards successively slip casting finish.Steel pipe or plastic pipe slurry outlet adopt strip, Kong Changwei 20cm, and Kong Kuanwei 1cm is used to improve the frictional resistance between steel pipe and the pile body.Other is identical with the specific embodiment one.
The specific embodiment seven: carry out uplift pile when construction at newly-built building in the present embodiment, the construction that can carry out before the sole plate construction or after the construction should be reserved a hole on the sole plate.Other is identical with the specific embodiment one.

Claims (8)

1, a kind of job practices of pulling-resistant and pressure-resistant slip casting pipe pile is characterized in that the job practices of pulling-resistant and pressure-resistant slip casting pipe pile realizes by following steps: one, hole downwards on the basal layer of building according to the design elevation and the aperture of stake; Two, be lowered to the steel pipe or the plastic pipe of band injected hole behind the pore-forming in the hole, the position of steel pipe or plastic pipe is placed in the middle in the hole; Three, in the hole in the steel pipe or the plastic pipe outside, be lowered to reinforcing bar or reinforcing cage; Four, in the outer wall of steel pipe or plastic pipe and the space between the hole wall, be lowered to sand or rubble; Five, in steel pipe or plastic pipe, be lowered to the Grouting Pipe of band grouting stop-valve; Six, start grouting pump and begin slip casting in the stake hole; Seven, steel pipe or plastic pipe effectively are connected and seal a waterproofing work respectively with between the basal layer of reinforcing bar or reinforcing cage and building behind the pile.
2, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1, the diameter of phi that it is characterized in that steel pipe or plastic pipe is 50~150mm.
3, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1 is characterized in that being fixed with cranse on the outer wall of steel pipe or plastic pipe, and the spacing of cranse is 50cm.
4, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1, it is characterized in that in groundwater table during with the overlying strata pile, sand between steel pipe or plastic pipe and the hole wall or rubble are provided with the plurality of sections concrete and end the slurry layer, and only starching layer thickness is 80~150cm.Its top is only starched layer thickness and is not less than 150cm.
5, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1, it is characterized in that in steel pipe or plastic pipe, being lowered to after the Grouting Pipe of band grouting stop-valve repeatedly in any one section slip casting, the Grouting Pipe diameter of phi is 25~50mm, and grouting pressure is 0.2~20Mpa.
6, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1 is characterized in that in groundwater table with the sub-surface pile, adopts churning mode or rotation drilling method pore-forming.
7, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 6 is characterized in that the slurry outlet of steel pipe or plastic pipe adopts strip, Kong Changwei 20cm, Kong Kuanwei 1cm.
8, the job practices of a kind of pulling-resistant and pressure-resistant slip casting pipe pile according to claim 1 is characterized in that the new building thing carries out uplift pile construction, before the sole plate construction or carry out the construction of stake after the construction, reserves a hole on the sole plate.
CNB2007100722559A 2007-05-24 2007-05-24 Construction method for pulling-resistant and pressure-resistant slip casting pipe pile Expired - Fee Related CN100462507C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100722559A CN100462507C (en) 2007-05-24 2007-05-24 Construction method for pulling-resistant and pressure-resistant slip casting pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100722559A CN100462507C (en) 2007-05-24 2007-05-24 Construction method for pulling-resistant and pressure-resistant slip casting pipe pile

Publications (2)

Publication Number Publication Date
CN101058979A true CN101058979A (en) 2007-10-24
CN100462507C CN100462507C (en) 2009-02-18

Family

ID=38865263

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100722559A Expired - Fee Related CN100462507C (en) 2007-05-24 2007-05-24 Construction method for pulling-resistant and pressure-resistant slip casting pipe pile

Country Status (1)

Country Link
CN (1) CN100462507C (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532290B (en) * 2009-02-25 2010-09-01 河海大学 Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN102041814A (en) * 2010-12-31 2011-05-04 郭红军 Novel composite pile (ground) foundation and application method thereof
CN102071645A (en) * 2010-12-31 2011-05-25 中铁大桥局集团有限公司 Bridge bored pile hole wall opening protection method
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN102677660A (en) * 2012-04-28 2012-09-19 邢台路桥建设总公司 Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method
CN103790548A (en) * 2012-10-29 2014-05-14 中国石油化工股份有限公司 Grouting pipe with star drill bit and strip-shaped screwed openings
CN104975595A (en) * 2014-04-13 2015-10-14 季德樑 Strengthened pile
CN106320374A (en) * 2016-08-31 2017-01-11 中铁二十局集团第四工程有限公司 Steel pipe column for subway station and construction process of steel pipe column
CN106703024A (en) * 2017-01-18 2017-05-24 安徽省经工建设集团有限公司 Construction technique for composite pile formed through broken stone consolidation by slurry
CN107460872A (en) * 2017-05-12 2017-12-12 李来宾 A kind of artificial tubes mix structure The End-bearing Piles Foundation and construction technology
CN107675705A (en) * 2017-11-17 2018-02-09 万保金 Prefabricated enlarging stake and its construction method
CN115142482A (en) * 2022-07-04 2022-10-04 中国十九冶集团有限公司 Later-stage anti-floating reinforcement treatment method for basement
CN115748650A (en) * 2022-11-29 2023-03-07 中国电建集团成都勘测设计研究院有限公司 Construction method of steel pipe concrete pipe wall structure for weak geological structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2246181A5 (en) * 1973-10-02 1975-04-25 Sefi
JPS57146822A (en) * 1981-03-04 1982-09-10 Morihisa Toda Method and apparatus for constructing cement mortar concrete pile
CN2129293Y (en) * 1992-02-14 1993-04-07 孔清华 Prestressed-bag device of prestressed pile
CN1072746C (en) * 1994-02-26 2001-10-10 任自放 Head and side grouting method for cast-in-situ pile

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101532290B (en) * 2009-02-25 2010-09-01 河海大学 Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN102041814A (en) * 2010-12-31 2011-05-04 郭红军 Novel composite pile (ground) foundation and application method thereof
CN102071645A (en) * 2010-12-31 2011-05-25 中铁大桥局集团有限公司 Bridge bored pile hole wall opening protection method
CN102071645B (en) * 2010-12-31 2012-10-17 中铁大桥局集团有限公司 Bridge bored pile hole wall opening protection method
CN102505684B (en) * 2011-11-02 2014-09-10 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN102677660A (en) * 2012-04-28 2012-09-19 邢台路桥建设总公司 Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method
CN102677660B (en) * 2012-04-28 2014-06-04 邢台路桥建设总公司 Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method
CN103790548A (en) * 2012-10-29 2014-05-14 中国石油化工股份有限公司 Grouting pipe with star drill bit and strip-shaped screwed openings
CN104975595A (en) * 2014-04-13 2015-10-14 季德樑 Strengthened pile
CN106320374A (en) * 2016-08-31 2017-01-11 中铁二十局集团第四工程有限公司 Steel pipe column for subway station and construction process of steel pipe column
CN106320374B (en) * 2016-08-31 2019-10-11 中铁二十局集团第四工程有限公司 A kind of subway station steel pipe column and its construction technology
CN106703024A (en) * 2017-01-18 2017-05-24 安徽省经工建设集团有限公司 Construction technique for composite pile formed through broken stone consolidation by slurry
CN106703024B (en) * 2017-01-18 2020-02-28 安徽省经工建设集团有限公司 Construction process of slurry-solidified gravel composite pile
CN107460872A (en) * 2017-05-12 2017-12-12 李来宾 A kind of artificial tubes mix structure The End-bearing Piles Foundation and construction technology
CN107675705A (en) * 2017-11-17 2018-02-09 万保金 Prefabricated enlarging stake and its construction method
CN115142482A (en) * 2022-07-04 2022-10-04 中国十九冶集团有限公司 Later-stage anti-floating reinforcement treatment method for basement
CN115142482B (en) * 2022-07-04 2024-02-13 中国十九冶集团有限公司 Later-stage anti-floating reinforcement treatment method for basement
CN115748650A (en) * 2022-11-29 2023-03-07 中国电建集团成都勘测设计研究院有限公司 Construction method of steel pipe concrete pipe wall structure for weak geological structure

Also Published As

Publication number Publication date
CN100462507C (en) 2009-02-18

Similar Documents

Publication Publication Date Title
CN100462507C (en) Construction method for pulling-resistant and pressure-resistant slip casting pipe pile
CN103993611B (en) A kind of deep layer rotating spraying cement-soil plate and anchor pole combine the construction method of anti-floating pile raft structure
CN111622272A (en) Post-construction process of anti-floating anchor rod
CN202543906U (en) Precast pile with reserved grouting pipes
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN206784372U (en) Injection forming club-footed pile
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN106996104A (en) Injection forming club-footed pile and its construction method
CN110965595A (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN101560775A (en) Composite soil nailing wall structure
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN102011591A (en) Grouting process for working surface of deep well
CN105133641B (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN111608210A (en) Construction method of pressure bearing type anti-floating anchor rod in water-saturated silt stratum
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN103343690B (en) Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer
CN203441498U (en) Anti-seepage structure for large-section water-bearing layer passing shaft of inclined shaft
CN100595397C (en) Anti-floating construction method by combination of bar-planting and anchoring-bolt
CN207862925U (en) A kind of slip casting casing device
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN201183950Y (en) Self-propelling type anchor rod of seamless steel pipe
CN1548661A (en) Method of supporting foundation pit in soft layer with brad
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090218

Termination date: 20210524

CF01 Termination of patent right due to non-payment of annual fee