CN100560738C - Method for replacing furnace burden flow valve plate - Google Patents

Method for replacing furnace burden flow valve plate Download PDF

Info

Publication number
CN100560738C
CN100560738C CNB2008100694638A CN200810069463A CN100560738C CN 100560738 C CN100560738 C CN 100560738C CN B2008100694638 A CNB2008100694638 A CN B2008100694638A CN 200810069463 A CN200810069463 A CN 200810069463A CN 100560738 C CN100560738 C CN 100560738C
Authority
CN
China
Prior art keywords
valve
valve plate
close
clack box
remove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2008100694638A
Other languages
Chinese (zh)
Other versions
CN101245397A (en
Inventor
贺镇
吴益平
吴涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Iron and Steel Group Co Ltd
Original Assignee
Chongqing Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Iron and Steel Group Co Ltd filed Critical Chongqing Iron and Steel Group Co Ltd
Priority to CNB2008100694638A priority Critical patent/CN100560738C/en
Publication of CN101245397A publication Critical patent/CN101245397A/en
Application granted granted Critical
Publication of CN100560738C publication Critical patent/CN100560738C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a kind of method for replacing furnace burden flow valve plate, the steps include: that 1. furnace charge empties after, associated components is opened, removed to blast furnace staying, carries out that coal gas is isolated and get rid of and handle; 2. remove the maintenance sect on close clack box both sides down, lifting appliance is set at place, maintenance sect and down close clack box the inside; 3. remove old valve plate, new valve plate is installed; 4. detect, debug, carry out recovery work after qualified, just can return to normal production this moment.The present invention is safe, the engineering time short (as long as 150 minutes), can farthest reduce to change the influence to producing.The proposition of this programme provides beneficial reference to the colleague, is fit to the unplanned replacing of furnace burden flow valve plate.

Description

Method for replacing furnace burden flow valve plate
Technical field
The present invention relates to a kind of method for replacing furnace burden flow valve plate.
Background technology
The blast furnace feeding section is followed successively by batch can 1, batch can 2 and airtight box 3 from top to bottom, sees Fig. 1, is provided with material stop valve 4 and last close valve 5 between last batch can 1 and the batch can 2, is provided with material valve 6 and following close valve 7 between batch can 2 and the airtight box 3.Material stop valve 4 and last close valve 5 are positioned at close clack box 8, material valve 6 and following close valve 7 are positioned at close clack box 9 down, are provided with the sect in following close clack box 9 fronts, and both sides are provided with the maintenance sect, be provided with central trunnion 10 in airtight box 3, central trunnion 10 is positioned at distributor chute 11 tops.Be provided with blocking material plate in the close clack box 9 down simultaneously, close valve 7 belows were so that furnace charge can enter central trunnion 10 under the guide functions of blocking material plate under blocking material plate was positioned at.
Material stop valve 4, last close valve 5, material valve 6 and following close valve 7 are by the hydro-cylinder control action, and hydro-cylinder is attached thereto by connecting rod.The main effect of material valve 6 is needs that the speed of control materials flow satisfies blast-furnace smelting, secondly is backgauge and blowing.The groundwork part is a valve plate 12, valve plate 12 is made up of two metal sheets that misplace up and down, and two valve plates are separately fixed on the connecting arm 13 by bolt 14, nut 15, see Fig. 2 and Fig. 3, connecting arm is connected with same hydro-cylinder by connecting rod again, controls two valve plate synchronization actions by hydro-cylinder.After opening down close valve and material valve, the central trunnion in batch can and the airtight box communicates, and furnace charge falls by central trunnion from batch can and enters distributor chute.The open angle of material valve has determined the progress of cloth, and this angle and chute cloth are closely related.
The Working environment very severe of material valve two valve plates, furnace charge forms continual impact to valve plate and washes away on the one hand, envrionment temperature also can cause big influence to valve plate on the other hand, consequently make valve plate brittle failure occur, need to change, though can prolong its work-ing life by the method that improves the valve plate material.According to common design, the replacement cycle of valve plate is consistent with the time between overhaul of blast furnace, promptly blast furnace overhaul the time, just the material valve valve plate is changed, and no matter whether valve plate expires, this is inside the plan replacing.That is to say that under the normal circumstances, within blast furnace overhaul, the material valve valve plate can not changed.The time between overhaul of blast furnace about 10 years, therefore requires the work-ing life of valve plate more than 10 years usually.But, because material valve valve plate bad working environment, before blast furnace overhaul its to break down, cause to shift to an earlier date work-ing life overdue situation also be outwardness, this just needs to change immediately, otherwise influence is produced.The replacing of this unplanned replacing during with blast furnace overhaul exists very big different, and the blast furnace overhaul time is long, and blast furnace shuts down fully, damping down, stops the supple of gas or steam, and associated components is easy to dismantle, and the dismounting of valve plate self is also easy, and the time is also well-to-do.And unplanned replacing time requirement is urgent, and blast furnace is damping down only, and coal gas still exists, and needs to consider safety factors.But, up to the present, both do not had referential actually operating, but do not had the learning theory article yet also not about the research of unplanned material valve valve plate replacing aspect.
Summary of the invention
At the prior art above shortcomings, the purpose of this invention is to provide a kind of quick, safe method for replacing furnace burden flow valve plate, present method is suitable for the unplanned replacing of furnace burden flow valve plate.
The object of the present invention is achieved like this:
Method for replacing furnace burden flow valve plate is characterized in that: it comprises the steps:
1. after treating that furnace charge in batch can and the last batch can all empties, make blast furnace staying, with material stop valve, go up close valve, material valve and down close valve all open and put in place, carry out the following preparation work of this step then: open down close clack box sect, remove close valve hydro-cylinder bearing pin down, remove close valve guard flitch down, draw back down close valve plate, blind plate and fill out the grains of sand on central trunnion upper end cover to cut off gas flue, downward close clack box the inside send pressurized air to get rid of the coal gas of blind plate top, removes material valve hydro-cylinder bearing pin and pitman pin simultaneously;
2. detect the gas concentration of down close clack box the inside, change step over to 3. after reaching safety standards, send pressurized air to get rid of coal gas otherwise continue downward close clack box the inside;
3. lifting appliance is installed: remove the maintenance sect on close clack box both sides down, the place respectively is provided with an electric block at the maintenance sect, makes the connecting arm of material valve can rest on the optional position by electric block; In down close clack box the inside bottle gouard moved by hands is set and is used for the new and old valve plate of lifting lifting;
4. remove old valve plate, new valve plate is installed: fixedly the nut of valve plate and connecting arm is cut device and is broken with the hydraulic pressure screw thread is broken, remove the bolt that connects valve plate and connecting arm, pull down old valve plate and transport down close clack box by bottle gouard moved by hands, by bottle gouard moved by hands new valve plate is transported down close clack box again, new valve plate is fixedlyed connected with connecting arm by bolt, nut;
5. detect, debug: remove the bottle gouard moved by hands of down close clack box the inside, two electric blocks with place, maintenance sect is provided with detect the material valve working order, and make it reach technical requirements by adjustment; Connect material valve pitman pin and hydro-cylinder bearing pin, open Hydraulic Station and carry out test run;
6. after 5. the step, operation made material valve working properly by the, the maintenance sect on close clack box both sides down is installed, puts down down close valve plate, connect close valve hydro-cylinder bearing pin down, remove the grains of sand and blind plate, close valve guard flitch down is installed, close close clack box sect down, valve plate was changed and was finished this moment, can return to normal production.
Above-mentioned the 5. the adjustment in step mainly be the gap of adjusting between two valve plates, its inflation method is: between new valve plate and connecting arm metallic gasket is set, change the angle of valve plate by different spacer thicknesses and position relation, thereby the gap that makes two valve plates is within technical requirements.
The proposition of the technical program provides one can supply method of operating and reference for the unplanned replacing of furnace burden flow valve plate, and it has following beneficial effect at least:
1, the engineering time short, high efficiency can finish wholely more changing jobs usually in 150 minutes, can farthest reduce to change the influence to producing.
2, the following compressed air purge of close clack box, gas concentration are in safety range, and not needing to get angry in the following close clack box just can finish wholely more changes jobs, and security is good.
3, the proposition of this programme provides beneficial reference for the solution of industry on same problem.
Description of drawings
Fig. 1-blast furnace feeding section structural representation of the present invention;
Fig. 2-two valve plate positional structure synoptic diagram;
Fig. 3-Fig. 2 vertical view (valve plate on one side).
Embodiment
Introduce the present invention in detail below in conjunction with accompanying drawing.
Before formally changing, need carry out following three parts preparation work:
One, formulates detailed arrangement and method for construction and detection method;
Two, spare part, material, instrument, personnel prepare to put in place;
Three, formulate security measures, be ready to needed material, put up the maintenance safety platform.
After above-mentioned preparation work is finished, just can formally carry out the replacing of furnace burden flow valve plate, its concrete operations step is as follows, asks simultaneously in conjunction with Fig. 1, Fig. 2 and Fig. 3:
1. after treating that furnace charge in batch can 2 and the last batch can 1 all empties, make blast furnace staying, with material stop valve 4, go up close valve 5, material valve 6 and following close valve 7 are all opened and are put in place, carry out the following preparation work of this step (as far as possible carrying out simultaneously of can carrying out simultaneously of following work then, to save the replacing time): open down close clack box 9 sects, remove close valve hydro-cylinder bearing pin down, make down close valve can be turned to the limit position that leaves its works better, remove close valve guard flitch down, draw back down close valve plate to leave the enough working spaces of replacing personnel for, blind plate and fill out the grains of sand on central trunnion 10 upper end covers to cut off the coal gas data feedback channel fully, downward close clack box 9 the insides feed pressurized air to get rid of the coal gas of blind plate top, remove material valve hydro-cylinder bearing pin and pitman pin simultaneously, make the connecting arm of fixedlying connected to rest on the optional position under external force with valve plate;
2. detect the gas concentration of down close clack box the inside, change step over to 3. after reaching safety standards, send pressurized air with further eliminating coal gas otherwise continue downward close clack box the inside, till reaching safety standards;
3. lifting appliance is installed:, therefore need to install lifting appliance because the weight of valve plate is unpractical up to hundreds of jin by manually transporting, transporting.At first remove the maintenance sect on close clack box both sides down, the place respectively is provided with an electric block on the maintaining roadway doorway, is that external force makes the connecting arm of material valve can rest on the optional position with the electric block; In the batch can the inside one horizontal stroke side is set simultaneously, bottle gouard moved by hands is installed in and is used for the new and old valve plate of lifting lifting in the horizontal stroke side;
4. remove old valve plate, new valve plate is installed: fixedly the broken device of cutting of the nut 15 usefulness hydraulic pressure screw threads of valve plate 12 and connecting arm 13 is broken (because the Working environment of nut has determined it normally not turn on, can only remove with failure mode, consider from security standpoint simultaneously, here can not use the flame cutting cutter, because can produce spark during the work of flame cutting cutter, and the interior residual coal gas that does not drain that has of following close clack box own, as producing explosion hazard) with flame flame cutting cutter, remove the bolt 14 that connects valve plate 12 and connecting arm 13, bolt 14, pull down old valve plate 12 after nut 15 is pulled down again and transport down close clack box 9 by bottle gouard moved by hands, and then new valve plate is transported down close clack box by bottle gouard moved by hands, pass through bolt, nut is fixedlyed connected new valve plate with connecting arm;
5. detect, debug: remove the bottle gouard moved by hands of down close clack box the inside,, detect the material valve working order and whether meet the demands, and make it reach technical requirements by adjustment with two electric blocks that place, maintaining roadway doorway is provided with; The technical requirements here mainly be meant between two valve plates the gap whether within the limits prescribed, requiring such as its gap of 750 blast furnaces is 8~12mm, its concrete inflation method is: between new valve plate 12 and connecting arm 13 metallic gasket 16 is set, see Fig. 2 and Fig. 3, arrow among Fig. 2 is represented valve plate direction of motion, change the angle of valve plate by the tightness of different spacer thicknesses, position relation and attaching nut, make valve plate rely on center one end and upwarp or sink, thereby the gap that makes two valve plates is within technical requirements; Connect material valve pitman pin and hydro-cylinder bearing pin, open Hydraulic Station and carry out test run;
6. after 5. the step, operation made material valve working properly by the, carry out recovery work at last, the maintenance sect of removing is reinstalled in down close clack box both sides, put down down close valve plate it is put in place, connect close valve hydro-cylinder bearing pin down, remove the grains of sand and blind plate, close valve guard flitch down is installed, close close clack box sect down, valve plate was changed and was finished this moment, can return to normal production.

Claims (2)

1, method for replacing furnace burden flow valve plate is characterized in that: it comprises the steps:
1. after treating that furnace charge in batch can (2) and the last batch can (1) all empties, make blast furnace staying, with material stop valve (4), go up close valve (5), material valve (6) and following close valve (7) are all opened and are put in place, carry out the following preparation work of this step then: open down close clack box sect, remove close valve hydro-cylinder bearing pin down, remove close valve guard flitch down, draw back down close valve plate, blind plate and fill out the grains of sand on central trunnion (10) upper end cover to cut off gas flue, downward close clack box the inside send pressurized air to get rid of the coal gas of blind plate top, removes material valve hydro-cylinder bearing pin and pitman pin simultaneously;
2. detect the gas concentration of down close clack box the inside, change step over to 3. after reaching safety standards, send pressurized air to get rid of coal gas otherwise continue downward close clack box the inside;
3. lifting appliance is installed: remove the maintenance sect on close clack box both sides down, the place respectively is provided with an electric block at the maintenance sect, makes the connecting arm of material valve can rest on the optional position by electric block; In down close clack box the inside bottle gouard moved by hands is set and is used for the new and old valve plate of lifting lifting;
4. remove old valve plate, new valve plate is installed: fixedly the nut (15) of valve plate (12) and connecting arm (13) is cut device and is broken with the hydraulic pressure screw thread is broken, remove the bolt (14) that connects valve plate (12) and connecting arm (13), pull down old valve plate and transport down close clack box by bottle gouard moved by hands, by bottle gouard moved by hands new valve plate is transported down close clack box again, new valve plate is fixedlyed connected with connecting arm by bolt, nut;
5. detect, debug: remove the bottle gouard moved by hands of down close clack box the inside, two electric blocks with place, maintenance sect is provided with detect the material valve working order, and make it reach technical requirements by adjustment; Connect material valve pitman pin and hydro-cylinder bearing pin, open Hydraulic Station and carry out test run;
6. after 5. the step, operation made material valve working properly by the, the maintenance sect on close clack box both sides down being installed, putting down down close valve plate, connect close valve hydro-cylinder bearing pin down, remove the grains of sand and blind plate, close valve guard flitch down is installed, resumes production in close clack box sect under closing.
2, method for replacing furnace burden flow valve plate according to claim 1 is characterized in that: described the when 5. step is whole, metallic gasket (16) is being set to adjust the gap of two valve plates (12) between new valve plate (12) and connecting arm (13).
CNB2008100694638A 2008-03-12 2008-03-12 Method for replacing furnace burden flow valve plate Expired - Fee Related CN100560738C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100694638A CN100560738C (en) 2008-03-12 2008-03-12 Method for replacing furnace burden flow valve plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100694638A CN100560738C (en) 2008-03-12 2008-03-12 Method for replacing furnace burden flow valve plate

Publications (2)

Publication Number Publication Date
CN101245397A CN101245397A (en) 2008-08-20
CN100560738C true CN100560738C (en) 2009-11-18

Family

ID=39946076

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100694638A Expired - Fee Related CN100560738C (en) 2008-03-12 2008-03-12 Method for replacing furnace burden flow valve plate

Country Status (1)

Country Link
CN (1) CN100560738C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU91583B1 (en) * 2009-07-03 2011-01-04 Wurth Paul Sa Sealing valve arrangement for a shaft furnace charging installation
CN107940479B (en) * 2017-12-28 2023-10-13 江苏中研宜普科技有限公司 Heat accumulating combustion device with double-valve-plate rotary valve
CN110926228B (en) * 2019-10-31 2021-04-27 中冶宝钢技术服务有限公司 Dismounting device and dismounting method for blanking flow regulating valve for blast furnace

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
马钢2500m3高炉料流调节阀故障诊断分析. 徐剑峰.炼铁,第22增刊卷. 2003
马钢2500m3高炉料流调节阀故障诊断分析. 徐剑峰.炼铁,第22增刊卷. 2003 *

Also Published As

Publication number Publication date
CN101245397A (en) 2008-08-20

Similar Documents

Publication Publication Date Title
CN202709739U (en) Ignition negative-pressure control device of sintering machine
CN100560738C (en) Method for replacing furnace burden flow valve plate
CN101811251A (en) Automatic assembly equipment for fixed torque bolt of splitting connecting rod
CN201505569U (en) Recyclable blast-furnace coal injection device
CN201961727U (en) Pneumatic block clearing device for coal dropping pipe
CN204694091U (en) A kind of recovery system of electric furnace zinc smelting tail gas
CN201110716Y (en) Sintering device blast box head and tail sealing device
CN205827212U (en) A kind of energy-saving glass production control system
CN107269855A (en) Double-layer flap valve blanking system
CN106179703A (en) Preventing clogging up device is broken in a kind of counterattack for treating construction waste
CN102304368A (en) Process device for modifying wet quenched coke into dry quenched coke
CN104949533B (en) A kind of recovery system of electric furnace zinc smelting tail gas and its control method
CN204058490U (en) A kind of blast furnace sealing mechanism
CN211689134U (en) Novel blast furnace top pressure-equalizing gas and blast furnace damping-down waste gas integrated treatment system
CN202946703U (en) Novel shot control valve
CN203564902U (en) Device for preventing ash spraying of dust remover
CN201343487Y (en) Vacuum suction system of glass forming furnace
CN203904257U (en) Improved coal gas weight connecting rod for coke oven exchange shutter
CN220027673U (en) Waste glass sorting and recycling device
CN202610192U (en) Non-stop production ash discharge device of descending dust remover of fixed bed clearance type gas producer
CN111849520B (en) Flue gas centralized treatment device applied to tamping coal charging coke pusher and application method thereof
CN204074146U (en) High-pressure roller mill new side baffle mechanism
CN214563333U (en) Device for improving sealing structure of M-wire bag making machine
CN203033467U (en) Tobacco storing cabinet fabrication and inching car high-pressure air cleaning device
CN219366435U (en) Coke oven high-low pressure ammonia water switching system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118

Termination date: 20140312