CN100552186C - 盾构隧道的进洞防水方法 - Google Patents
盾构隧道的进洞防水方法 Download PDFInfo
- Publication number
- CN100552186C CN100552186C CNB2005101120995A CN200510112099A CN100552186C CN 100552186 C CN100552186 C CN 100552186C CN B2005101120995 A CNB2005101120995 A CN B2005101120995A CN 200510112099 A CN200510112099 A CN 200510112099A CN 100552186 C CN100552186 C CN 100552186C
- Authority
- CN
- China
- Prior art keywords
- spring plate
- shield
- steel spring
- rubber tile
- walling crib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及防水方法类,具体的是涉及一种用于地下结构盾构隧道的进洞防水方法,该防水方法的特点是:在浇注隧道井圈混凝土前,预埋充气管,管口连接气囊和外界气源;之后在盾构进洞前,安装帘布橡胶板、弹簧钢板和气囊;盾构进洞时,使气囊充气膨胀,压迫推动弹簧钢板,从而压紧橡胶板,其优点是当盾构进洞时,气囊充气膨胀,将橡胶板紧密包裹于盾构或衬砌外表面,使盾构与井圈之间间隙处具有很好的水密性,避免了可能产生的泥水渗漏,改变了以往盾构进洞仅靠土体加固的单一措施,提高了盾构进洞的安全系数。
Description
技术领域
本发明涉及防水方法类,具体的讲是涉及一种用于地下结构盾构隧道的进洞防水方法。
背景技术
现有盾构隧道的进洞防水是通过土体加固方式来进行的,一般主要是在进洞口周边地区采用搅拌桩、旋喷桩或者是冻结法等土体加工方式施工,搅拌桩、旋喷桩主要施工原理为在进洞口一定范围内的土体里形成连续的止水帷幕,结合并点降水方法以保证盾构进洞开挖面的安全;冻结法主要施工原理为在进洞口采用冻结设备,使一定范围内的土体冻结***,保证了盾构进洞开挖面的安全。其缺点在于土体加固范围较大,要保证加固的均质性很困难,现场虽然可取样检测,但取样点有限,无法保证整个土体皆达到设计要求。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种盾构隧道的进洞防水方法,该方法是在井圈进口处设置橡胶板,并通过气囊和弹簧钢板对其的压合,以满足盾构进洞时的水密要求。
本发明目的实现由以下技术方案完成:
一种盾构隧道的进洞防水方法,包括井圈、衬砌管片、帘布橡胶板,帘布橡胶板位于井圈与衬砌管片外壁之间,其特征在于该方法采用如下的步骤:在浇注隧道井圈混凝土前,预埋充气管,管口连接气囊和外界气源;之后在盾构进洞前,安装帘布橡胶板、弹簧钢板和气囊;盾构进洞时,使气囊充气膨胀,压迫推动弹簧钢板,从而压紧橡胶板。
预埋的充气管根数与所连接的气囊个数一一对应。
其中帘布橡胶板、弹簧钢板的安装可以是将弹簧钢板与橡胶板贴合,形状匹配,二者贴合体的一端与井圈内壁固定连接,另一端弹簧钢板通过橡胶板紧紧包裹于衬砌管片外壁。
弹簧钢板与橡胶板的安装设置角度选择与衬砌管片外壁呈45°角左右,效果比较好。
弹簧钢板的安装还包括另外一块弧状弹簧钢板的安装,该钢板的安装位置与弹簧钢板安装位置交叉设置,其安装方法可以是将其一端与井圈内壁固定连接,另一端部呈圆弧状,该圆弧状端部在充气后的气囊作用下与弹簧钢板接触,并对其产生压力,压力的大小取决于气囊充气量的多少。
所述的固定连接是在浇注井圈混凝土之前,预埋螺母于井圈钢板上,之后采用螺栓固定连接。
所述的气囊数量为两个,二者依次排放,充气后一个接触压迫弹簧钢板,另一个接触压迫弧状弹簧板。
本发明的优点是,当盾构进洞时,气囊充气膨胀,将橡胶板紧密包裹于盾构或衬砌外表面,使盾构与井圈之间间隙处具有很好的水密性,避免了可能产生的泥水渗漏,改变了以往盾构进洞仅靠土体加固的单一措施,提高了盾构进洞的安全系数。
附图说明
附图1为盾构进洞土体加固图;
附图2为本实用新型结构示意图;
具体实施方式
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-2所示,标号1-21分别表示:盖形螺母1、三通接头2、井圈3、垫圈4、螺栓5、压块6、气囊7、帘布橡胶板8、弹簧钢板9、弧状弹簧钢板10、衬砌管片外壁11、充气管12、井圈钢板13、盖形螺母14、弧状弹簧钢板10的圆弧状端部15、盾构推进方向16、经加固过的土体17、围护结构18、内衬19、预埋钢环20、环形钢筋混凝土保护圈21。
本实施例涉及的盾构隧道的进洞防水方法,包括井圈3、衬砌管片外壁11、帘布橡胶板8、弹簧钢板9、弧状弹簧钢板10、气囊7及其充气管12,帘布橡胶板8位于井圈3与衬砌管片外壁11之间,该方法采用如下的步骤:
在浇注隧道井圈混凝土前,预埋盖形螺母1于井圈钢板13上,同时预埋两根充气管12,充气管12与三通接头2相连接。
之后在盾构进洞前,安装帘布橡胶板8和弹簧钢板9、弧状弹簧钢板10、气囊7,其中帘布橡胶板8、弹簧钢板9的安装是将弹簧钢板9与帘布橡胶板8贴合,二者形状匹配,且二者贴合体的一端与井圈钢板13采用压块6通过螺栓5固定于预埋盖形螺母1处,另一端弹簧钢板9通过帘布橡胶板8紧紧包裹于衬砌管片外壁11,弹簧钢板9与帘布橡胶板8的安装设置角度是与衬砌管片外壁11呈45°角;弧状弹簧钢板10的安装,该钢板10的安装位置与弹簧钢板9安装位置交叉设置,其安装方法是将其一端与井圈钢板13采用螺栓5固定于预埋盖形螺母14处,另一端部呈圆弧状,该圆弧状端部在充气后的气囊作用下与弹簧钢板接触,并对其产生压力,压力的大小取决于气囊充气量的多少。
最后在盾构进洞时,使气囊充气膨胀,压迫推动弹簧钢板9以及弧状弹簧钢板10,从而作用于帘布橡胶板8,使帘布橡胶板8紧密包裹于衬砌管片外壁11,达到水密要求。
上述两根预埋的充气管12的一端分别接有气囊7,另一端通过三通接头2连通外界气源。
上述的气囊7数量为两个,二者依次排放,充气后一个接触压迫弹簧钢板9,另一个接触压迫弧状弹簧板10。
在本实施例中弹簧钢板9和弧状弹簧钢板10的以及气囊7均是沿井圈内壁圆周方向呈环形设置。显然本领域技术人员可以认识到气囊7的设置也可以是沿圆周方向均匀分段设置,当然所设置的充气管的位置也要与之相对应,只要是能够实现对钢板9、10均匀施力即可。
Claims (5)
1、一种盾构隧道的进洞防水方法,包括井圈、衬砌管片、帘布橡胶板,帘布橡胶板位于井圈与衬砌管片外壁之间,其特征在于该方法采用如下的步骤:在浇注隧道并圈混凝土前,预埋充气管,管口连接气囊和外界气源;之后在盾构进洞前,安装帘布橡胶板、弹簧钢板和气囊,所述帘布橡胶板、弹簧钢板的安装是将弹簧钢板与橡胶板贴合,形状匹配,二者贴合体的一端与井圈内壁固定连接,另一端弹簧钢板通过橡胶板紧紧包裹于衬砌管片外壁,所述弹簧钢板的安装还包括另外一块弧状弹簧钢板的安装,该钢板的安装位置与弹簧钢板安装位置交叉设置,其安装方法是将其一端与井圈内壁固定连接,另一端部呈圆弧状,该圆弧状端部在充气后的气囊作用下与弹簧钢板接触,并对其产生压力,压力的大小取决于气囊充气量的多少;盾构进洞时,使气囊充气膨胀,压迫推动弹簧钢板,从而压紧橡胶板。
2、根据权利要求1所述的一种盾构隧道的进洞防水方法,其特征在于所预埋的充气管根数与所连接的气囊个数一一对应。
3、根据权利要求1所述的一种盾构隧道的进洞防水方法,其特征在于所述弹簧钢板与橡胶板的安装设置角度是与衬砌管片外壁呈45°角。
4、根据权利要求1所述的一种盾构隧道的进洞防水方法,其特征在于所述的固定连接是在浇注井圈混凝土之前,预埋螺母于井圈钢板上,之后采用螺栓固定连接。
5、根据权利要求1所述的一种盾构隧道的进洞防水方法,其特征在于所设置的气囊数量为两个,二者依次紧密排放,充气后一个接触压迫弹簧钢板,另一个接触压迫弧状弹簧钢板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101120995A CN100552186C (zh) | 2005-12-27 | 2005-12-27 | 盾构隧道的进洞防水方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101120995A CN100552186C (zh) | 2005-12-27 | 2005-12-27 | 盾构隧道的进洞防水方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1807839A CN1807839A (zh) | 2006-07-26 |
CN100552186C true CN100552186C (zh) | 2009-10-21 |
Family
ID=36839916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101120995A Expired - Fee Related CN100552186C (zh) | 2005-12-27 | 2005-12-27 | 盾构隧道的进洞防水方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100552186C (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101660419B (zh) * | 2008-08-27 | 2013-05-29 | 上海市机械施工有限公司 | 一种特殊地层中盾构进洞的施工方法 |
CN101566063B (zh) * | 2009-06-04 | 2011-02-09 | 上海交通大学 | 盾构进出洞口土体加固的方法 |
CN102296621B (zh) * | 2011-05-27 | 2013-09-25 | 深圳市市政设计研究院有限公司 | 一种地面分仓止水帷幕的施工方法 |
CN102588609A (zh) * | 2012-03-16 | 2012-07-18 | 盾建重工制造有限公司 | 盾构机用盾尾紧急密封装置及其安装结构 |
CN102797468B (zh) * | 2012-08-22 | 2015-04-22 | 中铁第四勘察设计院集团有限公司 | 盾构隧道浅覆土始发方法 |
CN104033167B (zh) * | 2013-03-08 | 2016-02-24 | 国家电网公司 | 电缆隧道出口的防水装置和防水方法 |
CN103867158B (zh) * | 2014-02-28 | 2017-01-25 | 中铁隧道集团有限公司 | 一种水下钻孔快速封堵气囊及其封堵方法 |
CN109026150B (zh) * | 2018-08-30 | 2020-09-15 | 上海隧道工程有限公司 | 隧道联络通道顶管法管节内置式气囊密封装置及密封方法 |
CN110374640B (zh) * | 2019-08-19 | 2021-07-30 | 上海市基础工程集团有限公司 | 顶管隧道机头进洞止沙止水装置 |
CN111828094B (zh) * | 2020-06-30 | 2021-10-12 | 上海大学 | 深埋土压平衡盾构进洞双气囊密封装置及其密封方法 |
-
2005
- 2005-12-27 CN CNB2005101120995A patent/CN100552186C/zh not_active Expired - Fee Related
Non-Patent Citations (5)
Title |
---|
盾构法隧道出洞防水装置的设计优化与演变. 陆明,曹伟飚,朱祖熹.中国建筑防水,第10期. 2005 |
盾构法隧道出洞防水装置的设计优化与演变. 陆明等陆明,曹伟飚,朱祖熹中国建筑防水.中国建筑防水,第10期. 2005 |
盾构法隧道出洞防水装置的设计优化与演变. 陆明,曹伟飚,朱祖熹.中国建筑防水,第10期. 2005 * |
盾构法隧道防水堵漏技术. 温竹茵,张庆贺,郑,坚,秦鸿元.盾构法隧道防水堵漏技术,第28卷第4期. 1999 |
盾构法隧道防水堵漏技术. 温竹茵,张庆贺,郑坚,秦鸿元.盾构法隧道防水堵漏技术,第28卷第4期. 1999 * |
Also Published As
Publication number | Publication date |
---|---|
CN1807839A (zh) | 2006-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100552186C (zh) | 盾构隧道的进洞防水方法 | |
CN100419210C (zh) | 盾构隧道的进洞防水装置 | |
CN209742914U (zh) | 一种地下工程施工背后回填注浆橡胶充气封堵装置 | |
CN204343312U (zh) | 基坑内降水井的一种封堵装置 | |
CN109595392B (zh) | F型钢筋混凝土中继间顶管 | |
US3665717A (en) | Method and apparatus for installing elongated rods in unstable earth formations | |
CN205025479U (zh) | 一种治理软岩巷道底鼓的底板支护*** | |
CN205618200U (zh) | 一种充气式隧道盾构密封高压橡胶气囊 | |
CN207761660U (zh) | 一种带支撑调向机构的中继顶进*** | |
CN2856419Y (zh) | 一种盾构隧道的进洞防水装置 | |
WO2008009344A3 (de) | Befestigung von kunststoff-folie und von betonfertigteilen an ankern | |
CN103806438B (zh) | 一种在地下洞室底板预埋注浆孔方法 | |
CN101705788B (zh) | 一种防喷塞掩护斜向钻孔的施工方法 | |
CN114718060A (zh) | 一种带翼式充气锚管及其施工方法 | |
CN203175569U (zh) | 一种盾构法隧道贯通钢管片洞门防水密封结构 | |
CN1166852C (zh) | 全断面掘进机的施工方法 | |
CN210661351U (zh) | 盾构机充气密封保护气囊 | |
CN201407051Y (zh) | 岩溶地层桩孔护壁构造 | |
CN202531092U (zh) | 封孔器 | |
CN2459349Y (zh) | 桩端桩侧压浆管 | |
JP3562731B2 (ja) | アンカー工法 | |
JP2002180780A (ja) | シールド掘進機の立坑到達用シール方法およびその装置 | |
WO2019232566A1 (en) | Expanding packer | |
CN109537611A (zh) | 一种人防工程管井封堵构造 | |
JP3401177B2 (ja) | 管渠更新シールド掘削機 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |