CN100383341C - Large scale concrete box girder hoisting method - Google Patents
Large scale concrete box girder hoisting method Download PDFInfo
- Publication number
- CN100383341C CN100383341C CNB2005100276741A CN200510027674A CN100383341C CN 100383341 C CN100383341 C CN 100383341C CN B2005100276741 A CNB2005100276741 A CN B2005100276741A CN 200510027674 A CN200510027674 A CN 200510027674A CN 100383341 C CN100383341 C CN 100383341C
- Authority
- CN
- China
- Prior art keywords
- hoisting
- large scale
- box girder
- concrete box
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000000725 suspension Substances 0.000 claims description 9
- 229920000728 polyester Polymers 0.000 claims description 3
- 241000972773 Aulopiformes Species 0.000 claims description 2
- 235000019515 salmon Nutrition 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 11
- 229910000831 Steel Inorganic materials 0.000 abstract description 7
- 239000010959 steel Substances 0.000 abstract description 7
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000007667 floating Methods 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 3
- 230000001066 destructive effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention relates to a method for hoisting a large scale concrete box girder, which belongs to the technical field of bridge construction. The method for hoisting a large scale concrete box girder is characterized in that a soft hoisting belt is adopted for binding, a vertical hoisting mode is used for hoisting, and therefore, the damage of the box girder with length of more than 60 m and self weight of more than 1600 ton, which is brought by horizontal divided force because of the non-vertical hoisting mode, is avoided; the soft hoisting belt easily selects a reasonable binding force application point, and is conveniently binded; the stiff characteristics of the binding process of a steel rope do not exist, and the binding process of the steel rope is not convenient and is easy to cause the damage. A large scale sea floating hoister with mature technology is used for hoisting a hoisting rack, and the design and the manufacture of a special purpose floating crane are omitted. The cost is saved, the period is greatly shortened, and the method for hoisting a large scale concrete box girder is a method with high engineering construction value under the construction of large scale bridges, such as large sea spanning bridges.
Description
Technical field
The invention belongs to technical field of bridge construction, exactly is a kind of method of lifting large concrete boxes beam.
Background technology
The effect of building traffic of bridge spanning the sea has the important strategic meaning, and China begins and will build many bridge spanning the seas successively from Donghai Bridge.In order to improve efficiency of construction and working security, reduce the offshore construction amount in the bridge spanning the sea building course as far as possible, therefore adopted mostly at prefabricated place precast unit, be transported to the offshore construction platform again and carry out the job practices that set up at the sea.And large scale prefabricated concrete box girder is as the important component in the bridge spanning the sea, and it is big to have a volume, self heavily waits characteristics, is the main difficult point in the work progress.
In order to set up being transported to offshore construction platform place at the prefabricated concrete box girder of precasting yard, must lift by crane the harbour of case beam, therefore just exist and play the box beam and adopt which kind of lifting to bring colligation and fixed case beam with which kind of structural establishment from precasting yard.
Mostly adopted special-purpose crane ship during existing bridge spanning the sea is built, the characteristics of this ship are that special setting up for the transportation of particular box beam built, and its hull has a fixing frame construction.The steel truss structure of upending frame for cooperating hull and case beam to make: the fixed case beam adopts the similar shoulder pole structural mat of a slice girder steel in case beam bottom, at four angle points of girder steel steel suspension rod suspension centre is set again, is fixed in by the steel suspension rod and plays the box beam on the upending frame.
Having used special-purpose crane ship, its suspension bracket and suspender belt mostly by the existing as can be known prefabricated large concrete boxes beam lifting of above introduction all is member with the supporting design of crane ship.Owing to crane ship is to make for box beam erection specially, its construction application scope is narrower and manufacturing cost is very high, and the cycle is also long.Therefore unit in charge of construction or follow traditional method and remove to make a special-purpose crane ship and its supporting member; The abandoning tradition way is sought new way.
It is long that my company has born more than 60 meter of Donghai Bridge, self weigh into more than 1600 ton non-navigation hole case beam prefabricated, set up task.Whether does my company also remove to make so special-purpose crane ship and its special-purpose assorted member?
Summary of the invention
The present invention provides and a kind ofly can lift by crane more than 60 meter long, more than 1600 ton the large concrete boxes beam that weighs certainly, and do not go specialized designs, make the suspension bracket of special-purpose crane ship and its supporting design and a kind of large concrete boxes beam hoisting method of suspender belt.
The technical scheme that the present invention takes:
According to vertical lifting requirement, determine prefabricated case beam lifting origin of force; According to origin of force, determine case back plate lead to the hole site, and construct through hole, the soft suspender belt that the high-strength polyester long filament that adopts safety factor to reach 5: 1 makes, soft suspender belt color is orange international standard look, passes through hole, vertically bundlees the case beam, soft suspender belt vertical direction is fixed on lifting sets a roof beam in place, and implements lifting upending frame by large-scale marine crane barge.
After implementing the present invention:
Owing to be to adopt soft suspender belt, pass case beam through hole easily, avoided the difficulty of cable wire hardness perforation and the damage that brings, adopt vertical lifting to avoid the lifting horizontal component that brings because of non-perpendicular lifting destructive power to case beam surface, and, improve antiwear property, and utilize technology maturation at suspension centre increase PES sheath, use the lifting of more large-scale marine crane barge enforcement to upending frame, save manufacturing and designing of special-purpose crane ship, provided cost savings, greatly shortened the cycle.
Description of drawings
Fig. 1, soft suspender belt are fixed in case beam vertical section schematic diagram;
Fig. 2, upending frame play box beam schematic diagram;
Fig. 3, upending frame plan structure schematic diagram;
The specific embodiment
Now the invention will be further described in conjunction with the accompanying drawings, at first to prefabricated case beam 1, require to determine the lifting origin of force according to vertical lifting, according to origin of force, determine the position of case back plate through hole 4, and construct through hole 4, the soft suspender belt 2 that the high-strength polyester long filament that adopts safety factor to reach 5: 1 makes, soft suspender belt color is a salmon pink international standard look, pass through hole 4, vertically be bundled in case beam 1, and with bottle gouard moved by hands 3, tighten up soft suspender belt 2, the head that hangs of soft suspender belt 2 is hung on the hook of hydraulic jack 5, by the upending frame that hanger box beam 8 and suspension bracket truss 9 constitute, the case beam 1 of vertically slinging, large-scale marine crane barge is implemented lifting to case beam 1 easily by suspension hook 6.
Claims (1)
1. large concrete boxes beam hoisting method is characterized in that:
(1), determines prefabricated case beam (1) lifting origin of force according to vertical lifting requirement;
(2), determine case back plate lead to the hole site, and construct through hole (4) according to origin of force;
(3) the soft suspender belt (2) that makes of the high-strength polyester long filament that adopts safety factor to reach 5: 1, soft suspender belt (2) color is a salmon pink international standard look, passes through hole (4), vertically bundlees case beam (1);
(4) soft suspender belt (2) vertical direction is fixed on and lifts by crane on the hydraulic jack (5) of setting a roof beam in place;
(5) large-scale marine crane barge is by the lifting of suspension hook (6) enforcement to upending frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100276741A CN100383341C (en) | 2005-07-12 | 2005-07-12 | Large scale concrete box girder hoisting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100276741A CN100383341C (en) | 2005-07-12 | 2005-07-12 | Large scale concrete box girder hoisting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1800498A CN1800498A (en) | 2006-07-12 |
CN100383341C true CN100383341C (en) | 2008-04-23 |
Family
ID=36810683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100276741A Active CN100383341C (en) | 2005-07-12 | 2005-07-12 | Large scale concrete box girder hoisting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100383341C (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383375B (en) * | 2011-08-10 | 2013-08-07 | 中国十九冶集团有限公司 | Construction method for quickly mounting large steel bridge on urban main road |
CN103174093A (en) * | 2013-03-14 | 2013-06-26 | 中交二航局第四工程有限公司 | Mounting device and mounting method of steel box girder in support zone |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1370247A (en) * | 1999-08-10 | 2002-09-18 | 齐默尔股份公司 | High-strength polyester threads and method for producing same |
CN1485502A (en) * | 2002-09-26 | 2004-03-31 | 上海市隧道工程轨道交通设计研究院 | Construction method of hanging module and cast-in-situ for ballast slab of channel beam |
JP2004190450A (en) * | 2002-12-13 | 2004-07-08 | Oriental Construction Co Ltd | Wagen form device for box girder with strut, strut support device and construction method of box girder with strut |
JP2004225275A (en) * | 2003-01-20 | 2004-08-12 | Taisei Corp | Erection apparatus for corrugated steel plate web box girder bridge, and construction method for corrugated steel plate web box girder bridge |
-
2005
- 2005-07-12 CN CNB2005100276741A patent/CN100383341C/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1370247A (en) * | 1999-08-10 | 2002-09-18 | 齐默尔股份公司 | High-strength polyester threads and method for producing same |
CN1485502A (en) * | 2002-09-26 | 2004-03-31 | 上海市隧道工程轨道交通设计研究院 | Construction method of hanging module and cast-in-situ for ballast slab of channel beam |
JP2004190450A (en) * | 2002-12-13 | 2004-07-08 | Oriental Construction Co Ltd | Wagen form device for box girder with strut, strut support device and construction method of box girder with strut |
JP2004225275A (en) * | 2003-01-20 | 2004-08-12 | Taisei Corp | Erection apparatus for corrugated steel plate web box girder bridge, and construction method for corrugated steel plate web box girder bridge |
Non-Patent Citations (2)
Title |
---|
40m跨箱梁远距离运输及安装方案比较. 吉汉均.交通科技,第205卷. 2004 * |
东海大桥预制墩柱海上架设施工. 王少峰,杨志君,朱海荣.城市道桥与防洪,第2004(6)期. 2004 * |
Also Published As
Publication number | Publication date |
---|---|
CN1800498A (en) | 2006-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476294B (en) | Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower | |
CN101684639B (en) | Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same | |
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN108547223A (en) | The hybrid beam bridge construction method of steel reinforced concrete overlapping | |
CN102328732A (en) | Offshore pile driving, pile pressing and installing united engineering ship | |
CN106049293A (en) | Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method | |
CN208088097U (en) | A kind of three-tower suspension bridge erection of main beam constructing structure | |
CN105088970B (en) | Construction method of corrugated steel web PC box girder cable-stayed bridge | |
CN2615042Y (en) | Special crane ship for transporting & erecting bridges on sea | |
CN100383341C (en) | Large scale concrete box girder hoisting method | |
CN201511439U (en) | System for integrally binding and hoisting box girder steel reinforcement framework | |
CN201132941Y (en) | Self floating lower carrying pole beam of moveable formwork | |
CN202967862U (en) | Lifting appliance for beam channel reinforcement cage | |
CN104627326A (en) | Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells | |
CN201943006U (en) | Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders | |
CN209890066U (en) | Box girder bottom web reinforcing bar lifting device | |
CN108439186A (en) | Water-permeable frame hoisting transportation equipment and method of jettisoninging | |
CN113216013A (en) | Self-balancing construction method for post-installed cantilever arm of composite-section beam bridge | |
CN207749426U (en) | A kind of bridge side guardrail template construction device | |
CN201952736U (en) | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder | |
CN201649667U (en) | Reinforcement cage immersion guide frame | |
CN102234979B (en) | Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof | |
CN211169608U (en) | Hanging basket prismatic sheet hoisting device | |
CN219906752U (en) | Hoisting device for anti-floating anchor rod | |
CN216920054U (en) | Long heavy cable hanging installation device for multipoint hanging of underbridge expansion cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING Free format text: FORMER NAME: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 200065 No. 1565 traffic road, Shanghai Patentee after: Shanghai Urban Construction Municipal Engineering (Group) Co.,Ltd. Address before: 200065 No. 1565 traffic road, Shanghai Patentee before: SHANGHAI NO. 2 MUNICIPAL ENGINEERING Co.,Ltd. |
|
OL01 | Intention to license declared | ||
OL01 | Intention to license declared |